15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER – 2<br />

HISTORY<br />

408<br />

2.1 Computerisation in the B.E.S.& T. <strong>Undertaking</strong> began with the first<br />

application of Stores Material Inventory in the year 1968. <strong>Undertaking</strong> started<br />

this activity by hiring 11 hours of Computer-time daily on IBM-1401<br />

Computer. Computerisation of Electricity Billing and Pay-roll followed.<br />

Electricity Billing was computerised in the year 1971 and Pay-roll in 1973.<br />

A stage was reached when IN-HOUSE COMPUTER was justified by the<br />

usage. In the year 1981, the Fourth Generation Computer MV/8000 was<br />

installed. The change-over to MV/8000 entailed rewriting about 100<br />

programs, which had been written in IBM-1401 Autocoder, in a new language,<br />

namely DG-COBOL. In doing this, not simply the programms were translated,<br />

but the Systems were redesigned in house, so as to exploit the power of the<br />

DG System. The huge conversion work was completed well in time and EDP<br />

Department was in a position to discontinue hire of Computer time from any<br />

outside agency on the day the In-House Computer became operational. This<br />

was a good achievement of which EDP Department ought to be justly proud<br />

of.<br />

The following were the major applications implemented on the Data General<br />

Computer Systems :<br />

i) Electricity Consumer billing;<br />

ii) Installation of load data and meter records;<br />

iii) Pay-roll – pay-slips, Ex-gratia, arrears, provident find, Income Tax,<br />

LTA and Leave Encashment, ESI etc.<br />

iv) Stores Material Inventory<br />

v) Traffic Ticket Accounting<br />

vi) Daily Vehicular Returns<br />

vii) Tyre Statistics<br />

2.2 In the year 1989 a back-up system PCS-7000-XP was installed. The increased<br />

load on DG MV/8000 system was shifted on this back-up system. Since<br />

November, 1993, the DG MV/8000 system stopped working and the entire<br />

load was shifted on PCS-7800-XP System. The DG MV-8000 System was<br />

replaced by the Supermini Computer System Wipro’s Synergy Pentium in<br />

April, 1994.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!