1523<br />

Materials getting out of stock due to Engineering<br />

Reasons/indenter’s actions<br />

e.g.<br />

i) Delay in forecasting requirement<br />

ii) Delay in furnishing recommendations<br />

iii) Delay in inspection of materials received from supplier.<br />

iv) Incomplete/Inadequate specification<br />

v) Erratic consumption<br />

vi) Disputed rejection<br />

vii) Incorrect/low forecasted requirement etc.<br />

15.2 Materials getting out of stock due to Materials<br />

Management Reasons.<br />

restrictions etc.<br />

a) Delay in raising of recoupment slip.<br />

b) Delay in processing of tenders, placement of<br />

P.O.’s<br />

c) Calculation error in working out quantity to be<br />

put on tender<br />

d) Delay in raising of Low Stock Form/Nonprocessing<br />

of Low Stock Form.<br />

e) Non-follow up with the suppliers.<br />

f) Improper Co-ordination with Audit, Accounts,<br />

Engg. Depts. etc.<br />

15.3 Materials getting out of stock beyond the control<br />

of Engg. Dept./M.M. Dept.<br />

15.4 Steps to control Stock outs<br />

a) Failure of supplier/strike/Lock outs<br />

b) Non-availability of alternate source.<br />

c) Non-availability materials, import<br />

d) Erratic price rise of materials etc.<br />

i) Advantage of rates received against the tender<br />

under process to procure urgent needs.