15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1711<br />

Sr.No.15<br />

DEPUTY ENGINEER (SPECIFICATIONS) GRADE<br />

P4/GVI<br />

He shall be responsible to the Assistant Engineer (Specifications) /<br />

Superintendent / Executive Engineer, as the case may be and his duties and<br />

responsibilities are as follows :<br />

14) To distribute the work to sub-ordinate staff viz. Overseers<br />

through Chief Estimator.<br />

15) To check up all types of estimates, draft tenders and<br />

quotations thoroughly and to scrutinise draft tenders and<br />

inclusive of special specifications, special conditions of<br />

contract, schedule of quantities, scope of work and programme<br />

of work critically and to ensure that the document is correct<br />

and complete in all respect.<br />

16) To fix completion period for various works.<br />

17) To submit draft tenders to the Chief Engineer (Civil) through<br />

Assistant Engineer / Superintendent / Executive Engineer for<br />

approval.<br />

18) To obtain the Management's approval for invitation of tenders.<br />

19) To arrange for submission of advertisement drafts for tenders<br />

to be advertised.<br />

20) To arrange for opening of tenders / quotations and reporting<br />

the results of opened tenders / quotations to the Asst. General<br />

Manager (Civil) through Executive Engineer / Chief Engineer<br />

(Civil)<br />

Page 1711

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!