15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

19. Procedures - Challan<br />

Receiving of material, supplied by contractors at the gate / undertaking’s premises / gate – procedure<br />

thereof as regard to the challan.<br />

The <strong>Undertaking</strong>’s material named by the<br />

undertaking are being supply by the various<br />

contractors / firms regularly in day to day<br />

business of the undertaking.<br />

The material such supplied are received by<br />

mainly the Security & Vigilance Department at the<br />

gate of every establishment / premises of the<br />

undertaking.<br />

At present, the material so reached at the gate, the contractors representative produced four copies of<br />

challans. S/Guard on duty on verifying the details such as date, vehicle no., name of the supplier, description of<br />

material, quantity mentioned, name of the buyer/user department etc. and then stamped the delivery challan,<br />

making entry of serial no., check post and then signed having received the material<br />

The copies of challan then handed over to the Contractor, when the<br />

concerned representative of the department check the material as regard to<br />

the quantity and quality and accept the material.<br />

- S/Guard at no way is concerned with the quantity and quality of<br />

the material so received<br />

- S/Guard then make an entry in the Challan Register with all<br />

details, indicating date, challan no., date of challan, Name of the<br />

firm, description of material and quantity (as mentioned in the<br />

challan)<br />

- The stamp is put on the challans<br />

BEST UNDERTAKING<br />

SECURITY & VIGILANCE DEPT<br />

Serial No.<br />

Challan Entry<br />

Signature<br />

Date<br />

The said work is carried mainly by the Assistant Security<br />

Inspector / Security Inspector at the premises such as Kussara, K’way<br />

Workshop, Wadala Bus Depot, Mumbai Central Depot, Backbay, Oshiwara<br />

Bus Depot, where the material received in bulk, between 09.00 hrs and<br />

17.00 hrs. In absence of the above security personnel, Security Guard /<br />

Havaldar carried out the said work and to take note of the Material received at<br />

office hours.<br />

1027

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!