06.05.2013 Views

Final Interventions Report - DWA Home Page

Final Interventions Report - DWA Home Page

Final Interventions Report - DWA Home Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Reconciliation Strategy Study for the Large Bulk Water Supply Systems: Greater Bloemfontein Area 18<br />

4.2.5 Agricultural Water Requirements<br />

The only expected growth in irrigation requirements is the allocation of 12 000 ha to resource poor farmers.<br />

The effect of the 12 000 ha (4 000 ha for the Upper Orange WMA, 4 000 ha for the Lower Orange WMA,<br />

and 4 000 ha for the Fish-Tsitsikamma WMA) is estimated to be in the region of 114 m³/a. The<br />

Implementation Strategy for the development of 3 000 ha irrigation in the Free State Province indicates that<br />

there is ± 200 ha available near Ficksburg (Caledon River) and ± 2 000 ha available next to the Orange-<br />

Riet Canal, which starts at the Vanderkloof Dam. The agricultural water requirement for the 200 ha near<br />

Ficksburg was taken into account in the determination of the available yield.<br />

<strong>Interventions</strong> <strong>Report</strong> June 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!