provision is made in 2005-2006 (Revised) as<br />

expenditure is expected in 2005-2006.<br />

Similarly, provision of Rs. 333 lakhs was made in<br />

2004-2005 (Revised) for turn key project for<br />

commissioning of 45MVA power transformer and 11<br />

KV VCB Switchgear with local SCADA at Backbay 110<br />

KV RSS. The material was received in 2004-2005.<br />

However, the transformer and local SCADA was not<br />

commissioned by the manufacturers in 2004-2005.<br />

The part payment i.e. Rs. 252 lakhs made to the firm<br />

227<br />

could only be booked.<br />

viii) (A) Remote control of Receiving Sub-station/Distribution Sub-station SCADA<br />

equipments and balance work :<br />

1) Provision of Rs. 70 lakhs was made in 2004-2005 (Revised) for SCADA<br />

equipment in South Zone for the additional outgoing feeders established due<br />

to 33 KV changeover or commissioning of new RSS in the zone. The<br />

quotation obtained from the firm (proprietary item) was found exorbitant<br />

hence decided to invite fresh tender for the same.<br />

2) Provision of Rs. 11 lakhs was made in 2004-2005 revised for purchasing of<br />

power packs for distribution automation in 59 DSS. However, it is now<br />

decided to carry out automation activity in 20 DSS in year 2005-2006 and<br />

after observing the performance of equipment in these DSS, automation will<br />

be carried out in remaining 39 Substations in the year 2006-2007.<br />

Accordingly the provision for purchase of power packs is revised as Rs. 4<br />

Lacs and Rs. 7 lacs for the year 2005-2006 and 2006-2007 respectively.<br />

viii) (B) Communication Network addition and extension :<br />

i) Mini Telephone Exchange : Provision of Rs. 15.14 lakhs was made in<br />

Revised Estimate 2004-2005. However, proposal of group mobile, hot line<br />

for transport section was kept in abeyance as it was expected that due to