14.05.2013 Views

Sea Turtle Recovery Action Plan for Barbados - WIDECAST

Sea Turtle Recovery Action Plan for Barbados - WIDECAST

Sea Turtle Recovery Action Plan for Barbados - WIDECAST

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CEP Technical Report No. 12<br />

BUDGET<br />

Funds to support and expand the monitoring programme and in<strong>for</strong>mation campaign in<br />

<strong>Barbados</strong> are needed. At present, the monitoring is done on a voluntary basis and Bellairs<br />

Research Institute (BRI) contributes towards costs such as are incurred through transport, the<br />

operation of sea water pumps, etc. BRI and the Fisheries Division (Ministry of Agriculture,<br />

Food and Fisheries) share the costs associated with the in<strong>for</strong>mation campaign. The table below<br />

summarizes the funding needed to implement the six activities proposed above.<br />

--------------------------------------------------------------------------------------------------------------------<br />

ITEM COST (US $) TOTAL (US $)<br />

--------------------------------------------------------------------------------------------------------------------<br />

ACTIVITY 1<br />

Technical adviser 10 days @ 200.00/d 2000.00D<br />

Office space 15 days @ 10.00/d 150.00B<br />

Transportation 10 days @ 30.00/d 300.00D<br />

Direction, camera work<br />

and equipment rental 15000.00D<br />

Tape stock 1000.00D<br />

Editing 7500.00D<br />

Script writing 2000.00D<br />

Voice over 500.00D<br />

Page 58<br />

Subtotal 28450.00<br />

D = Donor contribution 28300.00<br />

B = BRI contribution 150.00<br />

Contingency (10%) 2845.00<br />

ACTIVITY 2<br />

TOTAL 31295.00<br />

Programme co-ordinator 30 days over 6 mo @ 50.00/d 1500.00B<br />

Cellular phone 1500.00D<br />

Telephone operating costs 6 months @ 100.00/mo 600.00D<br />

Mileage 2250 km @ 0.50c/km 1125.00D<br />

Research assistant 6 months @ 750.00/mo 4500.00B<br />

Office space 6 months @ 300.00/mo 1800.00B<br />

<strong>Turtle</strong> tagging equipment 300.00D<br />

Subtotal 11325.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!