39) To prepare feasibility reports, estimates of cost of works,<br />

except for major projects, and of additions and alterations<br />

nature with sketches, for various departments for obtaining<br />

Administrative sanction and to prepare draft<br />

tender/quotations for the same.<br />

40) To maintain accounts of materials obtained from auxiliary<br />

stores and used on various works including maintaining daily<br />

consumption register.<br />

41) To requisition and receive building materials such as bricks,<br />

sand, metal, etc. on site from suppliers and certify challans<br />

(including that of water tankers during shortage and certify<br />

challans) of the suppliers.<br />

42) To supervise activities of the fabrication shop and get the jobs<br />

fabricated as per drawings.<br />

43) To attend major repairs and maintenance works and<br />

supervise contract works including lining out of the building in<br />

his jurisdiction and submit periodical progress report including<br />

arranging for transport of men and materials for departmental<br />

works.<br />

44) To inspect the site before commencement of work and get the<br />

work done in workmanship like manner as per Specifications<br />

and in specified time.<br />