15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

449<br />

and Cash Department (TKT), Transportation Engg., Welfare (Scholarships) till to<br />

date.<br />

Hence, from 4 Console Operators in the year 1968 in 2 shifts, the staff of the<br />

Console Section is increased to two CCO (A-5), one Sr.CO (G/GVI), six Console<br />

Officers (G/GV), eight Console Operators (G/GIV) and one Tape Librarian (G/GIV).<br />

The Console Section is running in round the clock in three shifts.<br />

Backup which we were preserving on 40 mb magnetic tapes since year 1968 is<br />

shifted on the new devices like Cartridges (capacity 150 MB, 525 MB), MOD media<br />

cartridge (capacity 5.2 GB), Dat (capacity 2 GB to 4 GB) and Colorado Backup<br />

Cartridges (2.5 GB to 5 GB compressed), DLT Tape Drive (40 GB/80 GB) till the<br />

year 2005.<br />

From two Drum Printers to 1 Lipi Line Printer of 1000 lines per Minute speed<br />

and Five printronix line matrix printers at 1400/1500 Lines per minute till to date.<br />

All computer Systems including their Hardware and Software Packages are<br />

under Console Section. Various daily and monthly job are processed under the<br />

supervision and control of this section.<br />

Preventive as well as corrective maintenance of the Computer Systems are<br />

carried out by the maintenance contractor, under supervision of Console Section.<br />

5.2. JOBS CARRIED OUT AT CONSOLE SECTION<br />

5.2.1 Bringing up the System :-<br />

a. Every Monday and on the next working day after holiday,<br />

and/or after emergency shutdown.<br />

b. Confirm whether UPS are working properly and switches on<br />

the Electrical distribution panel are set properly.<br />

c. To check the voltage, frequency and temperature at the time of<br />

bringing up the systems.<br />

d. Bring-up both the IBM RS 6000 systems, 4 PC’s and 2 servers<br />

in Console Room.<br />

5.2.2 Shutdown of the System :-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!