15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.2 SUB-SECTION-2<br />

COMPUTERISATION OF ELECTRICITY BILLING<br />

SYSTEM AND THE COMPUTERISATION OF<br />

ACTICVITIES OF VARIOUS DEPARTMENTS OF THE<br />

ELECTRIC SUPPLY BRANCH<br />

434<br />

4.2.1 The allocation of the on roll software officers who are attached to this<br />

sub-sections involved in the centrally processed systems of Electricity<br />

Bills, Security Deposit System and the ESL System for the defective<br />

meter etc., and in the computerisation of the various departments of<br />

Electric Supply Branch, is as follows :-<br />

Sectional Head is P.Sy.A.(BS) in Grade A-4 who is reporting to<br />

SEDP(II).<br />

Electric Supply Billing System - 2 Sy.O. in Grade A-5<br />

(for General Category and special 1 A.Sy.O. in Grade G/G6<br />

category Consumers) & related 2 Programmers in Grade G/G5<br />

work, Security Deposit and CIS System<br />

Billing system of temporary connections, - 1 A.Sy.O. in Grade G/G6<br />

computerisation of Commercial 2 Programmers in Grade G/G5<br />

Department and MRE Department<br />

Vigilance – Supply, Billing System - 1 A.Sy.O. in Grade G/G6<br />

For Agreemental Consumers and 1 Programmer in Grade G/G5<br />

ESC System for defective meters<br />

Total strength of this sub-section is as follows:-<br />

P.Sy.A. in Grade A-4 = 1<br />

Sy.O. in Grade A-5 = 2<br />

A.Sy.O. in Grade G/G6 = 3<br />

Programmers in Grade G/G5 = 5<br />

Total = 11<br />

4.2.2 The Electricity Billing System :-<br />

The Electricity Billing system handles the preparation of Bills for its<br />

General Category Consumers, Special Category Consumers and<br />

Agreemental Consumers. The monthly billing program is divided in to<br />

38 cycles, 18 cycles of each North zone and South zone for General<br />

Category Consumers and 19 for Special Category Consumers of high

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!