For internal use only 27. September 2012 Offshore Wind – Weather Conditions Early Contracting and Weather Forecast are Key, but … Project management to be supported by BI-Insurers …once the Loss is there, Project Management will not diminish Risk of ◙ High Cost of Offshore Equipment ◙ Weather related delays ◙ No or Poor Repair Strategy ◙ … Green Energy - Red Results for Insurer? 16 For internal use only
For internal use only Four Clusters within the German Bight for about 10 GW ◙ BorWin BorWin 1 (400 MW) / BorWin 2 (800 MW) BorWin 3 and 4 to be developed ◙ DolWin DolWin 1 (800 MW) / DolWin 2 (900 MW) DolWin 3 and 4 to be developed ◙ HelWin HelWin 1 (576 MW) / HelWin 2 (690 MW) HelWin 3 and 4 to be developed ◙ SylWin SylWin 1 with 864 MW SylWin 2 to be developed ◙ Further single wind farm connections 27. September 2012 Offshore Wind – Grid Connection TenneT is responsible for most of them New Technology due to long distance Onshore connection at TenneT Substation Dörpen/Diele Onshore connection at TenneT Substation Büttel Green Energy - Red Results for Insurer? 17 http://www.tennettso.de/site/netzausbau/de/offshore-projekte For internal use only
- Page 1 and 2: For internal use only Dieter Schima
- Page 3 and 4: For internal use only © EnBW Balti
- Page 5 and 6: For internal use only ◙ Actual wi
- Page 7 and 8: For internal use only ◙ Construct
- Page 9 and 10: For internal use only Several inter
- Page 11 and 12: For internal use only 27. September
- Page 13 and 14: For internal use only 27. September
- Page 15: For internal use only 27. September
- Page 19 and 20: For internal use only Insurance sol
- Page 21 and 22: For internal use only 27. September
- Page 23 and 24: For internal use only 27. September
- Page 25 and 26: For internal use only 27. September
For internal use only<br />
27. September 2012<br />
Offshore Wind <strong>–</strong> Weather Conditions<br />
Early Contracting and Weather Forecast are Key, but …<br />
Project management to be supported by BI-<strong>Insurers</strong><br />
…once the Loss is there, Project Management will not diminish Risk of<br />
◙ High Cost of Offshore Equipment<br />
◙ Weather related delays<br />
◙ No or Poor Repair Strategy<br />
◙ …<br />