14. Work carried out at the Depots/other Installations/premises of the <strong>Undertaking</strong> -<br />

Procedure -<br />

Whenever any outside Contractor is engaged by the Building Department/Supply Branch to<br />

carry out work in Depots/Installations, manned by Security Department, following procedure will be<br />

followed in addition to the one in force regarding Contractors' Entry Passes :<br />

1] Contractor should be asked to submit a list of tools/materials proposed to be taken inside, in<br />

duplicate and duly signed by him. (One copy should be retained at the Gate and other copy to<br />

be given back to the Contractor).<br />

2] Strict check should be exercised on the movement of men, tools and material;<br />

3] Search of Contractors' men should be thorough;<br />

4] At the commencement of the work, the Divisional Officers should check whether any movable<br />

material is stored in the vicinity. If so, they should make arrangement with the Department<br />

concerned to remove it to a safe place;<br />

5] Havaldars should take rounds of the premises to prevent loitering by the men of the Contractor<br />

in areas other than the one where work is being carried out. They should make entry in their<br />

diary, to be verified by Officer on the next day.<br />

6] If the Contractor is required to work after office hours or on Sunday/Holidays, a Security<br />

Guard should be posted at the site.<br />

7] On the completion of the work, a Certificate be obtained on our copy of the list that all tools<br />

and materials belonging to the Contractors have been taken out by him and that nothing was<br />

left behind.<br />

8] The Officer/Supervisor Incharge should be asked to certify that no damage is caused to the<br />

property/Installations at the premises where work was carried and nothing was found missing.<br />

9] The two documents should then be filed carefully.<br />

15. Security measures at Receiving/Sub-stations - Procedure -<br />

Whenever an intimation is received about the contract having been given to outside<br />

Contractors to carry out work at any of the Receiving Stations/Sub-stations, the Divisional Officers in<br />

whose jurisdiction it falls shall make it a point to :<br />

i) Visit the place immediately;<br />

ii)<br />

Check if any lacunae is there in the Security System;