INTEGRATED<br />
DEVELOPMENT PLAN REVIEW<br />
<strong>IDP12</strong>/<strong>13</strong><br />
ENGLISH / XHOSA / AFRIKAANS<br />
SUMMARY
TABLE OF CONTENTS<br />
Executive Mayor’s Foreword 2<br />
Overview by the <strong>City</strong> Manager 3<br />
1. BCMM’S VISION, MISSION & VALUES 5<br />
1.1 BCMM’S Vision 5<br />
1.2 BCMM’S Mission 5<br />
1.3 BCMM’S Core Values 5<br />
2. WHAT IS AN IDP? 6<br />
3. WHAT IS A BUDGET? 7<br />
4. THE IDP PROCESS FOLLOWED 8<br />
5. IDP INFORMANTS AND STRATEGIC FOCAL AREAS 10<br />
5.1 IDP Informants 10<br />
5.2 Key Strategic Objectives 11<br />
5.3 Strategic Focal Areas 11<br />
6. 2012/<strong>13</strong> – 2014/15 MTREF BUDGET 16<br />
6.1 Summarised Capital Budget 16<br />
6.2 Summarised Operating Budget 17<br />
6.3 Capital Projects 2012/<strong>13</strong> – 2014/15 18<br />
6.4 Operating Projects 2012/<strong>13</strong> -2014/15 24<br />
6.5 Major Projects for 2012/20<strong>13</strong> – 2014/2015 31<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
1<br />
“a <strong>City</strong> Growing with you”
EXECUTIVE MAYOR’S FOREWORD<br />
The changing and shifting socio-economic dynamics of life in<br />
<strong>Buffalo</strong> <strong>City</strong> have once again necessitated a strategic repositioning<br />
of our development and service delivery programmes and<br />
objectives, the aim being to ensure that such programmes<br />
address the revised needs of our stakeholders and communities.<br />
To this end, it has become necessary to revisit the Metro’s<br />
Integrated Development Plan, to review our spatial development<br />
framework, and to revise our development indicators and targets<br />
for the Financial Year 2012/20<strong>13</strong>.<br />
The content of this IDP Review document is therefore informed by<br />
new and emerging aspirations and needs of the people of <strong>Buffalo</strong><br />
<strong>City</strong>, expressed at duly constituted meetings of the different<br />
communities and stakeholders that were called for this purpose.<br />
We believe that, as the sphere of Government that is closest to the people, we carry a pronounced<br />
obligation to respond directly, immediately and positively to the needs and frustrations of our stakeholders<br />
and communities.<br />
In presenting this IDP Review document, therefore, I want to commend the people of <strong>Buffalo</strong> <strong>City</strong> for<br />
dutifully heeding the call to come and assist the Metro Council in revising its development and service<br />
delivery agenda for the city and its diversified communities. We could not have achieved this objective<br />
if it was not for the active and sustained participation of our communities in the process of setting the<br />
direction and pace of our development programmes and projects.<br />
The strategic focus areas contained in this IDP Review include institutional restructuring and stabilization,<br />
job creation, building sustainable communities, bridging the digital divide, improving governance and<br />
financial viability, and building citizen confidence.<br />
This document spells out specific projects and programmes that have to be undertaken. These include,<br />
amongst others, the provision of additional human settlements, electricity and water supply to informal<br />
settlements, skills and sector development programmes to assist and sustain economic development,<br />
and establishing an enabling environment for vulnerable groups to benefit from the Metro’s socioeconomic<br />
agenda.<br />
In conclusion, I want to rededicate the combined efforts of the political leadership and management of<br />
<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality to the task of fulfilling the local interests of our people within the<br />
national priority of endeavouring to create a better life for all our people.<br />
ZUKISWA NCITHA<br />
Executive Mayor<br />
<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
2<br />
“a <strong>City</strong> Growing with you”
OVERVIEW BY THE CITY MANAGER<br />
<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality has just concluded<br />
its first financial year as a metropolitan municipality, having<br />
successfully assumed the category ‘A’ or Metro status in<br />
May 2011, shortly after the Local Government Elections.<br />
The last twelve (12) months have inevitably been<br />
characterised by critical transitional activities aimed<br />
at embedding the foundation of a new metropolitan<br />
municipal establishment. The metro saw the inauguration<br />
of new political leadership in both the legislative and<br />
executive structures Council. The metro also conducted<br />
ward elections and established ward committees in all the<br />
newly demarcated 50 wards. In line with the prescripts of<br />
the Municipal Structures Act of 1998, <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality also incorporated<br />
twenty (20) traditional leaders into Municipal Council.<br />
From a strategic view, the metro adopted the Integrated Development Plan 2011-2016 on<br />
the 30 th June 2011. The preparation of this plan was undertaken by the previous Council.<br />
However, the review process which was undertaken during the last half of 2011 and the<br />
beginning of 2012 enabled the new Council to reconsider the strategic agenda contained in<br />
the previously adopted IDP.<br />
The 2012/<strong>13</strong> IDP review process has been informed by the following factors and activities<br />
such as Council priorities; Mayoral Lekgotla priorities; Ward priorities;12 Outcomes of<br />
Government; 7 outputs in Outcome 9 on Local Government; The draft National Development<br />
Plan produced by the National Planning Commission; Millennium Development Goals; The<br />
Provincial Growth and Development Plan; and The National Spatial Development Perspective<br />
The review undertaken confirmed the six (6) strategic objectives of council as follows:<br />
1. To be a financially sound organisation that efficiently manages its resources;<br />
2. To be an institutionally efficient and effective <strong>City</strong> that inclusively works with<br />
communities;<br />
3. To generate an enabling environment for an economy that is growing, diversifying,<br />
generating increasing number of sustainable employment opportunities and contributing<br />
to increased incomes and equality;<br />
4. To deliver sustainable infrastructure that support social and economic development;<br />
5. To be a well structured and capacitated institution that renders effective and efficient<br />
services to all by 2016<br />
6. To enhance and protect all environmental assets and natural resources within <strong>Buffalo</strong><br />
<strong>City</strong> Metropolitan Municipality by 2016<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
3<br />
“a <strong>City</strong> Growing with you”
The review further identified the following nine (9) strategic focus areas for inclusion and<br />
alignment with the IDP<br />
1. Institutional Restructuring and Stabilisation<br />
2. Improving Intergovernmental Relations<br />
3. Building Citizen Confidence<br />
4. Bridging the Digital Divide<br />
5. Improving performance, compliance, processes and systems<br />
6. Build Sustainable Communities<br />
7. Job Creation<br />
8. Improving Governance<br />
9. Financial Viability<br />
The programmes, projects and activities for the municipality in the financial year 2012/<strong>13</strong><br />
are aligned to the above-mentioned strategic objectives and key focal areas. The progress of<br />
the metro in addressing the Council’s priorities for the financial year will be reported monthly,<br />
quarterly, mid-yearly and annually in terms of the Council’s Performance Management Policy<br />
and Framework as well as other legislative compliance based reporting.<br />
The Metro’s administration endeavours to respond to service delivery needs of its communities<br />
and ensure the collective achievement of Council’s programme of delivery as contained in<br />
this Reviewed Integrated Development Plan (2012/<strong>13</strong>).<br />
A. FANI<br />
<strong>City</strong> Manager<br />
<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
4<br />
“a <strong>City</strong> Growing with you”
1. BCMM’s VISION, MISSION & VALUES<br />
1.1 BCMM’s VISION<br />
Through strategic planning sessions leadership of the municipality has refined the vision and<br />
mission of the institution to be more robust, comprehensible and realistic, thus making it a<br />
useful instrument in guiding the actions of the <strong>City</strong>, its citizens and key stakeholders in the<br />
development process.<br />
A long term Vision of <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality is to be:<br />
1.2 BCMM’s MISSION<br />
“a responsive, people centred and developmental <strong>City</strong>”<br />
In pursuit of realising the vision <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality strives to be a <strong>City</strong><br />
which:<br />
• Promotes a culture of good governance;<br />
• Provides effective and efficient municipal services;<br />
• Invests in the development and retention of human capital to service the <strong>City</strong> and its<br />
community;<br />
• Promotes social and equitable economic development;<br />
• Ensures municipal sustainability and financial viability;<br />
• Creates a safe and healthy environment; and<br />
• Places Batho Pele principles at the centre of service delivery<br />
1.3 BCMM’S CORE VALUES<br />
<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality espouses the following values and committed to<br />
serving its communities and providing services in a manner that is consistent with:<br />
(i) Integrity<br />
(ii) Good Governance<br />
(iii) Transparency<br />
(iv) Accountability<br />
(v) Fairness and equity<br />
(vi) Professionalism<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
5<br />
“a <strong>City</strong> Growing with you”
(vii) Loyalty<br />
(viii) Service Excellence<br />
(ix) Respect for cultural diversity<br />
(x) Unity of purpose<br />
(xi) Ubuntu<br />
2. WHAT IS AN IDP?<br />
In terms of the Municipal Systems Act 32 of 2000 (as amended) an IDP is defined as a<br />
strategic planning instrument that guides and informs all municipal development in the<br />
<strong>City</strong>. It is the key instrument that enables the municipality to work towards achieving its<br />
development goals as outlined in the Constitution.<br />
It consists of a long-term vision. It details the development priorities and objectives that<br />
contribute toward achieving this vision. It reflects strategies which are underwritten by the<br />
details in the budget, which must be linked with the IDP.<br />
An IDP adopted by the Council of a Municipality is the principal strategic planning instrument<br />
which guides and informs all planning and development decisions within the municipal area.<br />
Section 34 of the Municipal Systems Act stipulates that an IDP should be reviewed annually in<br />
accordance with an assessment of its performance measures and to the extent that changing<br />
circumstances so demand. Council is also required to set out in writing, the process to be<br />
followed for the IDP review. The Process Plan should include:<br />
• A programme specifying time-frames.<br />
• Outlined processes and procedures for consultation.<br />
• Identified plans and planning requirements binding on the Municipality.<br />
• IDP and Budget processes/programmes to be aligned.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
6<br />
“a <strong>City</strong> Growing with you”
The IDP review towards 2012/20<strong>13</strong> was undertaken as part of the continuous cycle of<br />
planning, implementation and monitoring as illustrated in the Figure below.<br />
PERFORMANCE<br />
MANAGEMENT<br />
IDP<br />
IMPLEMENTATION<br />
Figure A.1: IDP Development Process<br />
3. WHAT IS A BUDGET?<br />
1. PREPARING FOR IDP REVIEW<br />
2. MONITORING & EVALUATION –UPDATED<br />
ANALYSIS<br />
3. REFINED OBJECTIVES, STRATEGIES,<br />
INDICATORS & PROJECTS & PROGRAMMES<br />
(LINKED TO BUDGET) IDP IMPLEMENTATION<br />
4. CONSOLIDATE IDP (INCLUDING OPERATIONAL<br />
PLANS)<br />
5. APPROVAL - COUNCIL ADOPTS IDP & BUDGET<br />
A budget is a plan which summarizes in financial terms the activities planned in the<br />
forthcoming financial year by setting out the expenditure which will be incurred to fulfill these<br />
activities as well as the income and capital required to finance this expenditure.<br />
There are two types of budget: the operating budget and the capital budget.<br />
The operating budget involves the purchase of goods and services for which there will be<br />
a short-term benefit. Operating expenses are salaries, wages, repairs and maintenance,<br />
telephones and materials.<br />
The operating income is cash derived from municipal trading accounts such as water,<br />
electricity, rates and other services.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
7<br />
PUBLIC PARTICIPATION<br />
“a <strong>City</strong> Growing with you”
The capital budget specifies the expenditure on long-term purchases and investments such<br />
as land and buildings, motor vehicles, plant and equipment as well as office furniture etc. it<br />
encapsulates expenditure on goods that basically will be used for more than one financial<br />
year. It involves construction of roads, buildings and vehicles.<br />
An easy way to differentiate between the two budgets is to think about the purchase of a car.<br />
A car is a capital because it is envisaged to be used for more than one year. The fuel to run<br />
the car and the maintenance is operational costs and is thus within the operating budget.<br />
In developmental local government, the IDP and Budget must be linked and is therefore<br />
reviewed annually to ensure the linkage and community endorsement of the <strong>City</strong>’s programme.<br />
Total Budget 2012/<strong>13</strong> – 2014/15<br />
2011/12<br />
M/Y ADJ BUDGET<br />
R000<br />
2012/<strong>13</strong><br />
R000<br />
8<br />
20<strong>13</strong>/14<br />
R000<br />
2014/15<br />
R000<br />
Operating Budget 3,448,368,587 3,966,637,294 4,453,7<strong>13</strong>,893 4,924,341,303<br />
Capital Budget 725,646,383 749,097,271 879,840,714 876,057,416<br />
Total Budget 4,174,014,970 4,715,734,565 5,333,554,607 5,774,398,719<br />
4. THE IDP PROCESS FOLLOWED<br />
Section 28 (1) of the Municipal Systems Act requires each municipality to adopt a process<br />
in writing to guide the planning, drafting, adoption and review of its integrated development<br />
plan. In compliance with this requirement <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality adopted<br />
the plan on 26 October 2011. Key activities undertaken in line with the IDP/Budget review<br />
towards 2012/<strong>13</strong> include the following:<br />
• 11 October 2011 - A workshop with BCMM Councillors and Top Management was<br />
convened. The purpose of the workshop was, inter alia, to unpack the concept of<br />
Integrated Development Planning and outline the role of Councillors, Ward Committees<br />
and other stakeholders; introduce the IDP/Budget/PMS review process towards the<br />
2012/<strong>13</strong> financial year and enhance a common understanding of the process and to<br />
initiate a process of identifying ward priorities that will inform the IDP/Budget review<br />
towards 2012/<strong>13</strong>.<br />
• 26 October 2011 – Council adopted the IDP/Budget/PMS Process Plan 2012/<strong>13</strong>;<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
“a <strong>City</strong> Growing with you”
• 4 November 2011 – An IDP/Budget/PMS External Representative Forum meeting<br />
was held to consider institutional performance over the previous financial year and<br />
prepare external stakeholders for the IDP development process ahead;<br />
• 11 and 14 November 2011 -An IDP/Budget/PMS Technical Working Group Meeting<br />
was convened, wherein sector plan champions presented a synopsis of their plans<br />
with a view to identifying information that would feed into the situation analysis<br />
phase.<br />
• IDP Strategic Working Groups convened meetings with the aim of discussing and<br />
finalising their situation analysis reports. The meetings were held as follows:<br />
* Finance and Support Services: 23 November 2011<br />
* Municipal Services: 25 November 2011<br />
* Development Planning and Management: 30 November 2011<br />
* Development Facilitation and Partnerships: 20 December 2011<br />
• 28 November 2011 – A Technical Intergovernmental Relations Session was convened<br />
by the <strong>City</strong> with provincial and national government departments as well as civil<br />
society organs to foster collaborative planning and to share information about<br />
initiatives that are undertaken within the municipal area;<br />
• 19-21 February 2012 – A Mayoral Lekgotla was held to consider a situational analysis<br />
of the <strong>City</strong> and to map a way forward with regard to key strategic priorities that will<br />
guide the IDP and Budget review towards 2012/<strong>13</strong> financial year<br />
• 11-<strong>13</strong> March 2012 – A Technical Planning Session was convened to:<br />
– Form a problem statement on the development trajectory of the Metro<br />
– Align the political mandate (Lekgotla deliverables) with strategic objectives in<br />
order to respond to the Metro challenges<br />
– Ensure alignment of planning between BCMM and other spheres of government;<br />
– Distil key strategic focus areas for 2012 and beyond which will guide the<br />
development path of the Metro.<br />
• 23 March 2012: IDP/Budget Councillors Session held at the Regent Hotel to consider<br />
the draft BCMM Situation Analysis, Outcomes of the Mayoral Lekgotla and Technical<br />
Planning Session, the draft IDP 2012/<strong>13</strong> and MTREF Budget<br />
• 28 March 2012 – Tabling in Council of the draft 2012/<strong>13</strong> IDP Review and 2012/<strong>13</strong><br />
MTREF for approval;<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
9<br />
“a <strong>City</strong> Growing with you”
• 16-17 April 2012: IDP/Budget Councillors Session to consider amendments to draft<br />
IDP/Budget and the proposed IDP/Budget Roadshows.<br />
• 23-30 April 2012 – IDP/Budget Road Shows were held at fifteen venues across the<br />
Metro.<br />
• 4 May 2012 – IDP/Budget Business Breakfast was held to consult stakeholders from<br />
the business fraternity on the draft IDP 2012/<strong>13</strong> and MTREF Budget.<br />
• 25 May 2012 – Council Open Day to provide feedback to external stakeholders on the<br />
outcome of IDP/Budget Road shows.<br />
• 29 May 2012 – Adoption of the IDP Review 2012/<strong>13</strong> and MTREF Budget.<br />
5. IDP INFORMANTS AND STRATEGIC FOCAL<br />
AREAS<br />
5.1 IDP INFORMANTS<br />
The IDP process was undertaken within the framework of National, Provincial and District<br />
policies and legislation. The IDP/Budget review towards 2012/<strong>13</strong> has been informed by and<br />
took into consideration the following:<br />
• Ward priorities;<br />
• Priorities from the Mayoral Lekgotla held on 19-21 February 2012;<br />
• 12 Outcomes of Government;<br />
• Outcomes of the Technical Planning Session held on 11-<strong>13</strong> March 2012;<br />
• The draft National Development Plan produced by the NPC;<br />
• Millennium Development Goals;<br />
• The Provincial Growth and Development Plan; and<br />
• The National Spatial Development Perspective.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
10<br />
“a <strong>City</strong> Growing with you”
5.2 KEY STRATEGIC OBJECTIVES<br />
Emanating from a situation analysis undertaken towards development of the IDP, <strong>Buffalo</strong> <strong>City</strong><br />
Metropolitan Municipality identified a number of challenges and constraints which impact<br />
on the way in which the municipality functions and fulfils its mandate as per section 152 of<br />
the South African Constitution. Challenges confronting the Metro include a declining revenue<br />
base and poor management of resources, inefficiencies that limit the manner in which the<br />
<strong>City</strong> interfaces with the communities, ageing infrastructure and deferred maintenance,<br />
structural inefficiencies that result in poor service delivery standards, low economic growth<br />
and a high rate of unemployment, vulnerable environmental assets and natural resources.<br />
To address the identified challenges and work towards realization of the vision, the <strong>City</strong> has<br />
identified seven strategic focal areas and set the following long term strategic objectives:<br />
1.4.1 BCMM 1: To be a financially sound organisation that efficiently manages its<br />
resources;<br />
1.4.2 BCMM 2: To be an institutionally efficient and effective <strong>City</strong> that inclusively works<br />
with communities;<br />
1.4.3 BCMM 3: To generate an enabling environment for an economy that is growing,<br />
diversifying, generating increasing number of sustainable employment<br />
opportunities and contributing to increased incomes and equality;<br />
1.4.4 BCMM 4: To deliver sustainable infrastructure that support social and economic<br />
development;<br />
1.4.5 BCMM 5: To be a well structured and capacitated institution that renders effective<br />
and efficient services to all by 2016<br />
1.4.6 BCMM 6: To enhance and protect all environmental assets and natural resources<br />
within <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality by 2016<br />
The Metro has aligned the key strategic objectives and will strive to attain them within the<br />
context of the five key local government performance areas.<br />
5.3 STRATEGIC FOCAL AREAS<br />
Taking into account the prevailing economic environment and global factors that impact on<br />
development, the <strong>City</strong> has made significant inroads to address key development challenges<br />
within the municipality. There is however, more work to be done towards addressing the<br />
identified focal areas.<br />
Over the next five year term the <strong>City</strong> will concentrate on the nine strategic focus areas<br />
outlined below.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
11<br />
“a <strong>City</strong> Growing with you”
5.3.1 Institutional Restructuring and Stabilisation<br />
<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality is currently undergoing a process to restructure and<br />
stabilize the administration. This entails filling of posts on the approved macro structure i.e.<br />
the <strong>City</strong> Manager and Section 56 Managers.<br />
The medium to long term objective of the Metro is to promote organisational efficiency<br />
through the capacitation of staff and establishment of systems to enable staff to<br />
effectively perform their duties and align with the new Metro functions.<br />
5.3.2 Improving Intergovernmental Relations<br />
Section 41 of the South African Constitution of 1996 outlines the principles of co-operative<br />
government and intergovernmental relations, thus providing a broad framework for how<br />
the different spheres of government should interface. Section 4 of the Intergovernmental<br />
Relations Framework Act <strong>13</strong> of 2005 goes further and stipulates that the object of this act<br />
is to provide a framework for the national government, provincial governments and local<br />
governments, and all organs of state within those governments to facilitate co-ordination<br />
in the implementation of policy and legislation. The Act further requires establishment of<br />
provincial and district intergovernmental forums to promote and facilitate IGR between<br />
provinces, district and municipalities.<br />
Section 3 of the Municipal Systems Act 32 of 2000 (as amended) also defines how local<br />
government must develop co-operative approaches to governing, resources sharing and<br />
resolution of disputes within the context of Intergovernmental relations.<br />
Notwithstanding the above legislative provisions, intergovernmental relations between BCMM<br />
and other spheres of government still leave much to be desired, as they are still characterised<br />
by uncoordinated:<br />
• Alignment of planning and implementation;<br />
• Inter-sphere co-operation and co-ordination;<br />
• Information sharing on development programmes and projects;<br />
• Participation in platforms meant for engaging and co-operating; and<br />
• Approach to engaging and consulting with communities.<br />
5.3.3 Building Citizen Confidence<br />
Poor performance in terms of service delivery, administrative and political instability, and<br />
negative media coverage have largely contributed towards a low level of citizen confidence<br />
in the <strong>City</strong>.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
12<br />
“a <strong>City</strong> Growing with you”
Reversing the trend and building citizen confidence will require a concerted effort on the part<br />
of the Metro. It will also require the inculcation of a renewed work ethic from all who wear<br />
the name and brand of the municipality as well as the application of good governance and<br />
management principles, dedication and professionalism.<br />
5.3.4 Bridging the Digital Divide<br />
The Digital Divide refers to any inequalities between social groups in terms of their access<br />
to, use of, or knowledge of information and communication technologies. The divide within<br />
the municipal area refers to inequalities between individuals, households, businesses, and<br />
geographic areas at different socioeconomic and other demographic levels. Being a largely<br />
rural Metro the divide manifests itself in terms of the dichotomy between urban and rural<br />
areas with regard to access to telecommunication and IT systems.<br />
A key objective of the Metro is to ensure that telecommunication and IT systems become<br />
internationally compatible, thus facilitating access to broadband and/or other state-of-the-art<br />
technologies for citizens of the <strong>City</strong> and region.<br />
5.3.5 Improving performance, compliance, processes and systems<br />
Some of the weaknesses which negatively impact on the performance of the Metro relate<br />
to disintegrated systems internal control deficiencies, lack of staff with requisite capacity, a<br />
spatially fragmented workforce as well as lack of clearly defined processes and systems.<br />
• Develop mechanisms for the accurate complete reporting of financial information as<br />
required by NT and Accounting Standards.<br />
• Develop mechanisms to ensure that SCM operations are conducted strictly in accordance<br />
with legislated requirements.<br />
• Provide for the migration of existing records and the capturing of current records within<br />
a single repository in accordance with standards prescribed by the Archives Act and<br />
other relevant Acts and to ensure that such records can be retrieved for future use.<br />
5.3.6 Build Sustainable Communities<br />
The focus over the past years has been on delivering basic needs and housing. In spite of<br />
the remaining backlogs major strides have been in this regard, however, there still remains a<br />
huge challenge in terms of ensuring that we do not just deliver houses but create integrated<br />
and sustainable settlements.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
<strong>13</strong><br />
“a <strong>City</strong> Growing with you”
The challenge is not only about providing basic services and housing, but is also about<br />
‘building sustainable human settlements’ where residents have access to social and<br />
community facilities, economic opportunities, a healthy and sustainable environment and<br />
where opportunities can be accessed through convenient public transport and a safe road<br />
network.<br />
Integral to the creation of ‘sustainable human settlements’ is, integrated planning and<br />
implementation. The Metro is currently in the process of developing an ‘Integrated Sustainable<br />
Human Settlement Plan’, which will guide future investment and development.<br />
Creation of integrated and sustainable human settlements will directly contribute towards<br />
building of strong and integrated communities that manifest resilience against social,<br />
economic and natural adversities.<br />
5.3.7 Job Creation<br />
The <strong>City</strong> acknowledges that low economic growth and a high rate of unemployment are<br />
still prevalent and present a major challenge. This further translates to relatively high levels<br />
of poverty which is widespread within the <strong>City</strong>. High levels of poverty are apparent in the<br />
statistics from the 2001 Census where approximately 70% of households in the <strong>City</strong> indicated<br />
an income of less than R1500 per month, with 28% of all households indicating no income at<br />
all. Unemployment rate with the Metro is estimated at 24%.<br />
One of the threats to the future development of <strong>Buffalo</strong> <strong>City</strong> Metro is lack of appropriate<br />
education and skills levels. A significant portion of the Metro’s potential labour force have<br />
not attended school or completed their primary phase. Further, according to the last Census<br />
conducted in 2001 only 21% of the <strong>City</strong>’s 20 years and above population, had grade 12, 16%<br />
had post–school education and only 17% of 15 - 24 year olds were enrolled in post-school<br />
study. The recent 2007 community survey revealed a slight improvement, albeit<br />
To arrest the situation over the next five years the <strong>City</strong> will make concerted efforts, through<br />
its various programmes, in particular local economic development programmes, to attract<br />
investors into the <strong>City</strong> and thus contribute towards the national imperative of job creation.<br />
<strong>Buffalo</strong> <strong>City</strong> also contains a number of strengths to build upon for growth and development.<br />
A coastal location, unspoilt nature, a well-performing automotive industry and the status of<br />
being the capital of the Eastern Cape Province are a few of these comparative advantages to<br />
exploit in order to combat poverty and create jobs.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
14<br />
“a <strong>City</strong> Growing with you”
5.3.8 Improving Governance<br />
Corruption and poor service delivery undermines the credibility of the state. Poor state<br />
credibility leads to a democratic deficit undermining democracy and investment confidence.<br />
A weak local government leads to low investor confidence for both state and private sector<br />
decisions. Poor governance leads to poor economic performance.<br />
A well-governed city means that a clear and transparent agenda for the long term strategic<br />
work is formulated in co-operation with all stakeholders and communicated to all parties<br />
affected by the development process. A well-governed city is dependent on a reciprocal<br />
approach by other government spheres and agencies. Increased community feedback and<br />
engagement and improved customer reciprocity are other mitigating measures to apply in a<br />
democratic and well-governed city.<br />
It also means that quality basic services are provided through a financially sound and clear<br />
investment framework, which is aligned with the interventions by other public sector providers<br />
of basic services. Going forward, <strong>Buffalo</strong> <strong>City</strong> Metro will strive to become a well governed <strong>City</strong>.<br />
5.3.9 Financial Viability<br />
In order for the Metro to fulfill its mandate as stipulated in the Constitution of the country,<br />
there is a need to maintain financial viability and expand its revenue base in relation to<br />
expenditure. This requires robust strategies to turn around the current predicament of grant<br />
dependency and ensure that the <strong>City</strong> is in a financially sound position over the next five years<br />
and beyond.<br />
To achieve financial viability the <strong>City</strong> will put in place mechanisms for the recording and<br />
management of the financial resources of the Municipality and investigation and development<br />
of new revenue streams to provide for the financial sustainability of the Metro.<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
15<br />
“a <strong>City</strong> Growing with you”
6. 2012/<strong>13</strong> - 2014/15 MTREF BUDGET<br />
6.1 SUMMARISED CAPITAL BUDGET<br />
2012/20<strong>13</strong> - 2014/2015 CAPITAL BUDGET PER FUNDING<br />
Funding<br />
16<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2014/2015<br />
Capital<br />
Budget<br />
Own Funds 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />
Total Own Funding 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />
Integrated National Electrification Programme(INEP) 30 000 000 30 000 000 20 000 000<br />
Electricity Demand Side Management Grant 10 000 000 0 0<br />
Neighbourhood Development Partnership Grant 0 0 8 828 000<br />
Public Transport Infrastructure and Systems Grant (PTIS) 78 702 000 78 762 000 0<br />
Urban Settlement Development Grant 491 145 828 602 860 000 680 691 000<br />
Human Settlement Development Grant 19 170 420 35 495 714 16 318 416<br />
Total Grants 629 018 248 747 117 714 725 837 416<br />
TOTAL PER FUNDING 749 097 271 879 840 714 850 057 416<br />
2012/20<strong>13</strong> - 2014/2015 CAPITAL BUDGET PER DIRECTORATE<br />
Directorate<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2014/2015<br />
Capital<br />
Budget<br />
1. Executive Support Services 4 500 000 2 000 000 0<br />
2. Municipal Manager’s Office 0 0 0<br />
3. Chief Operations Officer 72 089 020 1<strong>13</strong> 700 478 111 064 024<br />
4. Directorate of Financial Services 3 600 000 3 000 000 3 000 000<br />
5. Directorate of Corporate Services 32 600 000 23 250 000 25 750 000<br />
6. Directorate of Engineering Services 411 259 273 473 614 293 484 773 392<br />
7. Directorate of Development Planning 191 920 978 210 762 000 107 000 000<br />
8. Directorate of Health & Public Safety 10 128 000 8 473 000 <strong>13</strong> 470 000<br />
9. Directorate of Community Services 23 000 000 45 040 943 105 000 000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
749 097 271 879 840 714 850 057 416<br />
“a <strong>City</strong> Growing with you”
6.2 SUMMARISED OPERATING BUDGET<br />
2012/20<strong>13</strong> - 2014/2015 OPEX BUDGET PER FUNDING<br />
OPEX<br />
2012/20<strong>13</strong><br />
Opex Budget<br />
17<br />
20<strong>13</strong>/2014<br />
Opex Budget<br />
2014/2015<br />
Opex Budget<br />
Own Funds 38 800 000 55 647 500 50 340 000<br />
Total Own Funding 38 800 000 55 647 500 50 340 000<br />
Finance Management Grant 1 500 000 1 500 000 1 500 000<br />
Infrastructure Skills Development Grant 3 000 000 3 800 000 4 000 000<br />
Urban Settlement Development Grant 8 328 172 10 445 000 5 850 000<br />
Reclaim Land Claims Commission 300 000 300 000 0<br />
Local Government and Housing 77 000 0 0<br />
Human Settlement Development Grant 111 645 824 168 849 664 179 337 305<br />
Dept of Water Affairs - DoRA 1 283 000 0 0<br />
Dept of Water Affairs - Province 400 000 0 0<br />
Dept of Water Affairs - ACIP 1 975 000 125 000 0<br />
Total Grants 128 508 996 185 019 664 190 687 305<br />
TOTAL PER FUNDING 167 308 996 240 667 164 241 027 305<br />
2012/20<strong>13</strong> - 2014/2015 OPEX BUDGET PER DIRECTORATE<br />
2012/20<strong>13</strong><br />
Opex Budget<br />
20<strong>13</strong>/2014<br />
Opex Budget<br />
2014/2015<br />
Opex Budget<br />
1. Executive Support Services 5 650 000 7 680 000 4 680 000<br />
2. Municipal Manager’s Office 6 200 000 8 200 000 8 200 000<br />
3. Chief Operations Officer 110 458 446 173 079 464 186 206 905<br />
4. Directorate of Financial Services 4 620 000 6 220 000 4 220 000<br />
5. Directorate of Corporate Services 9 150 000 8 450 000 7 700 000<br />
6. Dir. of Engineering Services 8 658 000 7 125 000 0<br />
7. Dir. of Development Planning 22 572 550 29 912 700 30 020 400<br />
8. Dir. of Health & Public Safety 0 0 0<br />
9. Dir. of Community Services 0 0 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
167 308 996 240 667 164 241 027 305<br />
“a <strong>City</strong> Growing with you”
6.3 CAPITAL PROJECTS 2012/<strong>13</strong> – 2014/15<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Cost STRATEGY CODE<br />
Source of<br />
Cost centre name<br />
Ward No. Project Name<br />
Capital Capital Capital<br />
centre no. (FROM THE IDP)<br />
Funding<br />
Budget Budget Budget<br />
KPA 1: MUNICIPAL TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT<br />
Electronic Attendance Control<br />
H.R. Administration 420005 MTOD03 N/A<br />
Own Funds 2 500 000 1 500 000 1 000 000<br />
System<br />
IT Systems (Asset management<br />
, SCM, Budget forecasting and<br />
Management Information<br />
415025 MTOD06 N/A Modelling, Demand Management Own Funds 20 000 000 20 750 000 23 750 000<br />
Services<br />
System, Fuel Management System<br />
and Stock Coding System<br />
Management Information<br />
415025 MTOD07 N/A IT Infrastructure Network Own Funds 4 600 000 0 0<br />
Services<br />
Management Information<br />
415025 MTOD07 N/A Disaster Recovery Centre ICT Own Funds 4 500 000 0 0<br />
Services<br />
Management Information<br />
415025 MTOD07 N/A Computer Equipment - BCMM Own Funds 500 000 1 000 000 1 000 000<br />
Services<br />
Management Information<br />
Upgrading of BCMM Website<br />
415205 MTOD08 N/A<br />
Own Funds 500 000 0 0<br />
Services<br />
(Including GIS on the Internet<br />
TOTAL 32 600 000 23 250 000 25 750 000<br />
KPA 2: BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT<br />
Housing Department 255005 BSDID01 12 Reeston Phase 3 Stage 2 -P1 & P3 USDG 10 000 000 21 500 000 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
18<br />
USDG 2 000 000 7 412 400 17 931 000<br />
Mdantsane Zone 18 CC Phase 2 - P1<br />
& P3<br />
Housing Department 255005 BSDID01 21<br />
USDG 8 000 000 200 000 0<br />
Manyano &Thembelihle Phase 2 -<br />
P1 & P3<br />
Housing Department 255005 BSDID01 17<br />
Housing Department 255005 BSDID01 19 Second Creek (Turn Key) - P1 & P3 USDG 8 000 000 100 000 0<br />
Housing Department 255005 BSDID01 6 Block Yard TRA - P 1& P3 USDG 1 000 000 0 0<br />
“a <strong>City</strong> Growing with you”
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Cost STRATEGY CODE<br />
Source of<br />
Cost centre name<br />
Ward No. Project Name<br />
Capital Capital Capital<br />
centre no. (FROM THE IDP)<br />
Funding<br />
Budget Budget Budget<br />
DVRI PILOT PROJECT (Mekeni, Haven<br />
Housing Department 255005 BSDID01 19<br />
USDG 2 500 000 0 0<br />
Hills, Competition Site) P1 & P3<br />
Cluster 1 (Chris Hani, Ilinge,<br />
48, 12, 21, Mahlangu Village, Sisulu<br />
Housing Department 255005 BSDID01<br />
USDG 3 706 200 9 265 500 11 730 123<br />
11,17, 11, 20 Village,Winnie Mandela,Deluxolo<br />
Village & Francis Mei) P1 & P3<br />
Cluster 2 (Masibambane, Masibulele,<br />
Housing Department 255005 BSDID01 17, 14, Velwano, Gwentshe Village,<br />
USDG 600 000 5 559 300 9 265 500<br />
Mathemba Vuso) P1 & P3<br />
Cluster 3 (Fynbos Informal 1, Fynbos<br />
Housing Department 255005 BSDID01 5, 10<br />
USDG 7 412 400 11 859 840 <strong>13</strong> 620 285<br />
Informal 2, Ndancama) P1 & P3<br />
Housing Department 255005 BSDID01 31 Sunny South - P1 & P3 USDG 600 000 1 000 000 2 000 000<br />
Housing Department 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 1 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />
Housing Department 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 2 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />
Housing Department 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 2- P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />
Housing Department 255005 BSDID01 23, 24 Potsdam North Kanana - P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />
Housing Department 255005 BSDID01 9 Amalinda Co- op P1 & P3 USDG 0 1 126 562 1 630 750<br />
Housing Department 255005 BSDID01 9 Amalinda Fairlands P1 & P2 USDG 0 1 126 562 1 630 750<br />
Housing Department 255005 BSDID01 12 Reeston Phase 3: stage 2 – P1 & P3 HSDG 15 000 000 25 000 000 0<br />
Housing Department 255005 BSDID01 12 Reeston Phase 3: stage 3 – P1 & P3 HSDG 1 000 000 5 559 300 5 559 300<br />
Housing Department 255005 BSDID01 2 Braelynn ext 10 – P1 & P3 HSDG 300 000 1 476 096 3 570 436<br />
C Section and Triangular Site – P1<br />
Housing Department 255005 BSDID01 7, 8<br />
HSDG 270 420 2 500 000 4 594 340<br />
& P3<br />
Housing Department 255005 BSDID01 7, 8 D Hostel – P1 & P3 HSDG 100 000 860 318 2 594 340<br />
DVRI Pilot Project (Mekeni, Haven<br />
Housing Department 255005 BSDID01 6, 8<br />
HSDG 2 500 000 100 000 0<br />
Hills, Competition Site)<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
19<br />
NDPG 0 0 8 828 000<br />
Township & CBD Regeneration<br />
Strategy<br />
Township Regeneration 255005 BSDID27 N/A<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
Source of<br />
Funding<br />
Ward No. Project Name<br />
STRATEGY CODE<br />
(FROM THE IDP)<br />
Cost<br />
centre no.<br />
Cost centre name<br />
3 500 000 4 000 000<br />
530020 BSDID29 N/A BCM Fleet Management System Own Funds 3 100 000<br />
530020 BSDID29 N/A BCMM Fleet Own Funds 6 000 000 15 000 000 15 000 000<br />
Fleet management -<br />
Braelynn<br />
Fleet Management –<br />
Braelynn<br />
10 000 000 0 0<br />
Electricity<br />
Demand Side<br />
Management<br />
Grant<br />
Electrification – Energy efficient<br />
Street lighting<br />
11, 12, 14,<br />
17, 20, 21,<br />
22, 23, 30<br />
535025 BSDID04<br />
Electricity Planning &<br />
Design<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
Own Funds 5 000 000 50 000 000 50 000 000<br />
Bulk Electricity Infrastructure<br />
Upgrade<br />
16, 18<br />
BSDID04<br />
535025<br />
Electricity Planning &<br />
Design<br />
30 000 000 30 000 000 20 000 000<br />
DoE<br />
(Integrated<br />
National<br />
ElectrificationProgramme)<br />
Electrification - Reeston, Potsdam<br />
unit P, Infills Mdantsane, Dimbaza,<br />
Zwelitsha, Pakamisa, Bhisho and<br />
Duncan Village<br />
<strong>13</strong>, 25, 43,<br />
34, 36,<br />
535025 BSDID04<br />
Electricity Planning &<br />
Design<br />
20<br />
Own Funds 5 000 000 20 000 000 20 000 000<br />
Electrification of Informal dwellings –<br />
Duncan Village Areas<br />
Electricity Infrastructure Network<br />
(2.47% Tariff increase – Ring fenced)<br />
1, 2, 7, 8,<br />
9, 10<br />
2, 7, 15,<br />
16, 44<br />
535025 BSDID04<br />
Own Funds 27 851 023 0 0<br />
535025 BSDID04<br />
525025 BSDID06 21, 22, 23 Mdantsane Roads USDG 60 000 000 80 484 000 125 419 392<br />
Electricity Planning &<br />
Design<br />
Electricity Planning &<br />
Design<br />
Roads and Stormwater<br />
Drainage<br />
Roads Design 525020 BSDID06 46 West Bank Restitution USDG 15 000 000 10 000 000 28 000 000<br />
Roads Design 525020 BSDID06 28 Quenera Main Roads USDG 5 000 000 0 0<br />
BCMM Roads Upgrade USDG 30 000 000 30 000 000 50 000 000<br />
29, <strong>13</strong>, 25,<br />
39, 34, 36,<br />
44, 41, 1, 2,<br />
7, 8<br />
Roads Design 525020 BSDID06<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
Source of<br />
Funding<br />
Ward No. Project Name<br />
STRATEGY CODE<br />
(FROM THE IDP)<br />
Cost<br />
centre no.<br />
Cost centre name<br />
23, 38, 43,<br />
Roads and Stormwater<br />
525025 BSDID06 31, 32, 24, Rehabilitation of Rural Roads USDG 10 000 000 10 000 000 25 000 000<br />
Drainage<br />
32<br />
28, 4, 41, <strong>13</strong>,<br />
16, 14, 21,<br />
Sewerage Treatment-<br />
515026 BSDID07 22, 5, 16, 27, Bulk Sanitation Provision USDG 152 608 250 155 854 000 99 854 000<br />
Coastal<br />
31, 32, 33,<br />
47, 11<br />
34, 37, 38,<br />
39, 40, 41, KWT, Dimbaza and Bhisho<br />
Water Administration 520005 BSDID07<br />
USDG 7 000 000 37 000 000 20 000 000<br />
43, 44, 49, Infrastructure(Water)<br />
35<br />
11, 12, <strong>13</strong>,<br />
14, 42, 48, Relocation of Midblocks in<br />
Water Administration 515010 BSDID07<br />
USDG 5 000 000 5 000 000 5 000 000<br />
50, 17, 20, Mdantsane<br />
23<br />
Water Administration 515010 BSDID07 36 Amahleke Water Supply USDG 3 000 000 3 000 000 3 000 000<br />
Augmentation of Water Treatment<br />
Bulk pumping stations 520015 BSDID07 5, <strong>13</strong> Capacity - Umzonyana/Raising USDG 12 000 000 22 000 000 22 000 000<br />
Upper weir<br />
Upgrade water networks in terms of<br />
Water Treatment Works 520020 BSDID07 N/A<br />
USDG 6 000 000 17 000 000 15 000 000<br />
densification and augmentation<br />
Bulk Water Supply Newlands and<br />
Water Treatment Works 520020 BSDID07 N/A<br />
USDG 1 000 000 0 0<br />
Other Areas<br />
Water Treatment Works 520020 BSDID07 33 Ward 33 Bulk Water Supply Scheme USDG 3 000 000 0 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
21<br />
Water Treatment Works 520020 BSDID07 31,33 Bulk Water Supply Coastal Areas USDG 5 000 000 1 276 293 0<br />
Water Treatment Works 520020 BSDID07 31 Winterstrand Water Supply USDG 1 000 000 0 0<br />
Own Funds 2 800 000 2 000 000 1 500 000<br />
Upgrading of the Laboratory<br />
infrastructure and equipment<br />
Water Treatment Works 520020 BSDID07 N/A<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
Source of<br />
Funding<br />
Ward No. Project Name<br />
STRATEGY CODE<br />
(FROM THE IDP)<br />
Cost<br />
centre no.<br />
Cost centre name<br />
78 702 000 78 762 000 0<br />
Public<br />
Transport<br />
Infrastructure<br />
and Systems<br />
Grant<br />
Bus Rapid Transit<br />
1, 10, 11, 12,<br />
<strong>13</strong>, 14, 15,<br />
16, 17, 18,<br />
19, 2, 20, 21,<br />
22, 23, 24,<br />
25, 28, 3, 4,<br />
5, 6, 7, 8, 9<br />
620005 BSDID23<br />
Transport Planning &<br />
Operations Admin<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
Transport Planning &<br />
620005 BSDID23 N/A ITP implementation USDG 3 000 000 3 000 000 3 000 000<br />
Operations Admin<br />
Transport Planning &<br />
620005 BSDID24 37 Public Transport Facilities USDG 23 000 000 22 000 000 30 000 000<br />
Operations Admin<br />
Transport Planning &<br />
620005 BSDID24 27, 28 Gonubie Main Road USDG 15 000 000 30 000 000 10 000 000<br />
Operations Admin<br />
Transport Planning &<br />
46, 31, 10,<br />
620005 BSDID24<br />
N2/R72 link road survey USDG 1 200 000 0 0<br />
Operations Admin<br />
16, 8, 19<br />
Land Admin 615080 BSDID21 1 -50 Land acquisition USDG 12 764 000 42 500 000 29 500 000<br />
Cleansing Administration<br />
Development of Community<br />
755010 BSDID16 <strong>13</strong>, 21, 23<br />
USDG 2 000 000 3 000 000 5 000 000<br />
Support<br />
Parks(Inland, Midlands and Coastal)<br />
Development and Upgrading of<br />
Interments 755025 BSDID16 N/A Cemeteries(Inland, Midland and USDG 5 000 000 12 040 943 20 000 000<br />
Coastal)<br />
Development and Upgrading of<br />
Halls 760025 BSDID16 5<br />
USDG 4 000 000 20 000 000 30 000 000<br />
Community Halls<br />
22<br />
770030 BSDID09 1 – 50 Design of the Central Transfer Station USDG 3 000 000 0 0<br />
E.L. Regional Waste<br />
Disposal Site & Transfer<br />
Station<br />
770030 BSDID09 1 – 50 Construction of the Third Cell USDG 10 000 000 0 0<br />
E.L. Regional Waste<br />
Disposal Site & Transfer<br />
Station<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
Source of<br />
Funding<br />
Ward No. Project Name<br />
STRATEGY CODE<br />
(FROM THE IDP)<br />
Cost<br />
centre no.<br />
Cost centre name<br />
770030 BSDID09 1 – 50 Rehabilitation of Landfill Sites USDG 5 000 000 0 0<br />
E.L. Regional Waste<br />
Disposal Site & Transfer<br />
Station<br />
7, 12, <strong>13</strong>, 28,<br />
Upgrading of Sport & Recreation<br />
Sportsfields 765010 BSDID16 29, 35, 37,<br />
USDG 9 000 000 10 000 000 50 000 000<br />
Facilities<br />
38, 41, 44<br />
Fire and Rescue Services 725010 BSDID12 1 to 50 Coastal and Midland Fire Station USDG 3 000 000 3 000 000 3 000 000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
KWT Fire Station USDG 6 000 000 0 0<br />
25, 35, 37,<br />
38, 39, 40,<br />
41, 43, 44,<br />
Fire and Rescue Services 725010 BSDID12<br />
45, 49<br />
Fire and Rescue Services 725010 BSDID12 31, 32, 33 Tsholomnqa Fire Station USDG 500 000 5 000 000 10 000 000<br />
KPA 3: LOCAL ECONOMIC DEVELOPMENT<br />
23<br />
USDG 12 254 978 20 000 000 30 000 000<br />
Economic Development<br />
Infrastructure (Heritage Route<br />
Development, Rollout of Informal<br />
Traders Stalls)<br />
63005 LED03 N/A<br />
Local Economic<br />
Development<br />
USDG 3 000 000 3 000 000 3 000 000<br />
BCMM Urban Agriculture<br />
635005 LED03 N/A<br />
Infrastructure Development<br />
KPA 4: FINANCIAL VIABILITY AND MANAGEMENT<br />
Local Economic<br />
Development<br />
Own Funds 1 100 000 1 000 000 1 000 000<br />
Office Furniture – Revenue<br />
Management<br />
Debtors Management 330015 MFVM01 N/A<br />
330025 MFVM02 N/A Pre-Payment Vending Machines Own Funds 1 000 000 500 000 500 000<br />
Own Funds 1 500 000 1 500 000 1 500 000<br />
Computer Equipment – Revenue<br />
Management<br />
415025 MTOD07 N/A<br />
Pre- Payment Vending<br />
Office<br />
Management Information<br />
Services<br />
330005 MFVM05 N/A General Valuations Own Funds 29 000 000 <strong>13</strong> 500 000 4 500 000<br />
Rates and Valuations<br />
Office<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Capital<br />
Budget<br />
20<strong>13</strong>/2014<br />
Capital<br />
Budget<br />
2012/20<strong>13</strong><br />
Capital<br />
Budget<br />
Source of<br />
Funding<br />
Ward No. Project Name<br />
STRATEGY CODE<br />
(FROM THE IDP)<br />
Cost<br />
centre no.<br />
Cost centre name<br />
Architecture 615075 MFVM01 N/A Upgrading of KWT Payments Hall USDG 4 000 000 1 000 000 0<br />
KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION<br />
Strategic Management 105035 MTOD12 N/A Back-up Generator – <strong>City</strong> Hall Own Funds 1 500 000 0 0<br />
Strategic Management 105035 MTOD12 N/A Upgrading of <strong>City</strong> Hall Own Funds 3 000 000 000 000 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
6.4 OPERATING PROJECTS 2012/<strong>13</strong> – 2014/15<br />
2014/2015<br />
Opex<br />
Budget<br />
20<strong>13</strong>/2014<br />
Opex<br />
Budget<br />
2012/20<strong>13</strong><br />
Opex<br />
Budget<br />
Source of<br />
Funding<br />
Project Name<br />
STRATEGY<br />
CODE FROM<br />
THE IDP<br />
Ward No.<br />
Cost<br />
Centre<br />
Directorate<br />
KPA 1: MUNICIPAL TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT<br />
Migration of BCMM documents to<br />
Legal and Admin 220005 N/A MTOD11<br />
Own Funds 300 000 100 000 0<br />
EDMS<br />
Development Planning<br />
615005 N/A MTOD10 GIS on the Internet Own Funds 700 000 0 0<br />
Administration<br />
Development Planning<br />
615005 N/A MTOD06 Updated Aerial Photography Own Funds 2 7000 000 0<br />
Administration<br />
Legal and Admin 220005 N/A MTOD11 Development and Review of By-Law Own Funds 500 000 500 000 500 000<br />
24<br />
Legal and Admin 220005 N/A MTOD11 Maintenance Policy Own Funds 600 000 0 0<br />
Own Funds 750 000 750 000 0<br />
Upgrade of BCMM off-site building<br />
to store vital documents and backup<br />
server (e.g. Bhisho / KWT<br />
415025 N/A MTOD08<br />
Management Information<br />
Services<br />
Roll out of Employee Performance<br />
HR Administration 420005 N/A GGPP02<br />
Own Funds 750 000 750 000 0<br />
Management System<br />
HR Administration 420005 N/A MTOD02 Infrastructure - Skills Development ISDG 3 000 000 3 800 000 4 000 000<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Opex<br />
Budget<br />
20<strong>13</strong>/2014<br />
Opex<br />
Budget<br />
2012/20<strong>13</strong><br />
Opex<br />
Budget<br />
Source of<br />
Funding<br />
Project Name<br />
STRATEGY<br />
CODE FROM<br />
THE IDP<br />
Ward No.<br />
Cost<br />
Centre<br />
Directorate<br />
KPA 2: BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT<br />
Housing Projects 255005 <strong>13</strong>, 43, 45, 46 BSDID01 Reeston Phase 3: Stage 2 - P5 HSDG 0 20 000 000 29 992 500<br />
Reeston Phase 3: Stage 3 – P4<br />
Housing Projects 255005 <strong>13</strong>, 43, 45, 46 BSDID01<br />
HSDG 163 515 0 0<br />
(Registration<br />
Ilitha Eradication of Wooden Houses<br />
Housing Projects 255005 45 BSDID01<br />
HSDG 19 995 000 31 992 000 11 330 500<br />
to Formal Houses<br />
Housing Projects 255005 43 BSDID01 Tyutyu Phase 2 – P5 (Top Structures) HSDG 6 665 000 500 000 0<br />
Airport / Phase 2A Construction of<br />
Housing Projects 255005 31 BSDID01<br />
HSDG 5 398 650 200 000 0<br />
new units-P4<br />
Housing Projects 255005 45 BDSID01 Ilitha South – 439 Units P5 HSDG 2 500 000 3 797 800 5 000 000<br />
17, 24, 26, 33,<br />
Reconstruction of Storm Damaged<br />
Housing Projects 255005<br />
BSDID01<br />
HSDG 20 000 000 30 000 000 15 862 700<br />
39, 40, 43, 36, 37<br />
Houses<br />
Housing Projects 255005 31 BSDID01 Sunny South – P5 HSDG 500 000 10 797 300 17 162 500<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
25<br />
Housing Projects 255005 23 BSDID01 Potsdam Village Phase 1 & 3 – P5 HSDG 0 500 000 500 000<br />
Cluster 1 (Chris Hani 3; Winnie<br />
48, 12, 21, 11,<br />
Mandela; Ilinge; Deluxolo Village;<br />
Housing Projects 255005<br />
BSDID01<br />
HSDG 5 811 880 17 395 650 26 660 000<br />
17, 11, 20<br />
Sisulu Village; Francis Mei; Mahlangu<br />
Village) P5<br />
Cluster 2 (Masibambane; Masibulele;<br />
19 995<br />
Housing Projects 255005 17, 14 BSDID01 Gwentshe; Velwano; Mathemba HSDG 0 9 664 250<br />
000<br />
Vuso) P5<br />
Cluster 3 (Fynbos1; Fynbos2;<br />
Housing Projects 255005 5, 10 BSDID01<br />
HSDG 0 9 664 250 19 995 000<br />
Ndancama)P5<br />
DVRI Pilot Project (Mekeni, Haven<br />
Housing Projects 255005 6, 8 BSDID01<br />
HSDG 0 11 797 050 19 995 000<br />
Hills, Competition Site) P5<br />
Cambridge 1 & 2 (Kei Road Dawn)<br />
Housing Projects 255005 15 BSDID01<br />
HSDG 465 000 0 0<br />
P2<br />
Housing Projects 255005 16 BSDID01 N2 Road Reserve HSDG 340 000 0 0<br />
“a <strong>City</strong> Growing with you”
STRATEGY<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Cost<br />
Source of<br />
Directorate<br />
Ward No. CODE FROM<br />
Project Name<br />
Opex Opex Opex<br />
Centre<br />
Funding<br />
THE IDP<br />
Budget Budget Budget<br />
Ford Msimango 1 (LU Housing Nomp<br />
Housing Projects 255005 6 BSDID01<br />
HSDG 165 000 0 0<br />
School)<br />
Housing Projects 255005 19 BSDID01 Second Creek – P5 HSDG 17 662 250 200 000 0<br />
Housing Needs Database and<br />
Housing Projects 255005 1-50 BSDID01<br />
HSDG 16 697 979 27 327 914 29 818 705<br />
Accreditation<br />
Housing Projects 255005 45, 46, 18, 19, 10 BSDID02 Beneficiary Education ( All USDG P4) USDG 300 000 250 000 250 000<br />
Relocation of beneficiaries to formal<br />
Housing Projects 255005 1 - 50 BSDID01 houses for all housing programmes Own funds 500 000 4 447 500 7 140 000<br />
– All Projects<br />
Housing Projects 255005 12 BSDID01 Dacawa P4 USDG 2 960 0 0<br />
Housing Projects 255005 10 BSDID01 Fynbos Informal 1-P4 USDG 27 488 0 0<br />
Housing Projects 255005 10 BSDID01 Fynbos Informal 2-P4 USDG 210 230 0 0<br />
Housing Projects 255005 12 BSDID01 Ilinge-P4 USDG 118 087 0 0<br />
Ilitha - Eradication of Wooden Houses<br />
Housing Projects 255005 45 BSDID01<br />
USDG 200 000 200 000 0<br />
to Formal Houses<br />
Housing Projects 255005 17 BSDID01 Masibambane-P4 USDG 20 038 0 0<br />
Housing Projects 255005 17 BSDID01 Masibulele-P4 USDG 20 553 0 0<br />
Housing Projects 255005 21 BSDID01 Mdantsane Zone 18 CC Phase 2-P4 USDG 256 425 0 0<br />
Housing Projects 255005 10 BSDID01 Ndacama-P2 USDG 160 000 0 0<br />
Housing Projects 255005 10 BSDID01 Ndacama-P4 USDG <strong>13</strong>8 308 0 0<br />
Housing Projects 255005 11 BSDID01 Sisulu Village-P4 USDG 19 636 0 0<br />
Housing Projects 255005 31 BSDID01 Sunny South-P4 USDG 112 7<strong>13</strong> 0 0<br />
Housing Projects 255005 14 BSDID01 Velwano-P4 USDG 81 999 0 0<br />
Housing Projects 255005 17 BSDID01 Winnie Mandela-P4 USDG 38 535 0 0<br />
Housing Projects 255005 9 BSDID01 Amalinda (Co-op) - P2 (EIA) USDG 200 000 0 0<br />
Housing Projects 255005 23,24 BSDID01 Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100 000 0 0<br />
Housing Projects 255005 23, 24 BSDID01 Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100 000 0 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
26<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Opex<br />
Budget<br />
20<strong>13</strong>/2014<br />
Opex<br />
Budget<br />
2012/20<strong>13</strong><br />
Opex<br />
Budget<br />
Source of<br />
Funding<br />
Project Name<br />
STRATEGY<br />
CODE FROM<br />
THE IDP<br />
Ward No.<br />
Cost<br />
Centre<br />
Directorate<br />
Housing Projects 255005 23, 24 BSDID01 Potsdam North Kanana - P2 (EIA) USDG 100 000 0 0<br />
Potsdam Village Rural Phase 1 &<br />
Housing Projects 255005 23 BSDID01<br />
USDG 100 000 0 0<br />
2 - P2 (EIA)<br />
Housing Projects 255005 21 BSDID01 Potsdam Unit P Stage 2 - P4 USDG 3 000 0 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
Housing Projects 255005 19 BSDID01 Second Creek P4 USDG 3 000 0 0<br />
Water, Sanitation and<br />
Caretakers - Duncan Village and<br />
520005 1, 2, 5, 6, 7, 8, 10<br />
Own Funds 2 000 000 2 000 000 0<br />
Scientific services<br />
Information Settlements<br />
Water, Sanitation and<br />
520005 18 BSDID06 East Bank WWTW ACIP Funding DWA -ACIP 1 525 000 125 000 0<br />
Scientific services<br />
Water, Sanitation and<br />
DWA –<br />
520005 N/A BSDID06 Water Services Business Plan<br />
400 000 0 0<br />
Scientific services<br />
Province<br />
520005 BSDID06 Dimbaza WWTW inlet Screen DWA – ACIP 450 000 0 0<br />
Implementation of Water<br />
Conservation and Demand<br />
Water, Sanitation and<br />
34, <strong>13</strong>, 9, 5, 28,<br />
Management(Dimbaza, Duncan Villa DWAF -<br />
520005<br />
BSDID06<br />
1 283 000 0 0<br />
Scientific services<br />
7, 41<br />
ge,Mdantsane,Reeston,Scenery Park DoRA<br />
,Nompumelelo,Mzamomhle,Sweetwa<br />
ters,Phakamisa,Zwelitsha)<br />
Roads and Stormwater<br />
Development of the BCMM Roads<br />
525025 N/A BSDID06<br />
USDG 3 000 000 5 000 000 0<br />
Drainage<br />
Masterplan<br />
Reeston Phase 3: Stage 2 – P4<br />
Land Admin 615080 12 BSDID01<br />
HSDG 788 800 480 000 480 000<br />
(Transfers)<br />
Reeston Phase 1 & 2 – Stage 1B –<br />
Land Admin 615080 12 BSDID01<br />
HSDG 200 000 46 400 0<br />
P4 (Transfers)<br />
Reeston Phase 3 Stage 1 – P4<br />
Land Admin 615080 12 BSDID01<br />
HSDG 500 000 86 800 0<br />
(Transfers)<br />
Land Admin 615080 43 BSDID01 Tyutyu Phase 1 – P4 (Transfers) HSDG 28 000 1 000 0<br />
Water, Sanitation and<br />
Scientific services<br />
27<br />
“a <strong>City</strong> Growing with you”
STRATEGY<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Cost<br />
Source of<br />
Directorate<br />
Ward No. CODE FROM<br />
Project Name<br />
Opex Opex Opex<br />
Centre<br />
Funding<br />
THE IDP<br />
Budget Budget Budget<br />
Land Admin 615080 43 BSDID01 Tyutyu 2 – P4 (Transfers) HSDG 34 000 1 000 0<br />
Land Admin 615080 45 BSDID01 Ilitha South – 439 Units (Transfers) HSDG 8 000 30 000 40 400<br />
Land Admin 615080 34, 36 BSDID01 Dimbaza Phase 2 P4 (Transfers) HSDG 5 000 12 500 0<br />
Potsdam Stage 2 Stage 1 – P4<br />
Land Admin 615080 <strong>13</strong> BSDID01<br />
HSDG 241 150 5 000 0<br />
(Transfers)<br />
Land Admin 615080 29 BSDID01 Nompumelelo – P4 (Transfers) HSDG 914 400 3 000 0<br />
Land Admin 615080 16 BSDID01 Amalinda Simanyene – P4 (Transfers) HSDG 15 000 1 000 0<br />
Land Admin 615080 48 BSDID01 Z Soga – P4 (Transfers) HSDG <strong>13</strong>6 000 1 000 0<br />
Land Transactions – upgrading of<br />
Land Admin 615080 Mdantsane BSDID22<br />
Own Funds 350 000 500 000 500 000<br />
former R293 & CPA Areas<br />
Airport / Phase 2A Construction of<br />
Land Admin 615080 46<br />
HSDG 441 200 10 000 0<br />
new units – P4<br />
Subdivision of Municipal leased<br />
Land Survey 615070 N/A BSDID21<br />
Own Funds 500 000 400 000 300 000<br />
properties<br />
Land Survey 615070 10 BSDID21 Ndancama P2 USDG 160 000 0 0<br />
Land Survey 615070 10 BSDID21 Fynbos Informal 1- P2 USDG 120 000 0 0<br />
Land Survey 615070 10 BSDID21 Fynbos Informal 2 – P2 USDG 110 000 0 0<br />
Land Survey 615070 9 BSDID21 Amalinda Fairlands Projects – P2 USDG 200 000 235 000 0<br />
Cambridge 1 & 2 (Kei Road) Dawn<br />
Land Survey 615070 15 BSDID21<br />
HSDG 465 000 0 0<br />
– P 2<br />
615070 16 BSDID21 N2 Road Reserve P 2 HSDG 340 000 0 0<br />
Ford Msimango 1 (LU Housing Nomp<br />
615070 6 BSDID21<br />
HSDG 165 000 0 0<br />
School) – P2<br />
<strong>City</strong> Planning 615070 16 BSDID17 DVRI Township Establishment LGH 77 000 0 0<br />
<strong>City</strong> Planning 615070 40926 BSDID17 Mdantsane Township Establishment USDG 0 500 000 600 000<br />
East Bank Restitution Township<br />
<strong>City</strong> Planning 615070 16 BSDID17<br />
RLCC 300 000 300 000<br />
Establishment<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
28<br />
“a <strong>City</strong> Growing with you”
STRATEGY<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Cost<br />
Source of<br />
Directorate<br />
Ward No. CODE FROM<br />
Project Name<br />
Opex Opex Opex<br />
Centre<br />
Funding<br />
THE IDP<br />
Budget Budget Budget<br />
Land Identification study for<br />
<strong>City</strong> Planning 615080 N/A BSDID21 Relocation of High Priority Informal Own Funds 300 000 0 0<br />
Settlements<br />
<strong>City</strong> Planning 615005 15 BSDID18 BCMM Township Establishment Own Funds 0 1 600 000 1 700 000<br />
Township Establishment for<br />
<strong>City</strong> Planning 615070 28 BSDID18<br />
Own Funds 400 000 0 0<br />
Mzamomhle Informal Settlement<br />
<strong>City</strong> Planning 615070 N/A BSDID18 Rural Settlement Planning Phase Own Funds 300 000 0 0<br />
Local Spatial Development<br />
<strong>City</strong> Planning 615070 27 BSDID19<br />
Own Funds 0 1 100 000 1 200 000<br />
framework<br />
<strong>City</strong> Planning 615070 4, 15, 18 BSDID19 Vincent, Berea LSDF Review Own Funds 500 000 0 0<br />
<strong>City</strong> Planning 615070 29 BSDID19 Home Hill LSDF Own Funds 233 408 0 0<br />
<strong>City</strong> Planning 615070 27, 29 BSDID19 Gonubie Main road LSDF Own Funds 34 735 0 0<br />
<strong>City</strong> Planning 615070 27, 29 BSDID19 Kwelera LSDF Own Funds 29 469 0<br />
BCMM SDF Comprehensive Update<br />
<strong>City</strong> Planning 615070 N/A BSDID19<br />
Own Funds 58 561 0 0<br />
and Review<br />
<strong>City</strong> Planning 615070 30, 38-45 BSDID19 Bhisho/King Williams Town LSDF Own Funds 43 827 0 0<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
29<br />
Development Planning<br />
615005 N/A BSDID20 Aerial Photography Own Funds 1 000 000 0 0<br />
Administration<br />
Development Planning<br />
615005 N/A MTOD05 GIS on the internet Own Funds 350 000 350 000 0<br />
Administration<br />
Transportation 620005 N/A BSDID23 ITP Review Own Funds 500 000 2 000 000 2 000 000<br />
KPA 3: LOCAL ECONOMIC DEVELOPMENT<br />
635005 N/A LED02 Destination Marketing Programme Own Funds 6 880 000 11 700 000 12 300 000<br />
635005 N/A LED03 Business Support Unit Programme Own Funds 2 000 000 6 300 000 5 900 000<br />
635005 N/A LED03 Economic Infrastructure Programme USDG 2 585 200 4 260 000 5 000 000<br />
Local Economic<br />
Development<br />
Local Economic<br />
Development<br />
Local Economic<br />
Development<br />
“a <strong>City</strong> Growing with you”
2014/2015<br />
Opex<br />
Budget<br />
20<strong>13</strong>/2014<br />
Opex<br />
Budget<br />
2012/20<strong>13</strong><br />
Opex<br />
Budget<br />
Source of<br />
Funding<br />
Project Name<br />
STRATEGY<br />
CODE FROM<br />
THE IDP<br />
Ward No.<br />
Cost<br />
Centre<br />
Directorate<br />
KPA 4: MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT<br />
Debtors Management<br />
330015 N/A MFVM01 Billing Data Cleanup Own Funds 400 000 1 000 000 500 000<br />
Office<br />
Debtors Management<br />
Meter Tampering Audit (Electricity &<br />
330015 N/A MFVM01<br />
Own Funds 2 000 000 3 000 000 1 500 000<br />
Office<br />
Water) - Municipal Services<br />
Budget Office 315005 N/A MFVM03 Budget Reforms FMG 1 500 000 1 500 000 1 500 000<br />
Budget Office 315005 N/A MFVM06 Accounting Reforms Project Own Funds 720 000 720 000 720 000<br />
KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION<br />
Strategic Support 105025 N/A MTOD03 IT Business Process Re-engineering Own Funds 1 000 000 3 000 000 0<br />
Public Relations &<br />
Ward Committee meetings (Out of<br />
120010 N/A GGPP09<br />
Own Funds 3 000 000 3 000 000 3 000 000<br />
International Events<br />
Pocket Expenses)<br />
Office of the Municipal<br />
205005 N/A GGPP07 Intergovernmental Relations Own Funds 50 000 80 000 80 000<br />
Manager<br />
Special Programmes 105030 N/A GGPP12 Municipal Bursaries Own Funds 1 200 000 1 200 000 1 200 000<br />
Office of the Municipal<br />
205005 N/A GGPP05 Documentation of case studies Own Funds 300 000 300 000 300 000<br />
Manager<br />
Office of the Municipal<br />
205005 N/A GGPP12 MDG Framework Rollout Own Funds 100 000 100 000 100 000<br />
Manager<br />
Office of the Municipal<br />
205005 N/A GGPP01 Risk Assessment Own Funds 200 000 200 000 200 000<br />
Manager<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
30<br />
205005 N/A MFMV06 Audit Turnaround Plan Own Funds 6 000 000 8 000 000 8 000 000<br />
205005 N/A GGPP01 Combined Assurance Model Own Funds 3 500 000 3 000 000 3 000 000<br />
Office of the Municipal<br />
Manager<br />
Office of the Municipal<br />
Manager<br />
“a <strong>City</strong> Growing with you”
6.5 MAJOR PROJECTS FOR 2012-15<br />
2012-2015<br />
DRAFT<br />
CAPITAL<br />
BUDGET<br />
SOURCE<br />
OF<br />
FUNDING<br />
PROJECT NAME<br />
Reeston Phase 3 Stage 2 -P1 & P3 USDG 31,500,000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
Mdantsane Zone 18 CC Phase 2 - P1 & P3 USDG 27,343,400<br />
Manyano & Thembelihle Phase 2 - P1 & P3 USDG 8,200,000<br />
Second Creek (Turn Key) - P1 & P3 USDG 8,100,000<br />
Block Yard TRA - P 1& P3 USDG 1,000,000<br />
DVRI PILOT PROJECT (Mekeni, Haven Hills, Competition Site) P1 & P3 USDG 2,500,000<br />
Cluster 1 (Chris Hani, Ilinge, Mahlangu Village, Sisulu Village, Winnie Mandela, Deluxolo Village & Francis Mei) P1 & P3 USDG 24,701,823<br />
Cluster 2 (Masibambane, Masibulele, Velwano, Gwentshe Village, Mathemba Vuso) P1 & P3 USDG 15,424,800<br />
Cluster 3 (Fynbos Informal 1, Fynbos Informal 2, Ndancama) P1 & P3 USDG 32,892,525<br />
Sunny South - P1 & P3 USDG 3,600,000<br />
Potsdam Ikhwezi Block 1 - P1 & P3 USDG 2,415,950<br />
Potsdam Ikhwezi Block 2 - P1 & P3 USDG 2,415,950<br />
Potsdam Ikhwezi Block 2- P1 USDG 2,415,950<br />
Potsdam North Kanana - P1 USDG 2,415,950<br />
Amalinda Co-op P1 & P3 USDG 2,757,312<br />
Amalinda Fairlands P1 & P2 USDG 2,757,312<br />
Dacawa P4 USDG 2,960<br />
Fynbos Informal 1-P4 USDG 27,488<br />
31<br />
“a <strong>City</strong> Growing with you”
2012-2015<br />
DRAFT<br />
CAPITAL<br />
BUDGET<br />
SOURCE<br />
OF<br />
FUNDING<br />
PROJECT NAME<br />
Fynbos Informal 2-P4 USDG 210,230<br />
Ilinge-P4 USDG 118,087<br />
Ilitha - Eradication of Wooden Houses to Formal Houses USDG 400,000<br />
Masibambane-P4 USDG 20,038<br />
Masibulele-P4 USDG 20,553<br />
Mdantsane Zone 18 CC Phase 2-P4 USDG 256,425<br />
Ndacama-P2 USDG 160,000<br />
Ndacama-P4 USDG <strong>13</strong>8,308<br />
Sisulu Village-P4 USDG 19,636<br />
Sunny South-P4 USDG 112,7<strong>13</strong><br />
Velwano-P4 USDG 81,999<br />
Winnie Mandela-P4 USDG 38,535<br />
Amalinda (Co-op) - P2 (EIA) USDG 200,000<br />
Fynbos Informal 1-P2 USDG 120,000<br />
Fynbos Informal 2-P2 USDG 110,000<br />
Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100,000<br />
Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100,000<br />
Potsdam North Kanana - P2 (EIA) USDG 100,000<br />
Potsdam Village Rural Phase 1 & 2 - P2 (EIA) USDG 100,000<br />
Amalinda Fairlands Projects - P2 USDG 435,000<br />
Potsdam Unit P Stage 2 - P4 USDG 3,000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
32<br />
“a <strong>City</strong> Growing with you”
2012-2015<br />
DRAFT<br />
CAPITAL<br />
BUDGET<br />
SOURCE<br />
OF<br />
FUNDING<br />
PROJECT NAME<br />
Second Creek P4 USDG 3,000<br />
Dacawa P4 USDG 800,000<br />
HOUSING 174,118,944<br />
Development of the BCMM Roads Masterplan 8,000,000<br />
Mdantsane Roads USDG 265,903,392<br />
West Bank Restitution USDG 53,000,000<br />
Quenera Main Roads USDG 5,000,000<br />
BCMM Roads Upgrade USDG 110,000,000<br />
Rehabilitation of Rural Roads Upgrade USDG 45,000,000<br />
ROADS 486,903,392<br />
Nord Avenue Pump station USDG 4,000,000<br />
Quinera Treatment Works USDG 19,000,000<br />
Waste Water Treatment Capacity (Zwelitsha) USDG 116,000,000<br />
Reeston Phase 3 Bulk Services Sewer USDG 50,000,000<br />
Bufferstrip Sanitation - Mdantsane USDG 1,108,250<br />
Mdantsane Sewers - Refurbishment USDG 17,000,000<br />
Diversion of Amalinda and Wilsonia effluent to Reeston USDG 80,000,000<br />
Inland Rural Sanitation - (Coastal Midland & Inland) USDG 103,208,000<br />
Eastern Beach Sewers USDG 45,000,000<br />
Sludge Handling Facility USDG 9,000,000<br />
KWT and Bhisho Infrastructure (Water) USDG 64,000,000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
33<br />
“a <strong>City</strong> Growing with you”
2012-2015<br />
DRAFT<br />
CAPITAL<br />
BUDGET<br />
SOURCE<br />
OF<br />
FUNDING<br />
PROJECT NAME<br />
Relocation of Midblocks in Mdantsane USDG 15,000,000<br />
Amahleke Water Supply USDG 9,000,000<br />
SEWERAGE 532,316,250<br />
Augmentation of Water Treatment Capacity - Umzonyana/Raising Upper weir USDG 56,000,000<br />
Upgrade water networks in terms of densification and augmentation USDG 38,000,000<br />
Bulk Water Supply Newlands and Other Areas USDG 1,000,000<br />
Ward 33 Bulk Water Supply Scheme USDG 3,000,000<br />
Bulk Water Supply Coastal Areas USDG 6,276,293<br />
Winterstrand Water Supply USDG 1,000,000<br />
WATER 105,276,293<br />
Mdantsane Township Establishment USDG 1,100,000<br />
ITP implementation USDG 9,000,000<br />
Taxi Ranks USDG 80,000,000<br />
Gonubie Main Road USDG 60,000,000<br />
N2/R72 link road survey USDG 26,200,000<br />
TRANSPORT PLANNING 176,300,000<br />
BCM Urban Agriculture Infrastructure Development USDG 8,000,000<br />
Economic Development Infrastructure (Heritage Route Development; Rollout of Informal Traders Stalls) USDG 62,254,978<br />
Economic Infrastructure Programme USDG 11,845,200<br />
LED 82,100,178<br />
Development of Community Parks(Mdantsane, Potsdam, Reeston) USDG 10,000,000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
34<br />
“a <strong>City</strong> Growing with you”
2012-2015<br />
DRAFT<br />
CAPITAL<br />
BUDGET<br />
SOURCE<br />
OF<br />
FUNDING<br />
PROJECT NAME<br />
Development and Upgrading of Cemeteries(Inland, Midland and Coastal) USDG 37,040,943<br />
Development and Upgrading of Community Halls USDG 54,000,000<br />
Sport & Recreation Facilities USDG 69,000,000<br />
COMMUNITY SERVICES 170,040,943<br />
Central Transfer Station (EL CBD) USDG 33,000,000<br />
Construction of a new cell - Roundhill Regional Landfill Site USDG 5,764,000<br />
Construction of Collection points Ward 10,5 &12 USDG 3,000,000<br />
Establishment of Central Transfer Station, Construction of Refuse Drop off Points, Establish and Upgrade<br />
USDG 17,000,000<br />
Garden Transfer Stations<br />
Construction of 4th Cell USDG 9,000,000<br />
REFUSE 67,764,000<br />
Coastal and Midland Infrastructure USDG 9,000,000<br />
KWT Fire Station USDG 6,000,000<br />
Tsholomnqa Fire Station USDG 15,500,000<br />
FIRE 30,500,000<br />
BCMM Integrated Development Plan<br />
Review • 2012 - 20<strong>13</strong><br />
35<br />
TOTAL MAJOR PROJECTS 1,825,320,000<br />
“a <strong>City</strong> Growing with you”
37<br />
XHOSA
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
ISIQULATHO<br />
Imbula mbethe nguMeya wesiGqeba 39<br />
Amagqabantshintshi nguMlawuli wesiXeko 41<br />
1. UMBONO, IMISHINI & NEXABISO LE-BCMM 43<br />
1.1 Umbono we-BCMM 43<br />
1.2 Imishini ye- BCMM 43<br />
1.3 Ixabiso elingundoqo kwi-BCMM 43<br />
2. YINTONI I-IDP? 44<br />
3. YINTONI UHLAHLO LWABIWO-MALI? 45<br />
4. INKQUBO YE-IDP ELANDELWAYO 46<br />
5. IDP INFORMANTS AND STRATEGIC FOCAL AREAS 49<br />
5.1 Umazisi we-IDP 49<br />
5.2 Iinjongo ezingundoqo zengcebo 49<br />
5.3 Imimandla yoqwalaselo kwingcebo 50<br />
6. 2012/<strong>13</strong> – 2014/15 UHLAHLO MALI LWE-MTREF 55<br />
6.1 Isishwankathelo sohlahlo mali sezinto zexesha elide 55<br />
6.2 Ushwankathelo kuhlahlo mali lwemali yokusebenza 56<br />
6.3 Iiprojekthi zokusebenza zika-2012/<strong>13</strong> – 2014/15 58<br />
6.4 IiProjekthi zokusebenza zika-2012/<strong>13</strong> -2014/15 65<br />
6.5 Iiprojekthi ezinkulu zika- 2012-15 74<br />
38 “Isixeko esikhula kunye nawe”
IMBULA MBETHE NGUMEYA WESIGQEBA<br />
Utshintsho kunye nokushenxa kwemiba yokuhlala noqoqosho<br />
kwimpilo ye-<strong>Buffalo</strong> <strong>City</strong> iye yafuna ukuba kwakhona<br />
kwenziwe ulungiso kwengcebo kwiinkqubo zophuhliso<br />
kunye nezo zokuhanjiswa kweenkonzo kunye neenjongo,<br />
injongo ikukuqinisekisa ukuba ezi nkqubo zikhawulelana<br />
neemfuno eziphindwe zahlelwa zabo babandakanyekayo<br />
kunye noluntu.<br />
Ukuphelisa oku, kuye kwayimfuneko ukuba kuphindwe<br />
kujongwe isiCwangciso esiHlangeneyo sesiXeko esiMbaxa,<br />
ukuphonononga izalathiso zophuhliso lwethu kunye<br />
nemigomo kuNyaka-mali ka-2012/20<strong>13</strong>.<br />
Umxholo wolu xwebhu lophononongo lwe-IDP lukhokelwa ziimbono ezintsha nezivelayo<br />
kunye neemfuno zabantu be-<strong>Buffalo</strong> <strong>City</strong>, zichazwe kwiintlanganiso ezenziwe kuluntu kwiindawo<br />
ezohlukeneyo kwakunye nabo babandakanyekayo ababethe babizelwa le njongo.<br />
Siya kholelwa ukuba, njengenqanaba likaRhulumente elikufutshane ebantwini, sinoxanduva<br />
olucacileyo lokuba masiphendule ngqo, ngokukhawuleza kwanangokulungileyo kwiimfuno<br />
nakwiingxaki zababandakanyekayo kunye noluntu.<br />
Xa kusithiwa dakaca uxwebhu loPhononongo lwe-IDP, ngoko, ndifuna ukubulela uluntu lwe-<br />
<strong>Buffalo</strong> <strong>City</strong> ngokusabela ngokungenamikhinqi kwikhwelo nokunceda iBhunga lesiXeko esiMbaxa<br />
ekuhleleni umbono wayo wophuhliso kunye nokuhanjiswa kweenkonzo kwisixeko<br />
kunye noluntu lwayo olwahlukeneyo. Besingasayi kuphumelela iinjongo zethu ukuba ibingekuko<br />
ukudlamka nokuthatha inxaxheba koluntu lwethu kwinkqubo yokwalatha indlela<br />
nokulawula isatya kwiinkqubo neeprojekthi zophuhliso.<br />
Imimandla yengcebo engundoqo ekolu Phononongo lwe-IDP kuquka ukuhlengahlengiswa<br />
kweziko kunye nozinzo, ukudalwa kwemisebenzi, ukwakha uluntu oluzinzileyo, ukuvala<br />
isikhewu sezobuchwephesha, ukuphuculwa korhulumente kunye nozinzo kwezezimali<br />
nokwakha ukuzithemba kubemi.<br />
Eli xwebhu luveza elubala iiprojekthi ezithile kunye neenkqubo emazenziwe. Oku kuquka,<br />
kwezinye, amalungiselelo okwakhiwa kwezindlu, ukufakelwa kombane kunye namanzi kwiindawo<br />
zokuhlala ezingamatyotyombe, izakhono kunye neenkqubo zophuhliso zamacandelo<br />
ukunceda kunye nokugcina uphuhliso loqoqosho, kunye nokusekwa kwemeko evumayo<br />
yokusingqongileyo kumaqela angakwazi kuzenzela nto ukuze azuze kwimbono zentlalo noqoqsho<br />
zikaMasipala oMbaxa.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
39<br />
“Isixeko esikhula kunye nawe”
Xa ndiqukumbela, ndifuna ukuphinda ndinikele kwakhona kwiinzame ezihlangeneyo<br />
zeenkokheli zezopolitiko kunye nolawulo loMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> kumsebenzi<br />
wokwanelisa iimfuno zoluntu kanye kwizinto ezibalulekileyo zesizwe ekuzameni ukudalwa<br />
ubomi obungcono kubantu bethu bonke.<br />
ZUKISWA NCITHA<br />
UMeya wesiGqeba<br />
UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong><br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
40<br />
“Isixeko esikhula kunye nawe”
AMAGQABANTSHINTSHI NGUMLAWULI WESIXEKO<br />
UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uthe wagqiba unyaka-mali<br />
wakhe wokuqala njengomasipala ombaxa,<br />
ethe waphumelela ukuba kudidi ‘A’ okanye umgangatho<br />
wokuba Mbaxa ngoMeyi ka-2011, kanye emva konyulo<br />
lukaRhulumente waseKhaya.<br />
Ezi nyanga zilishumi elinambini (12) zokugqibela zithe<br />
zaphawulwa ngokungenakunqandeka ziinxaxheba zotshintsho<br />
ezibalulekileyo ezinjonga zazo ekubekeni isiseko<br />
esitsha somasipala ombaxa. Umasipala uye wabona ukumiselwa<br />
kweenkokeli ezintsha kwezopilitiko kwisiseko<br />
seBhunga lomthetho nakwelolawulo. Umasipala ombaxa<br />
uthe wenza unyulo lweewadi kunye nokusekwa kweekomiti<br />
zeewadi kuzo zonke iiwadi ezohlulwe ngokutsha ezingama-50. Ngokuhambelana nemimiselo<br />
yoMthetho weZiseko zikaMasipala ka-1998, uMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uthe<br />
wadibanisa iinkokheli zemveli ezingamashumi amabini (20) kwiBhunga likaMasipala.<br />
Xa ujonge ngakwicala lengcebo, umasipala ombaxa uthe wathathela kuye isiCwangciso soHlanganiso<br />
soPhuhliso sika-2011-2016 ngomhla wama-30 Juni ka-2011. Amalungiselelo esi<br />
sicwangciso athi enziwa liBhunga elingaphambili. Nangona kunjalo, inkqubo yophononongo<br />
ethe yenziwa kwisiqingatha sokugqibela sonyaka ka-2011 kunye nokuqala kuka-2012 senze<br />
kwalula ukuba iBhunga elitsha likwazi ukuqwalasela kwakhona imbono yengcebo echazwe<br />
kwi- IDP yangaphambili eyayamkelwe.<br />
Inkqubo yophononongo ka-2012/<strong>13</strong> ye-IDP ithe yakhokelwa zezi mpawu kunye neenxaxheba<br />
ezifana nemiba ebalulekileyo yeBhunga; imiba ebalulekileyo ye-Mayoral Lekgotla; imiba<br />
ebalulekileyo yeWadi; iziPhumo ezili-12 zikaRhulumente; iziPhumo ezisi-7 kwiziphumo ezili-9<br />
kuRhulumente waseKhaya; Uyilo lwesiCwangciso seSizwe soPhuhliso esenziwe yiKhomishini<br />
yoCwangciso yeSizwe; iiMigomo yoPhuhliso yeNkulungwane; isiCwangciso sokuKhula<br />
kwePhondo kunye noPhuhliso; kunye nemMbono yeSizwe yoPhuhliso lweeNdawo<br />
UPhononongo olwenziweyo lungqina iinjongo ezintandathu (6) zebhunga ngale ndlela ilandelayo:<br />
1. Ukuze ibe liziko elinemali ngokufanelekileyo elikwaziyo ukulawula iziseko zayo<br />
ngokufezekileyo;<br />
2. Ukuba liziko lesiXeko elifezekileyo neliphunyeziweyo elithi liquke imisebenzi kunye noluntu;<br />
3. Ukudala imo yokusingqongileyo elungele ezoqoqosho olukhulayo, oluhlukeneyo, nokwandisa<br />
amathuba emisebenzi eyandayo kunye nokuba negalelo ekwandiseni imivuzo<br />
kunye nolingano;<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
41<br />
“Isixeko esikhula kunye nawe”
4. Ukunikezela ngezakhiwo ezilondolozekayo ezixhasa uphuhliso lwentlalo kunye noqoqosho;<br />
5. Ukuba liziko elimile ngendlela nelikwaziyo ukusebenza linikezela ngeenkonzo ezifezekileyo<br />
neziphunyeziweyo kubo bonke abntu ngowe-2016;<br />
6. Ukukhulisa nokukhusela zonke ii-asethi zokusingqongileyo kunye neziseko zendalo ku-<br />
Masipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> ngowe-2016.<br />
Uphononongo luthe lwachonga le mimandla engqalileyo yengcebo ukuba ifakwe kwaye ilungelelwaniswe<br />
ne-IDP<br />
1. Ukuhlengahlengiswa kweziko kunye noZinzo<br />
2. Ukuphuculwa koBudlelwana phakathi kooRhulumente<br />
3. Ukwakha iNgqiniseko kubemi<br />
4. Ukuvala umsantsa kwezobuchwephesha<br />
5. Ukuphucula indlela yokusebenza, ukuhambelana nomthetho, iinkqubo kunye neemixokelelwano<br />
6. Ukwakha uLuntu oluZinzileyo<br />
7. Ukudala imisebenzi<br />
8. Ukuphuculwa kuRhulumento<br />
9. Uzinzo kwezeziMali<br />
Iinkqubo, iiprojekthi kunye neenxaxheba zikamasipala kunyaka-mali ka-2012/<strong>13</strong> zithe<br />
zalungelelwaniswa kwezi njongo zingentla zengcebo kunye nemimandla engundoqo<br />
yengqwalaselo. Inkqubela yomasipala ombaxa ekujongeni imiba ebalulekileyo yeBhunga<br />
kunyaka-mali iya kuthi ichazwe kwiingxelo zenyanga, zekota, zaphakathi enyakeni kunye<br />
nakwezo zonyaka ngokwemiqathango yoMgaqo-nkqubo nesiKhokelo sokuSebenza kweBhunga<br />
kunye nezinye iingxelo ezimayela nokulandelwa komthetho.<br />
UMasipala oMbaxa uyazama ukuphendula iimfuno zokuhanjiswa kweenzkono kuluntu kunye<br />
nokuqinisekisa ukuphumelela okuhlangeyo kwenkqubo yeBhunga kuhanjiso lweenkonzo<br />
njengoko kuchaziwe kwisiCwangcso esiPhononongiweyo esiHlangeneyo soPhuhliso sika-<br />
(2012/<strong>13</strong>).<br />
A. FANI<br />
Umlawuli wesiXeko<br />
UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong><br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
42<br />
“Isixeko esikhula kunye nawe”
1. IMBONO, IMISHINI KUNYE NEXABISO LE-BCMM<br />
1.1 UMBONO WE-BCMM<br />
Ngeeseshini zocwangciso-ngcebo abalawuli bakamasipala bathe bahlalutya umbono kunye<br />
nemishini yeziko ukuba ibe yethathe unyawo, yeqondekayo kwaye inyaniseke, oko kwenze<br />
ukuba ibe sisixhobo esisebenzisekayo ekukhokeleni iintshukumo zesiXeko, abami baso<br />
kunye nababandakanyekayo abangundoqo kwinkqubo yophuhliso.<br />
Imbono kaMasipala oMbaxa we- <strong>Buffalo</strong> <strong>City</strong> kukuba:<br />
“kukusabela, engqale ebantwini kunye nokuphuhliso lwesiXeko”<br />
1.2 IMISHINI YE-BCMM<br />
Ekuqondeni imbono kaMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uyazama ukuba abesisiXeko esi:<br />
• Khuthaza imo yorhulumento olulungileyo;<br />
• Inika iinkonzo zikamasipala ezifezekileyo neziphunyeziweyo;<br />
• Ukuxhobisa kuphuhliso kunye nolondolozo lwabasebenzi ukuba banikezele ngenkonzo<br />
kwisiXeko nakuluntu;<br />
• Ukukhulisa uphuhliso loluntu kunye noqoqosho olulinganayo;<br />
• Ukuqiniseka ulondolozeko lukamasipala kunye nokuzinza kwizimali;<br />
• Ukudala imo yokusingqongileyo ekhuselekileyo kunye nesempilweni; kunye<br />
• Nokusebenzisa iinqobo zikaBatho Pele zibe sembindini wokuhanjiswa kweenkonzo<br />
1.3 IXABISO ELINGUNDOQO KWI-BCMM<br />
UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uxhasa lamaxabiso nokuzinikela kulandelayo ekusebenzeleni<br />
nasekunikeni iinkonzo kuluntu ngendlela ehambelanayo:<br />
(i) Ubulungisa<br />
(ii) URhulumento oLulungileyo<br />
(iii) Ukucaca gca ebala<br />
(iv) Ukuba noxanduva<br />
(v) Okufanelekileyo kunye noLingano<br />
(vi) Ubuchule<br />
(vii) Intembeko<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
43<br />
“Isixeko esikhula kunye nawe”
(viii) Unikelo lwenkonzo ngokugqwesileyo<br />
(ix) Imbeko kwiyantlukwano kwinkcubeko<br />
(x) Umanyano kwinjongo<br />
(xi) Ubuntu<br />
2. YINTONI I-IDP?<br />
Ngokwemiqathango yoMthetho weeNkqubo zikaMasipala nomb. 32 ka-2000 (njengoko<br />
ulungisiwe) i-IDP ichazwa njengesicwangciso sengcebo esithi sikhokele lonke uphuhliso<br />
lukamasipala esiXekweni. Sisixhobo esingundoqo esithi sazise umasipala ukuba asebenzele<br />
ukuphumelela iinjongo zakhe zophuhliso njengoko zithiwe dakanca kuMgaqo siseko.<br />
Iqulathe imbono yexesha elide. Ithi ichaze banzi ngemiba ebalulekileyo yophuhliso kunye<br />
neenjongo ezithi zibe negalelo ekuphumeleleni le mbono. Ithi iveze iingcebo ezithe zachazwa<br />
kuhlahlo lwabiwo-mali, olumele ukuba lwayanyaniswe ne-IDP.<br />
I-IDP ethe yamkelwa liBhunga likaMasipala sisixhobo esingondoqo kwisicwangciso sengcebo<br />
esithi sikhokele zonke izigqibo zocwangciso kunye nophuhliso kummandla kamasipala.<br />
ICandelo lama-34 loMthetho weeNkqubo zikaMasipala uchaza ukuba i-IDP imele<br />
ukuphononongwa rhoqo ngonyaka ngovavanyo lwemilinganiselo yokusebenza kwayo de<br />
kube kwinqanaba lokujika imeko xa kuyimfuneko. IBhunga kufuneka ukuba libhale phantsi,<br />
inkqubo emayilandelwe kuphononongo lwe-IDP. Isicwangciso seNkqubo kumele siquke:<br />
• Inkqubo echaza amaxesha amiselweyo.<br />
• Isikhokelo seenkqubo kunye neendlela zokusebenza kucetyiswano.<br />
• Ukuchongwa kwezicwangciso kunye neemfuno-zicwangciso ezibophelela uMasipala.<br />
• Iinkqubo ze-IDP kunye noHlahlo lwabiwo-mali/ iinkqubo zilungelelaniswe.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
44<br />
“Isixeko esikhula kunye nawe”
Uphononongo lwe-IDP ejonge unyaka ka-2012/20<strong>13</strong> lwenziwa njengenxalenye yesicwangciso<br />
somjikelezo oqhubayo, ukuphunyezwa kunye nokuhlowa njengoko kubonisiwe akulo Mboniso<br />
ungezantsi.<br />
ULAWULO LOKUSEBENZA<br />
UPHUNYEZO LWE-IDP<br />
Umboniso A.1: Inkqubo ye-IDP yoPhuhliso<br />
1. UKULUNGISELELA UKUQWLASELA I-IDP<br />
2. UHLOLO & NOKUNIKA IXABISO –<br />
UHLALUTYO OLUHLAZIYIWEYO<br />
3. IINJONGO EZIHLELIWEYO, IINGCEBO, IZALATHISO<br />
& IPROJEKTHI & IINKQUBO (ZIHLANGANISIWE<br />
KUHLAHLO LWABIWO MALIUDGET)<br />
4. UKUHLANGANISA I-IDP<br />
(KUQUKA IZICWANGCISO ZOKUSEBENZA)<br />
5. UKUVUNYWA – IBHUNGA LAMKELA I- IDP &<br />
NOHLAHLO LWABIWO-MALI<br />
3. YINTONI UHLAHLO LWABIWO-MALI?<br />
Uhlahlo lwabiwo-mali siscwangciso esithi sishwankathele ngokwezezimali iinxaxheba<br />
ezicwangcisiweyo kunyaka mali ozayo ngokuseka inkcitho-mali eya kuthi yenziwe xa<br />
kusenziwa imisebenzi kunye nengeniso neemfuno zemali yokusebenza kuhlawulwa inkcitho.<br />
Kukho iindidi ezimbini zohlahlo mali: uhlahlo mali lwemali yokusebenza kunye nohlahlo mali<br />
lwenkcitho-mali enkulu.<br />
UHlahlo mali lwenkcitho-mali kwizinto zexeshana ibandakanya ukuthengwa kwezinto<br />
neenkonzo zona ziya kusebenza ixeshana. Iindleko zokusebenza ezifana nemivuzo,<br />
izibonelelo, ukulungiswa kwezinto ezonakeleyo kunye nokulondolozwa kwazo, iminxeba<br />
kunye nemathiriyeli.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
45<br />
INTATHO-NXAXHEBA YOLUNTU<br />
“Isixeko esikhula kunye nawe”
Imali yenkcitho kwizinto zexeshana ifunyanwa kwimali eziinkozo kwii-akhawunti zikamasipala<br />
ezifana nokuhlawulwa kwamanzi, umbane, iireyithi kunye nezinye iinkonzo.<br />
Uhlahlo mali lokuthenga izinto zexesha elide lubhekise kwinkcitho ekuthengeni izinto ezihlala<br />
ixesha elide kunye notyalo-mali kwizinto ezifana nomhlaba, izakhiwo, iinqwelo, iplanti kunye<br />
nezixhobo kanye nefenitshala njl njl. Ithi ishwankathele inkcitho kwizinto ezi zakuthi zisebenze<br />
kudlule kunyaka mali omnye. Kuquka ukulungiswa kweendlela, izakhiwo kunye neenqwelo.<br />
Indlela elula yokwahlula phakathi kwezi ndlela zohlahlo mali kukucinga ngokuthenga inqwelo.<br />
Inqwelo yinkcitho enkulu kuba kunqwenelwa ukuba ingasebenza ngaphezulu konyaka<br />
omnye. Amafutha okuhambisa le nqwelo kunye nokuyigcina isemgangathweni ziindleko<br />
zexeshana ezo ngoko zona zingena kuhlahlo mali lokusebenza ixeshana.<br />
Kurhulumente wasekhaya ophuhlayo, i-IDP kunye noHlahlo mali mazihlanganiswe kwaye<br />
ziphononongwe rhoqo ngonyaka ukuqinisekisa ukuba uhlanganiso kunye nokuvuma koluntu<br />
kwinkqubo yesiXeko.<br />
UHLAHLO MALI 2012/<strong>13</strong> – 2014/15<br />
Uhlahlo mali<br />
lwezinto zexeshana<br />
uhlahlo mali<br />
lwezinto zexesha<br />
elide<br />
isixa mali sohlahlomali<br />
2011/12<br />
M/Y UHLENG<br />
LOHLAHLO MALI<br />
R000<br />
2012/<strong>13</strong><br />
R000<br />
46<br />
20<strong>13</strong>/14<br />
R000<br />
2014/15<br />
R000<br />
3,448,368,587 3,966,637,294 4,453,7<strong>13</strong>,893 4,924,341,303<br />
725,646,383 749,097,271 879,840,714 876,057,416<br />
4,174,014,970 4,715,734,565 5,333,554,607 5,774,398,719<br />
4. INKQUBO YE-IDP ELANDELWAYO<br />
ICandelo lama-28 (1) oMthetho weeNkqubo zikaMasipala ufuna ukuba umasipala ngamnye<br />
avume inkqubo ngokubhaliweyo ukuba ikhokele ucwangciso, uyilo kunye nophononongo<br />
kwesicwangciso sayo esihlangeneyo sophuhliso. Xa kulandelwa umthetho kule mfuno<br />
uMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uvume esi isicwangiso ngoma-26 Oktobha 2011.<br />
Iinxaxheba ezingundoqo ezithe zenziwa ngokuhambelana nophononongo lwe-IDP/ noHlahlo<br />
mali ukuya kunyaka ka-2012/<strong>13</strong> kuquka oku kulandelayo:<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
“Isixeko esikhula kunye nawe”
• 11 Oktobha ka-2011 – Kwenziwa ucweyo kunye nooCeba be-BCMM kunye nabaLawuli<br />
abaphezulu. Injongo yolo cweyo, lwalubandakanya, ukucazulula kwesicwangciso esiHlangenyo<br />
soPhuhliso kunye nokunika isikhokelo kwindima yooCeba, iiKomiti zeWadi<br />
kunye nabanye ababandakanyekayo; ukuchazwa kwenkqubo yophononongo ye-<br />
IDP/uHlahlo mali/i-PMS kunyaka mali ka-2012/<strong>13</strong> kunye nokuhlumisa imvisiswano<br />
ngenkqubo kwanokuqala inkqubo yokuchongwa imiba ebalulekileyo yeewadi eza<br />
kuthi kukhokele uphononongo lwe-IDP/uHlahlo mali/i-PMS luka-2012/20<strong>13</strong>.<br />
• 26 Oktobha ka-2011 – IBhunga lavuma iNkqubo yesiCwangciso se-IDP/uHlahlo mali/<br />
i-PMS ka-2012/<strong>13</strong>;<br />
• 4 Novemba ka-2011 – IForam yebammeli bangaphandle be-IDP/uHlahlo mali/i-PMS<br />
yaba nentlanganiso eyayenzelwe ukuqwalasela ukusebenza kweziko kunyaka mali<br />
odlulileyo kunye nokulungiswa kwababandakanyekayo bangaphandle kwinkqubo<br />
yophuhliso lwe-IDP ezayo;<br />
• 11 kunye 14 November ka-2011 – Intlanganiso ye-IDP/uHlahlo mali/i-PMS yeQela<br />
lokuSebenza ngobuChule yenziwa, apho iitshatsheli zesicwangciso secandelo zathi<br />
dakaca isishwankathelo zesicwangciso zalo ngenjongo yokuchonga ulwazi olu kuza<br />
kunceda kwimeko yokuhlalutywa kwesigaba.<br />
• Amaqela okuSebenza eNgcebi ye-IDP athi abize iintlanganiso ngenjongo zokuxoxa<br />
kwaye kugqitywe imeko yeengxelo zohlalutyo lwemeko. Ezo ntlanganiso zenziwa<br />
ngale ndlela:<br />
* EyeziMali kunye neeNkonzo zokuXhasa: 23 Novemba ka-2011<br />
* Iinkonzo zikaMasipala: 25 Novemba ka- 2011<br />
* IsiCwangciso soPhuhliso kunye noLawulo: 30 Novemba- 2011<br />
* Uququzelelo loPhuhliso kunye neNtsebenziswano: 20 Desemba- 2011<br />
• 28 Novemba ka- 2011 – Iseshini yoBuchule kubuDlelwane boRhulumente<br />
oHlangeneyo ithe yenziwa sisiXeko kunye namasebe ephondo nawesizwe kunye<br />
namaqumhru oluntu ukuba angenele kwintsebenziswano yocwangciso kunye<br />
nokwabelana ngolwazi malunga namaphulo athi enziwe kummandla kamazipala;<br />
• 19-21 Februwari ka- 2012 – I-Mayoral Lekgotla yenziwa ukuqwalasela uhlalutyo<br />
lwemeko yesiXeko kunye nokwandlala indlela eya phambili mayela nemiba<br />
ebalulekileyo yengcebo eza kuthi ikhokele uphononongo lwe-IDP kunye noHlahlo<br />
mali ukuya kunyaka mali ka-2012/<strong>13</strong><br />
• 11-<strong>13</strong> Matshi ka-2012 – Iseshini yobuChule yoCwagciso yenzelwa uku:<br />
– Ukuveza ingxaki kuphuhliso olukhawulezileyo loMasipala oMbaxa<br />
– Ukulungelelanisa umyalelo wepolitiki (izimvo zeLekgotla) kunye neenjongo<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
47<br />
“Isixeko esikhula kunye nawe”
zengcebo ukuze kuphendulwe kwimingeni yoMasipala oMbaxa<br />
– Ukuqinisekisa ulungelelwaniso lwesicwangciso phakathi kwe-BCMM kunye<br />
namanye amanqanaba karhulumente;<br />
– Ukuhluza imimandla engundoqo yengcebo kunyaka-2012 kunye nangaphaya<br />
eyakuthi ikhokele indlela yophuhliso kuMasipala oMbaxa.<br />
• 23 Matshi ka-2012: Iseshini yooCeba ye-IDP/uHlahlo mali eyayenziwe e-Regent Hotel<br />
kuqwalaselwa uyilo loHlalutyo lweMeko ye-BCMM, iziPhumo ze-Mayoral Lekgotla<br />
kunye neSeshini yobuChule yoCwangciso, uyilo lwe- IDP 2012/<strong>13</strong> kunye noHlahlo<br />
mali lwe-MTREF<br />
• 28 Matshi ka- 2012 – Ukuthiwa dakaca kwiBhunga uyilo luka-2012/<strong>13</strong> loPhononongo<br />
lwe- IDP kunye nokuvunywa kwe-MTREF ka-2012/<strong>13</strong>;<br />
• 16-17 Epreli ka-2012: Iseshini yooCeba ne-IDP/noHlahlo mali kuqwalaselwe uyilo<br />
lwe-IDP/uHlalo mali kunye noMboniso oCetywayo we-IDP/noHlahlo mali.<br />
• 23-30 Eprili ka-2012 – Imiboniso ye-IDP/noHlahlo mali yenziwa kwiindawo ezilishumi<br />
elinesihlanu kuMasipala oMbaxa.<br />
• 4 Meyi ka-2012 – Isidlo sakusasa esimayela noshishino saye senziwa ukuba<br />
kuthethwane nababandakanyekayo kummandla wezoshishino kuyilo lwe-IDP<br />
2012/<strong>13</strong> kunye noHlahlo mali lwe-MTREF.<br />
• 25 Meyi ka-2012 – Usuku oluVuleleke kuwonke wonke leBhunga kunikwa ingxelo<br />
kwababandakanyekayo abangaphandle ngeziphumo zeMiboniso ye-IDP/uHlahlo<br />
mali.<br />
• 29 Meyi ka-2012 – Ukwamkelwa koPhononongo lwe-IDP ka-2012/<strong>13</strong> kunye noHlahlo<br />
mali lwe-MTREF.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
48<br />
“Isixeko esikhula kunye nawe”
5. UMAZISI WE-IDP KUNYE NEMIMANDLA<br />
YENGQWALASELA YENGCEBO<br />
5.1 UMAZISI WE-IDP<br />
Inkqubo ye-IDP yathi yenziwa ngokuhambelana nesikhokelo semigaqo-nkqubo nemithetho<br />
yesizwe, yephondo kunye neseeNgingqi. Uphononongo lwe-IDP/noHlahlo mali olujonge<br />
kunyaka ka-2012/<strong>13</strong> luthe lwaziswa kwaye lwaqwalasela ezi zinto zilandelayo:<br />
• Imiba ebalulekileyo yeWadi;<br />
• Imiba ebalulekileyo evela kwi-Mayoral Lekgotla eyebziwe nge-19-21 Februwari ka-<br />
2012;<br />
• IziPhumo zikaRhulumenye ezili-12;<br />
• IziPhumo zeSheshini yobuChule yoCwangciso eyenziwe nge-11-<strong>13</strong> Matshi ka- 2012;<br />
• Uyilo lwesiCwangciso seSizwe soPhuhliso esenziwe yi-NPC;<br />
• Imigomo yeNkulungwane yePhuhliso;<br />
• IsiCwangciso soKukhula kwePhondo kunye noPhuhliso; kunye<br />
• neMbono yeSizwe yeNdawo yoPhuhliso.<br />
5.2 IINJONGO EZINGUNDOQO ZENGCEBO<br />
Evela kuhlalutyo lwemeko oluthe lwenziwa xa kuphuhliswa i-IDP, uMasipala oMbaxa we-<br />
<strong>Buffalo</strong> <strong>City</strong> othe waqaphela inani lemingeni kunye neembopheleleko ezithi zibe nempembelelo<br />
ngendlela umasipala athi asebenze ngayo kwanokuzalisekisa umyalelo njengoko ubekiwe<br />
kwicandelo lama-152 oMgaqo-siseko woMzantsi Afrika. Imingeni ejongene noMasipala<br />
oMbaxa iquka ukwehla kwengeniso kunye nolawulo kakubi lweziseko, ukungafezeki okuthi<br />
kunciphise indlela isiXeko esithi sisebenzisane ngayo noluntu, izakhiwo ezidala kunye<br />
nokungagcinwa kakuhle, ukungafezeki kweziseko ezibangela imigangatho yokuhanjiswa<br />
kweenkonzo okungalunganga, ukukhula kancinci koqoqosho kunye nenqanaba elikhulu<br />
lokungafumani imisebenzi, ii-asethi zokusingqongileyo ezibuthathaka kunye neziseko<br />
zendalo.<br />
Ukujongana nemingeni echaziweyo kuze kusetyenzwe kukhawulelwana nokuqonda imbono,<br />
isiXeko sithe sachonga imimandla esixhenxe engqalileyo yengcebo yaze yaseka ezi njongo<br />
zengcebo zexesha elide:<br />
1.4.1 BCMM 1: ukuba liziko eliqingqayo kwizimali elithi lilawule isiseko zalo kakuhle;<br />
1.4.2 BCMM 2: ukuba liziko elifezekileyo leziphunyeziweyo lesiXeko esithi sisebenze<br />
kunye noluntu;<br />
1.4.3 BCMM 3: ukwenza imeko elungileyo kuqoqosho olukhulayo, olwahlunekenyo,<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
49<br />
“Isixeko esikhula kunye nawe”
ekukhuliseni inani elininzi labantu abasebenzayo kunye nokuba negalelo<br />
ekukhuliseni imivuzo kunye nolingano;<br />
1.4.4 BCMM 4: ukwakha izakhiwo ezilondolozekayo eziza kuxhasa uphuhliso loluntu<br />
kunye noqoqoqsho;<br />
1.4.5 BCMM 5: Ukumila ngendlela kunye neziko elikwaziyo ukusebenza lihambise iinkonzo<br />
ezifezekileyo neziphunyeziweyo kubo bonke abantu ukuya kutsho kunyaka<br />
ka-2016<br />
1.4.6 BCMM 6: ukukhuthaza kunye nokukhusela zonke ii-asethi kunye nesiseko zendalo<br />
ezikuMasipala oMbaxa we- <strong>Buffalo</strong> <strong>City</strong> kunyaka ka-2016.<br />
UMasipala oMbaxa ulungelelanisa iinjongo ezingundoqo zengcebo kwaye uya kuzama<br />
ukulandela indlela yemimandla emihlanu engundoqo karhulumente wasekhaya.<br />
5.3 IMIMANDLA YENGQWALASELA YENGCEBO<br />
Ukungalibali imeko yokusingqongileyo kwezoqoqosho kunye neemeko zehlabathi ezithe<br />
zaba nempembelelo kuphuhliso, isiXeko siye senza imida emikhulu ekujongeni imingeni<br />
kuphuhliso olungundoqo kumasipala. Ngoko, kukho umsebenzi omkhulu omawenziwe<br />
ekujongeni imimandla yengqwalaselo echongiweyo.<br />
Kule minyaka mihlanu izayo, isiXeko siza kujongana nemimandla elithoba yengqwalaselo<br />
yengcebo ethe yachazwa apha ngezantsi.<br />
5.3.1 Ukuhlenga hlengiswa kweziko kunye nozinziso<br />
UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> ngoku ujongene nenkqubo yohlangahlengiso nozinziso<br />
kulalwulo. Oku kuquka ukuzaliswa kwezithuba ezivunyiweyo kwisakhiwo esikhulu seziko<br />
o.k.t uMlawuli wesiXeko kunye nabaLawuli beCandelo lama-56.<br />
Injongo ephakathi ukuya kweyexesha elide kuMasipala oMbaxa ikhulisa imfezeko kwiziko<br />
ngokukhulisa abasebenzi kunye nokuseka iinkqubo ezibangela abasebenzi bakwazi<br />
ukusebenza ngemfezeko kwimisebenzi yabo kwaye ilungelelaniswe kunye nemisebenzi<br />
kaMasipala oMbaxa.<br />
5.3.2 Ukuphuculwa kobuDlelwane borhulumente ohlangeneyo<br />
ICandelo le-41 loMgaqo-siseko woMzantsi Afrika ka-1996 ubonisa iinqobo zorhulumnete<br />
lwentsebenziswano kunye norhulumento oluhlangenyo, oko kunika isikhokelo esibanzi<br />
sokuba bangasebenza njani amanqanaba karhulumente. ICandelo lesi-4 loMthetho nomb.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
50<br />
“Isixeko esikhula kunye nawe”
<strong>13</strong> ka-2005 wobuDlelwane boRhulumnete oHlangeneyo ugqitha uchaze ukuba injongo yalo<br />
mthetho kukunika isikhokelo kurhulumente wesizwe, owephondo nowasekhaya, kunye<br />
namaqumrhu esizwe kwabo rhulumente ukuba baququzelele uphunyezo lomgaqo-nkqubo<br />
kunye nomthetho. UMthetho uthi kwakhona ufune ukusekwa kweeforam zephondo kunye<br />
nezengingqi kurhulumente ohlangeneyo ukukhuthaza nokuququzelela i-IGR phakathi<br />
kwamaphondo, iingingqi kunye noomasipala.<br />
ICandelo lesi-loMthetho weeNkqubo zikaMasipala lama-32 ka-2000 (njengoko ulungisiwe)<br />
uthi uchaze ukuba urhulumente wasekhaya makaphuhlise iindlela zentsebenziswano<br />
kurhulumente, ekwabeleni ngeziseko kunye nasekusombululeni iingxaki kanye kubudlelwane<br />
borhulumente ohlangeneyo.<br />
Nangona kunjalo kule mithetho ingentla, ubudlelwane kurhulumente ohlangeneyo phakathi<br />
kwe-BCMM kunye namanqanaba karhulumente kubafuna ukujongwa ngeso elibanzi,<br />
njengoko kusekho iimpawu zokungaququzelelwa kakhulu:<br />
• Ulungelelaniso lwesicwangciso kunye nophunyezo;<br />
• INtsebenziswano kumanqanaba ahlangeneyo kunye noququzelelo;<br />
• Ukwabelana ngolwazi kwiinkqubo zophuhliso kunye neeprojekthi;<br />
• Ukuthatha inxaxheba kwiindawo ezifanele ukuba kubekho intsebenziswano; kunye<br />
• Nendlela yokudibana nothethwano noluntu.<br />
5.3.3 Ukwakha ingqiniseko kubemi<br />
Ukusebenza kakubi ngokwemiqathango yokuhanjiswa kweenkonzo, ulawulo kunye<br />
nokungazinzi kwezopolitiko, kunye nopapasho olungelulo kuthi kube nempembelelo embi<br />
kakhulu ekudaleni ukungaqiniseki kubemi kwesi siXeko.<br />
Ukubuyisela umva lo monakalo kwanokwakha kwakhona ukuqiniseka kubemi kuya kufuneka<br />
imizamo ehlangeneyo kuMasipala oMbaxa. Iya kufuna utyalo lwendlela entsha yomsebenzi<br />
kusebenza kubo bonke abo basebenzela umasipala kwanokusebenzisa urhulumento<br />
olulungileyo kwaneenqobo zolawulo, ukuzinikela kwanokusebenza ngobuchule.<br />
5.3.4 Ukuvala umsantsa kwezoChwephesha<br />
Umsantsa kwezobuChwephesha kubhekisele kukungalingani phakathi kwamaqela ekuhlaleni<br />
ngokufikelela, ukusetyenziswa, kwanolwazi kunye nonxibelelwano ngobuchwephesha.<br />
umsantsa kummandla kamasipala sithetha ngokungalingani phakathi kwabantu, emakhaya,<br />
kushishino kunye nakwiindawo zokuhlala kumanqanaba awohlukeneyo entlalo noqoqosho<br />
kunye neendawo zokuhlala, isini nobuhlanga. Kuba uMasipala oMbaxa ikakhulu ezele ziilali<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
51<br />
“Isixeko esikhula kunye nawe”
lo msantsa ubonakala kakhulu ngokwendlela ezimbini emaphandleni nasezidolophini mayela<br />
nokufikelela kunxibelelwano ngomnxeba kunye neenkqubo ze- IT.<br />
Injongo ephambili kukuqinisekisa ukuba unxibelelwano nomnxeba kunye neenkqubo<br />
ze-IT ziya lungelelana, kwaye kukho ufikeleleko kwinethiwekhi ebanzi kunye / okanye<br />
kubuchwephesha obukwinqanaba eliphezulu kubemi besiXeko kunye nommandla waso.<br />
5.3.5 Ukuphuculwa kwendlela yokusebenza, ukulandela umthetho, iinkqubo<br />
kunye neenkqubo nemixokelelwano<br />
Obunye ubuthathaka buthi bube nempembelelo embi kwindlela yokusebenza kuMasipala<br />
oMbaxa ngenxa yokungahambelani kwemixokelelwano, ulawulo olungaphakathi olungalunganga,<br />
ukusilela kwabasebenzi ekuxhotyisweni ngokusebenza, abasebenzi abathe sa kunye<br />
nokungachazwa kakuhle kweenkqubo kunye nezixhokelelwano zokusebenza.<br />
• Makwenziwe iindlela zokusebenza zokunika ingxelo ethe ngqo negqibeleleyo<br />
ngezimali njengoko kufunwa yi-NT kunye nemiGangatho yezoPhicotho zincwadi.<br />
• Makwenziwe iindlela zokuqiniseka ukuba iindlela zokusebenza zenziwa ngendlela<br />
kuhambelane neemfuno zomthetho.<br />
• Ukunika indlela yokuhanjiswa kweerekhodi kunye nokuthathwa kweerekhodi ngendlela<br />
enye yogcino ngokwemigangantho echazwe kuMthetho yokuGcina izinto ezindala<br />
kunye nokuqinisekisa ukuba iirekhodi ziya kwazi ukufumankea kwixa elizayo.<br />
5.3.6 Ukwakha uLuntu oluZinzileyo<br />
Ingqwalasela kule minyaka idlulileyo ibe yejonge ekuhanjiswa kweemfuno ezisisiseko kunye<br />
nezindlu. Ngaphandle komsebenzi ongekenziwa amanyathelo abanzi enziwe kulo mmandla,<br />
nangona kunjalo, kusekho umngeni omkhulu ngokubhekisele ekuqinisekiseni ukuba asakhi<br />
zindlu kuphela koko sidala izindlu ezihlangeneyo kwaye ezikwaziyo ukulondolozeka.<br />
Umngeni awukho ekubeni kufuneka kuziswe iinkonzo nezindlu kuphela, kodwa kusekubeni<br />
kwakhiwe iindawo zokuhlala ezinokulondolozeka ngcono apho abahlali baza kukwazi<br />
ukufikelela kwizakhiwo zokuhlala nezoluntu, kumathuba ezoqoqosho, kunye nemeko<br />
yokusingqongileyo esempilweni nelondolozekayo apho abantu banokukwazi ukufikelela kula<br />
mathuba ngokusebenzisa izithuthi zikawonke wonke kunye neendlela ezikhuselekileyo.<br />
Kuyimfuneko ukudala ‘iindawo zokuhlala zabantu’, kunye nokuhlanganiswa kwesicwangciso<br />
kunye nophunyezo. UMasipala oMbaxa ngoku wenza inkqubo yokuphuhlisa ‘isiCwangciso<br />
esiHlangeneyo sokuLondoloza iindawo zokuhlala’ esi kuthi sikhokele utyalo mali oluzayo<br />
kunye nophuhliso.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
52<br />
“Isixeko esikhula kunye nawe”
Ukudalwa kweendawo zokuhlala ezihlangenyo nezilondolozekayo kuya kuba negalelo elithe<br />
ngqo ekwakheni uluntu oluhlangeneyo nolomeleleyo oluya kuthi lwenze uqilima kwiingxaki<br />
zokuhlala, zoqoqoqsho kwanezendalo.<br />
5.3.7 Ukudala imisebenzi<br />
IsiXeko siyazi ngokukhula kancinci kwezoqoqosho kunye nenqanaba elikhulu lokungaqeshwa<br />
kwabantu ukuba oko kusekho kwaye kubangela umngeni omkhulu. Oku kuchaza kumanqanaba<br />
aphezulu entlupheko athe tshitshilili kwesi siXeko. Inqanaba elikhulu lentlupheko liye<br />
libonakale kakhulu kumanani oBalo enziwe ngonyaka ka-2001 apha malunga nama-70%<br />
amakhaya kwesi siXeko abonisa ukwamkela umvuzo engaphatsi kwe-R1 500 ngenyanga,<br />
kunye nama-28% amakhaya angenawo kwaphela umvuzo. Ukungaqesheki kuMasipala oMbaxa<br />
kubalelwa kuma - 24%.<br />
Enye yezoyikiso kuphuhliso loMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> kukusilela kumanqanaba<br />
emfundo kunye nezakhono. Isixa esivakalayo sabasebenzi bakaMasipala oMbaxa abayanga<br />
esikolweni okanye abagqibanga amabanga asezantsi. Ukongeza apho, xa kukhangelwa uBalo<br />
olwenziwa ngowama-2001 kuphela ngama-21% kwiminyaka engama-20 esiXekweni kunye<br />
nangaphezulu, abanalo ibanga lika-12, li-16% banayo imfundo engaphaya kweyesikolo ze<br />
ibe li-17% abaneminyaka eli-15 - 24 abathe babhalisela izifundo ezingaphaya kwesikolo.<br />
Uphando lwakutsha nje lwangowama-2007 lubonise ukuphucuka okuncinci.<br />
Ukunqanda le meko kule minyaka mihlanu izayo, isiXeko ziza kwenza iinzame, ngeenkqubo<br />
ezohlukenye, ingakumbi kuphuhliso loqoqosho lwasekhaya, ukuba kutsalwe umdla<br />
wabatyali-mali kwesi siXeko ukuze bakwazi ukudala imisebenzi oko kuyimfuno yesizwe.<br />
UMasipala we<strong>Buffalo</strong> <strong>City</strong> unawo amandla kwezinye iindawo ekukhuleni nasekuphuhleni.<br />
Ukusekeka elunxwemeni, indalo esulungekileyo, imizi mveliso esebenza kakuhle kunye<br />
nemeko yokuba ibe likomkhulu laseMpuma Koloni zizo izinto ezimbalwa ezinokusetyenziswa<br />
ukulwa nentlupheko kunye nokudala imisebenzi.<br />
5.3.8 Ukuphuculwa koRhulumento<br />
Urhwaphilizo kunye nokuhanjiswa kakubi kweenkzono kusengela phantsi isidima sesizwe.<br />
isidima esiphantsi sesizwe sikhokelela ekungaphumelelini kokawulo lwentando yesininzi<br />
oluthi lusengele phantsi ulawulo lwentando yesininzi kunye nokuqiniseka kutyalo-mali.<br />
Urhulumente wasekhaya obhetyebhetye ukhokelela ekwehleni kwenqanaba lengqiniseko<br />
kwizigqibo zotyalo-mali kwisizwe nakumacandelo abucala. Urhulumento olubhetyebhetye<br />
lukhokelela ekusebenzeni kwezoqoqosho nzima.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
53<br />
“Isixeko esikhula kunye nawe”
Isixeko esinorhulumento olulungileyo sithetha ukuba izicwangciso zicacile kwaye ziyaziswa<br />
kwingcebo yokusebenza ngentsebenziswano nabo bonke ababandakanyekayo kwaye kunxityelelwane<br />
nawo onke amacala athi achaphazeleke kuphuhliso. Isixeko esinorhulumento olulungileyo<br />
sixhomekeke kwindlela ekuphindwa kuzuzwe kuyo ngamanqanaba karhulumente<br />
kunye nee-arhente. Ukwanda kwengxelo evela kuluntu, intsebenziswano kunye nokuphuculwa<br />
kwembuyekezo evela kubathengi ngamanye amalungiselelo okuthintela amele ukusetyenziswa<br />
kwisixeko esilawulwa ngesininzi kwaneso sinorhulumento olulungileyo.<br />
Oko kukwatsho ukuba iinkonzo ezizizo ezisisiseko ziyanikezelwa ngokuhambelana<br />
nesikhokelo esibonisa izimali ezilungileyo kunye notyalo-mali olucacileyo oluthi lulungelelaniswe<br />
kunye neenjongo ngabanye abaniki nkonzo babucaIa. Ukuya phambili, uMasipala<br />
oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uza kuzama ukuba abe sisixeko esinorhulumente olulungileyo.<br />
5.3.9 Uzinzo kwezezimali<br />
Ukuze uMasipala oMbaxa akwazi ukuzalisekisa umyalelo njengoko uchazizwe kuMgaqosiseko<br />
wesizwe, kukho imfuno yokulondoloza uzinzo kwizimali kunye nokwandisa ingeniso<br />
esekwe kwinkcitho. Oku kufuna iingcebo ezimandla ukujika imeko ekhoyo yokuxhomekeka<br />
kwizibonelelo kunye nokuqiniseka ukuba isiXeko sikwimo elungileyo yezimali kule minyaka<br />
mihlanu izayo nangaphezulu.<br />
Ukuze kuphunyelelwe uzinzo kwezezimali isiXeko siza kwenza iindlela zokurekhodisha<br />
nokulawula iziseko zezimali zikaMasipala kunye nokuphandwa nophuhliso lweendlela<br />
ezintsha zokungenisa imali ukunika uzinzo kwezezimali kuMasipala oMbaxa.<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
54<br />
“Isixeko esikhula kunye nawe”
6. 2012/<strong>13</strong>-2014/15 UHLAHLO MALI LWE-MTREF<br />
6.1 ISISHWANKATHELO SOHLAHLO MALI SEZINTO ZEXESHA ELIDE<br />
2012/20<strong>13</strong> - 2014/2015 UHLAHLO MALI LWEZINTO ZEXESHA ELIDE NGENKXASO<br />
NGANYE<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
UHlahlo mali UHlahlo mali UHlahlo mali<br />
INkxaso<br />
lwezinto lwezinto lwezinto<br />
zexesha zexesha zexesha<br />
elide elide elide<br />
INkxaso yakhe 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />
Isixa seNkxaso yakhe 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />
Inkqubo ehlangeneyo yeSizwe yokufakela<br />
umbane (INEP)<br />
30 000 000 30 000 000 20 000 000<br />
Isibonelelo solawulo lwemfudo yombane<br />
osecaleni<br />
10 000 000 0 0<br />
Isibonelelo seNtsebenziswano<br />
yobuMelwane kuPhuhliso<br />
0 0 8 828 000<br />
Isibonelelo seziXokelelwano zezakhiwo<br />
zoThutho lukaWonke wonke (PTIS)<br />
78 702 000 78 762 000 0<br />
Isibonelelo siPhuhliso lweeNdawo zokuHlala 491 145 828 602 860 000 680 691 000<br />
Isibonelelo siPhuhliso lweeNdawo zokuHlala 19 170 420 35 495 714 16 318 416<br />
Isixa seziBonelelo 629 018 248 747 117 714 725 837 416<br />
ISIXA NGENKXASO NGANYE 749 097 271 879 840 714 850 057 416<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
55<br />
“Isixeko esikhula kunye nawe”
2012/20<strong>13</strong> - 2014/2015 ICANDELO LOHLAHLO MALI LWEZINTO ZEXESHA ELIDE<br />
NGENKXASO NGANYE<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Icandelo<br />
Uhlahlo mali<br />
lwezinto<br />
Uhlahlo mali<br />
lwezinto<br />
Uhlahlo mali<br />
lwezinto<br />
zexesha elide zexesha elide zexesha elide<br />
1. Iinkonzo zeNkxaso yesiGqeba 4 500 000 2 000 000 0<br />
2. I-ofisi yoMlawuli kaMasipala 0 0 0<br />
2. Igosa eliyiNtloko kwimiSebenzi 72 089 020 1<strong>13</strong> 700 478 111 064 024<br />
3. ICandelo leenkonzo zezimali 3 600 000 3 000 000 3 000 000<br />
4. ICandelo leenkonzo zoshishino 32 600 000 23 250 000 25 750 000<br />
5. ICandelo lweenkonzo zeeNjineli 411 259 273 473 614 293 484 773 392<br />
6. ICandleo loCwangciso loPhuhliso 191 920 978 210 762 000 107 000 000<br />
7. ICandelo lwezeMpilo & NoKhuseleko<br />
loluNtu<br />
10 128 000 8 473 000 <strong>13</strong> 470 000<br />
8. ICandelo leenkzono zoLuntu 23 000 000 45 040 943 105 000 000<br />
749 097 271 879 840 714 850 057 416<br />
6.2 USHWANKATHELO LOHLAHLO MALI LWEMALI YOKUSEBENZA<br />
2012/20<strong>13</strong> - 2014/2015 UHLAHLO MALI LWE-OPEX NGENKXASO NGANYE<br />
I-OPEX<br />
2012/20<strong>13</strong><br />
Uhlahlo mali<br />
lwe-Opex<br />
56<br />
20<strong>13</strong>/2014<br />
Uhlahlo mali<br />
lwe-Opex<br />
2014/2015<br />
Uhlahlo mali<br />
lwe-Opex<br />
Inkxaso yayo 38 800 000 55 647 500 50 340 000<br />
Isixa mali senkxaso yayo 38 800 000 55 647 500 50 340 000<br />
IsiBonelelo soLawulo lweziMali 1 500 000 1 500 000 1 500 000<br />
IsiBonelelo soPhuhliso lweZakhono 3 000 000 3 800 000 4 000 000<br />
IsiBonelelo soPhuhliso lweeNdawo zokuhlala 8 328 172 10 445 000 5 850 000<br />
Ikhomishini yokuPhinda kubangwe umhlala 300 000 300 000 0<br />
URhulumente waseKhaya kunye neziNdlu 77 000 0 0<br />
IsiBonelelo soPhuhlso lweeNdawo zokuHlala 111 645 824 168 849 664 179 337 305<br />
ISebe leMicimbi yaManzi – DoRA 1 283 000 0 0<br />
ISebe leMicimbi yaManzi - iPhondo 400 000 0 0<br />
ISebe leMicimbi yaManzi - ACIP 1 975 000 125 000 0<br />
Isixa mali seziBonelelo 128 508 996 185 019 664 190 687 305<br />
ISIXA NGENKXASO NGANYE 167 308 996 240 667 164 241 027 305<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
“Isixeko esikhula kunye nawe”
2012/20<strong>13</strong> - 2014/2015 UHLAHLO MALI LWE-OPEX ICANDELO NGALINYE<br />
57<br />
2012/20<strong>13</strong><br />
UHlahlo mali<br />
ye-Opex<br />
20<strong>13</strong>/2014<br />
UHlahlo mali<br />
ye-Opex<br />
2014/2015<br />
UHlahlo mali<br />
ye-Opex<br />
1. Iinkonzo zeNkxaso yesiGqeba 5 650 000 7 680 000 4 680 000<br />
2. I-Ofisi yoMlawuli kaMasipala 6 200 000 8 200 000 8 200 000<br />
3. IGosa eliyiNtloko lokuSebenza 110 458 446 173 079 464 186 206 905<br />
4. ICandelo leenkonzo zezimali 4 620 000 6 220 000 4 220 000<br />
5. ICandleo leenkonzo zeShishini 9 150 000 8 450 000 7 700 000<br />
6. ICandelo leenkonzo zeeNjineli 8 658 000 7 125 000 0<br />
7. ICandelo locwangciso loPhuhliso 22 572 550 29 912 700 30 020 400<br />
8. ICandelo lwezeMpilo & noKhuseleko<br />
loLuntu<br />
0 0 0<br />
9. ICandelo lweenkonzo zoLuntu 0 0 0<br />
167 308 996 240 667 164 241 027 305<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
“Isixeko esikhula kunye nawe”
6.3 IIPROJEKTHI ZEZINTO ZEXESHA ELIDE 2012/<strong>13</strong> – 2014/15<br />
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
2 500 000 1 500 000 1 000 000<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
20 000 000 20 750 000 23 750 000<br />
58<br />
4 600 000 0 0<br />
4 500 000 0 0<br />
500 000 1 000 000 1 000 000<br />
KPA 1: UTSHINTSHO KUMASIPALA KUNYE NOPHUHLISO LWEZIKO<br />
Uxokelelwano lolawulo lokungena Inkxaso-mali<br />
Ulawulo lwabaSebenzi 420005 MTOD03 N/A<br />
emsebenzini ngombane<br />
yayo<br />
Uxokelelwano lwe-IT (ulawulo<br />
lwee-asethi , i-SCM, uhlahlo mali<br />
lwemibono kunye nezibonelo,<br />
Inkxaso-mali<br />
Iinkonzo zolawulo lolwazi 415025 MTOD06 N/A uxokelelwano lolawulo lweemfuno,<br />
yayo<br />
uxokelelwano lolawlo lwemafutha<br />
enqwelo kunye nemixokelwano<br />
lwekhowudi zempahla<br />
Inkxaso-mali<br />
Iinkonzo zolawulo lolwazi 415025 MTOD07 N/A Isakhiwo senethiwekhi ye-IT<br />
yayo<br />
Inkxaso-mali<br />
Iinkonzo zolawulo lolwazi 415025 MTOD07 N/A Iziko le-ICT lokusindisa kwintlekele<br />
yayo<br />
Inkxaso-mali<br />
Iinkonzo zolawulo lolwazi 415025 MTOD07 N/A Isixhobo seKhompyutha – BCMM<br />
yayo<br />
Inkxaso-mali<br />
500 000 0 0<br />
yayo<br />
ISIXA MALI 32 600 000 23 250 000 25 750 000<br />
Ukuhlaziywa kwewebhusayithi ye-<br />
BCMM (kuquka i-GIS kwintanethi)<br />
Iinkonzo zolawulo lolwazi 415205 MTOD08 N/A<br />
KPA 2: UHANJISO LWEENKONZO EZISISISEKO KUNYE NOPHUHLISO LWESAKHIWO<br />
USDG 10 000 000 21 500 000 0<br />
Reeston isiGaba 3 iNqanaba 2 -P1<br />
& P3<br />
ISebe lezeziNdlu 255005 BSDID01 12<br />
USDG 2 000 000 7 412 400 17 931 000<br />
Mdantsane Zone 18 CC IsiGaba<br />
2 - P1 & P3<br />
ISebe lezeziNdlu 255005 BSDID01 21<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
Manyano &Thembelihle IsiGaba<br />
ISebe lezeziNdlu 255005 BSDID01 17<br />
USDG 8 000 000 200 000 0<br />
2 - P1 & P3<br />
ISebe lezeziNdlu 255005 BSDID01 19 Second Creek (Turn Key) - P1 & P3 USDG 8 000 000 100 000 0<br />
ISebe lezeziNdlu 255005 BSDID01 6 Block Yard TRA - P 1& P3 USDG 1 000 000 0 0<br />
DVRI PILOT PROJECT (Mekeni, Haven<br />
ISebe lezeziNdlu 255005 BSDID01 19<br />
USDG 2 500 000 0 0<br />
Hills, Competition Site) P1 & P3<br />
IQela 1 (Chris Hani, Ilinge,<br />
48, 12, 21,<br />
Mahlangu Village, SisuluVillage,<br />
ISebe lezeziNdlu 255005 BSDID01 11, 17, 11,<br />
USDG 3 706 200 9 265 500 11 730 123<br />
WinnieMandela, Deluxolo Village &<br />
20<br />
Francis Mei) P1 & P3<br />
IQela 2 (Masibambane, Masibulele,<br />
ISebe lezeziNdlu 255005 BSDID01 17,14, Velwano, Gwentshe Village,<br />
USDG 600 000 5 559 300 9 265 500<br />
MathembaVuso) P1 & P3<br />
IQela 3 (Fynbos Informal 1, Fynbos<br />
ISebe lezeziNdlu 255005 BSDID01 5, 10<br />
USDG 7 412 400 11 859 840 <strong>13</strong> 620 285<br />
Informal 2, Ndancama) P1 & P3<br />
ISebe lezeziNdlu 255005 BSDID01 31 Sunny South - P1 & P3 USDG 600 000 1 000 000 2 000 000<br />
ISebe lezeziNdlu 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 1 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />
ISebe lezeziNdlu 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 2 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />
ISebe lezeziNdlu 255005 BSDID01 23,24 Potsdam Ikhwezi Block 2- P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />
ISebe lezeziNdlu 255005 BSDID01 23,24 Potsdam North Kanana - P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />
ISebe lezeziNdlu 255005 BSDID01 9 Amalinda Co-op P1 & P3 USDG 0 1 126 562 1 630 750<br />
ISebe lezeziNdlu 255005 BSDID01 9 AmalindaFairlands P1 & P2 USDG 0 1 126 562 1 630 750<br />
Reeston IsiGaba 3: INqanaba 2 – P1<br />
ISebe lezeziNdlu 255005 BSDID01 12<br />
HSDG 15 000 000 25 000 000 0<br />
& P3<br />
Reeston IsiGaba 3: INqanaba 3 – P1<br />
ISebe lezeziNdlu 255005 BSDID01 12<br />
HSDG 1 000 000 5 559 300 5 559 300<br />
& P3<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
59<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
ISebe lezeziNdlu 255005 BSDID01 2 Braelyn ext 10 – P1 & P3 HSDG 300 000 1 476 096 3 570 436<br />
HSDG 270 420 2 500 000 4 594 340<br />
C Section and Triangular Site – P1<br />
& P3<br />
ISebe lezeziNdlu 255005 BSDID01 7, 8<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
ISebe lezeziNdlu 255005 BSDID01 7, 8 D Hostel – P1 & P3 HSDG 100 000 860 318 2 594 340<br />
HSDG 2 500 000 100 000 0<br />
DVRI Pilot Project (Mekeni, Haven<br />
Hills, Competition Site)<br />
0 8 828 000<br />
0<br />
3 500 000 4 000 000<br />
3 100 000<br />
60<br />
6 000 000 15 000 000 15 000 000<br />
10 000 000 0 0<br />
5 000 000 50 000 000 50 000 000<br />
ISebe lezeziNdlu 255005 BSDID01 6, 8<br />
Ukuvuselelwa<br />
Ingcebo yoVuselelo lweDolophu ne<br />
255005 BSDID27 N/A<br />
kweeDolophu<br />
& CBD NDPG<br />
Ulawulo lwezoThutho –<br />
Inkxaso-mali<br />
530020 BSDID29 N/A BCM Ulawulo lwezoThutho<br />
Braelyn<br />
yayo<br />
Ulawulo lwezoThutho –<br />
Inkxaso-mali<br />
530020 BSDID29 N/A Iizthuthi ze-BCMM<br />
Braelyn<br />
yayo<br />
Isibonelelo<br />
11, 12, 14,<br />
UCwangciso ngombane<br />
Ukufakela umbane – Izibane<br />
sombane<br />
535025 BSDID04 17, 20, 21,<br />
& noYilo<br />
zezitalato ezonga umbane<br />
oyimfuneko<br />
22, 23, 30<br />
wabucala<br />
UCwangciso ngombane<br />
Uhlaziyo lwezakhiwo zombane Inkxaso-mali<br />
535025<br />
16, 18<br />
& noYilo<br />
BSDID04<br />
zininzi<br />
yayo<br />
30 000 000 30 000 000 20 000 000<br />
DoE (Inkqubo<br />
eHlangeneyo<br />
yesizwe<br />
yokufakela<br />
umbane)<br />
Ukufakela umbane - Reeston,<br />
Potsdam unit P, Infills mdantsane,<br />
Dimbaza, Zwelitsha, Pakamisa, Bisho<br />
and Duncan Village<br />
<strong>13</strong>, 25, 43,<br />
34, 36,<br />
535025 BSDID04<br />
UCwangciso ngombane<br />
& noYilo<br />
5 000 000 20 000 000 20 000 000<br />
Inkxaso-mali<br />
yayo<br />
Ukufakela umbane kwiindawo<br />
zogobityholo – Imimandla<br />
yaseDuncan Village<br />
1, 2, 7, 8,<br />
9, 10<br />
535025 BSDID04<br />
UCwangciso ngombane<br />
& noYilo<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
27 851 023 0 0<br />
Inkxaso-mali<br />
yayo<br />
Inetwekhi yokufakela umbane<br />
kwizakhiwo(2.47% Ukunyuswa<br />
kwamaxabiso – ubiyo)<br />
2, 7, 15,<br />
16, 44<br />
535025 BSDID04<br />
UCwangciso ngombane<br />
& noYilo<br />
125 419<br />
392<br />
525025 BSDID06 21, 22, 23 Iindlela zaseMdantsane USDG 60 000 000 80 484 000<br />
Iindlela noHanjiso<br />
lwamanzi ezaNdyondyo<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
Uyilo lweNdlela 525020 BSDID06 46 West Bank Restitution USDG 15 000 000 10 000 000 28 000 000<br />
Uyilo lweNdlela 525020 BSDID06 28 Quenera Main Roads USDG 5 000 000 0 0<br />
Uhlaziyo lweendlela ze-BCMM USDG 30 000 000 30 000 000 50 000 000<br />
29, <strong>13</strong>, 25,<br />
39, 34, 36,<br />
44, 41, 1,<br />
Uyilo lweNdlela 525020 BSDID06<br />
2, 7,8<br />
61<br />
USDG 10 000 000 10 000 000 25 000 000<br />
Ukulungiswa kweendlela<br />
Zasemaphandleni<br />
23, 38, 43,<br />
31, 32, 24,<br />
32<br />
28, 4, 41, <strong>13</strong>,<br />
16, 14, 21,<br />
22, 5, 16, 27,<br />
31, 32,33,<br />
525025 BSDID06<br />
Iindlela noHanjiso<br />
Lwamanzi ezaNdyondyo<br />
99 854 000<br />
155 854<br />
000<br />
152 608<br />
250<br />
Ulungiselelo logutyulo oluninzi USDG<br />
515026 BSDID07<br />
Ugutyulo lweliNdle-<br />
Nxwemeni<br />
47, 11<br />
USDG 7 000 000 37 000 000 20 000 000<br />
Iizakhiwo zamanzi eQonce, Dimbaza<br />
kunye Bisho<br />
34, 37, 38,<br />
39, 40, 41,<br />
43, 44, 49,<br />
35<br />
11, 12, <strong>13</strong>,<br />
14, 42, 48,<br />
50, 17, 20,<br />
23<br />
Ulawulo lwamanzi 520005 BSDID07<br />
USDG 5 000 000 5 000 000 5 000 000<br />
Ukususwa kwe-Midblocks<br />
eMdantsane<br />
Ulawulo lwamanzi 515010 BSDID07<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
USDG 3 000 000 3 000 000 3 000 000<br />
Ulawulo lwamanzi 515010 BSDID07 36<br />
USDG 12 000 000 22 000 000 22 000 000<br />
520015 BSDID07 5, <strong>13</strong><br />
USDG 6 000 000 17 000 000 15 000 000<br />
520020 BSDID07 N/A<br />
Iizitishi ezimpompa<br />
kakhulu<br />
Umsebenzi wococo<br />
lwaManzi<br />
USDG 1 000 000 0 0<br />
520020 BSDID07 N/A<br />
Umsebenzi wococo<br />
lwaManzi<br />
USDG 3 000 000 0 0<br />
Ucoco lwaManzi 520020 BSDID07 33<br />
62<br />
USDG 5 000 000 1 276 293 0<br />
520020 BSDID07 31,33<br />
USDG 1 000 000 0 0<br />
UNikezelo lwamanzi lwase-<br />
Amahleke<br />
Ukuncedisa Ucoco lwaManzi -<br />
Umzonyana/Raising Upper weir<br />
Uhlaziyo lwenetwekhi yamanzi<br />
ngokwengxinano nokuncedisa<br />
Ukunikelwa kwamanzi amaninzi<br />
eNewlands kunye neminye<br />
imiMmandla<br />
IWadi 33 iskimu sokunikezela<br />
ngamanzi<br />
Imimandla yaseNxwemeni<br />
yoNikezelo ngamanzi amaninzi<br />
UNikezelo ngamanzi eWinterstrand<br />
Water<br />
Uhlaziyo lwesakhiwo seLebhu kunye<br />
nezixhobo<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
520020 BSDID07 31<br />
2 800 000 2 000 000 1 500 000<br />
Inkxaso-mali<br />
yayo<br />
520020 BSDID07 N/A<br />
Umsebenzi wococo<br />
lwaManzi<br />
Umsebenzi wococo<br />
lwaManzi<br />
Umsebenzi wococo<br />
lwaManzi<br />
78 702 000 78 762 000 0<br />
Public<br />
Transport<br />
Infrastructure<br />
and Systems<br />
Grant<br />
UThutho oluKhawulezayo ngeeBhasi<br />
1, 10, 11, 12,<br />
<strong>13</strong>, 14, 15,<br />
16, 17, 18,<br />
19, 2, 20, 21,<br />
22, 23, 24,<br />
25, 28, 3, 4,<br />
5, 6, 7, 8, 9<br />
620005 BSDID23<br />
UCwangciso lwezoThutho<br />
& uLawulo lweMisebenzi<br />
620005 BSDID23 N/A Ukuphunyezwa kwe-ITP USDG 3 000 000 3 000 000 3 000 000<br />
620005 BSDID24 37 Izakhiwo zoThutho zoLuntu USDG 23 000 000 22 000 000 30 000 000<br />
UCwangciso lwezoThutho<br />
& uLawulo lweMisebenzi<br />
UCwangciso lwezoThutho<br />
& uLawulo lweMisebenzi<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
UCwangciso lwezoThutho<br />
620005 BSDID24 27,28 Gonubie Main Road USDG 15 000 000 30 000 000 10 000 000<br />
& uLawulo lweMisebenzi<br />
UCwangciso lwezoThutho<br />
46, 31, 10, N2/R72 uphando lwendlela<br />
620005 BSDID24<br />
USDG 1 200 000 0 0<br />
& uLawulo lweMisebenzi<br />
16, 8, 19 edibanisyo<br />
Ulawulo loMhlaba 615080 BSDID21 1 -50 Ukubangwa komhlaba USDG 12 764 000 42 500 000 29 500 000<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
USDG 2 000 000 3 000 000 5 000 000<br />
UPhuhliso loLuntu(Inland, Mbindini<br />
kunye neNxwemeni)<br />
755010 BSDID16 <strong>13</strong>, 21, 23<br />
USDG 5 000 000 12 040 943 20 000 000<br />
Uphuhliso kunye noHlaziyo<br />
lwamaNgcwaba(Inland, Mbindini<br />
755025 BSDID16 N/A<br />
kunye neNxwemeni)<br />
Inkxaso yoLawulo<br />
lokuCoca<br />
Izinto ezimana<br />
ukwenziwa ngamaxesha<br />
athile<br />
USDG 4 000 000 20 000 000 30 000 000<br />
Uphuhliso kunye noHlaziyo<br />
lwamaHolo oLuntu<br />
Amaholo 760025 BSDID16 5<br />
63<br />
770030 BSDID09 1 – 50 Uyilo lwesititshi sotshintsho USDG 3 000 000 0 0<br />
770030 BSDID09 1 – 50 UKwakhiwa kweSeli yesiThathu USDG 10 000 000 0 0<br />
USDG 5 000 000 0 0<br />
Ukulungiswa kwemimandla ye-<br />
Landfill<br />
770030 BSDID09 1 – 50<br />
Ummandla we-E.L. Itiphu<br />
& nesititshi sotshintsho<br />
Ummandla we-E.L. Itiphu<br />
& nesititshi sotshintsho<br />
Ummandla we-E.L. Itiphu<br />
& nesititshi sotshintsho<br />
USDG 9 000 000 10 000 000 50 000 000<br />
Ukuhlaziya kwezakhiwo zemidlalo &<br />
nolonwabo<br />
7, 12, <strong>13</strong>, 28,<br />
29, 35, 37,<br />
38, 41, 44<br />
Amabala omdlala 765010 BSDID16<br />
USDG 3 000 000 3 000 000 3 000 000<br />
IsiTitshi soMlilo saseNxwemeni<br />
kunye neMbindini Fire Station<br />
Iinkonzo zoMlilo noNcedo 725010 BSDID12 1 to 50<br />
IsiTitshi soMlilo saseQONCE USDG 6 000 000 0 0<br />
25, 35, 37,<br />
38, 39, 40,<br />
41, 43, 44,<br />
45, 49<br />
Iinkonzo zoMlilo noNcedo 725010 BSDID12<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mlai<br />
lwezinto<br />
zexesha<br />
elide<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali<br />
lwezinto<br />
zexesha<br />
elide<br />
Indlela<br />
yenkxasomali<br />
Igama leProjekthi<br />
Inomb.<br />
yeWadi<br />
IKHOWU-DI<br />
YENGCE-BO<br />
(UKUSU-KA KWI-<br />
IDP)<br />
Inomb.<br />
yeziko<br />
elihlawulwayo<br />
IGama leziko<br />
elihlawulwayo<br />
Iinkonzo zoMlilo noNcedo 725010 BSDID12 31, 32, 33 IsiTitshi soMlilo eTsholomnqa USDG 500 000 5 000 000 10 000 000<br />
KPA 3: UPHUHLISO LOQOQOSHO LWASEKHAYA<br />
USDG 12 254 978 20 000 000 30 000 000<br />
Isakhiwo soPhuhliso loQoqosho<br />
(UPhuhliso lweNdlela yamafa,<br />
ukwenziwa kwezitandi zethutyana)<br />
63005 LED03 N/A<br />
Uphuhliso loQoqoqsho<br />
lwasekhaya<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
Uphuhliso loQoqoqsho<br />
Uphuhliso lwezakhiwo zolimo<br />
635005 LED03 N/A<br />
USDG 3 000 000 3 000 000 3 000 000<br />
lwasekhaya<br />
ezidolophini kwi-BCMM<br />
KPA 4: UZINZO KWIZIMALI KUNYE NOLAWULO<br />
IFenitshala ye-Ofisi – ULawulo Inkxaso-mali<br />
Ulawulo lwamatyala 330015 MFVM01 N/A<br />
1 100 000 1 000 000 1 000 000<br />
lweNgeniso<br />
yayo<br />
I-Ofisi yokuhlawula<br />
OoMatshini bokuhlawula kuqala Inkxaso-mali<br />
330025 MFVM02 N/A<br />
1 000 000 500 000 500 000<br />
kuqala kwabathengisayo<br />
kwabathengisayo<br />
yayo<br />
Isixhobo sekhompyutha – uLawulo Inkxaso-mali<br />
Iinkonzo zoLawulo lolwazi 415025 MTOD07 N/A<br />
1 500 000 1 500 000 1 500 000<br />
lweNgeniso<br />
yayo<br />
IReyithi kunye ne-Ofisi<br />
Inkxaso-mali<br />
330005 MFVM05 N/A Iziniki-maxabiso jikelele<br />
29 000 000 <strong>13</strong> 500 000 4 500 000<br />
enika amaxabiso<br />
yayo<br />
Uhlaziyo lweHolo lokuhlawula<br />
Ulwakhiwo 615075 MFVM01 N/A<br />
USDG 4 000 000 1 000 000 0<br />
eQonce<br />
KPA 5: URHULUMENTO OLULUNGILEYO KUNYE NENTATHO-NXAXHEBA YOLUNTU<br />
Inkxaso-mali<br />
Ulawulo lweNgcebo 105035 MTOD12 N/A Injini elilalela – kwiHolo lwesiXeko<br />
1 500 000 0 0<br />
yayo<br />
Inkxaso-mali<br />
Ulawulo lweNgcebo 105035 MTOD12 N/A Uhlaziyo lweHolo lwesiXeko<br />
3 000 000 000 000 0<br />
yayo<br />
64<br />
“Isixeko esikhula kunye nawe”
6.4 IIPROJEKTHI ZOKUSEBENZA 2012/<strong>13</strong> – 2014/15<br />
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
ICandelo<br />
KPA 1: UTSHINTSHO LUKAMASIPALA KUNYE NOPHUHLISO LWEZIKO<br />
300 000 100 000 0<br />
Inkxaso-mali<br />
yayo<br />
Ukususwa kwamaxwebhu e-BCMM<br />
esiwe kwi-EDMS<br />
220005 N/A MTOD11<br />
EzoMthetho kunye<br />
neLawulo<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
700 000 0 0<br />
Inkxaso-mali<br />
yayo<br />
615005 N/A MTOD10 I-GIS kwi-intanethi<br />
ULawulo loCwangciso<br />
loPhuhliso<br />
2 7000 000 0<br />
Inkxaso-mali<br />
yayo<br />
Uhlaziyo lwemifanekiso ethathwa<br />
phezu kwezindlu<br />
615005 N/A MTOD06<br />
ULawulo loCwangciso<br />
loPhuhliso<br />
500 000 500 000 500 000<br />
Inkxaso-mali<br />
yayo<br />
Uphuhliso nophononongo loMthetho<br />
kaMasipala<br />
220005 N/A MTOD11<br />
EzoMthetho kunye<br />
neLawulo<br />
Inkxaso-mali<br />
yayo<br />
EzoMthetho kunye<br />
neLawulo<br />
65<br />
600 000 0 0<br />
220005 N/A MTOD11 Umgaqo-nkqubo wokulondoloza<br />
750 000 750 000 0<br />
Inkxaso-mali<br />
yayo<br />
Uhlaziyo lweendawo ezingaphandle<br />
ze-BCMM zokugcina amaxwebhu<br />
abalulekileyo kunye neseva<br />
yokugcina ulwazi (umz. Bisho /<br />
Qonce<br />
Iinkonzo zolawulo lolwazi 415025 N/A MTOD08<br />
750 000 750 000 0<br />
Inkxaso-mali<br />
yayo<br />
Ukusungulwa kwenkqubo yolawulo<br />
lokusebenza kwabasebenzi<br />
Ulawulo lwabasebenzi 420005 N/A GGPP02<br />
Ulawulo lwabasebenzi 420005 N/A MTOD02 Izakhiwo - uPhuhliso lwezakhono ISDG 3 000 000 3 800 000 4 000 000<br />
KPA 2: UHANJISO LWEENKONZO EZISISISEKO KUNYE NOPHUHLISO LWEZAKHIWO<br />
255005 <strong>13</strong>, 43, 45, 46 BSDID01 Reeston IsiGaba 3: INqanaba 2 - P5 HSDG 0 20 000 000 29 992 500<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
HSDG 163 515 0 0<br />
Reeston IsiGaba 3: INqanaba 3 – P4<br />
(Registration<br />
255005 <strong>13</strong>, 43, 45, 46 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
ICandelo<br />
HSDG 19 995 000 31 992 000 11 330 500<br />
Ilitha ukupheliswa kwezindlu<br />
zamaplanga kwakhiwe izindlu<br />
ezifanelekileyo<br />
255005 45 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
HSDG 6 665 000 500 000 0<br />
Tyutyu IsiGaba 2 – P5 (Izakhiwo<br />
ezikudidi oluphezulu - Top<br />
Structures)<br />
255005 43 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
HSDG 5 398 650 200 000 0<br />
Isikhululo seNqelo moya / IsiGaba<br />
2A Ukwakhiwa kweeyunithi ezintsha<br />
-P4<br />
255005 31 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
255005 45 BDSID01 Ilitha NgeZantsi– 439 iiyunithi P5 HSDG 2 500 000 3 797 800 5 000 000<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
HSDG 20 000 000 30 000 000 15 862 700<br />
Ukwakhiwa okutsha kwezindlu<br />
ezatshatyalaliswa sisichotho<br />
BSDID01<br />
17, 24, 26, 33, 39,<br />
40, 43, 36, 37<br />
255005<br />
66<br />
255005 31 BSDID01 Sunny eZantsi – P5 HSDG 500 000 10 797 300 17 162 500<br />
255005 23 BSDID01 Potsdam Village IsiGaba 1 & 3 – P5 HSDG 0 500 000 500 000<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
HSDG 5 811 880 17 395 650 26 660 000<br />
IQela 1 (Chris Hani 3; Winnie<br />
Mandela; Ilinge; Deluxolo Village;<br />
Sisulu Village; Francis Mei; Mahlangu<br />
BSDID01<br />
48, 12, 21, 11, 17,<br />
11, 20<br />
255005<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
Village) P5<br />
19 995<br />
000<br />
HSDG 0 9 664 250<br />
IQela 2 (Masibambane; Masibulele;<br />
Gwentshe; Velwano; MathembaVuso)<br />
P5<br />
255005 17, 14 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
HSDG 0 9 664 250 19 995 000<br />
255005 5, 10 BSDID01<br />
HSDG 0 11 797 050 19 995 000<br />
IQela 3 (Fynbos1; Fynbos2;<br />
Ndancama)P5<br />
DVRI Pilot Project (Mekeni, Haven<br />
Hills, Competition Site) P5<br />
255005 6, 8 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
ICandelo<br />
HSDG 465 000 0 0<br />
Cambridge 1 & 2 (Kei Road Dawn)<br />
P2<br />
255005 15 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
255005 16 BSDID01 N2 Road Reserve HSDG 340 000 0 0<br />
HSDG 165 000 0 0<br />
Ford Msimango 1 (LU Housing Nomp<br />
School)<br />
255005 6 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
255005 19 BSDID01 Second Creek – P5 HSDG 17 662 250 200 000 0<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
HSDG 16 697 979 27 327 914 29 818 705<br />
Housing Needs Database and<br />
Accreditation<br />
255005 1-50 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
USDG 300 000 250 000 250 000<br />
Inzuzo kwezeMfundo( Zonke ii-<br />
USDG P4)<br />
255005 45, 46, 18, 19, 10 BSDID02<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
67<br />
500 000 4 447 500 7 140 000<br />
Inkxaso-mali<br />
yayo<br />
Ukususwa kwabaza kuzuza izindlu<br />
basiwe kwindawo yesigxina kuzo<br />
zonke iinkqubo zezindlu– Zonke<br />
iiProjekthi<br />
255005 1 - 50 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
255005 12 BSDID01 Dacawa P4 USDG 2 960 0 0<br />
255005 10 BSDID01 Fynbos Informal 1-P4 USDG 27 488 0 0<br />
255005 10 BSDID01 Fynbos Informal 2-P4 USDG 210 230 0 0<br />
255005 12 BSDID01 Ilinge-P4 USDG 118 087 0 0<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
USDG 200 000 200 000 0<br />
Ilitha – Ukupheliswa kwezindlu<br />
zamaplanga kuyiwe kwizindlu<br />
zesigxina<br />
255005 45 BSDID01<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
255005 17 BSDID01 Masibambane-P4 USDG 20 038 0 0<br />
255005 17 BSDID01 Masibulele-P4 USDG 20 553 0 0<br />
255005 21 BSDID01 Mdantsane Zone 18 CC IsiGaba 2-P4 USDG 256 425 0 0<br />
255005 10 BSDID01 Ndacama-P2 USDG 160 000 0 0<br />
255005 10 BSDID01 Ndacama-P4 USDG <strong>13</strong>8 308 0 0<br />
255005 11 BSDID01 Sisulu Village-P4 USDG 19 636 0 0<br />
ICandelo<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
68<br />
255005 31 BSDID01 Sunny South-P4 USDG 112 7<strong>13</strong> 0 0<br />
255005 14 BSDID01 Velwano-P4 USDG 81 999 0 0<br />
255005 17 BSDID01 Winnie Mandela-P4 USDG 38 535 0 0<br />
255005 9 BSDID01 Amalinda (Co-op) - P2 (EIA) USDG 200 000 0 0<br />
255005 23,24 BSDID01 Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100 000 0 0<br />
255005 23,24 BSDID01 Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100 000 0 0<br />
255005 23,24 BSDID01 Potsdam North Kanana - P2 (EIA) USDG 100 000 0 0<br />
USDG 100 000 0 0<br />
Potsdam Village Rural IsiGaba 1 &<br />
2 - P2 (EIA)<br />
255005 23 BSDID01<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
ICandelo<br />
255005 21 BSDID01 Potsdam Unit P INqanaba 2 - P4 USDG 3 000 0 0<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
255005 19 BSDID01 Second Creek P4 USDG 3 000 0 0<br />
IiProjekthi zokwakha<br />
iziNdlu<br />
2 000 000 2 000 000 0<br />
Inkxaso mali<br />
yayo<br />
Caretakers - Duncan Village<br />
namatyotyombe (Informal<br />
Settlements)<br />
Inkxaso mali ye-East Bank WWTW<br />
ACIP<br />
520005 1, 2, 5, 6, 7, 8, 10<br />
Iinkonzo zamanzi, zelindle<br />
nenzulu lwazi<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
DWA -ACIP 1 525 000 125 000 0<br />
520005 18 BSDID06<br />
Iinkonzo zamanzi, zelindle<br />
nenzulu lwazi<br />
400 000 0 0<br />
DWA –<br />
iPhondo<br />
IsiCwangciso soShishino seeNkonzo<br />
zamanzi<br />
520005 N/A BSDID06<br />
Iinkonzo zamanzi, zelindle<br />
nenzulu lwazi<br />
520005 BSDID06 Dimbaza WWTW inlet Screen DWA – ACIP 450 000 0 0<br />
Iinkonzo zamanzi,<br />
zelindle nenzululwazi<br />
69<br />
Ukuphunyezwa kolondolozo<br />
lwamanzi kunye noLawulo<br />
Iinkonzo zamanzi,<br />
34, <strong>13</strong>, 9, 5, 28,<br />
lwemfuno (Dimbaza, Duncan Village, DWAF –<br />
520005<br />
BSDID06<br />
1 283 000 0 0<br />
zelindle nenzululwazi<br />
7, 41<br />
Mdantsane, Reeston, SceneryPark, DoRA<br />
Nompumelelo, Mzamomhle,<br />
Sweetwaters, Phakamisa, Zwelitsha)<br />
Iindlela noHanjiso<br />
Ukuphuhliswa kwesicwangciso<br />
525025 N/A BSDID06<br />
USDG 3 000 000 5 000 000 0<br />
lwamanzi ezaNdyondyo<br />
esisio seeNdlela ze-BCMM<br />
Reeston IsiGaba 3: INqanaba 2 – P4<br />
Ulawulo loMhlaba 615080 12 BSDID01<br />
HSDG 788 800 480 000 480 000<br />
(UTshintsho)<br />
Reeston IsiGaba 1 & 2 – INqanaba<br />
Ulawulo loMhlaba 615080 12 BSDID01<br />
HSDG 200 000 46 400 0<br />
1B – P4 (UTshintsho)<br />
Reeston IsiGaba 3 INqanaba 1 – P4<br />
Ulawulo loMhlaba 615080 12 BSDID01<br />
HSDG 500 000 86 800 0<br />
(UTshintsho)<br />
Ulawulo loMhlaba 615080 43 BSDID01 Tyutyu IsiGaba 1 – P4 (UTshintsho) HSDG 28 000 1 000 0<br />
“Isixeko esikhula kunye nawe”
IKHOWUDI<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Iziko<br />
YENGCEBO<br />
Inkxaso Uhlahlo Uhlahlo Uhlahlo<br />
ICandelo eliHlawu- IWadi Nomb.<br />
Igama leProjekthi<br />
EVELA KWI-<br />
ivela phi mali lwe- mali lwe- mali lwelayo<br />
IDP<br />
Opex Opex Opex<br />
Ulawulo loMhlaba 615080 43 BSDID01 Tyutyu 2 – P4 (UTshintsho) HSDG 34 000 1 000 0<br />
Ilitha South – 439 iiyunitho<br />
Ulawulo loMhlaba 615080 45 BSDID01<br />
HSDG 8 000 30 000 40 400<br />
(utshintsho)<br />
Ulawulo loMhlaba 615080 34, 36 BSDID01 Dimbaza IsiGaba 2 P4 (utshintsho) HSDG 5 000 12 500 0<br />
Potsdam INqanaba 2 INqanaba 1 –<br />
Ulawulo loMhlaba 615080 <strong>13</strong> BSDID01<br />
HSDG 241 150 5 000 0<br />
P4 (UTshintsho)<br />
Ulawulo loMhlaba 615080 29 BSDID01 Nompumelelo – P4 (UTshintsho) HSDG 914 400 3 000 0<br />
AmalindaSimanyene – P4<br />
Ulawulo loMhlaba 615080 16 BSDID01<br />
HSDG 15 000 1 000 0<br />
(UTshintsho)<br />
Ulawulo loMhlaba 615080 48 BSDID01 Z Soga – P4 (UTshintsho) HSDG <strong>13</strong>6 000 1 000 0<br />
Land Transactions – upgrading of Inkxaso-mali<br />
Ulawulo loMhlaba 615080 Mdantsane BSDID22<br />
350 000 500 000 500 000<br />
former R293 & CPA Areas<br />
yayo<br />
Isikhululo senqwelo moyat / IsiGaba<br />
Ulawulo loMhlaba 615080 46<br />
2A Ukwakhiwa okutsha kwe-unithi HSDG 441 200 10 000 0<br />
– P4<br />
Icandelwana lwepropati<br />
Inkxaso mali<br />
UPhononongo loMhlaba 615070 N/A BSDID21<br />
500 000 400 000 300 000<br />
zikamasipala eziqeshisayo<br />
yayo<br />
UPhononongo loMhlaba 615070 10 BSDID21 Ndancama P2 USDG 160 000 0 0<br />
Fynbos (Amatyotyombe) Informal<br />
UPhononongo loMhlaba 615070 10 BSDID21<br />
USDG 120 000 0 0<br />
1- P2<br />
Fynbos (Amatyotyombe) Informal<br />
UPhononongo loMhlaba 615070 10 BSDID21<br />
USDG 110 000 0 0<br />
2 – P2<br />
UPhononongo loMhlaba 615070 9 BSDID21 Amalinda Fairlands Projects – P2 USDG 200 000 235 000 0<br />
Cambridge 1 & 2 (Kei Road) Dawn<br />
UPhononongo loMhlaba 615070 15 BSDID21<br />
HSDG 465 000 0 0<br />
– P 2<br />
615070 16 BSDID21 N2 Road Reserve P 2 HSDG 340 000 0 0<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
70<br />
“Isixeko esikhula kunye nawe”
IKHOWUDI<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
Iziko<br />
YENGCEBO<br />
Inkxaso Uhlahlo Uhlahlo Uhlahlo<br />
ICandelo eliHlawu- IWadi Nomb.<br />
Igama leProjekthi<br />
EVELA KWI-<br />
ivela phi mali lwe- mali lwe- mali lwelayo<br />
IDP<br />
Opex Opex Opex<br />
Ford Msimango 1 (LU Housing Nomp<br />
615070 6 BSDID21<br />
HSDG 165 000 0 0<br />
School) – P2<br />
UCwangciso lwesiXeko 615070 16 BSDID17 DVRI Ukusekwa kwedolophu LGH 77 000 0 0<br />
UCwangciso lwesiXeko 615070 40926 BSDID17 Mdantsane UKusekwa kwedolophu USDG 0 500 000 600 000<br />
East Bank Ukubuyiselwa nokusekwa<br />
UCwangciso lwesiXeko 615070 16 BSDID17<br />
RLCC 300 000 300 000<br />
kwedolophu<br />
UKuchongwa komhlaba wophando<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615080 N/A BSDID21 ukuze kususwe amatyotyombe<br />
300 000 0 0<br />
yayo<br />
akwindawo ekumba ophambili<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615005 15 BSDID18 BCMM Ukusekwa kwedolophu<br />
0 1 600 000 1 700 000<br />
yayo<br />
Ukusekwa kwedolophu<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 28 BSDID18<br />
400 000 0 0<br />
kumatyotyombe ase-Mzamomhle yayo<br />
IsiGaba socwangciso lwendawo Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 N/A BSDID18<br />
300 000 0 0<br />
zokuhlala emaphandleni<br />
yayo<br />
Isikhokelo soPhuhliso yeNdawo Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 27 BSDID19<br />
0 1 100 000 1 200 000<br />
yokuhlala ekhaya<br />
yayo<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 4, 15, 18 BSDID19 Vincent, Berea LSDF Review<br />
500 000 0 0<br />
yayo<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 29 BSDID19 Home Hill LSDF<br />
233 408 0 0<br />
yayo<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 27, 29 BSDID19 Gonubie Main road LSDF<br />
34 735 0 0<br />
yayo<br />
Inkxaso-mali<br />
UCwangciso lwesiXeko 615070 27, 29 BSDID19 Kwelera LSDF<br />
29 469 0<br />
yayo<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
71<br />
58 561 0 0<br />
Inkxaso-mali<br />
yayo<br />
BCMM SDF Ukunikezwa kwengxelo<br />
nohlolo - Comprehensive Update<br />
and Review<br />
UCwangciso lwesiXeko 615070 N/A BSDID19<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
ICandelo<br />
43 827 0 0<br />
UCwangciso lwesiXeko 615070 30, 38-45 BSDID19 Bhisho/King Williams Town LSDF<br />
1 000 000 0 0<br />
615005 N/A BSDID20 Imifanekiso yaphezulu<br />
350 000 350 000 0<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
615005 N/A MTOD05 I-GIS kwi-intanethi<br />
ULawulo loCwangciso<br />
loPhuhliso<br />
ULawulo loCwangciso<br />
loPhuhliso<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
500 000 2 000 000 2 000 000<br />
UThutho 620005 N/A BSDID23 Uphononongo lwe-ITP<br />
6 880 000 11 700 000 12 300 000<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
KPA 3: UPHUHLISO LOQOQOSHO LWASEKHAYA<br />
Inkqubo yoMaketho ngeNdawo<br />
635005 N/A LED02<br />
yokufikela<br />
2 000 000 6 300 000 5 900 000<br />
Inkqubo ngeYunithi yeNkxaso<br />
yoShishino<br />
635005 N/A LED03<br />
Uphuhliso loQoqosho<br />
lwaseKhaya<br />
Uphuhliso loQoqosho<br />
lwaseKhaya<br />
Uphuhliso loQoqosho<br />
lwaseKhaya<br />
72<br />
635005 N/A LED03 Inkqubo ngeZakhiwo zoQoqosho USDG 2 585 200 4 260 000 5 000 000<br />
KPA 4: UZINZO KWIZIMALI ZIKAMASIPALA KUNYE NOLAWULO<br />
400 000 1 000 000 500 000<br />
Inkxaso-mali<br />
yayo<br />
Ucoco lweData yokukhupha<br />
amatyala<br />
330015 N/A MFVM01<br />
I-Ofisi yolawulo<br />
lwamatyala<br />
2 000 000 3 000 000 1 500 000<br />
Inkxaso-mali<br />
yayo<br />
Uphicotho lwemitha<br />
ezichukunyisiweyo (Umbane &<br />
amanzi) – Iinkonzo zikaMasipala<br />
330015 N/A MFVM01<br />
I-Ofisi yolawulo<br />
lwamatyala<br />
I-Ofisi yohlahlo mali 315005 N/A MFVM03 Utshintsho loHlahlo mali FMG 1 500 000 1 500 000 1 500 000<br />
iProjekthi yoTshintsho yoPhicotho Inkxaso-mali<br />
I-Ofisi yohlahlo mali 315005 N/A MFVM06<br />
720 000 720 000 720 000<br />
ziNcwadi<br />
yayo<br />
KPA 5: URHULUMENTO OLULUNGILEYO KUNYE NENTATHO NXAXHEBA YOLUNTU<br />
1 000 000 3 000 000 0<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso yeNgcebo 105025 N/A MTOD03 Uguqulo lwenkqubo zoshishino ze-IT<br />
“Isixeko esikhula kunye nawe”
2014/2015<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
20<strong>13</strong>/2014<br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
2012/20<strong>13</strong><br />
Uhlahlo<br />
mali lwe-<br />
Opex<br />
Inkxaso<br />
ivela phi<br />
Igama leProjekthi<br />
IKHOWUDI<br />
YENGCEBO<br />
EVELA KWI-<br />
IDP<br />
IWadi Nomb.<br />
Iziko<br />
eliHlawulayo<br />
ICandelo<br />
3 000 000 3 000 000 3 000 000<br />
Iintlanganiso zeWadi Komiti<br />
(yinkcitho evela engxoweni)<br />
120010 N/A GGPP09<br />
UbuDlelwana noLuntu &<br />
neZiganeko zamazwe<br />
50 000 80 000 80 000<br />
205005 N/A GGPP07 Ubudlelwane boorhulumente<br />
I-Ofisi yoMlawuli<br />
kaMasipala<br />
1 200 000 1 200 000 1 200 000<br />
300 000 300 000 300 000<br />
100 000 100 000 100 000<br />
200 000 200 000 200 000<br />
6 000 000 8 000 000 8 000 000<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
Inkxaso-mali<br />
yayo<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
Iinkqubo eziKhethekileyo 105030 N/A GGPP12 IBhasari kaMasipala<br />
I-Ofisi yoMlawulo<br />
205005 N/A GGPP05 Ukubhalwa kwezibonelo studies<br />
kaMasipala<br />
I-Ofisi yoMlawuli<br />
205005 N/A GGPP12 Usungulo lwesikhokelo se-MDG<br />
kaMasipala<br />
I-Ofisi yoMlawuli<br />
205005 N/A GGPP01 Uvavanyo loMngcipheko<br />
kaMasipala<br />
I-Ofisi yoMlawuli<br />
IsiCwangciso soPhicotho zincwadi<br />
205005 N/A MFMV06<br />
kaMasipala<br />
sokujika izinto<br />
73<br />
3 500 000 3 000 000 3 000 000<br />
IModeli yokudityaniswa<br />
kweNgqiniseko<br />
205005 N/A GGPP01<br />
I-Ofisi yoMlawuli<br />
kaMasipala<br />
“Isixeko esikhula kunye nawe”
6.5 IPROJEKTHI EZINKULU ZIKA-2012-15<br />
2012-2015 UYILO<br />
LOHLAHLO MALI<br />
LWEZINTO ZEXESHA<br />
ELIDE<br />
IMVELAPHI<br />
YENKXASO<br />
IGAMA LEPROJEKTHI<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
Reeston IsiGaba 3 INqanaba 2 -P1 & P3 USDG 31,500,000<br />
Mdantsane Zone 18 CC IsiGaba 2 - P1 & P3 USDG 27,343,400<br />
Manyano & Thembelihle IsiGaba 2 - P1 & P3 USDG 8,200,000<br />
Second Creek (Turn Key) - P1 & P3 USDG 8,100,000<br />
Block Yard TRA - P 1& P3 USDG 1,000,000<br />
DVRI PILOT PROJECT (Mekeni, Haven Hills, Competition Site) P1 & P3 USDG 2,500,000<br />
IQela 1 (Chris Hani, Ilinge, Mahlangu Village, Sisulu Village, Winnie Mandela, Deluxolo Village &<br />
USDG 24,701,823<br />
Francis Mei) P1 & P3<br />
IQela 2 (Masibambane, Masibulele, Velwano, Gwentshe Village, Mathemba Vuso) P1 & P3 USDG 15,424,800<br />
IQela 3 (Fynbos Informal 1, Fynbos Informal 2, Ndancama) P1 & P3 USDG 32,892,525<br />
Sunny South - P1 & P3 USDG 3,600,000<br />
Potsdam Ikhwezi Block 1 - P1 & P3 USDG 2,415,950<br />
Potsdam Ikhwezi Block 2 - P1 & P3 USDG 2,415,950<br />
Potsdam Ikhwezi Block 2- P1 USDG 2,415,950<br />
Potsdam North Kanana - P1 USDG 2,415,950<br />
Amalinda Co- op P1 & P3 USDG 2,757,312<br />
Amalinda Fairlands P1 & P2 USDG 2,757,312<br />
Dacawa P4 USDG 2,960<br />
Fynbos Informal 1-P4 USDG 27,488<br />
74<br />
“Isixeko esikhula kunye nawe”
2012-2015 UYILO<br />
LOHLAHLO MALI<br />
LWEZINTO ZEXESHA<br />
ELIDE<br />
IMVELAPHI<br />
YENKXASO<br />
IGAMA LEPROJEKTHI<br />
Fynbos Informal 2-P4 USDG 210,230<br />
Ilinge-P4 USDG 118,087<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
Ilitha – Ukupheliswa kwezindlu zamaplanga kwnziwe ezisezingeni -Eradication of Wooden Houses<br />
USDG 400,000<br />
to Formal Houses<br />
Masibambane-P4 USDG 20,038<br />
Masibulele-P4 USDG 20,553<br />
Mdantsane Zone 18 CC IsiGaba 2-P4 USDG 256,425<br />
Ndacama-P2 USDG 160,000<br />
Ndacama-P4 USDG <strong>13</strong>8,308<br />
Sisulu Village-P4 USDG 19,636<br />
Sunny South-P4 USDG 112,7<strong>13</strong><br />
Velwano-P4 USDG 81,999<br />
Winnie Mandela-P4 USDG 38,535<br />
Amalinda (Co-op) - P2 (EIA) USDG 200,000<br />
Fynbos Informal 1-P2 USDG 120,000<br />
Fynbos Informal 2-P2 USDG 110,000<br />
Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100,000<br />
Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100,000<br />
Potsdam North Kanana - P2 (EIA) USDG 100,000<br />
Potsdam Village Rural IsiGaba 1 & 2 - P2 (EIA) USDG 100,000<br />
Amalinda Fairlands Projects - P2 USDG 435,000<br />
75<br />
“Isixeko esikhula kunye nawe”
2012-2015 UYILO<br />
LOHLAHLO MALI<br />
LWEZINTO ZEXESHA<br />
ELIDE<br />
IMVELAPHI<br />
YENKXASO<br />
IGAMA LEPROJEKTHI<br />
Potsdam Unit P4 INqanaba 2 - P4 USDG 3,000<br />
Second Creek P4 USDG 3,000<br />
Dacawa P4 USDG 800,000<br />
IZINDLU 174,118,944<br />
Uphuhliso lwesiCwangciso esiKhulu seeNdlela ze-BCMM 8,000,000<br />
Iindlela zaseMdantsane USDG 265,903,392<br />
West Bank Restitution USDG 53,000,000<br />
Quenera Main Roads USDG 5,000,000<br />
BCMM Roads Upgrade USDG 110,000,000<br />
Rehabilitation of Rural Roads Upgrade USDG 45,000,000<br />
IINDLELA 486,903,392<br />
Nord Avenue Isitishi Sempompo - Pump station USDG 4,000,000<br />
Quinera Ukucocwa kwamanzi amdaka - Treatment Works USDG 19,000,000<br />
Ukuxhotyiswa kococo lwaManzi amdaka (Zwelitsha) USDG 116,000,000<br />
Reeston IsiGaba 3 INkonzo yelindle oluninzi USDG 50,000,000<br />
Bufferstrip Ukucocwa Kwamanzi - Sanitation – Mdantsane USDG 1,108,250<br />
Mdantsane Sewers – Refurbishment USDG 17,000,000<br />
Diversion of Amalinda and Wilsonia effluent to Reeston USDG 80,000,000<br />
UGutyulo lwaseMbindini emaphandleni - (Nxwemeni Mbindini & Inland) USDG 103,208,000<br />
Ilindle laseEastern Beach USDG 45,000,000<br />
Izakhiwo wokumelana nelindle USDG 9,000,000<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
76<br />
“Isixeko esikhula kunye nawe”
2012-2015 UYILO<br />
LOHLAHLO MALI<br />
LWEZINTO ZEXESHA<br />
ELIDE<br />
IMVELAPHI<br />
YENKXASO<br />
IGAMA LEPROJEKTHI<br />
Izakhiwo eQonce naseBisho (zamanzi) USDG 64,000,000<br />
Ukususwa kweMidblocks eMdantsane USDG 15,000,000<br />
Ukunikezelwa kwamanzi e-Amahleke USDG 9,000,000<br />
lLINDLE 532,316,250<br />
Uxhotyiso lokuncedisa kucoco lwaManzi - Umzonyana/Raising Upper weir USDG 56,000,000<br />
Uhlaziyo lwezixokelelwano zamanzi ngokwengxinano nokwandiswa USDG 38,000,000<br />
Unikezelo ngamanzi amaninzi eNewlands kunye neminye imimandla USDG 1,000,000<br />
Wadi 33 Isikimu sokunikezala ngamanzi USDG 3,000,000<br />
Unikezelo ngamanzi amaninzi kummandla wase-Nxwemeni USDG 6,276,293<br />
Unikezelo ngamanzi eWinterstrand USDG 1,000,000<br />
AMANZI 105,276,293<br />
UKusekwa kweDolophu yaseMdantsane USDG 1,100,000<br />
Ukuphunyezwa kwe-ITP USDG 9,000,000<br />
IRenki zeeteksi USDG 80,000,000<br />
Gonubie Main Road USDG 60,000,000<br />
N2/R72 uphando ngendlela elikhonkco USDG 26,200,000<br />
UCWANGCISO LWEZOTHUTHO 176,300,000<br />
UPhuhliso lwezakhiwo zolimo eziDolophini e-BCM USDG 8,000,000<br />
Izakhiwo zoPhuhliso loQoqoqsho(Uphuhliso lomzila yamaFa; usungulo lwezitandi zethutyana) USDG 62,254,978<br />
Ikqubo yezakhiwo zoQoqosho USDG 11,845,200<br />
I-LED 82,100,178<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
77<br />
“Isixeko esikhula kunye nawe”
2012-2015 UYILO<br />
LOHLAHLO MALI<br />
LWEZINTO ZEXESHA<br />
ELIDE<br />
IMVELAPHI<br />
YENKXASO<br />
IGAMA LEPROJEKTHI<br />
Ukuphuhliswa kweePaka zoLuntu (Mdantsane, Potsdam, Rheeston) USDG 10,000,000<br />
Uphuhliso nohlaziyo lwamaNgcwaba(Inland, Mbindini and Nxwemeni) USDG 37,040,943<br />
Uphuhliso nohlaziyo lwamaHolo oluntu USDG 54,000,000<br />
Izakhiwo zemidlalo & nolonwabo USDG 69,000,000<br />
IINKONZO ZOLUNTU 170,040,943<br />
IsiTitshi soTshinstho esiseMbindini (EL CBD) USDG 33,000,000<br />
UKwakhiwa kweseli entsha – Indawo yeRoundhill Regional Landfill USDG 5,764,000<br />
UKwakhiwa kwendawo yokuqokelela kwa-Wadi 10,5 &12 USDG 3,000,000<br />
Ukusekwa kwesititshi sotshintsho eMbindini, ukwakhiwa kwendawo yokuchitha inkunkuma, kunye<br />
USDG 17,000,000<br />
nokusekwa nokuhlaziywa kwesititshi soTshintsho<br />
Ukwakhiwa kweSel ye-4 USDG 9,000,000<br />
INKUNKUMA 67,764,000<br />
Izakhiwo eNxwemeni kunye naseMbindini USDG 9,000,000<br />
Isikhululo somlilo eQonce USDG 6,000,000<br />
Isikhululo somlilo eTsholomnqa USDG 15,500,000<br />
UMLILO 30,500,000<br />
uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />
Uhlolo lwesicwangciso sophuhliso<br />
oluhlangeneyo • 2012 - 20<strong>13</strong><br />
78<br />
ISIXA MALI SEEPROJEKTHI EZINKULU 1,825,320,000<br />
“Isixeko esikhula kunye nawe”
79<br />
AFRIKAANS
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
INHOUDSOPGAWE<br />
Voorwoord deur Uitvoerende Burgemeester 81<br />
Oorsig deur die Stadsbestuurder 83<br />
1. BCMM SE VISIE, MISSIE & WAARDES 85<br />
1.1 BCMM se Visie 85<br />
1.2 BCMM se Missie 85<br />
1.3 BCMM se Kernwaardes 85<br />
2. WAT IS ‘N GEÏNTEGREERDE ONTWIKKELINGSPLAN (GOP)? 86<br />
3. WAT IS ‘N BEGROTING? 87<br />
4. DIE GOP-PROSES WAT GEVOLG IS 88<br />
5. GOP-INLIGTINGSBRONNE EN STRATEGIESE FOKUSGEBIEDE 90<br />
5.1 Inligtingsbronne vir die GOP 90<br />
5.2 Sleutel- strategiese doelstellings 91<br />
5.3 Strategiese Fokusgebiede 92<br />
6. 2012/<strong>13</strong> – 2014/15 BEGROTING: MEDIUMTERMYN- INKOMSTE-EN-<br />
BESTEDINGSRAAMWERK (‘MTREF’)<br />
6.1 Opsomming van Kapitaalbegroting 97<br />
6.2 Opsomming van Bedryfsbegroting 98<br />
6.3 Kapitaalprojekte (2012/<strong>13</strong> – 2014/15) 99<br />
6.4 Bedryfsprojekte (2012/<strong>13</strong> – 2014/15) 109<br />
6.5 Groot projekte (2012/<strong>13</strong> – 2014/15) 121<br />
80<br />
97<br />
“’n Stad wat met u groei”
VOORWOORD DEUR UITVOERENDE<br />
BURGEMEESTER<br />
Die veranderende en verskuiwende sosio-ekonomiese<br />
dinamika van bestaan in <strong>Buffalo</strong>stad het nogmaals die<br />
strategiese herposisionering van ons ontwikkelings-<br />
en diensleweringsprogramme en -doelstellings nodig<br />
gemaak sodat seker gemaak kan word dat sodanige<br />
programme ingestel is op die hersiene behoeftes van ons<br />
belangegroepe en gemeenskappe.<br />
In dié verband het dit nodig geword om weer na die Metro<br />
se Geïntegreerde Ontwikkelingsplan te kyk, ons ruimtelike<br />
ontwikkelingsraamwerk in heroorweging te neem, en ons<br />
ontwikkelingsaanwysers en -mikpunte vir die 2012/<strong>13</strong><br />
finansiële jaar te hersien.<br />
Die inhoud van hierdie GOP-hersieningsdokument is dus opgestel aan die hand van die nuwe<br />
en opkomende aspirasies en behoeftes van die mense van <strong>Buffalo</strong>stad, soos uitgespreek<br />
op die behoorlik saamgestelde vergarderings van die verskillende gemeenskappe en<br />
belangegroepe wat vir dié doel belê is. Ons glo dat, as die regeringsfeer wat die naaste<br />
aan die mense is, ons ‘n sterk verpligting het om regstreeks, onmiddellik en positief op die<br />
behoeftes en frustrasies van ons belangegroepe en gemeenskappe te reageer.<br />
In die voorlegging van hierdie GOP-hersieningsdokument wil ek die inwoners van <strong>Buffalo</strong>stad<br />
dus bedank vir hulle positiewe reaksie op die oproep om die Metroraad by te staan met<br />
die hersiening van sy ontwikkeling-en-diensleweringsagenda vir die Stad en sy diverse<br />
gemeenskappe. Ons sou nooit dié doelstelling kon verwesenlik het as dit nie was vir die<br />
aktiewe en volgehoue deelname van ons gemeenskappe in die rigting- en tempobepaling van<br />
ons ontwikkelingsprogramme en -projekte nie.<br />
Die strategiese fokusgebiede wat in hierdie GOP-hiersieningsdokument vervat word, sluit die<br />
volgende in: institutionele herstrukturering en stabilisering, werkskepping, die ontwikkeling<br />
van volhoubare gemeenskappe, die oorbrugging van die digitale kloof, die verbetering van<br />
regerings- en finansiële lewensvatbaarheid, asook die opbou van vertroue onder inwoners.<br />
Hierdie document sit ook die spesifieke projekte en programme wat onderneem moet word,<br />
uiteen. Dit sluit onder meer in die voorsiening van bykomende menslike nedersettings,<br />
‘n elektrisiteits- en watertoevoer aan informele nedersettings, vaardigheids- en<br />
sektorontwikkelingsprogramme om ekonomiese ontwikkeling te bevorder en te volhou, en<br />
die skep van ‘n omgewing waarin kwesbare groepe baat kan vind by die Metro se sosioekonomiese<br />
agenda.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
81<br />
“’n Stad wat met u groei”
Ten slotte herbevestig ek graag die verbintenis van die politieke leierskap en bestuur van<br />
die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit tot die taak om die plaaslike belange van ons<br />
mense te dien, binne die konteks van die nasionale prioriteit om ‘n beter lewe vir al ons<br />
mense te skep.<br />
ZUKISWA NCITHA<br />
UITVOERENDE BURGEMEESTER<br />
BUFFALOSTAD METROPOLITAANSE MUNISIPALITEIT<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
82<br />
“’n Stad wat met u groei”
OORSIG DEUR DIE STADSBESTUURDER<br />
Die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit het pas sy<br />
eerste finansiële jaar as ‘n metropolitaanse munisipaliteit<br />
afgesluit, nadat dit in Mei 2011, kort na afloop van die<br />
plaaslike regeringsverkiesing, kategorie ‘A’ of Metrostatus<br />
opgelê is.<br />
Die afgelope twaalf (12) maande is noodwendig gekenmerk<br />
deur kritiese oorgangsaktiwIteite wat daarop gerig was<br />
om ‘n grondslag vir die nuwe metropolitaanse munisipale<br />
organisasie te lê. ‘n Nuwe politieke leierskap is in beide<br />
die wetgewende en uitvoerende strukture van die Raad<br />
ingehuldig. Die Metro het ook wyksverkiesings gehou en<br />
wykskomitees in al die pas afgebakende 50 wyke gestig.<br />
Ingevolge die bepalings van die Wet op Munisipale Strukture (1998) het die <strong>Buffalo</strong>stad<br />
Metropolitaanse Munisipaliteit ook twintig (20) tradisionele leiers in die munisipale Raad<br />
opgeneem.<br />
Uit ‘n strategiese oogpunt het die Metro sy Geïntegreerde Ontwikkelingsplan 2011-2016 op<br />
30 Junie 2011 aanvaar. Die Plan is deur die vorige Raad opgestel. Die hersiening van die<br />
Plan, wat deur die laaste helfte van 2011 en die begin van 2012 gedoen is, het die nuwe Raad<br />
egter in staat gestel om die strategiese agenda wat in die voorheen aanvaarde GOP vervat<br />
is, te heroorweeg.<br />
Die 2012/<strong>13</strong> GOP-hersieningsproses het die volgende faktore en aktiwiteite as grondslag<br />
gehad: Raadsprioriteite; prioriteite wat tydens die Burgemeester se Lekgotlas bepaal is;<br />
Wyksprioriteite: twaalf regeringsuitkomste; sewe uitsette ten opsigte van Uitkoms 9<br />
(plaaslike regering); die Konsep- Nasionale Ontwikkelingsplan wat deur die Nasionale<br />
Beplanningskommissie opgestel is; Millennium-ontwikkelingsdoelstellings; die Provinsiale<br />
Groei-en-Ontwikkelingsplan; en die Nasionale Ruimtelike Ontwikkelingsperspektief.<br />
Die hersiening wat gedoen is, het bevestig dat die Raad se ses (6) strategiese doelstellings<br />
die volgende is:<br />
1. Om ‘n finansieel gesonde organisasie wat sy middele doeltreffend bestuur, te wees;<br />
2. Om ‘n institusioneel doeltreffende en doelmatige Stad wat inklusief met gemeenskappe<br />
saamwerk, te wees;<br />
3. Om ‘n omgewing te skep waarin die ekonomie kan groei, diversifiseer, ‘n groeiende<br />
getal volhoubare werksgeleenthede skep, en tot hoer inkomste en gelykheid bydra;<br />
4. Om volhoubare infrastruktuur te voorsien wat sosiale en ekonomiese ontwikkeling<br />
ondersteun;<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
83<br />
“’n Stad wat met u groei”
5. Om, teen 2016, ‘n goed gestruktureerde en bevoegde instansie te wees wat doeltreffende<br />
en doelmatige dienste aan almal voorsien;<br />
6. Om, teen 2016, alle omgewingsbates en natuurlike hulpbronne binne die <strong>Buffalo</strong>stad<br />
Metropolitaanse Munisipaliteit te verbeter en te beskerm.<br />
Gedurende die hersiening is die volgende nege (9) strategiese fokusgebiede vir insluiting en<br />
inlynbringing met die GOP geïdentifiseer:<br />
1. Institusionele herstrukturering en stabilisering.<br />
2. Verbetering van tussenregeringsbetrekkinge.<br />
3. Bou van vertroue onder inwoners.<br />
4. Oorbrugging van digitale kloof.<br />
5. Verbetering van prestasie, voldoening, prosesse en stelsels.<br />
6. Bou van volhoubare gemeenskappe.<br />
7. Werkskepping.<br />
8. Verbetering van regering.<br />
9. Finansiële lewensvatbaarheid.<br />
Die programme, projekte en aktiwiteite van die Munisipaliteit in die 2012/<strong>13</strong> finansiële jaar<br />
staan in lyn met bogemelde strategiese doelstellings en sleutelfokusgebiede. Ingevolge<br />
die Raad se Prestasiebestuursbeleid en raamwerk, asook ander voldoeningsgebaseerde<br />
verslagdoening sal daar op ‘n maandelikse, kwartaallikse, halfjaarlikse en jaarlikse grondslag<br />
oor die vordering van die Metro en die hantering van die Raad se prioriteite vir die finansiële<br />
jaar verslag gedoen word.<br />
Die Metro se administratiewe pogings om in die diensleweringsbehoeftes van sy gemeenskappe<br />
te voorsien en die kollektiewe verwesenliking van die Raad se leweringsprogram te verseker,<br />
word in hierdie hersiene Geïtegreerde Ontwikkelingsplan (2012/<strong>13</strong>) vervat.<br />
ANDILE FANI<br />
STADSBESTUURDER<br />
BUFFALOSTAD METROPOLITAANSE MUNISIPALITEIT<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
84<br />
“’n Stad wat met u groei”
1. BCMM SE VISIE, MISSIE & WAARDES<br />
1.1 BCMM sE VISIE<br />
Deur strategiese beplanningsessies het die leierskap van die Munisipaliteit die visie en<br />
missie van die organisasie hersien om dit meer robuust, verstaanbaar en realisties te maak,<br />
waardeur dit ‘n nuttige instrument geword het om die aksies van die Stad, sy inwoners en<br />
sleutelbelanghebbendes in die ontwikkelingsproses te lei.<br />
’n Lantermynvisie van die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit is om die volgende te<br />
wees:<br />
1.2 BCMM sE MISSIE<br />
“’n responsiewe, mens- en ontwikkelingsgerigte Stad”<br />
In nastrewing van dié visie streef die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit daarna om<br />
‘n stad te wees wat:<br />
• ‘n Kultuur van goeie regering bevorder;<br />
• Doeltreffende en doelmatige munisipale dienste verskaf;<br />
• Belê in die ontwikkeling en behoud van menslike kapitaal om die stad en sy<br />
gemeenskap te dien;<br />
• Maatskaplike en gelyke ekonomiese ontwikkeling bevorder;<br />
• Munisipale volhoubaarheid en finansiële lewensvatbaarheid verseker;<br />
• ‘n Veilige en gesonde omgewing skep; en<br />
• Batho Pele-beginsels die kern van dienslewering maak.<br />
1.3 BCMM SE KERNWAARDES<br />
Die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit streef die volgende waardes na en is daartoe<br />
verbind om sy gemeenskappe te dien en dienste te lewer op ‘n wyse wat die volgende<br />
weerspieël:<br />
(i) Integriteit<br />
(ii) Goeie regering<br />
(iii) Deursigtigheid<br />
(iv) Rekenpligtigheid<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
85<br />
“’n Stad wat met u groei”
(v) Billikheid en gelykheid<br />
(vi) Professionalisme<br />
(vii) Getrouheid<br />
(viii) Uitmuntende diens<br />
(ix) Respek vir kulturele diversiteit<br />
(x) Eenheid van doel<br />
(xi) Ubuntu<br />
2. WAT IS ‘N GOP?<br />
Ingevolge die Wet op Munisipale Stelsel (32 van 2000) word ‘n GOP omskryf as ‘n strategiese<br />
beplanningsinstrument wat alle munisipale ontwikkeling in die Stad lei en informeer. Dit<br />
is die sleutelinstrument wat die Munisipaliteit in staat stel om die verwesenliking van sy<br />
ontwikkelingsdoelstellings, soos in die Grondwet geskets, na te streef.<br />
Dit bestaan uit ‘n langtermynvisie. Dit verstrek besonderhede van die ontwikkelingsprioriteite<br />
en -doelstellings wat tot die verwesenliking van hierdie visie bydra. Dit weerspieël strategieë<br />
wat deur die besonderhede in die begroting onderskryf word, wat aan die GOP gekoppel<br />
moet wees.<br />
‘n GOP wat deur die Raad van ‘n munisipaliteit aanvaar is, dien as daardie munisipaliteit<br />
se hoof- strategiese beplanningsinstrument wat alle beplannings- en ontwikkelingsbesluite<br />
binne die munisipale gebied lei en informeer.<br />
Artikel 34 van die Wet op Munisipale Stelsels bepaal dat Geïntegreerde Ontwikkelingsplanne<br />
jaarliks hersien word ingevolge ‘n evaluering van die prestasiemaatreëls wat daarin vervat<br />
word en in die mate wat deur veranderende omstandighede vereis word. Daar word ook van<br />
die Raad verlang om die proses wat vir die hersiening van die GOP gevolg sal word, op skrif<br />
te stel. Die Prosesplan moet die volgende insluit:<br />
• ‘n Program wat die tydsraamwerke uiteensit.<br />
• Die konsultasieprosesse en -prosedures.<br />
• Geidentifiseerde planne en beplanningsvereistes wat bindend op die Munisipaliteit is.<br />
• GOP- en Begrotingsprosesse/-programme wat in lyn gebring moet word.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
86<br />
“’n Stad wat met u groei”
Die GOP-hersiening vir 2012/<strong>13</strong> is onderneem as deel van die deurlopende siklus van<br />
beplanning, implementering en monitoring, soos geïllustreer in onderstaande Figuur.<br />
PRESTASIE-<br />
BESTUUR<br />
GOP-<br />
IMPLEMENTERING<br />
FIGUUR A.1: GOP-ontwikkelingsproses<br />
3. WAT IS ‘N BEGROTING?<br />
1. VOORBEREIDING VIR GOP<br />
HERSIENINGSDOKUMENT<br />
2. MONITERING & EVALUERING –<br />
BYGEWERKTE ONTLEDING<br />
3. VERFYNDE DOELSTELLINGS, STRATEGIEË,<br />
AANWYSERS & PROJEKTE & PROGRAMME<br />
(GEKOPPEL AAN BEGROTING)<br />
4. KONSOLIDEER GOP<br />
(INSLUITEND BEDRYFSPLANNE)<br />
5. GOEDKEURING - RAAD AANVAAR GOP &<br />
BEGROTING<br />
‘n Begroting is ‘n plan wat die aktiwiteite wat vir die komende finansiële jaar beplan word,<br />
in finansiële terme opsom deur die besteding uiteen te sit wat aangegaan sal word om<br />
uitvoering aan gemelde aktiwiteite te gee, asook die inkomste en kapitaal wat nodig is om<br />
gemelde besteding te finansier.<br />
Daar is twee tipes begrotings: Die bedryfsbegroting en die kapitaalbegroting.<br />
Die bedryfsbegroting behels die aankoop van goedere en dienste, waarvoor daar ‘n<br />
korttermynvoordeel sal wees. Bedryfsuitgawes sluit in salarisse, lone, herstelwerk en<br />
instandhouding, telefone en materiaal.<br />
Bedryfsinkomste is kontant verkry uit munisipale handelsrekenings, soos water, elektrisiteit,<br />
belasting en ander dienste.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
87<br />
OPENBARE DEELNAME<br />
“’n Stad wat met u groei”
Die kapitaalbegroting spesifiseer die besteding aan langtermyn-aankope en -beleggings,<br />
soos grond en geboue, motorvoertuie, masjinerie en toerusting, asook kantoormeubels. Dit<br />
sit die besteding aan goedere wat wesenlik vir langer as een finansiële jaar gebruik sal word,<br />
uiteen en sluit in die bou van paaie, geboue en voertuie.<br />
‘n Maklike manier om tussen die twee begrotings te onderskei, is om aan die aankoop van<br />
‘n motor te dink. ‘n Motor word onder die kapitaalbegroting aangekoop, omdat dit vir langer<br />
as een jaar gebruik sal word. Die brandstof waarop die motor loop en die onderhoud, is<br />
bedryfskoste en maak dus deel van die bedryfsbegroting uit.<br />
In ontwikkelings- plaaslike regering moet die GOP en Begroting gekoppel wees en word dit<br />
dus jaarliks hersien om skakeling met en die gemeenskap se goedkeuring vir die Stad se<br />
program te verkry.<br />
Totale Begroting 2012/<strong>13</strong> – 2014/15<br />
2011/12<br />
M/J HERSIENINGS-<br />
BEGROTING<br />
R000<br />
2012/<strong>13</strong><br />
R000<br />
88<br />
20<strong>13</strong>/14<br />
R000<br />
2014/15<br />
R000<br />
Bedryfsbegroting 3,448,368,587 3,966,637,294 4,453,7<strong>13</strong>,893 4,924,341,303<br />
Kapitaalbegroting 725,646,383 749,097,271 879,840,714 876,057,416<br />
Totale Begroting 4,174,014,970 4,715,734,565 5,333,554,607 5,774,398,719<br />
4. DIE GOP-PROSES WAT GEVOLG IS<br />
Artikel 28(1) van die Wet op Munisipale Stelsels vereis dat elke munisipaliteit ‘n proses op<br />
skrif stel en aanvaar wat as gids by die beplanning, opstel, aanvaarding en hersiening van<br />
sy Geïntegreerde Ontwikkelingsplan (GOP) moet dien. Ter voldoening aan hierdie vereiste<br />
het die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit die Plan op 26 Oktober 2011 aanvaar.<br />
Sleutelaktiwiteite wat ingevolge die hersiening van die GOP-begroting vir 2012/<strong>13</strong> onderneem<br />
is, sluit die volgende in:<br />
• 11 Oktober 2011 – ‘n werkwinkel is met BCMM-Raadslede en topbestuur belê.<br />
Die doel van die werkswinkel was onder meer om die konsep van geïntegreerde<br />
ontwikkelingsbeplanning te verduidelik en die rol van Raadslede, wykskomitees en ander<br />
belangegroepe te verduidelik; die GOP-begrotings-/ prestasiebestuurshersieningsproses<br />
vir die 2012/<strong>13</strong> finansiële jaar bekend te stel en ‘n gedeelde begrip van die proses<br />
te bevorder; en om ‘n proses in te stel waarvolgens wyksprioriteite wat die GOPbegrotingshersiening<br />
vir 2012/<strong>13</strong> sal informeer, geïdentifiseer word.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
“’n Stad wat met u groei”
• 26 Oktober 2011 – Raad het die GOP/Begroting/Prestasiebestuurstelsel-prosesplan<br />
aanvaar.<br />
• 4 November 2011 – ‘n Vergadering is oor die GOP/Begroting/Prestasiebestuurstelsel se<br />
Forum van Eksterne Verteenwoordigers gehou om institusionele prestasie oor die vorige<br />
finansiële jaar te oorweeg en om eksterne belanghebbendes voor te berei op die GOPontwikkelingsproses<br />
wat voorlê;<br />
• 11 en 14 November 2011 – ‘n Tegniese Werkgroepvergadering oor die GOP/Begroting/<br />
Prestasiebestuurstelsel is belê, waartydens sektorplankampioene ‘n samevatting van<br />
hul planne aangebied het ten einde inligting te verkry wat tydens die situasionele<br />
ontledingsfase geïntegreer kan word;<br />
• GOP strategiese werkgroepe het vergaderings belê om hul situasionele ontledingsverslae<br />
te bespreek en te voltooi. Die volgende vergaderings is in dié verband gehou:<br />
* Strategiese Werkgroep vir Finansies en Ondersteuningsdienste: 23 November 2011<br />
* Strategiese Werkgroep vir Munisipale Dienste: 25 November 2011<br />
* Strategiese Werkgroep vir Ontwikkelingsbeplanning en Bestuur: 30 November 2011<br />
* Strategiese Werkgroep vir Ontwikkelingsfasilitering en Vennootskappe: 20 Desember<br />
2011<br />
• 28 November 2011 – Die Stad het ‘n tegniese tussenregeringsbetrekkinge-sessie met<br />
provinsiale en nasionale regerings-departemente asook instansies in die burgerlike<br />
gemeenskap gehou om gesamentlike beplanning te bevorder en om inligting uit te ruil<br />
oor inisiatiewe wat binne die munisipale gebied onderneem word.<br />
• 19-21 Februarie 2012 – Die Burgemeester se Lekgotla is gehou om ‘n situasionele<br />
ontleding van die Stad te bespreek en om die weg vorentoe te bepaal ten opsigte van<br />
sleutel- strategiese prioriteite wat die hersiening van die GOP en begroting vir die<br />
2012/<strong>13</strong> finansiële jaar sal lei.<br />
• 11-<strong>13</strong> Maart 2012 –‘n Tegniese beplanningsessie is belê met die volgende oogmerke:<br />
* Om ‘n probleemverklaring oor die ontwikkelingsbaan (‘trajectory’) van die Metro op te<br />
stel.<br />
* Om die politieke mandaat (Lekgotla-lewerbares) met strategiese doelstellings in lyn<br />
te bring ten einde die Metro se uitdagings die hoof te bied.<br />
* Om die BCMM en ander regeringsfere se beplanning in lyn te bring.<br />
* Om sleutel- strategiese fokusgebiede vir 2012 en verder, wat die ontwikkelingsbaan<br />
van die Metro sal lei, te bepaal.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
89<br />
“’n Stad wat met u groei”
• 23 Maart 2012 – ‘n GOP/Begrotingsessie vir Raadslede is by die Regent-hotel gehou om<br />
die volgende te oorweeg:<br />
* Die konsep- situasionele ontleding van die BCMM.<br />
* Die uitkomste van die Burgemeester se lekgotla en die tegniese beplanningsessie.<br />
* Die Begroting vir die Konsep-GOP 2012/<strong>13</strong> en Mediumtermyn-inkomste-enbestedingsraamwerk<br />
(‘MTREF’)<br />
• 28 Maart 2012 – Tabulering in Raad van die Konsep-2012/<strong>13</strong> GOP-hersiening en<br />
2012/<strong>13</strong> Mediumtermyn-inkomste-en-bestedingsraamwerk (‘MTREF’) vir goedkeuring;<br />
• 16-17 April 2012 – ‘n GOP/Begrotingsessie vir Raadslede om wysigings aan die Konsep-<br />
GOP/Begroting en die beoogde GOP/Begroting- openbare sessies (‘roadshows’) te<br />
oorweeg.<br />
• 23-30 April 2012 – GOP/Begroting- openbare sessies (‘roadshows’) is in 15 lokale<br />
regdeur die Metro gehou.<br />
• 4 Mei 2012 – ‘n GOP/Begroting-sakeontbyt is gehou om met belanghebbendes<br />
uit die sakesektor oor die Konsep-GOP 2012/<strong>13</strong> en Mediumtermyn-inkomste-enbestedingsraamwerk<br />
(‘MTREF’) oorleg te pleeg.<br />
• 25 Mei 2012 – Die Raad se Ope Dag om terugvoering oor die uitkoms van die GOP/<br />
Begroting- openbare sessies (‘roadshows’) aan eksterne belangegroepe te gee.<br />
• 29 Mei 2012 – Aanvaarding van die GOP-hersiening 2012/<strong>13</strong> en Begroting vir die<br />
Mediumtermyn-inkomste-en-bestedingsraamwerk (‘MTREF’).<br />
5. GOP-INLIGTINGSBRONNE EN STRATEGIESE<br />
FOKUSGEBIEDE<br />
5.1 INLIGTINGSBRONNE VIR DIE GOP<br />
Die GOP-proses is binne die raamwerk van Nasionale, Provinsiale en Distriksbeleidsrigtings<br />
en –wetgewing onderneem. Die volgende het as inligtingsbronne vir die ontwikkeling van<br />
die GOP gedien:<br />
• Wyksprioriteite;<br />
• Prioriteite van die Burgemeester se lekgotla, wat op 19 tot 21 Februarie 2012 gehou is;<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
90<br />
“’n Stad wat met u groei”
• 12 uitkomste van die regering;<br />
• Uitkomste van die tegniese beplanningsessie wat op 11 tot <strong>13</strong> Maart 2012 gehou is;<br />
• Die Konsep-nasionale ontwikkelingsplan wat deur die Nasionale Beplanningskommissie<br />
opgestel is;<br />
• Millennium-ontwikkelingsdoelstellings;<br />
• Provinsiale Groei-en-Ontwikkelingsplan;<br />
• Nasionale Ruimtelike Ontwikkelingsperspektief.<br />
5.2 SLEUTEL- STRATEGIESE DOELSTELLINGS<br />
Voortspruitend uit ‘n situasionele ontleding wat met die oog op die ontwikkeling van die<br />
GOP gedoen is, het die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit ‘n aantal uitdagings en<br />
struikelblokke geïdentifiseer wat ‘n uitwerking het op die wyse waarop die Munisipaliteit<br />
funksioneer en uitvoering gee aan sy mandaat ingevolge Artikel 152 van die Suid-Afrikaanse<br />
Grondwet. Uitdagings wat die Metro in die gesig staar, sluit in die krimpende inkomstebasis<br />
en swak bestuur van hulpbronne, ondoeltreffendhede wat die manier beperk waarop die Stad<br />
in wisselwerking met die gemeenskappe tree, verouderende infrastruktuur en uitgestelde<br />
instandhoudingswerk, strukturele ondoeltreffendhede wat swak diensleweringstandaarde<br />
tot gevolg het, swak ekonomiese groei en ‘n hoë werkloosheidsyfer, en kwesbare<br />
omgewingsbates en natuurlike hulpbronne.<br />
Om die geïdentifiseerde uitdagings die hoof te bied en tot die verwesenliking van die visie te<br />
werk, het die Stad sewe strategiese fokusgebiede geïdentifiseer en die volgende langtermyn-<br />
strategiese doelstellings gestel:<br />
1.4.1 BCMM 1: Om ‘n finansieel gesonde organisasie te wees wat sy hulpbronne<br />
doeltreffend bestuur;<br />
1.4.2 BCMM 2: Om ‘n institusioneel doeltrefffende en doelmatige Stad te wees wat<br />
inklusief met gemeenskappe saamwerk;<br />
1.4.3 BCMM 3: Om ‘n bevorderlike omgewing te skep vir ‘n groeiende ekonomie<br />
wat besig is om te diversifiseer en ‘n groeiende aantal volhoubare<br />
werksgeleenthede genereer en wat tot verhoogde inkomste en gelykheid<br />
lei;<br />
1.4.4 BCMM 4: Om volhoubare infrastruktuur te verskaf wat maatskaplike en<br />
ekonomiese ontwikkeling steun;<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
91<br />
“’n Stad wat met u groei”
1.4.5 BCMM 5: Om ‘n goed gestruktureerde en bevoegde organisasie te skep wat teen<br />
2016 doeltreffende en doelmatige dienste aan almal lewer;<br />
1.4.6 BCMM 6: Om alle omgewingsbates en natuurlike hulpbronne binne die <strong>Buffalo</strong>stad<br />
Metropolitaanse Munisipaliteit teen 2016 te verbeter en te beskerm.<br />
Die Metro het die sleutel- strategiese doelstellings in lyn gebring en sal daarna streef om dit<br />
binne die konteks van die vyf sleutelprestasiegebiede van plaaslike regering te verwesenlik.<br />
5.3 STRATEGIESE FOKUSGEBIEDE<br />
Indien die heersende ekonomiese omgewing en die globale faktore wat ‘n uitwerking op<br />
ontwikkeling het, in aanmerking geneem word, het die Stad wesenlike vordering gemaak om<br />
die sleuteluitdagings wat die Munisipaliteit in sy ontwikkeling in die gesig staar, die hoof te<br />
bied. Meer werk moet egter gedoen word ten opsigte van die geïdentifiseerde fokusgebiede.<br />
Oor die volgende vyfjaartermyn sal die Stad op die volgende nege strategiese fokusgebiede<br />
konsentreer:<br />
5.3.1 Institusionele herstrukturering en stabilisering<br />
Die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit is tans besig met ‘n proses om sy administrasie<br />
te herstruktureer en te stabiliseer. Dit behels die vul van poste op die goedgekeurde<br />
makrostruktuur, d.w.s. die Stadsbestuurder en Artikel 56-bestuurders.<br />
Die medium- tot langtermyndoelstelling van die Metro is om organisatoriese doeltreffendheid<br />
te bevorder deur personeel meer bevoeg te maak en stelsels in te stel om personeel in staat<br />
te stel om hul pligte doeltreffend te verrig, in lyn met die nuwe Metro-funksies.<br />
5.3.2 Verbetering van tussenregeringsbetrekkinge<br />
Artikel 41 van die Suid-Afrikaanse Grondwet van 1996 bevat die beginsels van kooperatiewe<br />
regering en tussenregeringsbetrekkinge; dit verskaf ‘n breë raamwerk van hoe die<br />
verskillende regeringsfere moet saamwerk. Artikel 4 van die Wet op die Raamwerk vir<br />
Tussenregeringsbetrekkinge (Nr. <strong>13</strong> van 2005) lui voorts dat die doel van die Wet is om<br />
‘n raamwerk te bied waarbinne die nasionale regering, provinsiale regerings en plaaslike<br />
regerings, asook alle regeringsorganisasies binne daardie regerings, koördinasie in die<br />
implementering van Beleidsrigtings en Wetgewing kan bevorder. Die Wet vereis voorts dat<br />
provinsiale en distrik-tussenregeringsforums gestig word om tussenregeringsbetrekkinge<br />
tussen provinsies, distrikte en munisipaliteite te bevorder en te fasiliteer.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
92<br />
“’n Stad wat met u groei”
Artikel 3 van die Wet op Munisipale Stelsels (Nr. 32 van 2000), soos gewysig, omskryf voorts<br />
hoe plaaslike regering koöperatiewe benaderings tot die regering, die deel van middele en die<br />
oplossing van verskille binne die konteks van tussenregeringsbetrekkinge moet ontwikkel.<br />
Ten spyte van die bepalings van bogemelde wetgewing laat tussenregeringsbetrekkinge<br />
tussen die BCMM en ander regeringsfere steeds veel te wense oor, aangesien die betrekkinge<br />
steeds gekenmerk word deur die ongekoördineerde:<br />
• Inlynbringing van beplanning en implementering.<br />
• Samewerking tussen die sfere.<br />
• Deel van inligting oor ontwikkelingsprogramme en -projekte.<br />
• Deelname aan platforms vir oorlegpleging en samewerking; en<br />
• Benadering tot oorlegpleging met en konsultering van gemeenskappe.<br />
5.3.3 Bou van vertroue onder inwoners<br />
Swak prestasie in terme van dienslewering, administratiewe en politieke onstabiliteit, en<br />
negatiewe mediadekking het grootliks bygedra tot ‘n lae vlak van vertroue onder inwoners<br />
in die Stad.<br />
Die omswaai van hierdie tendens en die bou van vertroue onder inwoners sal ‘n doelgerigte<br />
poging aan die kant van die Metro vereis. Dit sal ook vereis dat ‘n nuwe werksetiek posvat<br />
onder almal wat die naam en merk (‘brand’) van die Munisipaliteit dra, asook die toepassing<br />
van goeie regerings- en bestuursbeginsels, toewyding en professionaliteit.<br />
5.3.4 Oorbrugging van die digitale kloof (‘digital divide’)<br />
Die digitale kloof verwys na enige ongelykhede tussen sosiale groepe ten opsigte van<br />
hul toegang tot, gebruik van, of kennis van inligtings- en kommunikasietegnologieë. Die<br />
kloof (“divide”) binne die munisipale gebied verwys na ongelykhede tussen individue,<br />
huishoudings, sakeondernemings en geografiese gebiede wat op verskillende sosioekonomiese<br />
en ander demografiese vlakke verkeer. Aangesien die Metro hoofsaaklik landelik<br />
is, manifesteer die kloof in die groot verskil tussen stedelike en landelike gebiede in toegang<br />
tot telekommunikasie- en inligtingtegnologiestelsels.<br />
‘n Sleuteldoelstelling van die Metro is om die internasionale versoenbaarheid van<br />
telekommunikasie- en inligtingtegnologiestelsels te verseker, waardeur toegang tot<br />
breëband- en/of ander moderne tegnologieë vir die inwoners van die Stad en streek<br />
gefasiliteer sal word.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
93<br />
“’n Stad wat met u groei”
5.3.5 Verbetering van prestasie, voldoening, prosesse en stelsels<br />
Sommige van die tekortkominge wat ‘n negatiewe uitwerking op die prestasie van die Metro<br />
het, het betrekking op gedisintegreerde stelsels, tekortkominge in interne kontrole, ‘n tekort<br />
aan personeel met die vereiste bevoegdhede, ‘n ruimtelik gefragmenteerde werksmag, asook<br />
‘n gebrek aan duidelik omskrewe prosesse en stelsels.<br />
Die volgende is nodig:<br />
• Ontwikkeling van meganismes vir die akkurate en volledige rapportering van finansiële<br />
inligting, soos vereis deur Nasionale Tesourie en Rekeningkundige Standaarde.<br />
• Ontwikkelingvanmeganismesomteversekerdatvoorsieningskettingbestuursprosesse<br />
(‘SCM operations’) streng aan regsvereistes voldoen.<br />
• Voorsiening moet gemaak word vir die migrasie van bestaande rekords en die<br />
vaslegging van lopende rekords binne ‘n enkele bewaarplek, ooreenkomstig die<br />
standaarde wat deur die Argiewewet en ander betrokke wetgewing voorgeskryf<br />
word en daar moet seker gemaak word dat sodanige rekords vir toekomstige gebruik<br />
getrek kan word.<br />
5.3.6 Ontwikkeling van volhoubare gemeenskappe<br />
Die fokuspunt oor die afgelope jare was op die lewering van basiese dienste en behuising. Ten<br />
spyte van die oorblywende agterstande is groot vordering in dié verband gemaak. ‘n Groot<br />
uitdaging is steeds om te verseker dat ons nie bloot huise voorsien nie, maar geïntegreerde<br />
en volhoubare nedersettings skep.<br />
Die uitdaging lê nie net daarina om basiese dienste en behuising te lewer nie, maar ook om<br />
volhoubare menslike nedersettings te bou waarin inwoners toegang geniet tot sosiale en<br />
gemeenskapsfasiliteite, ekonomiese geleenthede, ‘n gesonde en volhoubare omgewing en<br />
waarin gerieflike openbare vervoer- en veilige padnetwerke dit vir inwoners moontlik maak<br />
om toegang tot geleenthede te kry.<br />
Integraal tot die skepping van ‘volhoubare menslike nedersettings’ is geïntegreerde beplanning<br />
en implementering. Die Metro is tans in die proses om ‘n ‘Geïntegreerde Volhoubare Menslike<br />
Nedersettingsplan’ te ontwikkel, wat rigting aan toekomstige beleggings en ontwikkeling sal<br />
gee.<br />
Die skep van geïntegreerde en volhoubare menslike nedersettings sal regstreeks bydra<br />
tot die bou van sterk en geïntegreerde gemeenskappe wat weerstandig teen ongunstige<br />
maatskaplike, ekonomiese en natuurlike faktore is.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
94<br />
“’n Stad wat met u groei”
5.3.7 Werkskepping<br />
Die Stad erken dat swak ekonomiese groei en ‘n hoë werkloosheidsyfer steeds geld en groot<br />
uitdagings verteenwoordig. ‘n Uitvloeisel hiervan is ‘n betreklik hoë vlak van armoede, wat<br />
wydverspreid binne die Stad voorkom. Die hoë armoedevlak blyk duidelik uit statistiek in die<br />
2001 Sensus, waarvolgens ongeveer 70% van die huishoudings in die Stad ‘n inkomste van<br />
minder as R1500 per maand verdien, met 28% van alle huishoudings wat geen inkomste<br />
hoegenaamd ontvang nie. Die werkloosheidsyfer binne die Metro word op ongeveer 24%<br />
geraam.<br />
Een van die uitdagings in die toekomstige ontwikkeling van die <strong>Buffalo</strong>stad Metro is ‘n gebrek<br />
aan toepaslike onderwys- en vaardigheidsvlakke. ‘n Wesenlike persentasie van die Metro<br />
se potensiële arbeidsmag het nie skoolonderrig ontvang of hul primêre skoolfase voltooi<br />
nie. Daarbenewens, volgens die jongste Sensus, wat in 2001 gehou is, beskik net 21% van<br />
die Stad se inwoners wat 20 jaar of ouer is oor ‘n Graad 12-kwalifikasie; 16% het naskoolse<br />
onderrig ontvang; terwyl net 17% van diegene in die ouderdomsgroep 15 - 24 jaar met<br />
naskoolse studie besig was. Die 2007-gemeenskapsopname het ‘n geringe verbetering<br />
aangetoon.<br />
Die Stad sal homself oor die volgende vyf jaar daarop toespits om die situasie deur ‘n<br />
aantal programme te verbeter, veral deur plaaslike ekonomiese ontwikkelingsprogramme,<br />
om beleggers na die Stad te lok en daardeur die nasionale opdrag van werkskepping te<br />
gehoorsaam.<br />
<strong>Buffalo</strong>stad beskik oor ‘n aantal sterk punte wat stukrag aan groei en ontwikkeling kan verleen.<br />
‘n Paar van die voordele wat ontgin kan word om armoede te bestry en werksgeleenthede te<br />
skep, is die Stad se ligging aan die kus, die ongerepte natuur, ‘n presterende motorbedryf en<br />
die status dat dit die hoofstad van die Oos-Kaapprovinsie is.<br />
5.3.8 Verbetering van Regering<br />
Korrupsie en swak dienslewering ondermyn die geloofwaardigheid van die regering. As ‘n<br />
regering swak geloofwaardigheid het, ontwikkel ‘n demokratiese agterstand, wat demokrasie<br />
en beleggersvertroue ondermyn. Swak plaaslike regering lei tot lae beleggersvertroue in<br />
sowel regerings- as privaatsektorbesluite. Swak regering lei tot swak ekonomiese prestasie.<br />
‘n Stad wat goed bestuur word, het ‘n duidelike en deursigtige agenda vir langtermyn-<br />
strategiese werk in samewerking met alle belangegroepe geformuleer en dit aan alle partye<br />
wat deur die ontwikkelingsproses geraak word, gekommunikeer. ‘n Stad wat goed bestuur<br />
word, is afhanklik van ‘n wederkerige benadering deur ander regeringsfere en agentskappe.<br />
Verhoogde terugvoering van en oorlegpleging met die gemeenskap en groter terugvoer van<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
95<br />
“’n Stad wat met u groei”
klante is ander positiewe maatreëls wat in ‘n demokratiese en goed bestuurde stad aangetref<br />
word.<br />
Dit beteken ook dat basiese dienste van gehalte voorsien word deur ‘n finansieel gesonde en<br />
duidelike beleggingsraamwerk, wat in lyn is met die intervensies van ander verskaffers van<br />
basiese dienste in die openbare sektor.<br />
5.3.9 Finansiële volhoubaarheid<br />
Ten einde dit vir die Metro moontlik te maak om uitvoering te gee aan sy mandaat, soos wat<br />
in die Grondwet van Suid-Afrika vervat word, moet finansiële volhoubaarheid gehandhaaf<br />
word en moet sy inkomstebasis teenoor uitgawes vergroot word. Robuuste strategieë is<br />
nodig om die bestaande dilemma van ‘n afhanklikheid van toelaes om te swaai en te verseker<br />
dat die Stad oor die volgende vyf jaar en verder in ‘n finansieel gesonde posisie sal verkeer.<br />
Ten einde finansieel volhoubaar te word, sal die Stad meganismes vir die optekening en<br />
bestuur van die finansiële middele van die Munisipaliteit instel en nuwe inkomstestrome<br />
ondersoek en ontwikkel.<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
96<br />
“’n Stad wat met u groei”
6. 2012/<strong>13</strong> – 2014/15 BEGROTING:<br />
MEDIUMTERMYN- INKOMSTE-EN-<br />
BESTEDINGSRAAMWERK (‘MTREF’)<br />
6.1 OPSOMMING VAN<br />
2012/20<strong>13</strong> - 2014/2015 KAPITAALBEGROTING PER BEFONDSING<br />
Befondsing<br />
97<br />
2012/20<strong>13</strong><br />
Kapitaalbegroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
begroting<br />
2014/2015<br />
Kapitaal-<br />
begroting<br />
Eie fondse 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />
Totale Eie Befondsing 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />
Geïntegreerde Nasionale Elektrifiseringsprogram (INEP) 30 000 000 30 000 000 20 000 000<br />
Elektrisiteit: Vraagkantbestuurstoelae 10 000 000 0 0<br />
Buurtontwikkelings-vennootskaptoelae 0 0 8 828 000<br />
Openbare Vervoerinfrastruktuur en Stelseltoelae (PTIS) 78 702 000 78 762 000 0<br />
Stedelike Nedersettings: Ontwikkelingstoelae 491 145 828 602 860 000 680 691 000<br />
Menslike Nedersettings: Ontwikkelingstoelae 19 170 420 35 495 714 16 318 416<br />
Totale toelaes 629 018 248 747 117 714 725 837 416<br />
TOTAAL PER BEFONDSING 749 097 271 879 840 714 850 057 416<br />
2012/20<strong>13</strong> - 2014/2015 KAPITAALBEGROTING PER DIREKTORAAT<br />
Direktoraat<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
begroting<br />
2014/2015<br />
Kapitaal-<br />
begroting<br />
1. Uitvoerende Ondersteuningsdienste 4 500 000 2 000 000 0<br />
2. Kantoor van die Munisipale Bestuurder 0 0 0<br />
3. Hoofbedryfsbeampte 72 089 020 1<strong>13</strong> 700 478 111 064 024<br />
4. Direktoraat: Finansiële Dienste 3 600 000 3 000 000 3 000 000<br />
5. Direktoraat: Korporatiewe Dienste 32 600 000 23 250 000 25 750 000<br />
6. Direktoraat: Ingenieursdienste 411 259 273 473 614 293 484 773 392<br />
7. Direktoraat: Ontwikkelingsbeplanning 191 920 978 210 762 000 107 000 000<br />
8. Direktoraat: Gesondheid en Openbare Veiligheid 10 128 000 8 473 000 <strong>13</strong> 470 000<br />
9. Direktoraat: Gemeenskapsdienste 23 000 000 45 040 943 105 000 000<br />
749 097 271 879 840 714 850 057 416<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
“’n Stad wat met u groei”
6.2 OPSOMMING VAN BEDRYFSBEGROTING<br />
2012/20<strong>13</strong> - 2014/2015 BEDRYFSBEGROTING PER BEFONDSING<br />
BEDRYFSBEGROTING<br />
98<br />
2012/20<strong>13</strong><br />
Bedryfs-<br />
begroting<br />
20<strong>13</strong>/2014<br />
Bedryfs-<br />
begroting<br />
2014/2015<br />
Bedryfsbegroting<br />
Eie fondse 38 800 000 55 647 500 50 340 000<br />
Totale Eie Befondsing 38 800 000 55 647 500 50 340 000<br />
Finansiesbestuurstoelae 1 500 000 1 500 000 1 500 000<br />
Ontwikkelingstoelae: Infrastrukturele vaardighede 3 000 000 3 800 000 4 000 000<br />
Stedelike Nedersettings: Ontwikkelingstoelae 8 328 172 10 445 000 5 850 000<br />
Terugeise: Grondeisekommissie 300 000 300 000 0<br />
Plaaslike regering en behuising 77 000 0 0<br />
Ontwikkelingstoelae: Menslike Nedersettings 111 645 824 168 849 664 179 337 305<br />
Departement van Waterwese – DoRA 1 283 000 0 0<br />
Departement van Waterwese – Provinsiaal 400 000 0 0<br />
Departement van Waterwese – Versnelde Gemeenskapinfrastruktuurprogram<br />
(‘ACIP’)<br />
1 975 000 125 000 0<br />
Totale toelaes 128 508 996 185 019 664 190 687 305<br />
TOTAAL PER BEFONDSING 167 308 996 240 667 164 241 027 305<br />
2012/20<strong>13</strong> - 2014/2015 BEDRYFSBEGROTING PER BEFONDSING<br />
2012/20<strong>13</strong><br />
Bedryfs-<br />
begroting<br />
20<strong>13</strong>/2014<br />
Bedryfs-<br />
begroting<br />
2014/2015<br />
Bedryfs-<br />
begroting<br />
1.Uitvoerende Ondersteuningsdienste 5 650 000 7 680 000 4 680 000<br />
2. Kantoor van die Munisipale Bestuurder 6 200 000 8 200 000 8 200 000<br />
3. Hoofbedryfsbeampte 110 458 446 173 079 464 186 206 905<br />
4. Direktoraat: Finansiële Dienste 4 620 000 6 220 000 4 220 000<br />
5. Direktoraat: Korporatiewe Dienste 9 150 000 8 450 000 7 700 000<br />
6. Direktoraat: Ingenieursdienste 8 658 000 7 125 000 0<br />
7. Direktoraat : Ontwikkelingsbeplanning 22 572 550 29 912 700 30 020 400<br />
8. Direktoraat: Gesondheid en Openbare Veiligheid 0 0 0<br />
9. Direktoraat: Gemeenskapsdienste 0 0 0<br />
167 308 996 240 667 164 241 027 305<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
“’n Stad wat met u groei”
6.3 KAPITAALPROJEKTE 2012/<strong>13</strong> – 2014/15<br />
2014/2015<br />
Kapitaal-<br />
Begroting<br />
KosteStrategie- 2012/20<strong>13</strong> 20<strong>13</strong>/2014<br />
Wyks-<br />
Bron van<br />
sentrumkode (uit die<br />
Naam van projek<br />
Kapitaal- Kapitaalnommer<br />
befondsing<br />
nommer GOP)<br />
Begroting Begroting<br />
SLEUTELPRESTASIE-AANWYSER 1: MUNISIPALE TRANSFORMASIE EN ORGANISATORIESE ONTWIKKELING<br />
Naam van<br />
kostesentrum<br />
Eie fondse 2 500 000 1 500 000 1 000 000<br />
Electroniese<br />
bywoningsbeheerstelsel<br />
420005 MTOD03 NVT<br />
Menslikehulpbronadministrasie<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Eie fondse 20 000 000 20 750 000 23 750 000<br />
IT-stelsels (batebestuur,<br />
voorsienings-kettingbestuur<br />
(SCM), begrotingsraming<br />
en -modellering,<br />
aanvraagbestuurstelsel,<br />
brandstofbestuurstelsel en<br />
voorraadkoderingstelsel<br />
415025 MTOD06 NVT<br />
Bestuursinligtingsdienste<br />
415025 MTOD07 NVT IT-Infrastruktuurnetwerk Eie fondse 4 600 000 0 0<br />
Bestuursinligtingsdienste<br />
99<br />
Eie fondse 4 500 000 0 0<br />
Rampherstelsentrum<br />
(inligting- en<br />
kommunikasietegnologie)<br />
415025 MTOD07 NVT<br />
Bestuursinligtingsdienste<br />
415025 MTOD07 NVT Rekenaartoerusting – BCMM Eie fondse 500 000 1 000 000 1 000 000<br />
Bestuursinligtingsdienste<br />
Eie fondse 500 000 0 0<br />
Opgradering van BCMMwebtuiste<br />
(insluitend GIS op<br />
internet<br />
415205 MTOD08 NVT<br />
Bestuursinligtingsdienste<br />
TOTAAL 32 600 000 23 250 000 25 750 000<br />
SLEUTELPRESTASIE-AANWYSER 2: BASIESE DIENSVERSKAFFING EN INFRASTRUKTUURONTWIKKELING<br />
10 000 000 21 500 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Reeston Fase 3, Stadium 2<br />
-P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 12<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
2 000 000 7 412 400 17 931 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Mdantsane Sone 18 CC Fase<br />
2 - P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 21<br />
Nedersettings<br />
8 000 000 200 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Manyano &Thembelihle Fase<br />
2 - P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 17<br />
Nedersettings<br />
8 000 000 100 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Second Creek (Sleutelklaar)<br />
- P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 19<br />
Nedersettings<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
1 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsdepartement 255005 BSDID01 6 Blokwerf TRA - P 1& P3<br />
Nedersettings<br />
2 500 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
DVRI-loodsprojek (Mekeni,<br />
Haven Hills, Competition Site)<br />
Behuisingsdepartement 255005 BSDID01 19<br />
P1 & P3<br />
100<br />
3 706 200 9 265 500 11 730 123<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Kluster 1 (Chris Hani, Ilinge,<br />
Mahlangu Village, Sisulu<br />
Village, Winnie Mandela,<br />
Deluxolo Village & Francis<br />
48, 12,<br />
21, 11,<br />
17, 11,<br />
20<br />
Behuisingsdepartement 255005 BSDID01<br />
Mei) P1 & P3<br />
600 000 5 559 300 9 265 500<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Kluster 2 (Masibambane,<br />
Masibulele, Velwano,<br />
Gwentshe Village,<br />
MathembaVuso) P1 & P3<br />
Kluster 3 (Fynbos Informeel<br />
1, Fynbos Informeel 2,<br />
Ndancama) P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 17,14,<br />
7 412 400 11 859 840 <strong>13</strong> 620 285<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsdepartement 255005 BSDID01 5, 10<br />
Nedersettings<br />
600 000 1 000 000 2 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Behuisingsdepartement 255005 BSDID01 31 Sunny Suid - P1 & P3<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
0 <strong>13</strong>8 650 2 277 300<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Potsdam Ikhwezi Blok 1 - P1<br />
& P3<br />
Behuisingsdepartement 255005 BSDID01 23,24<br />
Nedersettings<br />
0 <strong>13</strong>8 650 2 277 300<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Potsdam Ikhwezi Blok 2 - P1<br />
& P3<br />
Behuisingsdepartement 255005 BSDID01 23,24<br />
Nedersettings<br />
0 <strong>13</strong>8 650 2 277 300<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsdepartement 255005 BSDID01 23,24 Potsdam Ikhwezi Blok 2- P1<br />
Nedersettings<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
0 <strong>13</strong>8 650 2 277 300<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsdepartement 255005 BSDID01 23,24 Potsdam Noord Kanana - P1<br />
Nedersettings<br />
0 1 126 562 1 630 750<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsdepartement 255005 BSDID01 9 Amalinda Ko-op P1 & P3<br />
Nedersettings<br />
101<br />
0 1 126 562 1 630 750<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsdepartement 255005 BSDID01 9 Amalinda Fairlands P1 & P2<br />
Nedersettings<br />
15 000 000 25 000 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fase 3: Stadium<br />
2 – P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 12<br />
Nedersettings<br />
1 000 000 5 559 300 5 559 300<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fase 3: Stadium<br />
3 – P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 12<br />
Nedersettings<br />
300 000 1 476 096 3 570 436<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Behuisingsdepartement 255005 BSDID01 2 Braelyn Uitbr. 10 – P1 & P3<br />
Nedersettings<br />
270 420 2 500 000 4 594 340<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
C Seksie en Driehoekperseel<br />
– P1 & P3<br />
Behuisingsdepartement 255005 BSDID01 7, 8<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
100 000 860 318 2 594 340<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Behuisingsdepartement 255005 BSDID01 7, 8 D Hostel – P1 & P3<br />
2 500 000 100 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
DVRI-loodsperseel (Mekeni,<br />
Haven Hills, Competition Site)<br />
Behuisingsdepartement 255005 BSDID01 6, 8<br />
0 0 8 828 000<br />
Buurtontwikkelingvennootskapstoelae<br />
Regenerasiestrategie:<br />
Dorpsgebied en sentrale<br />
sakegebied<br />
255005 BSDID27 NVT<br />
Regenerasie van<br />
dorpsgebiede<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Vlootbestuur - Braelyn 530020 BSDID29 NVT BCMM Vlootbestuurstelsel Eie fondse 3 100 000 3 500 000 4 000 000<br />
Vlootbestuur - Braelyn 530020 BSDID29 NVT BCMM Vloot Eie fondse 6 000 000 15 000 000 15 000 000<br />
102<br />
10 000 000 0 0<br />
Elektrisiteitvraagkantbestuurstoelae<br />
Elektrifisering –<br />
Energiedoeltreffende<br />
straatbeligting<br />
11, 12,<br />
14, 17,<br />
20, 21,<br />
22, 23,<br />
30<br />
535025 BSDID04<br />
Elektrisiteitsbeplanning<br />
en -ontwerp<br />
Eie fondse 5 000 000 50 000 000 50 000 000<br />
Grootmaatelektrisiteitsinfrastruktuur:<br />
Opgradering<br />
535025 BSDID04 16, 18<br />
Elektrisiteitsbeplanning<br />
en -ontwerp<br />
30 000 000 30 000 000 20 000 000<br />
Departement<br />
van Onderwys<br />
(Geïntegreerde<br />
Nasionale<br />
Elektrisiferingsprogram)<br />
Elektrifisering - Reeston,<br />
Potsdam-eenheid P,<br />
Infillsmdantsane, Dimbaza,<br />
Zwelitsha, Pakamisa, Bhisho<br />
en Duncan Village<br />
<strong>13</strong>, 25,<br />
43, 34,<br />
36<br />
535025 BSDID04<br />
Elektrisiteitsbeplanning<br />
en -ontwerp<br />
Eie fondse 5 000 000 20 000 000 20 000 000<br />
Elektrifisering van Informele<br />
nedersettings – Duncan<br />
Village-gebiede<br />
1,2, 7, 8,<br />
9, 10<br />
535025 BSDID04<br />
Elektrisiteitsbeplanning<br />
en -ontwerp<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
Eie fondse 27 851 023 0 0<br />
Elektrisiteitsinfrastruktuurnetwerk<br />
(2.47% tariefverhoging<br />
– ‘ring fenced’)<br />
2, 7, 15,<br />
16, 44<br />
535025 BSDID04<br />
Elektrisiteitsbeplanning<br />
en -ontwerp<br />
60 000 000 80 484 000 125 419 392<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Mdantsane-paaie<br />
21, 22,<br />
23<br />
525025 BSDID06<br />
Paaie en Stormwaterdreinering<br />
15 000 000 10 000 000 28 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Ontwerp van paaie 525020 BSDID06 46 West Bank-restitusie<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
5 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Ontwerp van paaie 525020 BSDID06 28 Quenera-hoofpaaie<br />
29, <strong>13</strong>,<br />
25, 39,<br />
34, 36,<br />
44, 41,<br />
1, 2,<br />
7, 8<br />
103<br />
30 000 000 30 000 000 50 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
BCMM- opgradering van<br />
paaie<br />
Ontwerp van paaie 525020 BSDID06<br />
10 000 000 10 000 000 25 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Rehabilitering van landelike<br />
paaie<br />
23, 38,<br />
43, 31,<br />
32, 24,<br />
32<br />
525025 BSDID06<br />
Paaie en Stormwaterdreinering<br />
152 608 250 155 854 000 99 854 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Grootmaatsanitasievoorsiening<br />
28, 4,<br />
41, <strong>13</strong>,<br />
16, 14,<br />
21, 22,<br />
5, 16,<br />
27, 31,<br />
32,33,<br />
47, 11<br />
515026 BSDID07<br />
Rioolbehandeling:<br />
Kusgebied<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
7 000 000 37 000 000 20 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
KWT, Dimbaza en Bhisho –<br />
Infrastruktuur (Water)<br />
34, 37,<br />
38, 39,<br />
40, 41,<br />
43, 44,<br />
49, 35<br />
Wateradministrasie 520005 BSDID07<br />
5 000 000 5 000 000 5 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Hervestiging van mid-blokke<br />
in Mdantsane<br />
11, 12,<br />
<strong>13</strong>, 14,<br />
42, 48,<br />
50, 17,<br />
20, 23<br />
Wateradministrasie 515010 BSDID07<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
3 000 000 3 000 000 3 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Wateradministrasie 515010 BSDID07 36 Amahleke-watertoevoer<br />
Versterking van<br />
waterbehandelingsvermoë<br />
- Umzonyana/Styggang<br />
(boonste dam)<br />
104<br />
12 000 000 22 000 000 22 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Grootmaat-pompstasies 520015 BSDID07 5, <strong>13</strong><br />
6 000 000 17 000 000 15 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Opgradering van<br />
waternetwerke ingevolge<br />
densifisering en versterking<br />
520020 BSDID07 NVT<br />
Waterbehandelingswerke<br />
1 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Grootmaat-watertoevoer:<br />
Newlands en ander gebiede<br />
520020 BSDID07 NVT<br />
Waterbehandelingswerke<br />
3 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Wyk 33 Grootmaatwatertoevoerskema<br />
520020 BSDID07 33<br />
Waterbehandelingswerke<br />
5 000 000 1 276 293 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Grootmaat-watertoevoer:<br />
Kusgebiede<br />
520020 BSDID07 31,33<br />
Waterbehandelingswerke<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
1 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
520020 BSDID07 31 Winterstrand-watertoevoer<br />
Waterbehandelingswerke<br />
Eie fondse 2 800 000 2 000 000 1 500 000<br />
Opgradering van<br />
laboratoriuminfrastruktuur en<br />
-toerusting<br />
520020 BSDID07 NVT<br />
Waterbehandelingswerke<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
78 702 000 78 762 000 0<br />
Toelae:<br />
Openbarevervoerinfrastruktuur<br />
en<br />
Stelsels<br />
Snelvervoerstelsel: Busse<br />
(‘Bus Rapid Transit’)<br />
1, 10,<br />
11, 12,<br />
<strong>13</strong>, 14,<br />
15, 16,<br />
17, 18,<br />
19, 2,<br />
20, 21,<br />
22, 23,<br />
24, 25,<br />
28, 3, 4,<br />
5, 6, 7,<br />
8, 9<br />
620005 BSDID23<br />
Vervoerbeplanning en<br />
Operasionale Admin<br />
105<br />
3 000 000 3 000 000 3 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Implementering<br />
van Geïntegreerde<br />
Vervoerbeplanning<br />
620005 BSDID23 NVT<br />
Vervoerbeplanning en<br />
Operasionale Admin<br />
Nedersettings<br />
23 000 000 22 000 000 30 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
620005 BSDID24 37 Openbarevervoer-fasiliteite<br />
Vervoerbeplanning en<br />
Operasionale Admin<br />
Nedersettings<br />
15 000 000 30 000 000 10 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
620005 BSDID24 27, 28 Gonubie-hoofpad<br />
Vervoerbeplanning en<br />
Operasionale Admin<br />
1 200 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
N2/R72 skakelpad: opname<br />
46, 31,<br />
10, 16,<br />
8, 19<br />
620005 BSDID24<br />
Vervoerbeplanning en<br />
Operasionale Admin<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
12 764 000 42 500 000 29 500 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Grondadministrasie 615080 BSDID21 1 -50 Grondaankope<br />
2 000 000 3 000 000 5 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Ontwikkeling van<br />
gemeenskapsparke<br />
(Binneland, Middelland en<br />
<strong>13</strong>, 21,<br />
23<br />
755010 BSDID16<br />
Reiniging:<br />
Administratiewe<br />
Ondersteuning<br />
Kusgebied)<br />
5 000 000 12 040 943 20 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Ontwikkeling en opgradering<br />
van begraafplase (Binneland,<br />
Middelland en Kusgebied)<br />
Begrafnisse 755025 BSDID16 NVT<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Nedersettings<br />
4 000 000 20 000 000 30 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Ontwikkeling en opgradering<br />
van Gemeenskapsale<br />
Verkope 760025 BSDID16 5<br />
O.L. Streek<br />
Vulliswegdoeningsperseel<br />
en<br />
-oorplasingstasie<br />
106<br />
3 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Ontwerp van sentrale<br />
oorplasingstasie<br />
770030 BSDID09 1 – 50<br />
10 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
770030 BSDID09 1 – 50 Bou van die derde sel<br />
O.L. Streek<br />
Vulliswegdoeningsperseel<br />
en<br />
-oorplasingstasie<br />
5 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Rehabilitering van<br />
grondopvulpersele<br />
770030 BSDID09 1 – 50<br />
O.L. Streek<br />
Vulliswegdoeningsperseel<br />
en<br />
-oorplasingstasie<br />
9 000 000 10 000 000 50 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Opgradering van sport- en<br />
rekreasiefasiliteite<br />
7, 12,<br />
<strong>13</strong>, 28,<br />
29, 35,<br />
37, 38,<br />
41, 44<br />
Sportvelde 765010 BSDID16<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
3 000 000 3 000 000 3 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Brandweerstasie: Kusgebied<br />
en Middelland<br />
725010 BSDID12 1 to 50<br />
Brandweer en<br />
reddingsdienste<br />
6 000 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
KWT-brandweerstasie<br />
25, 35,<br />
37, 38,<br />
39, 40,<br />
41, 43,<br />
44, 45,<br />
49<br />
725010 BSDID12<br />
Brandweer en<br />
reddingsdienste<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
500 000 5 000 000 10 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Tsholomnqa-brandweerstasie<br />
31, 32,<br />
33<br />
725010 BSDID12<br />
Brandweer en<br />
reddingsdienste<br />
SLEUTELPRESTASIE-AANWYSER 3: PLAASLIKE EKONOMIESE ONTWIKKELING<br />
Infrastruktuur-ekonomiese<br />
ontwikkeling (Erfenisroeteontwikkeling,<br />
aanbring<br />
van stalletjies vir informele<br />
handelaars)<br />
107<br />
12 254 978 20 000 000 30 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
63005 LED03 NVT<br />
Plaaslike Ekonomiese<br />
Ontwikkeling<br />
3 000 000 3 000 000 3 000 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
BCMM<br />
Infrastruktuurontwikkeling:<br />
Stedelike landbou<br />
635005 LED03 NVT<br />
Plaaslike Ekonomiese<br />
Ontwikkeling<br />
SLEUTELPRESTASIE-AANWYSER 4: FINANSIËLE VOLHOUBAARHEID EN BESTUUR<br />
Eie fondse 1 100 000 1 000 000 1 000 000<br />
Kantoormeubels –<br />
Inkomstebestuur<br />
Debiteursbestuur 330015 MFVM01 NVT<br />
Eie fondse 1 000 000 500 000 500 000<br />
Masjiene:<br />
Vooruitbetaalverkope<br />
330025 MFVM02 NVT<br />
Kantoor:<br />
Vooruitbetaalverkope<br />
Eie fondse 1 500 000 1 500 000 1 500 000<br />
Rekenaartoerusting –<br />
Inkomstebestuur<br />
415025 MTOD07 NVT<br />
Bestuursinligtingsdienste<br />
“’n Stad wat met u groei”
2014/2015<br />
Kapitaal-<br />
Begroting<br />
20<strong>13</strong>/2014<br />
Kapitaal-<br />
Begroting<br />
2012/20<strong>13</strong><br />
Kapitaal-<br />
Begroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Wyksnommer<br />
Strategiekode<br />
(uit die<br />
GOP)<br />
Kostesentrumnommer<br />
Naam van<br />
kostesentrum<br />
330005 MFVM05 NVT Algemene waardasies Eie fondse 29 000 000 <strong>13</strong> 500 000 4 500 000<br />
Belasting-en-<br />
Waardasiekantoor<br />
4 000 000 1 000 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Opgradering van KWTbetaallokaal<br />
Argitektuur 615075 MFVM01 NVT<br />
SLEUTELPRESTASIE-AANWYSER 5: GOEIE REGERING EN OPENBARE DEELNAME<br />
Rugsteun-opwekker –<br />
Strategiese bestuur 105035 MTOD12 NVT<br />
Eie fondse 1 500 000 0 0<br />
Stadsaal<br />
Strategiese bestuur 105035 MTOD12 NVT Opgradering van Stadsaal Eie fondse 000 000 1 000 000 0<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
108<br />
“’n Stad wat met u groei”
6.4 BEDRYFSPROJEKTE 2012/<strong>13</strong> – 2014/15<br />
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
SLEUTELPRESTASIE-AANWYSER 1: MUNISIPALE TRANSFORMASIE EN ORGANISATORIESE ONTWIKKELING<br />
Eie fondse 300 000 100 000 0<br />
Migrasie van BCMMdokumente<br />
na Elektroniese<br />
Dokumentbestuurstelsel<br />
220005 NVT MTOD11<br />
Regs- en Administratiewe<br />
dienste<br />
Ontwikkelingsbeplannings-administrasie<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
615005 NVT MTOD10 GIS op die internet Eie fondse 700 000 0 0<br />
615005 NVT MTOD06 Bygewerkte lugfotografie Eie fondse 2 7000 000 0<br />
Ontwikkelingsbeplannings-administrasie<br />
Eie fondse 500 000 500 000 500 000<br />
Ontwikkeling en hersiening<br />
van verordening<br />
220005 NVT MTOD11<br />
Regs- en Administratiewe<br />
dienste<br />
109<br />
220005 NVT MTOD11 Bywerking: Beleidsrigtings Eie fondse 600 000 0 0<br />
Regs- en Administratiewe<br />
dienste<br />
Eie fondse 750 000 750 000 0<br />
Opgradering van<br />
BCMM-gebou om<br />
belangrike dokumente<br />
en rugsteunbediener (bv.<br />
Bhisho/KWT) te bewaar<br />
Bestuursinligtingsdienste 415025 NVT MTOD08<br />
Eie fondse 750 000 750 000 0<br />
Implementering van<br />
Prestasiebestuurstelsel vir<br />
werknemers<br />
420005 NVT GGPP02<br />
Menslikehulpbronadministrasie<br />
3 000 000 3 800 000 4 000 000<br />
Ontwikkelingstoelae:Infrastruktuurdienste<br />
Infrastruktuur -<br />
vaardigheidsontwikkeling<br />
420005 NVT MTOD02<br />
Menslikehulpbronadministrasie<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
SLEUTELPRESTASIE-AANWYSER 2: BASIESE DIENSVERSKAFFING EN INFRASTRUKTUURONTWIKKELING<br />
0 20 000 000 29 992 500<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fase 3: Stadium<br />
2 - P5<br />
Behuisingsprojekte 255005 <strong>13</strong>,43,45,46 BSDID01<br />
Nedersettings<br />
163 515 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fase 3: Stadium<br />
3 – P4 (Registrasie)<br />
Behuisingsprojekte 255005 <strong>13</strong>,43,45,46 BSDID01<br />
Nedersettings<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
19 995 000 31 992 000 11 330 500<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Ilitha: Houthutte tot formele<br />
huise<br />
Behuisingsprojekte 255005 45 BSDID01<br />
Nedersettings<br />
6 665 000 500 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Tyutyu Fase 2 – P5 (Top<br />
strukture)<br />
Behuisingsprojekte 255005 43 BSDID01<br />
Nedersettings<br />
110<br />
5 398 650 200 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Lughawe / Fase 2A Bou van<br />
nuwe eenhede-P4<br />
Behuisingsprojekte 255005 31 BSDID01<br />
Nedersettings<br />
2 500 000 3 797 800 5 000 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Ilitha-Suid – 439 eenhede<br />
P5<br />
Behuisingsprojekte 255005 45 BDSID01<br />
Nedersettings<br />
20 000 000 30 000 000 15 862 700<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Herbou van<br />
stormbeskadigde huise<br />
BSDID01<br />
17, 24, 26,<br />
33, 39, 40,<br />
43, 36, 37<br />
Behuisingsprojekte 255005<br />
Nedersettings<br />
500 000 10 797 300 17 162 500<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Behuisingsprojekte 255005 31 BSDID01 Sunny Suid – P5<br />
0 500 000 500 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Potsdam Village Fases 1 &<br />
3 – P5<br />
Behuisingsprojekte 255005 23 BSDID01<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
5 811 880 17 395 650 26 660 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Kluster 1 (Chris Hani 3;<br />
Winnie Mandela; Ilinge;<br />
Deluxolo Village; Sisulu<br />
Village; Francis Mei;<br />
BSDID01<br />
48, 12, 21,<br />
11, 17, 11,<br />
20<br />
Behuisingsprojekte 255005<br />
Mahlangu Village) P5<br />
0 9 664 250 19 995 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Kluster 2 (Masibambane;<br />
Masibulele; Gwentshe;<br />
Velwano; MathembaVuso)<br />
P5<br />
Behuisingsprojekte 255005 17, 14 BSDID01<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
0 9 664 250 19 995 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Kluster 3 (Fynbos1;<br />
Fynbos2; Ndancama)P5<br />
Behuisingsprojekte 255005 5, 10 BSDID01<br />
Nedersettings<br />
0 11 797 050 19 995 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
DVRI-loodsprojek (Mekeni,<br />
Haven Hills, Competition<br />
Site) P5<br />
Behuisingsprojekte 255005 6, 8 BSDID01<br />
111<br />
Nedersettings<br />
465 000 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Cambridge 1 & 2 (Keiweg<br />
Dawn) P2<br />
Behuisingsprojekte 255005 15 BSDID01<br />
Nedersettings<br />
340 000 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Behuisingsprojekte 255005 16 BSDID01 N2 Padreserwe<br />
Nedersettings<br />
165 000 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Ford Msimango 1 (LUbehuising<br />
Nomp-skool)<br />
Behuisingsprojekte 255005 6 BSDID01<br />
Nedersettings<br />
17 662 250 200 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Behuisingsprojekte 255005 19 BSDID01 Second Creek – P5<br />
Nedersettings<br />
16 697 979 27 327 914 29 818 705<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Behuisingsprojekte 255005 1-50 BSDID01 Behuisingsbehoeftes:<br />
Databasis en akkreditasie<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
300 000 250 000 250 000<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Opvoeding van begunstigdes<br />
(Alle Ontwikkelingstoelae:<br />
Stedelike Nedersettings P4)<br />
Hervestiging van<br />
begunstigdes na<br />
formele huise vir alle<br />
behuisingsprogramme – alle<br />
projekte<br />
BSDID02<br />
45, 46, 18,<br />
19, 10<br />
Behuisingsprojekte 255005<br />
Eie fondse 500 000 4 447 500 7 140 000<br />
Behuisingsprojekte 255005 1 - 50 BSDID01<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
2 960 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 12 BSDID01 Dacawa P4<br />
Nedersettings<br />
27 488 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 10 BSDID01 Fynbos Informeel 1-P4<br />
Nedersettings<br />
112<br />
210 230 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 10 BSDID01 Fynbos Informeel 2-P4<br />
Nedersettings<br />
118 087 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 12 BSDID01 Ilinge-P4<br />
Nedersettings<br />
200 000 200 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Ilitha – Houthutte na formele<br />
huise<br />
Behuisingsprojekte 255005 45 BSDID01<br />
Nedersettings<br />
20 038 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 17 BSDID01 Masibambane-P4<br />
Nedersettings<br />
20 553 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Behuisingsprojekte 255005 17 BSDID01 Masibulele-P4<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
256 425 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Mdantsane Sone 18 CC<br />
Fase 2-P4<br />
Behuisingsprojekte 255005 21 BSDID01<br />
Nedersettings<br />
160 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 10 BSDID01 Ndacama-P2<br />
Nedersettings<br />
<strong>13</strong>8 308 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 10 BSDID01 Ndacama-P4<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Nedersettings<br />
19 636 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 11 BSDID01 Sisulu Village-P4<br />
Nedersettings<br />
112 7<strong>13</strong> 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 31 BSDID01 Sunny Suid-P4<br />
1<strong>13</strong><br />
Nedersettings<br />
81 999 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 14 BSDID01 Velwano-P4<br />
Nedersettings<br />
38 535 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 17 BSDID01 Winnie Mandela-P4<br />
Nedersettings<br />
200 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Behuisingsprojekte 255005 9 BSDID01 Amalinda (Ko-op) - P2 (EIA)<br />
Nedersettings<br />
100 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Potsdam Ikhwezi Blok 1 - P2<br />
(Omgewingsimpakevaluering)<br />
Potsdam Ikhwezi Blok 2- P2<br />
(Omgewingsimpakevaluering)<br />
Behuisingsprojekte 255005 23,24 BSDID01<br />
Nedersettings<br />
100 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Behuisingsprojekte 255005 23,24 BSDID01<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
100 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Potsdam Noord Kanana - P2<br />
(Omgewingsimpakevaluering)<br />
Behuisingsprojekte 255005 23,24 BSDID01<br />
Nedersettings<br />
100 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Potsdam Village (Landelik)<br />
Fases 1 & 2 - P2 (Omgewingsimpakevaluering)<br />
Behuisingsprojekte 255005 23 BSDID01<br />
Nedersettings<br />
3 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Potsdam Eenheid P Stadium<br />
2 - P4<br />
Behuisingsprojekte 255005 21 BSDID01<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Nedersettings<br />
3 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Behuisingsprojekte 255005 19 BSDID01 Second Creek P4<br />
Eie fondse 2 000 000 2 000 000 0<br />
Opsigters - Duncan Village<br />
en Informele Nedersettings<br />
1, 2, 5, 6, 7,<br />
8, 10<br />
520005<br />
Water-, sanitasie- en<br />
wetenskaplike dienste<br />
114<br />
1 525 000 125 000 0<br />
Departement<br />
Waterwese<br />
- Versnelde<br />
Gemeenskapsinfrastruktuur<br />
East Bank-Vuilwaterbehandelingswerke<br />
– Befondsing:<br />
Versnelde Gemeenskapsinfrastruktuurprogram<br />
(‘ACIP’)<br />
520005 18 BSDID06<br />
Water-, sanitasie- en<br />
wetenskaplike dienste<br />
program<br />
400 000 0 0<br />
Departement<br />
Waterwese –<br />
520005 NVT BSDID06 Sakeplan: Waterdienste<br />
Water-, sanitasie- en<br />
wetenskaplike dienste<br />
Provinsie<br />
450 000 0 0<br />
Departement<br />
Waterwese<br />
– Versnelde<br />
Gemeenskapsinfrastruktuurprogram<br />
Dimbaza Vuilwaterbehandelingswerke:<br />
Inlaatskerm<br />
520005 BSDID06<br />
Water-, sanitasie- en<br />
wetenskaplike dienste<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
1 283 000 0 0<br />
Departement<br />
Waterwese en<br />
Bosbou - DoRA<br />
Implementering van<br />
waterbesparing en<br />
aanvraagbestuur (Dimbaza,<br />
Duncan Village, Mdantsane,<br />
Reeston, Scenery Park,<br />
Nompumelelo, Mzamomhle,<br />
Sweetwaters, Phakamisa,<br />
Zwelitsha)<br />
BSDID06<br />
34, <strong>13</strong>, 9, 5,<br />
28, 7, 41<br />
520005<br />
Water-, sanitasie- en<br />
wetenskaplike dienste<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
3 000 000 5 000 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Ontwikkeling van BCMM<br />
Meesterplan vir Paaie<br />
525025 NVT BSDID06<br />
Paaie en Stormwaterdreinering<br />
Nedersettings<br />
788 800 480 000 480 000<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fase 3: Stadium<br />
2 – P4 (Oorplasings)<br />
Grondadministrasie 615080 12 BSDID01<br />
Nedersettings<br />
115<br />
200 000 46 400 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fases 1 &<br />
2 – Stadium 1B – P4<br />
(Oorplasings)<br />
Grondadministrasie 615080 12 BSDID01<br />
Nedersettings<br />
500 000 86 800 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Reeston Fase 3 Stadium 1 –<br />
P4 (Oorplasings)<br />
Grondadministrasie 615080 12 BSDID01<br />
Nedersettings<br />
28 000 1 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Tyutyu Fase 1 – P4<br />
(Oorplasings)<br />
Grondadministrasie 615080 43 BSDID01<br />
Nedersettings<br />
34 000 1 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Grondadministrasie 615080 43 BSDID01 Tyutyu 2 – P4 (Oorplasings)<br />
Nedersettings<br />
8 000 30 000 40 400<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Ilitha Suid – 439 eenhede<br />
(Oorplasings)<br />
Grondadministrasie 615080 45 BSDID01<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
5 000 12 500 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Dimbaza Fase 2 P4<br />
(Oorplasings)<br />
Grondadministrasie 615080 34, 36 BSDID01<br />
241 150 5 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Potsdam Stadium 2 Stadium<br />
1 – P4 (Oorplasings)<br />
Grondadministrasie 615080 <strong>13</strong> BSDID01<br />
914 400 3 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Nompumelelo – P4<br />
(Oorplasings)<br />
Grondadministrasie 615080 29 BSDID01<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
15 000 1 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
AmalindaSimanyene – P4<br />
(Oorplasings)<br />
Grondadministrasie 615080 16 BSDID01<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
116<br />
<strong>13</strong>6 000 1 000 0<br />
Grondadministrasie 615080 48 BSDID01 Z Soga – P4 (Oorplasings)<br />
Eie fondse 350 000 500 000 500 000<br />
Grondtransaksies –<br />
Opgradering van voormalige<br />
gebiede R293 & KPAgebiede<br />
Grondadministrasie 615080 Mdantsane BSDID22<br />
441 200 10 000 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Lughawe / Fase 2A Bou van<br />
nuwe eenhede – P4<br />
Grondadministrasie 615080 46<br />
Eie fondse 500 000 400 000 300 000<br />
Onderverdeling van<br />
gehuurde munisipale<br />
eiendomme<br />
Grondopmeting 615070 NVT BSDID21<br />
160 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Nedersettings<br />
Grondopmeting 615070 10 BSDID21 Ndancama P2<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
120 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Grondopmeting 615070 10 BSDID21 Fynbos Informeel 1- P2<br />
Nedersettings<br />
110 000 0 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
Grondopmeting 615070 10 BSDID21 Fynbos Informeel 2 – P2<br />
Nedersettings<br />
200 000 235 000 0<br />
Ontwikkelingstoelae:<br />
Stedelike<br />
AmalindaFairlands-projekte<br />
– P2<br />
Grondopmeting 615070 9 BSDID21<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Nedersettings<br />
465 000 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Cambridge 1 & 2 (Keiweg)<br />
Dawn – P 2<br />
Grondopmeting 615070 15 BSDID21<br />
Nedersettings<br />
340 000 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
615070 16 BSDID21 N2 Padreserwe P2<br />
117<br />
Nedersettings<br />
165 000 0 0<br />
Ontwikkelingstoelae:<br />
Menslike<br />
Nedersettings<br />
Ford Msimango 1 (LU<br />
Behuising Nomp-skool) – P2<br />
615070 6 BSDID21<br />
Stadsbeplanning 615070 16 BSDID17 DVRI-dorpsgebiedstigting LGH 77 000 0 0<br />
Stadsbeplanning 615070 40926 BSDID17 MdantsaneOntwikkelingstoelae:<br />
Stedelike<br />
0 500 000 600 000<br />
dorpsgebiedstigting<br />
Nedersettings<br />
East Bank Restitusie-<br />
Stadsbeplanning 615070 16 BSDID17<br />
RLCC 300 000 300 000<br />
dorpsgebiedstigting<br />
Grondidentifiseringstudie<br />
vir hervestiging van<br />
Stadsbeplanning 615080 NVT BSDID21<br />
Eie fondse 300 000 0 0<br />
hoëprioriteit- informele<br />
nedersettings<br />
Stadsbeplanning 615005 15 BSDID18 BCMM-dorpsgebiedstigting Eie fondse 0 1 600 000 1 700 000<br />
“’n Stad wat met u groei”
2014/2015<br />
Bedryfsbegroting<br />
20<strong>13</strong>/2014<br />
Bedryfsbegroting<br />
2012/20<strong>13</strong><br />
Bedryfsbegroting<br />
Bron van<br />
befondsing<br />
Naam van projek<br />
Strategie-kode<br />
(uit die<br />
GOP)<br />
Wyksnommer<br />
Kostesentrum<br />
Direktoraat<br />
Eie fondse 400 000 0 0<br />
Stadsbeplanning 615070 28 BSDID18<br />
Eie fondse 300 000 0 0<br />
Stadsbeplanning 615070 NVT BSDID18<br />
Eie fondse 0 1 100 000 1 200 000<br />
Stadsbeplanning 615070 27 BSDID19<br />
Eie fondse 500 000 0 0<br />
Stadsbeplanning 615070 4, 15, 18 BSDID19<br />
Eie fondse 233 408 0 0<br />
Stadsbeplanning 615070 29 BSDID19<br />
118<br />
Eie fondse 34 735 0 0<br />
Dorpsgebiedstigting vir<br />
Mzamomhle- Informele<br />
Nedersetting<br />
Beplanningsfase: Landelike<br />
Nedersetting<br />
Plaaslike Ruimtelike<br />
Ontwikkelingsraamwerk<br />
Vincent, Berea: Hersiening<br />
van Plaaslike Ruimtelike<br />
Ontwikkelingsraamwerk<br />
Home Hill: Plaaslike<br />
Ruimtelike<br />
Ontwikkelingsraamwerk<br />
Gonubie Hoofweg:<br />
Plaaslike Ruimtelike<br />
Ontwikkelingsraamwerk<br />
Kwelera Plaaslike Ruimtelike<br />
Ontwikkelingsraamwerk<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Stadsbeplanning 615070 27, 29 BSDID19<br />
Eie fondse 29 469 0<br />
Stadsbeplanning 615070 27, 29 BSDID19<br />
Eie fondse 58 561 0 0<br />
BCMM: Ruimtelike<br />
Ontwikkelingsraamwerk:<br />
Omvattende bywerking en<br />
Stadsbeplanning 615070 NVT BSDID19<br />
hersiening<br />
Eie fondse 43 827 0 0<br />
Bhisho/King Williams<br />
Town: Plaaslike Ruimtelike<br />
Ontwikkelingsraamwerk<br />
Stadsbeplanning 615070 30, 38-45 BSDID19<br />
615005 NVT BSDID20 Lugfotografie Eie fondse 1 000 000 0 0<br />
615005 NVT MTOD05 GIS op internet Eie fondse 350 000 350 000 0<br />
OntwikkelingsbeplanningsadministrasieOntwikkelingsbeplanningsadministrasie<br />
“’n Stad wat met u groei”
Strate-<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
KosteWyksnomgie-kode Bron van<br />
Direktoraat<br />
Naam van projek<br />
BedryfsBedryfsBedryfssentrummer (uit die<br />
befondsing<br />
begrotingbegrotingbegroting GOP)<br />
Hersiening van<br />
Vervoer 620005 NVT BSDID23 geïntegreerde<br />
Eie fondse 500 000 2 000 000 2 000 000<br />
vervoerbeplanning<br />
SLEUTELPRESTASIE-AANWYSER 3: PLAASLIKE EKONOMIESE ONTWIKKELING<br />
Plaaslike Ekonomiese<br />
Bestemmingsbemarking-<br />
635005 NVT LED02<br />
Eie fondse 6 880 000 11 700 000 12 300 000<br />
Ontwikkeling<br />
sprogram<br />
Plaaslike Ekonomiese<br />
Besigheidsondersteuning-<br />
635005 NVT LED03<br />
Eie fondse 2 000 000 6 300 000 5 900 000<br />
Ontwikkeling<br />
seenheid-programOntwikkelings-<br />
Plaaslike Ekonomiese<br />
Ekonomiese<br />
635005 NVT LED03<br />
toelae: Stedelike 2 585 200 4 260 000 5 000 000<br />
Ontwikkeling<br />
Infrastruktuurprogram<br />
Nedersettings<br />
SLEUTELPRESTASIE-AANWYSER 4: FINANSIËLE VOLHOUBAARHEID EN BESTUUR<br />
Skoonmaak van<br />
Debiteursbestuurskantoor 330015 NVT MFVM01<br />
Eie fondse 400 000 1 000 000 500 000<br />
faktureringsdata<br />
Oudit van meterpeutery<br />
Debiteursbestuurskantoor 330015 NVT MFVM01 (elektrisiteit en water) - Eie fondse 2 000 000 3 000 000 1 500 000<br />
munisipale dienste<br />
Begrotingskantoor 315005 NVT MFVM03 Begrotingshervormings FMG 1 500 000 1 500 000 1 500 000<br />
Rekeningkundige<br />
Begrotingskantoor 315005 NVT MFVM06<br />
Eie fondse 720 000 720 000 720 000<br />
hervormingsprojek<br />
SLEUTELPRESTASIE-AANWYSER 5: GOEIE REGERING EN OPENBARE DEELNAME<br />
Strategiese<br />
Herontwerp van IT-<br />
105025 NVT MTOD03 Eie fondse 1 000 000 3 000 000 0<br />
ondersteuning<br />
sakeproses<br />
Skakeldienste en<br />
internasionale<br />
120010 NVT GGPP09<br />
gebeurtenisse<br />
Wykskomiteevergaderings<br />
Eie fondse 3 000 000 3 000 000 3 000 000<br />
(los-uitgawes)<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
119<br />
205005 NVT GGPP07 Tussenregeringsbetrekkinge Eie fondse 50 000 80 000 80 000<br />
Kantoor van die<br />
Munisipale Bestuurder<br />
“’n Stad wat met u groei”
Strate-<br />
2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />
KosteWyksnomgie-kode Bron van<br />
Direktoraat<br />
Naam van projek<br />
BedryfsBedryfsBedryfssentrummer (uit die<br />
befondsing<br />
begrotingbegrotingbegroting GOP)<br />
Spesiale programme 105030 NVT GGPP12 Munisipale beurse Eie fondse 1 200 000 1 200 000 1 200 000<br />
Kantoor van die<br />
Dokumentering van<br />
205005 NVT GGPP05<br />
Eie fondse 300 000 300 000 300 000<br />
Munisipale Bestuurder<br />
gevallestudies<br />
Kantoor van die<br />
Implementering van MDG-<br />
205005 NVT GGPP12<br />
Eie fondse 100 000 100 000 100 000<br />
Munisipale Bestuurder<br />
raamwerk<br />
205005 NVT GGPP01 Risiko-evaluering Eie fondse 200 000 200 000 200 000<br />
205005 NVT MFMV06 Oudit-omswaaiplan Eie fondse 6 000 000 8 000 000 8 000 000<br />
Kantoor van die<br />
Munisipale Bestuurder<br />
Kantoor van die<br />
Munisipale Bestuurder<br />
Kantoor van die<br />
Munisipale Bestuurder<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Eie fondse 3 500 000 3 000 000 3 000 000<br />
Gekombineerde<br />
Versekeringsmodel<br />
205005 NVT GGPP01<br />
120<br />
“’n Stad wat met u groei”
6.5 GROOT PROJEKTE VIR 2012-2015<br />
2012 - 2015<br />
KONSEPKAPITAAL-<br />
BEGROTING<br />
NAAM VAN PROJEK BRON VAN BEFONDSING<br />
31,500,000<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Reeston Fase 3 Stadium 2 -P1 & P3<br />
27,343,400<br />
Mdantsane Sone 18 CC Fase 2 - P1 & P3<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
8,200,000<br />
Manyano & Thembelihle Fase 2 - P1 & P3<br />
8,100,000<br />
Second Creek (Sleutelklaar) - P1 & P3<br />
1,000,000<br />
Blokwerf TRA - P 1& P3<br />
121<br />
2,500,000<br />
DVRI-loodsprojek (Mekeni, Haven Hills, Competition Site) P1 & P3<br />
24,701,823<br />
15,424,800<br />
Kluster 1 (Chris Hani, Ilinge, Mahlangu Village, Sisulu Village,Winnie<br />
Mandela,Deluxolo Village & Francis Mei) P1 & P3<br />
Kluster 2 (Masibambane, Masibulele, Velwano, Gwentshe Village, Mathemba<br />
Vuso) P1 & P3<br />
32,892,525<br />
Kluster 3 (Fynbos Informeel 1, Fynbos Informeel 2, Ndancama) P1 & P3<br />
3,600,000<br />
Sunny Suid - P1 & P3<br />
2,415,950<br />
Potsdam Ikhwezi Blok 1 - P1 & P3<br />
“’n Stad wat met u groei”
2012 - 2015<br />
KONSEPKAPITAAL-<br />
BEGROTING<br />
NAAM VAN PROJEK BRON VAN BEFONDSING<br />
2,415,950<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Potsdam Ikhwezi Blok 2 - P1 & P3<br />
2,415,950<br />
Potsdam Ikhwezi Blok 2- P1<br />
2,415,950<br />
Potsdam Noord Kanana - P1<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
2,757,312<br />
Amalinda Ko-op P1 & P3<br />
2,757,312<br />
Amalinda Fairlands P1 & P2<br />
2,960<br />
Dacawa P4<br />
122<br />
27,488<br />
Fynbos Informeel 1-P4<br />
210,230<br />
Fynbos Informeel 2-P4<br />
118,087<br />
Ilinge-P4<br />
400,000<br />
Ilitha – Houthutte tot formele huise<br />
20,038<br />
Masibambane-P4<br />
20,553<br />
Masibulele-P4<br />
“’n Stad wat met u groei”
2012 - 2015<br />
KONSEPKAPITAAL-<br />
BEGROTING<br />
NAAM VAN PROJEK BRON VAN BEFONDSING<br />
256,425<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Mdantsane Sone 18 CC Fase 2-P4<br />
160,000<br />
Ndacama-P2<br />
<strong>13</strong>8,308<br />
Ndacama-P4<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
19,636<br />
Sisulu Village-P4<br />
112,7<strong>13</strong><br />
Sunny Suid-P4<br />
81,999<br />
Velwano-P4<br />
123<br />
38,535<br />
Winnie Mandela-P4<br />
200,000<br />
Amalinda (Ko-op) - P2 (Omgewingsimpakevaluering)<br />
120,000<br />
Fynbos Informeel 1-P2<br />
110,000<br />
Fynbos Informeel 2-P2<br />
100,000<br />
Potsdam Ikhwezi Blok 1 - P2 (Omgewingsimpakevaluering)<br />
100,000<br />
Potsdam Ikhwezi Blok 2- P2 (Omgewingsimpakevaluering)<br />
“’n Stad wat met u groei”
2012 - 2015<br />
NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />
BEGROTING<br />
Ontwikkelingstoelae: Stedelike<br />
Potsdam Noord Kanana - P2 (Omgewingsimpakevaluering)<br />
100,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Potsdam Village (Landelik) Fase 1 & 2 - P2 (Omgewingsimpak-evaluering)<br />
100,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Amalinda Fairlands-projekte - P2<br />
435,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Potsdam Eenheid P Stadium 2 - P4<br />
3,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Second Creek P4<br />
3,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Dacawa P4<br />
800,000<br />
Nedersettings<br />
BEHUISING 174,118,944<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
124<br />
Ontwikkeling van Meesterplan vir BCMM-paaie 8,000,000<br />
Ontwikkelingstoelae: Stedelike<br />
Mdantsane-Paaie<br />
265,903,392<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
West Bank-restitusie<br />
53,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Quenera-hoofpaaie<br />
5,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Opgradering van BCMM-paaie<br />
110,000,000<br />
Nedersettings<br />
“’n Stad wat met u groei”
2012 - 2015<br />
NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />
BEGROTING<br />
Ontwikkelingstoelae: Stedelike<br />
Rehabilitering van landelike paaie (opgradering)<br />
45,000,000<br />
Nedersettings<br />
PAAIE 486,903,392<br />
4,000,000<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Nord-laan (pompstasie)<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
19,000,000<br />
Quinera-behandelingswerke<br />
116,000,000<br />
Kapasiteit van vuilwaterbehandelingswerke (Zwelitsha)<br />
50,000,000<br />
Reeston Fase 3: Grootmaatdienste - riolering<br />
125<br />
1,108,250<br />
Bufferstrook-sanitasie (Mdantsane)<br />
17,000,000<br />
Opknapping van Mdantsane-riolering<br />
80,000,000<br />
Afvoer van uitloop van Amalinda en Wilsonia na Reeston<br />
103,208,000<br />
Binnelandse/landelike sanitasie (Kusgebied, Middelland en Binneland)<br />
45,000,000<br />
Oosstrand: Riole<br />
9,000,000<br />
Slikhanteringsfasiliteit<br />
“’n Stad wat met u groei”
2012 - 2015<br />
NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />
BEGROTING<br />
Ontwikkelingstoelae: Stedelike<br />
Infrastruktuur: KWT en Bhisho (Water)<br />
64,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Verskuifing van Midblokke in Mdantsane<br />
15,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Amahleke-watertoevoer<br />
9,000,000<br />
Nedersettings<br />
RIOLERING 532,316,250<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Versterking van waterbehandelingskapasiteit - Umzonyana/ Styggang: Ontwikkelingstoelae: Stedelike<br />
56,000,000<br />
Boonste dam<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Opgradering van waternetwerke ingevolge densifikasie en versterking<br />
38,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Grootmaat-watertoevoer: Newlands en ander gebiede<br />
1,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Wyk 33: Grootmaat-watertoevoerskema<br />
3,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Grootmaat-watertoevoer: Kusgebiede<br />
6,276,293<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Winterstrand-watertoevoer<br />
1,000,000<br />
Nedersettings<br />
WATER 105,276,293<br />
126<br />
1,100,000<br />
Ontwikkelingstoelae: Stedelike<br />
Nedersettings<br />
Mdantsane-dorpsgebiedstigting<br />
“’n Stad wat met u groei”
2012 - 2015<br />
NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />
BEGROTING<br />
Ontwikkelingstoelae: Stedelike<br />
Implementering van geïntegreerde vervoerplan<br />
9,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Taxihaltes<br />
80,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Gonubie-hoofweg<br />
60,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
N2/R72 Skakelpad-opname<br />
26,200,000<br />
Nedersettings<br />
VERVOERBEPLANNING 176,300,000<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Ontwikkelingstoelae: Stedelike<br />
BCM: Infrastruktuurontwikkeling vir stedelike landbou<br />
8,000,000<br />
Nedersettings<br />
Infrastruktuur vir ekonomiese ontwikkeling (Erfenisroete ontwikkeling; Ontwikkelingstoelae: Stedelike<br />
62,254,978<br />
voorsiening van stalletjies vir informele handelaars)<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Ekonomiese-infrastruktuurprogram<br />
11,845,200<br />
Nedersettings<br />
PLAASLIKE EKONOMIESE ONTWIKKELING 82,100,178<br />
Ontwikkelingstoelae: Stedelike<br />
Ontwikkeling van gemeenskapsparke (Mdantsane, Potsdam, Rheeston)<br />
10,000,000<br />
Nedersettings<br />
Opgradering en ontwikkeling van begraafplase (Binneland, Middelland en Ontwikkelingstoelae: Stedelike<br />
37,040,943<br />
Kusgebiede)<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Ontwikkeling en opgradering van Gemeenskapsale<br />
54,000,000<br />
Nedersettings<br />
127<br />
“’n Stad wat met u groei”
2012 - 2015<br />
NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />
BEGROTING<br />
Ontwikkelingstoelae: Stedelike<br />
Sport- en rekreasiefasiliteite<br />
69,000,000<br />
Nedersettings<br />
GEMEENSKAPSDIENSTE 170,040,943<br />
BCMM Geïntegreerde Ontwikkelings Plan<br />
Hersieningsdokument • 2012 - 20<strong>13</strong><br />
Ontwikkelingstoelae: Stedelike<br />
Sentrale Oorplasingstasie (Sentrale sakegebied van Oos Londen)<br />
33,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Bou van ‘n nuwe sel – Roundhill-Streek-Grondopvullingsperseel<br />
5,764,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Bou van versamelpunte (Wyke 5, 10 en 12)<br />
3,000,000<br />
Nedersettings<br />
Stigting van sentrale oorplasingstasie, bou van vullis-aflaaipunte, en stigting Ontwikkelingstoelae: Stedelike<br />
17,000,000<br />
en opgradering van tuinvullis-oorplasingstasies<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Bou van vierde sel<br />
9,000,000<br />
Nedersettings<br />
VULLIS 67,764,000<br />
128<br />
Ontwikkelingstoelae: Stedelike<br />
Infrastruktuur: Kusgebiede en Middelland<br />
9,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
KWT-brandweerstasie<br />
6,000,000<br />
Nedersettings<br />
Ontwikkelingstoelae: Stedelike<br />
Tsholomnqa-brandweerstasie<br />
15,500,000<br />
Nedersettings<br />
BRANDWEER 30,500,000<br />
TOTAAL: GROOT PROJEKTE 1,825,320,000<br />