Table L9: 281 RSA-KwaZulu Development Project infrastructure options for the upgrading of existing areas, and for the establishment of new black (urban) residential sites and towns in NatailKwaZulu, 1990. Development Water supplies Sanitation Bus routes Streets ElectricitY Refuse option 1 Vending through VIP or VIDP Gravel roadway, Tracks, surveyed None (can be Central skip water kiosks or latrine as open drains, road reserves, no provided later if system metered standpipe necessary levelled walkways formal drains, required - 1,5 vending points. (only if practical) crossflow, kVA connection Spacing as per site waterbars. On plus 12 street requirements land steeper than lights km-', (approximately one a gradient of source every 250 1 : 2,5 pedestrian m) access only - road within 250 m of house 2 Vending through VIP or VIDP Gravel roadway, Gravel roadway, None (can be Central skip water kiosks or latrine as open drains, levelled provided later if system metered standpipe necessary levelled walkways walkways, required - 1,5 vending points. (only if practical) combination of kVA connection Spacing as per site open drains in plus 12 street requirements areas of excessive lights km-') (approximately one stormwater source per 10 accumulation residential sites) (lined or unlined), and no drains (crossfall) in others

Table L9: 282 RSA-KwaZulu Development Project infrastructure options for the upgrading of existing ereas, and for the establishment of new black (urbanl residential sites and towns in Natal/KwaZulu, 1990 (continued). Development Water supplies Sanitation Bus routes Streets Electricity Refuse option 3 Vending through VIP or VIDP Gravel roadway, Gravel roadway, None (can be Central skip water kiosks or latrine as open drains, levelled provided later if system or door metered standpipe necessary levelled walkways walkways, required· 1,6 to door vending points. (only if practical) combination of kVA connection collection Spacing as per site open drains in plus 12 street requirements areas of excessive lights km-') (approximately one stormwater source per 10 accumulation residential sites) (lined or unlined), and no drains (crossflow) in others 4 Metered standpipe VIP or VIOP Paved roadway, Gravel roadway, 1,5 kVA Central skip on site. Owner to latrine or suitable levelled walkways levelled connection plus system or door pay for connection alternative (paved if walkways, 12 street lights to door from property on site, wet required), combination of km-' collection boundary to disposal sanitation kerb/channel or grassed and lined standpipe system as lined open drains open drains, no (including meter necessary crossflow assembly and standpipe), and to provide a soakpit as required

Table L9:<br />

281<br />

RSA-KwaZulu Development Project infrastructure options for the upgrading <strong>of</strong> existing areas, and for the establishment<br />

<strong>of</strong> new black (urban) residential sites and towns in NatailKwaZulu, 1990.<br />

Development Water supplies Sanitation Bus routes Streets ElectricitY Refuse<br />

option<br />

1 Vending through VIP or VIDP Gravel roadway, Tracks, surveyed None (can be Central skip<br />

water kiosks or latrine as open drains, road reserves, no provided later if system<br />

metered standpipe necessary levelled walkways formal drains, required - 1,5<br />

vending points. (only if practical) crossflow, kVA connection<br />

Spacing as per site waterbars. On plus 12 street<br />

requirements land steeper than lights km-',<br />

(approximately one a gradient <strong>of</strong><br />

source every 250 1 : 2,5 pedestrian<br />

m) access only - road<br />

within 250 m <strong>of</strong><br />

house<br />

2 Vending through VIP or VIDP Gravel roadway, Gravel roadway, None (can be Central skip<br />

water kiosks or latrine as open drains, levelled provided later if system<br />

metered standpipe necessary levelled walkways walkways, required - 1,5<br />

vending points. (only if practical) combination <strong>of</strong> kVA connection<br />

Spacing as per site open drains in plus 12 street<br />

requirements areas <strong>of</strong> excessive lights km-')<br />

(approximately one stormwater<br />

source per 10 accumulation<br />

residential sites) (lined or unlined),<br />

and no drains<br />

(crossfall) in<br />

others