03.05.2013 Views

IDP12/13 - Buffalo City

IDP12/13 - Buffalo City

IDP12/13 - Buffalo City

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTEGRATED<br />

DEVELOPMENT PLAN REVIEW<br />

<strong>IDP12</strong>/<strong>13</strong><br />

ENGLISH / XHOSA / AFRIKAANS<br />

SUMMARY


TABLE OF CONTENTS<br />

Executive Mayor’s Foreword 2<br />

Overview by the <strong>City</strong> Manager 3<br />

1. BCMM’S VISION, MISSION & VALUES 5<br />

1.1 BCMM’S Vision 5<br />

1.2 BCMM’S Mission 5<br />

1.3 BCMM’S Core Values 5<br />

2. WHAT IS AN IDP? 6<br />

3. WHAT IS A BUDGET? 7<br />

4. THE IDP PROCESS FOLLOWED 8<br />

5. IDP INFORMANTS AND STRATEGIC FOCAL AREAS 10<br />

5.1 IDP Informants 10<br />

5.2 Key Strategic Objectives 11<br />

5.3 Strategic Focal Areas 11<br />

6. 2012/<strong>13</strong> – 2014/15 MTREF BUDGET 16<br />

6.1 Summarised Capital Budget 16<br />

6.2 Summarised Operating Budget 17<br />

6.3 Capital Projects 2012/<strong>13</strong> – 2014/15 18<br />

6.4 Operating Projects 2012/<strong>13</strong> -2014/15 24<br />

6.5 Major Projects for 2012/20<strong>13</strong> – 2014/2015 31<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

1<br />

“a <strong>City</strong> Growing with you”


EXECUTIVE MAYOR’S FOREWORD<br />

The changing and shifting socio-economic dynamics of life in<br />

<strong>Buffalo</strong> <strong>City</strong> have once again necessitated a strategic repositioning<br />

of our development and service delivery programmes and<br />

objectives, the aim being to ensure that such programmes<br />

address the revised needs of our stakeholders and communities.<br />

To this end, it has become necessary to revisit the Metro’s<br />

Integrated Development Plan, to review our spatial development<br />

framework, and to revise our development indicators and targets<br />

for the Financial Year 2012/20<strong>13</strong>.<br />

The content of this IDP Review document is therefore informed by<br />

new and emerging aspirations and needs of the people of <strong>Buffalo</strong><br />

<strong>City</strong>, expressed at duly constituted meetings of the different<br />

communities and stakeholders that were called for this purpose.<br />

We believe that, as the sphere of Government that is closest to the people, we carry a pronounced<br />

obligation to respond directly, immediately and positively to the needs and frustrations of our stakeholders<br />

and communities.<br />

In presenting this IDP Review document, therefore, I want to commend the people of <strong>Buffalo</strong> <strong>City</strong> for<br />

dutifully heeding the call to come and assist the Metro Council in revising its development and service<br />

delivery agenda for the city and its diversified communities. We could not have achieved this objective<br />

if it was not for the active and sustained participation of our communities in the process of setting the<br />

direction and pace of our development programmes and projects.<br />

The strategic focus areas contained in this IDP Review include institutional restructuring and stabilization,<br />

job creation, building sustainable communities, bridging the digital divide, improving governance and<br />

financial viability, and building citizen confidence.<br />

This document spells out specific projects and programmes that have to be undertaken. These include,<br />

amongst others, the provision of additional human settlements, electricity and water supply to informal<br />

settlements, skills and sector development programmes to assist and sustain economic development,<br />

and establishing an enabling environment for vulnerable groups to benefit from the Metro’s socioeconomic<br />

agenda.<br />

In conclusion, I want to rededicate the combined efforts of the political leadership and management of<br />

<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality to the task of fulfilling the local interests of our people within the<br />

national priority of endeavouring to create a better life for all our people.<br />

ZUKISWA NCITHA<br />

Executive Mayor<br />

<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

2<br />

“a <strong>City</strong> Growing with you”


OVERVIEW BY THE CITY MANAGER<br />

<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality has just concluded<br />

its first financial year as a metropolitan municipality, having<br />

successfully assumed the category ‘A’ or Metro status in<br />

May 2011, shortly after the Local Government Elections.<br />

The last twelve (12) months have inevitably been<br />

characterised by critical transitional activities aimed<br />

at embedding the foundation of a new metropolitan<br />

municipal establishment. The metro saw the inauguration<br />

of new political leadership in both the legislative and<br />

executive structures Council. The metro also conducted<br />

ward elections and established ward committees in all the<br />

newly demarcated 50 wards. In line with the prescripts of<br />

the Municipal Structures Act of 1998, <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality also incorporated<br />

twenty (20) traditional leaders into Municipal Council.<br />

From a strategic view, the metro adopted the Integrated Development Plan 2011-2016 on<br />

the 30 th June 2011. The preparation of this plan was undertaken by the previous Council.<br />

However, the review process which was undertaken during the last half of 2011 and the<br />

beginning of 2012 enabled the new Council to reconsider the strategic agenda contained in<br />

the previously adopted IDP.<br />

The 2012/<strong>13</strong> IDP review process has been informed by the following factors and activities<br />

such as Council priorities; Mayoral Lekgotla priorities; Ward priorities;12 Outcomes of<br />

Government; 7 outputs in Outcome 9 on Local Government; The draft National Development<br />

Plan produced by the National Planning Commission; Millennium Development Goals; The<br />

Provincial Growth and Development Plan; and The National Spatial Development Perspective<br />

The review undertaken confirmed the six (6) strategic objectives of council as follows:<br />

1. To be a financially sound organisation that efficiently manages its resources;<br />

2. To be an institutionally efficient and effective <strong>City</strong> that inclusively works with<br />

communities;<br />

3. To generate an enabling environment for an economy that is growing, diversifying,<br />

generating increasing number of sustainable employment opportunities and contributing<br />

to increased incomes and equality;<br />

4. To deliver sustainable infrastructure that support social and economic development;<br />

5. To be a well structured and capacitated institution that renders effective and efficient<br />

services to all by 2016<br />

6. To enhance and protect all environmental assets and natural resources within <strong>Buffalo</strong><br />

<strong>City</strong> Metropolitan Municipality by 2016<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

3<br />

“a <strong>City</strong> Growing with you”


The review further identified the following nine (9) strategic focus areas for inclusion and<br />

alignment with the IDP<br />

1. Institutional Restructuring and Stabilisation<br />

2. Improving Intergovernmental Relations<br />

3. Building Citizen Confidence<br />

4. Bridging the Digital Divide<br />

5. Improving performance, compliance, processes and systems<br />

6. Build Sustainable Communities<br />

7. Job Creation<br />

8. Improving Governance<br />

9. Financial Viability<br />

The programmes, projects and activities for the municipality in the financial year 2012/<strong>13</strong><br />

are aligned to the above-mentioned strategic objectives and key focal areas. The progress of<br />

the metro in addressing the Council’s priorities for the financial year will be reported monthly,<br />

quarterly, mid-yearly and annually in terms of the Council’s Performance Management Policy<br />

and Framework as well as other legislative compliance based reporting.<br />

The Metro’s administration endeavours to respond to service delivery needs of its communities<br />

and ensure the collective achievement of Council’s programme of delivery as contained in<br />

this Reviewed Integrated Development Plan (2012/<strong>13</strong>).<br />

A. FANI<br />

<strong>City</strong> Manager<br />

<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

4<br />

“a <strong>City</strong> Growing with you”


1. BCMM’s VISION, MISSION & VALUES<br />

1.1 BCMM’s VISION<br />

Through strategic planning sessions leadership of the municipality has refined the vision and<br />

mission of the institution to be more robust, comprehensible and realistic, thus making it a<br />

useful instrument in guiding the actions of the <strong>City</strong>, its citizens and key stakeholders in the<br />

development process.<br />

A long term Vision of <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality is to be:<br />

1.2 BCMM’s MISSION<br />

“a responsive, people centred and developmental <strong>City</strong>”<br />

In pursuit of realising the vision <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality strives to be a <strong>City</strong><br />

which:<br />

• Promotes a culture of good governance;<br />

• Provides effective and efficient municipal services;<br />

• Invests in the development and retention of human capital to service the <strong>City</strong> and its<br />

community;<br />

• Promotes social and equitable economic development;<br />

• Ensures municipal sustainability and financial viability;<br />

• Creates a safe and healthy environment; and<br />

• Places Batho Pele principles at the centre of service delivery<br />

1.3 BCMM’S CORE VALUES<br />

<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality espouses the following values and committed to<br />

serving its communities and providing services in a manner that is consistent with:<br />

(i) Integrity<br />

(ii) Good Governance<br />

(iii) Transparency<br />

(iv) Accountability<br />

(v) Fairness and equity<br />

(vi) Professionalism<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

5<br />

“a <strong>City</strong> Growing with you”


(vii) Loyalty<br />

(viii) Service Excellence<br />

(ix) Respect for cultural diversity<br />

(x) Unity of purpose<br />

(xi) Ubuntu<br />

2. WHAT IS AN IDP?<br />

In terms of the Municipal Systems Act 32 of 2000 (as amended) an IDP is defined as a<br />

strategic planning instrument that guides and informs all municipal development in the<br />

<strong>City</strong>. It is the key instrument that enables the municipality to work towards achieving its<br />

development goals as outlined in the Constitution.<br />

It consists of a long-term vision. It details the development priorities and objectives that<br />

contribute toward achieving this vision. It reflects strategies which are underwritten by the<br />

details in the budget, which must be linked with the IDP.<br />

An IDP adopted by the Council of a Municipality is the principal strategic planning instrument<br />

which guides and informs all planning and development decisions within the municipal area.<br />

Section 34 of the Municipal Systems Act stipulates that an IDP should be reviewed annually in<br />

accordance with an assessment of its performance measures and to the extent that changing<br />

circumstances so demand. Council is also required to set out in writing, the process to be<br />

followed for the IDP review. The Process Plan should include:<br />

• A programme specifying time-frames.<br />

• Outlined processes and procedures for consultation.<br />

• Identified plans and planning requirements binding on the Municipality.<br />

• IDP and Budget processes/programmes to be aligned.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

6<br />

“a <strong>City</strong> Growing with you”


The IDP review towards 2012/20<strong>13</strong> was undertaken as part of the continuous cycle of<br />

planning, implementation and monitoring as illustrated in the Figure below.<br />

PERFORMANCE<br />

MANAGEMENT<br />

IDP<br />

IMPLEMENTATION<br />

Figure A.1: IDP Development Process<br />

3. WHAT IS A BUDGET?<br />

1. PREPARING FOR IDP REVIEW<br />

2. MONITORING & EVALUATION –UPDATED<br />

ANALYSIS<br />

3. REFINED OBJECTIVES, STRATEGIES,<br />

INDICATORS & PROJECTS & PROGRAMMES<br />

(LINKED TO BUDGET) IDP IMPLEMENTATION<br />

4. CONSOLIDATE IDP (INCLUDING OPERATIONAL<br />

PLANS)<br />

5. APPROVAL - COUNCIL ADOPTS IDP & BUDGET<br />

A budget is a plan which summarizes in financial terms the activities planned in the<br />

forthcoming financial year by setting out the expenditure which will be incurred to fulfill these<br />

activities as well as the income and capital required to finance this expenditure.<br />

There are two types of budget: the operating budget and the capital budget.<br />

The operating budget involves the purchase of goods and services for which there will be<br />

a short-term benefit. Operating expenses are salaries, wages, repairs and maintenance,<br />

telephones and materials.<br />

The operating income is cash derived from municipal trading accounts such as water,<br />

electricity, rates and other services.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

7<br />

PUBLIC PARTICIPATION<br />

“a <strong>City</strong> Growing with you”


The capital budget specifies the expenditure on long-term purchases and investments such<br />

as land and buildings, motor vehicles, plant and equipment as well as office furniture etc. it<br />

encapsulates expenditure on goods that basically will be used for more than one financial<br />

year. It involves construction of roads, buildings and vehicles.<br />

An easy way to differentiate between the two budgets is to think about the purchase of a car.<br />

A car is a capital because it is envisaged to be used for more than one year. The fuel to run<br />

the car and the maintenance is operational costs and is thus within the operating budget.<br />

In developmental local government, the IDP and Budget must be linked and is therefore<br />

reviewed annually to ensure the linkage and community endorsement of the <strong>City</strong>’s programme.<br />

Total Budget 2012/<strong>13</strong> – 2014/15<br />

2011/12<br />

M/Y ADJ BUDGET<br />

R000<br />

2012/<strong>13</strong><br />

R000<br />

8<br />

20<strong>13</strong>/14<br />

R000<br />

2014/15<br />

R000<br />

Operating Budget 3,448,368,587 3,966,637,294 4,453,7<strong>13</strong>,893 4,924,341,303<br />

Capital Budget 725,646,383 749,097,271 879,840,714 876,057,416<br />

Total Budget 4,174,014,970 4,715,734,565 5,333,554,607 5,774,398,719<br />

4. THE IDP PROCESS FOLLOWED<br />

Section 28 (1) of the Municipal Systems Act requires each municipality to adopt a process<br />

in writing to guide the planning, drafting, adoption and review of its integrated development<br />

plan. In compliance with this requirement <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality adopted<br />

the plan on 26 October 2011. Key activities undertaken in line with the IDP/Budget review<br />

towards 2012/<strong>13</strong> include the following:<br />

• 11 October 2011 - A workshop with BCMM Councillors and Top Management was<br />

convened. The purpose of the workshop was, inter alia, to unpack the concept of<br />

Integrated Development Planning and outline the role of Councillors, Ward Committees<br />

and other stakeholders; introduce the IDP/Budget/PMS review process towards the<br />

2012/<strong>13</strong> financial year and enhance a common understanding of the process and to<br />

initiate a process of identifying ward priorities that will inform the IDP/Budget review<br />

towards 2012/<strong>13</strong>.<br />

• 26 October 2011 – Council adopted the IDP/Budget/PMS Process Plan 2012/<strong>13</strong>;<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

“a <strong>City</strong> Growing with you”


• 4 November 2011 – An IDP/Budget/PMS External Representative Forum meeting<br />

was held to consider institutional performance over the previous financial year and<br />

prepare external stakeholders for the IDP development process ahead;<br />

• 11 and 14 November 2011 -An IDP/Budget/PMS Technical Working Group Meeting<br />

was convened, wherein sector plan champions presented a synopsis of their plans<br />

with a view to identifying information that would feed into the situation analysis<br />

phase.<br />

• IDP Strategic Working Groups convened meetings with the aim of discussing and<br />

finalising their situation analysis reports. The meetings were held as follows:<br />

* Finance and Support Services: 23 November 2011<br />

* Municipal Services: 25 November 2011<br />

* Development Planning and Management: 30 November 2011<br />

* Development Facilitation and Partnerships: 20 December 2011<br />

• 28 November 2011 – A Technical Intergovernmental Relations Session was convened<br />

by the <strong>City</strong> with provincial and national government departments as well as civil<br />

society organs to foster collaborative planning and to share information about<br />

initiatives that are undertaken within the municipal area;<br />

• 19-21 February 2012 – A Mayoral Lekgotla was held to consider a situational analysis<br />

of the <strong>City</strong> and to map a way forward with regard to key strategic priorities that will<br />

guide the IDP and Budget review towards 2012/<strong>13</strong> financial year<br />

• 11-<strong>13</strong> March 2012 – A Technical Planning Session was convened to:<br />

– Form a problem statement on the development trajectory of the Metro<br />

– Align the political mandate (Lekgotla deliverables) with strategic objectives in<br />

order to respond to the Metro challenges<br />

– Ensure alignment of planning between BCMM and other spheres of government;<br />

– Distil key strategic focus areas for 2012 and beyond which will guide the<br />

development path of the Metro.<br />

• 23 March 2012: IDP/Budget Councillors Session held at the Regent Hotel to consider<br />

the draft BCMM Situation Analysis, Outcomes of the Mayoral Lekgotla and Technical<br />

Planning Session, the draft IDP 2012/<strong>13</strong> and MTREF Budget<br />

• 28 March 2012 – Tabling in Council of the draft 2012/<strong>13</strong> IDP Review and 2012/<strong>13</strong><br />

MTREF for approval;<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

9<br />

“a <strong>City</strong> Growing with you”


• 16-17 April 2012: IDP/Budget Councillors Session to consider amendments to draft<br />

IDP/Budget and the proposed IDP/Budget Roadshows.<br />

• 23-30 April 2012 – IDP/Budget Road Shows were held at fifteen venues across the<br />

Metro.<br />

• 4 May 2012 – IDP/Budget Business Breakfast was held to consult stakeholders from<br />

the business fraternity on the draft IDP 2012/<strong>13</strong> and MTREF Budget.<br />

• 25 May 2012 – Council Open Day to provide feedback to external stakeholders on the<br />

outcome of IDP/Budget Road shows.<br />

• 29 May 2012 – Adoption of the IDP Review 2012/<strong>13</strong> and MTREF Budget.<br />

5. IDP INFORMANTS AND STRATEGIC FOCAL<br />

AREAS<br />

5.1 IDP INFORMANTS<br />

The IDP process was undertaken within the framework of National, Provincial and District<br />

policies and legislation. The IDP/Budget review towards 2012/<strong>13</strong> has been informed by and<br />

took into consideration the following:<br />

• Ward priorities;<br />

• Priorities from the Mayoral Lekgotla held on 19-21 February 2012;<br />

• 12 Outcomes of Government;<br />

• Outcomes of the Technical Planning Session held on 11-<strong>13</strong> March 2012;<br />

• The draft National Development Plan produced by the NPC;<br />

• Millennium Development Goals;<br />

• The Provincial Growth and Development Plan; and<br />

• The National Spatial Development Perspective.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

10<br />

“a <strong>City</strong> Growing with you”


5.2 KEY STRATEGIC OBJECTIVES<br />

Emanating from a situation analysis undertaken towards development of the IDP, <strong>Buffalo</strong> <strong>City</strong><br />

Metropolitan Municipality identified a number of challenges and constraints which impact<br />

on the way in which the municipality functions and fulfils its mandate as per section 152 of<br />

the South African Constitution. Challenges confronting the Metro include a declining revenue<br />

base and poor management of resources, inefficiencies that limit the manner in which the<br />

<strong>City</strong> interfaces with the communities, ageing infrastructure and deferred maintenance,<br />

structural inefficiencies that result in poor service delivery standards, low economic growth<br />

and a high rate of unemployment, vulnerable environmental assets and natural resources.<br />

To address the identified challenges and work towards realization of the vision, the <strong>City</strong> has<br />

identified seven strategic focal areas and set the following long term strategic objectives:<br />

1.4.1 BCMM 1: To be a financially sound organisation that efficiently manages its<br />

resources;<br />

1.4.2 BCMM 2: To be an institutionally efficient and effective <strong>City</strong> that inclusively works<br />

with communities;<br />

1.4.3 BCMM 3: To generate an enabling environment for an economy that is growing,<br />

diversifying, generating increasing number of sustainable employment<br />

opportunities and contributing to increased incomes and equality;<br />

1.4.4 BCMM 4: To deliver sustainable infrastructure that support social and economic<br />

development;<br />

1.4.5 BCMM 5: To be a well structured and capacitated institution that renders effective<br />

and efficient services to all by 2016<br />

1.4.6 BCMM 6: To enhance and protect all environmental assets and natural resources<br />

within <strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality by 2016<br />

The Metro has aligned the key strategic objectives and will strive to attain them within the<br />

context of the five key local government performance areas.<br />

5.3 STRATEGIC FOCAL AREAS<br />

Taking into account the prevailing economic environment and global factors that impact on<br />

development, the <strong>City</strong> has made significant inroads to address key development challenges<br />

within the municipality. There is however, more work to be done towards addressing the<br />

identified focal areas.<br />

Over the next five year term the <strong>City</strong> will concentrate on the nine strategic focus areas<br />

outlined below.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

11<br />

“a <strong>City</strong> Growing with you”


5.3.1 Institutional Restructuring and Stabilisation<br />

<strong>Buffalo</strong> <strong>City</strong> Metropolitan Municipality is currently undergoing a process to restructure and<br />

stabilize the administration. This entails filling of posts on the approved macro structure i.e.<br />

the <strong>City</strong> Manager and Section 56 Managers.<br />

The medium to long term objective of the Metro is to promote organisational efficiency<br />

through the capacitation of staff and establishment of systems to enable staff to<br />

effectively perform their duties and align with the new Metro functions.<br />

5.3.2 Improving Intergovernmental Relations<br />

Section 41 of the South African Constitution of 1996 outlines the principles of co-operative<br />

government and intergovernmental relations, thus providing a broad framework for how<br />

the different spheres of government should interface. Section 4 of the Intergovernmental<br />

Relations Framework Act <strong>13</strong> of 2005 goes further and stipulates that the object of this act<br />

is to provide a framework for the national government, provincial governments and local<br />

governments, and all organs of state within those governments to facilitate co-ordination<br />

in the implementation of policy and legislation. The Act further requires establishment of<br />

provincial and district intergovernmental forums to promote and facilitate IGR between<br />

provinces, district and municipalities.<br />

Section 3 of the Municipal Systems Act 32 of 2000 (as amended) also defines how local<br />

government must develop co-operative approaches to governing, resources sharing and<br />

resolution of disputes within the context of Intergovernmental relations.<br />

Notwithstanding the above legislative provisions, intergovernmental relations between BCMM<br />

and other spheres of government still leave much to be desired, as they are still characterised<br />

by uncoordinated:<br />

• Alignment of planning and implementation;<br />

• Inter-sphere co-operation and co-ordination;<br />

• Information sharing on development programmes and projects;<br />

• Participation in platforms meant for engaging and co-operating; and<br />

• Approach to engaging and consulting with communities.<br />

5.3.3 Building Citizen Confidence<br />

Poor performance in terms of service delivery, administrative and political instability, and<br />

negative media coverage have largely contributed towards a low level of citizen confidence<br />

in the <strong>City</strong>.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

12<br />

“a <strong>City</strong> Growing with you”


Reversing the trend and building citizen confidence will require a concerted effort on the part<br />

of the Metro. It will also require the inculcation of a renewed work ethic from all who wear<br />

the name and brand of the municipality as well as the application of good governance and<br />

management principles, dedication and professionalism.<br />

5.3.4 Bridging the Digital Divide<br />

The Digital Divide refers to any inequalities between social groups in terms of their access<br />

to, use of, or knowledge of information and communication technologies. The divide within<br />

the municipal area refers to inequalities between individuals, households, businesses, and<br />

geographic areas at different socioeconomic and other demographic levels. Being a largely<br />

rural Metro the divide manifests itself in terms of the dichotomy between urban and rural<br />

areas with regard to access to telecommunication and IT systems.<br />

A key objective of the Metro is to ensure that telecommunication and IT systems become<br />

internationally compatible, thus facilitating access to broadband and/or other state-of-the-art<br />

technologies for citizens of the <strong>City</strong> and region.<br />

5.3.5 Improving performance, compliance, processes and systems<br />

Some of the weaknesses which negatively impact on the performance of the Metro relate<br />

to disintegrated systems internal control deficiencies, lack of staff with requisite capacity, a<br />

spatially fragmented workforce as well as lack of clearly defined processes and systems.<br />

• Develop mechanisms for the accurate complete reporting of financial information as<br />

required by NT and Accounting Standards.<br />

• Develop mechanisms to ensure that SCM operations are conducted strictly in accordance<br />

with legislated requirements.<br />

• Provide for the migration of existing records and the capturing of current records within<br />

a single repository in accordance with standards prescribed by the Archives Act and<br />

other relevant Acts and to ensure that such records can be retrieved for future use.<br />

5.3.6 Build Sustainable Communities<br />

The focus over the past years has been on delivering basic needs and housing. In spite of<br />

the remaining backlogs major strides have been in this regard, however, there still remains a<br />

huge challenge in terms of ensuring that we do not just deliver houses but create integrated<br />

and sustainable settlements.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

<strong>13</strong><br />

“a <strong>City</strong> Growing with you”


The challenge is not only about providing basic services and housing, but is also about<br />

‘building sustainable human settlements’ where residents have access to social and<br />

community facilities, economic opportunities, a healthy and sustainable environment and<br />

where opportunities can be accessed through convenient public transport and a safe road<br />

network.<br />

Integral to the creation of ‘sustainable human settlements’ is, integrated planning and<br />

implementation. The Metro is currently in the process of developing an ‘Integrated Sustainable<br />

Human Settlement Plan’, which will guide future investment and development.<br />

Creation of integrated and sustainable human settlements will directly contribute towards<br />

building of strong and integrated communities that manifest resilience against social,<br />

economic and natural adversities.<br />

5.3.7 Job Creation<br />

The <strong>City</strong> acknowledges that low economic growth and a high rate of unemployment are<br />

still prevalent and present a major challenge. This further translates to relatively high levels<br />

of poverty which is widespread within the <strong>City</strong>. High levels of poverty are apparent in the<br />

statistics from the 2001 Census where approximately 70% of households in the <strong>City</strong> indicated<br />

an income of less than R1500 per month, with 28% of all households indicating no income at<br />

all. Unemployment rate with the Metro is estimated at 24%.<br />

One of the threats to the future development of <strong>Buffalo</strong> <strong>City</strong> Metro is lack of appropriate<br />

education and skills levels. A significant portion of the Metro’s potential labour force have<br />

not attended school or completed their primary phase. Further, according to the last Census<br />

conducted in 2001 only 21% of the <strong>City</strong>’s 20 years and above population, had grade 12, 16%<br />

had post–school education and only 17% of 15 - 24 year olds were enrolled in post-school<br />

study. The recent 2007 community survey revealed a slight improvement, albeit<br />

To arrest the situation over the next five years the <strong>City</strong> will make concerted efforts, through<br />

its various programmes, in particular local economic development programmes, to attract<br />

investors into the <strong>City</strong> and thus contribute towards the national imperative of job creation.<br />

<strong>Buffalo</strong> <strong>City</strong> also contains a number of strengths to build upon for growth and development.<br />

A coastal location, unspoilt nature, a well-performing automotive industry and the status of<br />

being the capital of the Eastern Cape Province are a few of these comparative advantages to<br />

exploit in order to combat poverty and create jobs.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

14<br />

“a <strong>City</strong> Growing with you”


5.3.8 Improving Governance<br />

Corruption and poor service delivery undermines the credibility of the state. Poor state<br />

credibility leads to a democratic deficit undermining democracy and investment confidence.<br />

A weak local government leads to low investor confidence for both state and private sector<br />

decisions. Poor governance leads to poor economic performance.<br />

A well-governed city means that a clear and transparent agenda for the long term strategic<br />

work is formulated in co-operation with all stakeholders and communicated to all parties<br />

affected by the development process. A well-governed city is dependent on a reciprocal<br />

approach by other government spheres and agencies. Increased community feedback and<br />

engagement and improved customer reciprocity are other mitigating measures to apply in a<br />

democratic and well-governed city.<br />

It also means that quality basic services are provided through a financially sound and clear<br />

investment framework, which is aligned with the interventions by other public sector providers<br />

of basic services. Going forward, <strong>Buffalo</strong> <strong>City</strong> Metro will strive to become a well governed <strong>City</strong>.<br />

5.3.9 Financial Viability<br />

In order for the Metro to fulfill its mandate as stipulated in the Constitution of the country,<br />

there is a need to maintain financial viability and expand its revenue base in relation to<br />

expenditure. This requires robust strategies to turn around the current predicament of grant<br />

dependency and ensure that the <strong>City</strong> is in a financially sound position over the next five years<br />

and beyond.<br />

To achieve financial viability the <strong>City</strong> will put in place mechanisms for the recording and<br />

management of the financial resources of the Municipality and investigation and development<br />

of new revenue streams to provide for the financial sustainability of the Metro.<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

15<br />

“a <strong>City</strong> Growing with you”


6. 2012/<strong>13</strong> - 2014/15 MTREF BUDGET<br />

6.1 SUMMARISED CAPITAL BUDGET<br />

2012/20<strong>13</strong> - 2014/2015 CAPITAL BUDGET PER FUNDING<br />

Funding<br />

16<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2014/2015<br />

Capital<br />

Budget<br />

Own Funds 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />

Total Own Funding 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />

Integrated National Electrification Programme(INEP) 30 000 000 30 000 000 20 000 000<br />

Electricity Demand Side Management Grant 10 000 000 0 0<br />

Neighbourhood Development Partnership Grant 0 0 8 828 000<br />

Public Transport Infrastructure and Systems Grant (PTIS) 78 702 000 78 762 000 0<br />

Urban Settlement Development Grant 491 145 828 602 860 000 680 691 000<br />

Human Settlement Development Grant 19 170 420 35 495 714 16 318 416<br />

Total Grants 629 018 248 747 117 714 725 837 416<br />

TOTAL PER FUNDING 749 097 271 879 840 714 850 057 416<br />

2012/20<strong>13</strong> - 2014/2015 CAPITAL BUDGET PER DIRECTORATE<br />

Directorate<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2014/2015<br />

Capital<br />

Budget<br />

1. Executive Support Services 4 500 000 2 000 000 0<br />

2. Municipal Manager’s Office 0 0 0<br />

3. Chief Operations Officer 72 089 020 1<strong>13</strong> 700 478 111 064 024<br />

4. Directorate of Financial Services 3 600 000 3 000 000 3 000 000<br />

5. Directorate of Corporate Services 32 600 000 23 250 000 25 750 000<br />

6. Directorate of Engineering Services 411 259 273 473 614 293 484 773 392<br />

7. Directorate of Development Planning 191 920 978 210 762 000 107 000 000<br />

8. Directorate of Health & Public Safety 10 128 000 8 473 000 <strong>13</strong> 470 000<br />

9. Directorate of Community Services 23 000 000 45 040 943 105 000 000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

749 097 271 879 840 714 850 057 416<br />

“a <strong>City</strong> Growing with you”


6.2 SUMMARISED OPERATING BUDGET<br />

2012/20<strong>13</strong> - 2014/2015 OPEX BUDGET PER FUNDING<br />

OPEX<br />

2012/20<strong>13</strong><br />

Opex Budget<br />

17<br />

20<strong>13</strong>/2014<br />

Opex Budget<br />

2014/2015<br />

Opex Budget<br />

Own Funds 38 800 000 55 647 500 50 340 000<br />

Total Own Funding 38 800 000 55 647 500 50 340 000<br />

Finance Management Grant 1 500 000 1 500 000 1 500 000<br />

Infrastructure Skills Development Grant 3 000 000 3 800 000 4 000 000<br />

Urban Settlement Development Grant 8 328 172 10 445 000 5 850 000<br />

Reclaim Land Claims Commission 300 000 300 000 0<br />

Local Government and Housing 77 000 0 0<br />

Human Settlement Development Grant 111 645 824 168 849 664 179 337 305<br />

Dept of Water Affairs - DoRA 1 283 000 0 0<br />

Dept of Water Affairs - Province 400 000 0 0<br />

Dept of Water Affairs - ACIP 1 975 000 125 000 0<br />

Total Grants 128 508 996 185 019 664 190 687 305<br />

TOTAL PER FUNDING 167 308 996 240 667 164 241 027 305<br />

2012/20<strong>13</strong> - 2014/2015 OPEX BUDGET PER DIRECTORATE<br />

2012/20<strong>13</strong><br />

Opex Budget<br />

20<strong>13</strong>/2014<br />

Opex Budget<br />

2014/2015<br />

Opex Budget<br />

1. Executive Support Services 5 650 000 7 680 000 4 680 000<br />

2. Municipal Manager’s Office 6 200 000 8 200 000 8 200 000<br />

3. Chief Operations Officer 110 458 446 173 079 464 186 206 905<br />

4. Directorate of Financial Services 4 620 000 6 220 000 4 220 000<br />

5. Directorate of Corporate Services 9 150 000 8 450 000 7 700 000<br />

6. Dir. of Engineering Services 8 658 000 7 125 000 0<br />

7. Dir. of Development Planning 22 572 550 29 912 700 30 020 400<br />

8. Dir. of Health & Public Safety 0 0 0<br />

9. Dir. of Community Services 0 0 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

167 308 996 240 667 164 241 027 305<br />

“a <strong>City</strong> Growing with you”


6.3 CAPITAL PROJECTS 2012/<strong>13</strong> – 2014/15<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Cost STRATEGY CODE<br />

Source of<br />

Cost centre name<br />

Ward No. Project Name<br />

Capital Capital Capital<br />

centre no. (FROM THE IDP)<br />

Funding<br />

Budget Budget Budget<br />

KPA 1: MUNICIPAL TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT<br />

Electronic Attendance Control<br />

H.R. Administration 420005 MTOD03 N/A<br />

Own Funds 2 500 000 1 500 000 1 000 000<br />

System<br />

IT Systems (Asset management<br />

, SCM, Budget forecasting and<br />

Management Information<br />

415025 MTOD06 N/A Modelling, Demand Management Own Funds 20 000 000 20 750 000 23 750 000<br />

Services<br />

System, Fuel Management System<br />

and Stock Coding System<br />

Management Information<br />

415025 MTOD07 N/A IT Infrastructure Network Own Funds 4 600 000 0 0<br />

Services<br />

Management Information<br />

415025 MTOD07 N/A Disaster Recovery Centre ICT Own Funds 4 500 000 0 0<br />

Services<br />

Management Information<br />

415025 MTOD07 N/A Computer Equipment - BCMM Own Funds 500 000 1 000 000 1 000 000<br />

Services<br />

Management Information<br />

Upgrading of BCMM Website<br />

415205 MTOD08 N/A<br />

Own Funds 500 000 0 0<br />

Services<br />

(Including GIS on the Internet<br />

TOTAL 32 600 000 23 250 000 25 750 000<br />

KPA 2: BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT<br />

Housing Department 255005 BSDID01 12 Reeston Phase 3 Stage 2 -P1 & P3 USDG 10 000 000 21 500 000 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

18<br />

USDG 2 000 000 7 412 400 17 931 000<br />

Mdantsane Zone 18 CC Phase 2 - P1<br />

& P3<br />

Housing Department 255005 BSDID01 21<br />

USDG 8 000 000 200 000 0<br />

Manyano &Thembelihle Phase 2 -<br />

P1 & P3<br />

Housing Department 255005 BSDID01 17<br />

Housing Department 255005 BSDID01 19 Second Creek (Turn Key) - P1 & P3 USDG 8 000 000 100 000 0<br />

Housing Department 255005 BSDID01 6 Block Yard TRA - P 1& P3 USDG 1 000 000 0 0<br />

“a <strong>City</strong> Growing with you”


2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Cost STRATEGY CODE<br />

Source of<br />

Cost centre name<br />

Ward No. Project Name<br />

Capital Capital Capital<br />

centre no. (FROM THE IDP)<br />

Funding<br />

Budget Budget Budget<br />

DVRI PILOT PROJECT (Mekeni, Haven<br />

Housing Department 255005 BSDID01 19<br />

USDG 2 500 000 0 0<br />

Hills, Competition Site) P1 & P3<br />

Cluster 1 (Chris Hani, Ilinge,<br />

48, 12, 21, Mahlangu Village, Sisulu<br />

Housing Department 255005 BSDID01<br />

USDG 3 706 200 9 265 500 11 730 123<br />

11,17, 11, 20 Village,Winnie Mandela,Deluxolo<br />

Village & Francis Mei) P1 & P3<br />

Cluster 2 (Masibambane, Masibulele,<br />

Housing Department 255005 BSDID01 17, 14, Velwano, Gwentshe Village,<br />

USDG 600 000 5 559 300 9 265 500<br />

Mathemba Vuso) P1 & P3<br />

Cluster 3 (Fynbos Informal 1, Fynbos<br />

Housing Department 255005 BSDID01 5, 10<br />

USDG 7 412 400 11 859 840 <strong>13</strong> 620 285<br />

Informal 2, Ndancama) P1 & P3<br />

Housing Department 255005 BSDID01 31 Sunny South - P1 & P3 USDG 600 000 1 000 000 2 000 000<br />

Housing Department 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 1 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />

Housing Department 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 2 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />

Housing Department 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 2- P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />

Housing Department 255005 BSDID01 23, 24 Potsdam North Kanana - P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />

Housing Department 255005 BSDID01 9 Amalinda Co- op P1 & P3 USDG 0 1 126 562 1 630 750<br />

Housing Department 255005 BSDID01 9 Amalinda Fairlands P1 & P2 USDG 0 1 126 562 1 630 750<br />

Housing Department 255005 BSDID01 12 Reeston Phase 3: stage 2 – P1 & P3 HSDG 15 000 000 25 000 000 0<br />

Housing Department 255005 BSDID01 12 Reeston Phase 3: stage 3 – P1 & P3 HSDG 1 000 000 5 559 300 5 559 300<br />

Housing Department 255005 BSDID01 2 Braelynn ext 10 – P1 & P3 HSDG 300 000 1 476 096 3 570 436<br />

C Section and Triangular Site – P1<br />

Housing Department 255005 BSDID01 7, 8<br />

HSDG 270 420 2 500 000 4 594 340<br />

& P3<br />

Housing Department 255005 BSDID01 7, 8 D Hostel – P1 & P3 HSDG 100 000 860 318 2 594 340<br />

DVRI Pilot Project (Mekeni, Haven<br />

Housing Department 255005 BSDID01 6, 8<br />

HSDG 2 500 000 100 000 0<br />

Hills, Competition Site)<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

19<br />

NDPG 0 0 8 828 000<br />

Township & CBD Regeneration<br />

Strategy<br />

Township Regeneration 255005 BSDID27 N/A<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

Source of<br />

Funding<br />

Ward No. Project Name<br />

STRATEGY CODE<br />

(FROM THE IDP)<br />

Cost<br />

centre no.<br />

Cost centre name<br />

3 500 000 4 000 000<br />

530020 BSDID29 N/A BCM Fleet Management System Own Funds 3 100 000<br />

530020 BSDID29 N/A BCMM Fleet Own Funds 6 000 000 15 000 000 15 000 000<br />

Fleet management -<br />

Braelynn<br />

Fleet Management –<br />

Braelynn<br />

10 000 000 0 0<br />

Electricity<br />

Demand Side<br />

Management<br />

Grant<br />

Electrification – Energy efficient<br />

Street lighting<br />

11, 12, 14,<br />

17, 20, 21,<br />

22, 23, 30<br />

535025 BSDID04<br />

Electricity Planning &<br />

Design<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

Own Funds 5 000 000 50 000 000 50 000 000<br />

Bulk Electricity Infrastructure<br />

Upgrade<br />

16, 18<br />

BSDID04<br />

535025<br />

Electricity Planning &<br />

Design<br />

30 000 000 30 000 000 20 000 000<br />

DoE<br />

(Integrated<br />

National<br />

ElectrificationProgramme)<br />

Electrification - Reeston, Potsdam<br />

unit P, Infills Mdantsane, Dimbaza,<br />

Zwelitsha, Pakamisa, Bhisho and<br />

Duncan Village<br />

<strong>13</strong>, 25, 43,<br />

34, 36,<br />

535025 BSDID04<br />

Electricity Planning &<br />

Design<br />

20<br />

Own Funds 5 000 000 20 000 000 20 000 000<br />

Electrification of Informal dwellings –<br />

Duncan Village Areas<br />

Electricity Infrastructure Network<br />

(2.47% Tariff increase – Ring fenced)<br />

1, 2, 7, 8,<br />

9, 10<br />

2, 7, 15,<br />

16, 44<br />

535025 BSDID04<br />

Own Funds 27 851 023 0 0<br />

535025 BSDID04<br />

525025 BSDID06 21, 22, 23 Mdantsane Roads USDG 60 000 000 80 484 000 125 419 392<br />

Electricity Planning &<br />

Design<br />

Electricity Planning &<br />

Design<br />

Roads and Stormwater<br />

Drainage<br />

Roads Design 525020 BSDID06 46 West Bank Restitution USDG 15 000 000 10 000 000 28 000 000<br />

Roads Design 525020 BSDID06 28 Quenera Main Roads USDG 5 000 000 0 0<br />

BCMM Roads Upgrade USDG 30 000 000 30 000 000 50 000 000<br />

29, <strong>13</strong>, 25,<br />

39, 34, 36,<br />

44, 41, 1, 2,<br />

7, 8<br />

Roads Design 525020 BSDID06<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

Source of<br />

Funding<br />

Ward No. Project Name<br />

STRATEGY CODE<br />

(FROM THE IDP)<br />

Cost<br />

centre no.<br />

Cost centre name<br />

23, 38, 43,<br />

Roads and Stormwater<br />

525025 BSDID06 31, 32, 24, Rehabilitation of Rural Roads USDG 10 000 000 10 000 000 25 000 000<br />

Drainage<br />

32<br />

28, 4, 41, <strong>13</strong>,<br />

16, 14, 21,<br />

Sewerage Treatment-<br />

515026 BSDID07 22, 5, 16, 27, Bulk Sanitation Provision USDG 152 608 250 155 854 000 99 854 000<br />

Coastal<br />

31, 32, 33,<br />

47, 11<br />

34, 37, 38,<br />

39, 40, 41, KWT, Dimbaza and Bhisho<br />

Water Administration 520005 BSDID07<br />

USDG 7 000 000 37 000 000 20 000 000<br />

43, 44, 49, Infrastructure(Water)<br />

35<br />

11, 12, <strong>13</strong>,<br />

14, 42, 48, Relocation of Midblocks in<br />

Water Administration 515010 BSDID07<br />

USDG 5 000 000 5 000 000 5 000 000<br />

50, 17, 20, Mdantsane<br />

23<br />

Water Administration 515010 BSDID07 36 Amahleke Water Supply USDG 3 000 000 3 000 000 3 000 000<br />

Augmentation of Water Treatment<br />

Bulk pumping stations 520015 BSDID07 5, <strong>13</strong> Capacity - Umzonyana/Raising USDG 12 000 000 22 000 000 22 000 000<br />

Upper weir<br />

Upgrade water networks in terms of<br />

Water Treatment Works 520020 BSDID07 N/A<br />

USDG 6 000 000 17 000 000 15 000 000<br />

densification and augmentation<br />

Bulk Water Supply Newlands and<br />

Water Treatment Works 520020 BSDID07 N/A<br />

USDG 1 000 000 0 0<br />

Other Areas<br />

Water Treatment Works 520020 BSDID07 33 Ward 33 Bulk Water Supply Scheme USDG 3 000 000 0 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

21<br />

Water Treatment Works 520020 BSDID07 31,33 Bulk Water Supply Coastal Areas USDG 5 000 000 1 276 293 0<br />

Water Treatment Works 520020 BSDID07 31 Winterstrand Water Supply USDG 1 000 000 0 0<br />

Own Funds 2 800 000 2 000 000 1 500 000<br />

Upgrading of the Laboratory<br />

infrastructure and equipment<br />

Water Treatment Works 520020 BSDID07 N/A<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

Source of<br />

Funding<br />

Ward No. Project Name<br />

STRATEGY CODE<br />

(FROM THE IDP)<br />

Cost<br />

centre no.<br />

Cost centre name<br />

78 702 000 78 762 000 0<br />

Public<br />

Transport<br />

Infrastructure<br />

and Systems<br />

Grant<br />

Bus Rapid Transit<br />

1, 10, 11, 12,<br />

<strong>13</strong>, 14, 15,<br />

16, 17, 18,<br />

19, 2, 20, 21,<br />

22, 23, 24,<br />

25, 28, 3, 4,<br />

5, 6, 7, 8, 9<br />

620005 BSDID23<br />

Transport Planning &<br />

Operations Admin<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

Transport Planning &<br />

620005 BSDID23 N/A ITP implementation USDG 3 000 000 3 000 000 3 000 000<br />

Operations Admin<br />

Transport Planning &<br />

620005 BSDID24 37 Public Transport Facilities USDG 23 000 000 22 000 000 30 000 000<br />

Operations Admin<br />

Transport Planning &<br />

620005 BSDID24 27, 28 Gonubie Main Road USDG 15 000 000 30 000 000 10 000 000<br />

Operations Admin<br />

Transport Planning &<br />

46, 31, 10,<br />

620005 BSDID24<br />

N2/R72 link road survey USDG 1 200 000 0 0<br />

Operations Admin<br />

16, 8, 19<br />

Land Admin 615080 BSDID21 1 -50 Land acquisition USDG 12 764 000 42 500 000 29 500 000<br />

Cleansing Administration<br />

Development of Community<br />

755010 BSDID16 <strong>13</strong>, 21, 23<br />

USDG 2 000 000 3 000 000 5 000 000<br />

Support<br />

Parks(Inland, Midlands and Coastal)<br />

Development and Upgrading of<br />

Interments 755025 BSDID16 N/A Cemeteries(Inland, Midland and USDG 5 000 000 12 040 943 20 000 000<br />

Coastal)<br />

Development and Upgrading of<br />

Halls 760025 BSDID16 5<br />

USDG 4 000 000 20 000 000 30 000 000<br />

Community Halls<br />

22<br />

770030 BSDID09 1 – 50 Design of the Central Transfer Station USDG 3 000 000 0 0<br />

E.L. Regional Waste<br />

Disposal Site & Transfer<br />

Station<br />

770030 BSDID09 1 – 50 Construction of the Third Cell USDG 10 000 000 0 0<br />

E.L. Regional Waste<br />

Disposal Site & Transfer<br />

Station<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

Source of<br />

Funding<br />

Ward No. Project Name<br />

STRATEGY CODE<br />

(FROM THE IDP)<br />

Cost<br />

centre no.<br />

Cost centre name<br />

770030 BSDID09 1 – 50 Rehabilitation of Landfill Sites USDG 5 000 000 0 0<br />

E.L. Regional Waste<br />

Disposal Site & Transfer<br />

Station<br />

7, 12, <strong>13</strong>, 28,<br />

Upgrading of Sport & Recreation<br />

Sportsfields 765010 BSDID16 29, 35, 37,<br />

USDG 9 000 000 10 000 000 50 000 000<br />

Facilities<br />

38, 41, 44<br />

Fire and Rescue Services 725010 BSDID12 1 to 50 Coastal and Midland Fire Station USDG 3 000 000 3 000 000 3 000 000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

KWT Fire Station USDG 6 000 000 0 0<br />

25, 35, 37,<br />

38, 39, 40,<br />

41, 43, 44,<br />

Fire and Rescue Services 725010 BSDID12<br />

45, 49<br />

Fire and Rescue Services 725010 BSDID12 31, 32, 33 Tsholomnqa Fire Station USDG 500 000 5 000 000 10 000 000<br />

KPA 3: LOCAL ECONOMIC DEVELOPMENT<br />

23<br />

USDG 12 254 978 20 000 000 30 000 000<br />

Economic Development<br />

Infrastructure (Heritage Route<br />

Development, Rollout of Informal<br />

Traders Stalls)<br />

63005 LED03 N/A<br />

Local Economic<br />

Development<br />

USDG 3 000 000 3 000 000 3 000 000<br />

BCMM Urban Agriculture<br />

635005 LED03 N/A<br />

Infrastructure Development<br />

KPA 4: FINANCIAL VIABILITY AND MANAGEMENT<br />

Local Economic<br />

Development<br />

Own Funds 1 100 000 1 000 000 1 000 000<br />

Office Furniture – Revenue<br />

Management<br />

Debtors Management 330015 MFVM01 N/A<br />

330025 MFVM02 N/A Pre-Payment Vending Machines Own Funds 1 000 000 500 000 500 000<br />

Own Funds 1 500 000 1 500 000 1 500 000<br />

Computer Equipment – Revenue<br />

Management<br />

415025 MTOD07 N/A<br />

Pre- Payment Vending<br />

Office<br />

Management Information<br />

Services<br />

330005 MFVM05 N/A General Valuations Own Funds 29 000 000 <strong>13</strong> 500 000 4 500 000<br />

Rates and Valuations<br />

Office<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Capital<br />

Budget<br />

20<strong>13</strong>/2014<br />

Capital<br />

Budget<br />

2012/20<strong>13</strong><br />

Capital<br />

Budget<br />

Source of<br />

Funding<br />

Ward No. Project Name<br />

STRATEGY CODE<br />

(FROM THE IDP)<br />

Cost<br />

centre no.<br />

Cost centre name<br />

Architecture 615075 MFVM01 N/A Upgrading of KWT Payments Hall USDG 4 000 000 1 000 000 0<br />

KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION<br />

Strategic Management 105035 MTOD12 N/A Back-up Generator – <strong>City</strong> Hall Own Funds 1 500 000 0 0<br />

Strategic Management 105035 MTOD12 N/A Upgrading of <strong>City</strong> Hall Own Funds 3 000 000 000 000 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

6.4 OPERATING PROJECTS 2012/<strong>13</strong> – 2014/15<br />

2014/2015<br />

Opex<br />

Budget<br />

20<strong>13</strong>/2014<br />

Opex<br />

Budget<br />

2012/20<strong>13</strong><br />

Opex<br />

Budget<br />

Source of<br />

Funding<br />

Project Name<br />

STRATEGY<br />

CODE FROM<br />

THE IDP<br />

Ward No.<br />

Cost<br />

Centre<br />

Directorate<br />

KPA 1: MUNICIPAL TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT<br />

Migration of BCMM documents to<br />

Legal and Admin 220005 N/A MTOD11<br />

Own Funds 300 000 100 000 0<br />

EDMS<br />

Development Planning<br />

615005 N/A MTOD10 GIS on the Internet Own Funds 700 000 0 0<br />

Administration<br />

Development Planning<br />

615005 N/A MTOD06 Updated Aerial Photography Own Funds 2 7000 000 0<br />

Administration<br />

Legal and Admin 220005 N/A MTOD11 Development and Review of By-Law Own Funds 500 000 500 000 500 000<br />

24<br />

Legal and Admin 220005 N/A MTOD11 Maintenance Policy Own Funds 600 000 0 0<br />

Own Funds 750 000 750 000 0<br />

Upgrade of BCMM off-site building<br />

to store vital documents and backup<br />

server (e.g. Bhisho / KWT<br />

415025 N/A MTOD08<br />

Management Information<br />

Services<br />

Roll out of Employee Performance<br />

HR Administration 420005 N/A GGPP02<br />

Own Funds 750 000 750 000 0<br />

Management System<br />

HR Administration 420005 N/A MTOD02 Infrastructure - Skills Development ISDG 3 000 000 3 800 000 4 000 000<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Opex<br />

Budget<br />

20<strong>13</strong>/2014<br />

Opex<br />

Budget<br />

2012/20<strong>13</strong><br />

Opex<br />

Budget<br />

Source of<br />

Funding<br />

Project Name<br />

STRATEGY<br />

CODE FROM<br />

THE IDP<br />

Ward No.<br />

Cost<br />

Centre<br />

Directorate<br />

KPA 2: BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT<br />

Housing Projects 255005 <strong>13</strong>, 43, 45, 46 BSDID01 Reeston Phase 3: Stage 2 - P5 HSDG 0 20 000 000 29 992 500<br />

Reeston Phase 3: Stage 3 – P4<br />

Housing Projects 255005 <strong>13</strong>, 43, 45, 46 BSDID01<br />

HSDG 163 515 0 0<br />

(Registration<br />

Ilitha Eradication of Wooden Houses<br />

Housing Projects 255005 45 BSDID01<br />

HSDG 19 995 000 31 992 000 11 330 500<br />

to Formal Houses<br />

Housing Projects 255005 43 BSDID01 Tyutyu Phase 2 – P5 (Top Structures) HSDG 6 665 000 500 000 0<br />

Airport / Phase 2A Construction of<br />

Housing Projects 255005 31 BSDID01<br />

HSDG 5 398 650 200 000 0<br />

new units-P4<br />

Housing Projects 255005 45 BDSID01 Ilitha South – 439 Units P5 HSDG 2 500 000 3 797 800 5 000 000<br />

17, 24, 26, 33,<br />

Reconstruction of Storm Damaged<br />

Housing Projects 255005<br />

BSDID01<br />

HSDG 20 000 000 30 000 000 15 862 700<br />

39, 40, 43, 36, 37<br />

Houses<br />

Housing Projects 255005 31 BSDID01 Sunny South – P5 HSDG 500 000 10 797 300 17 162 500<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

25<br />

Housing Projects 255005 23 BSDID01 Potsdam Village Phase 1 & 3 – P5 HSDG 0 500 000 500 000<br />

Cluster 1 (Chris Hani 3; Winnie<br />

48, 12, 21, 11,<br />

Mandela; Ilinge; Deluxolo Village;<br />

Housing Projects 255005<br />

BSDID01<br />

HSDG 5 811 880 17 395 650 26 660 000<br />

17, 11, 20<br />

Sisulu Village; Francis Mei; Mahlangu<br />

Village) P5<br />

Cluster 2 (Masibambane; Masibulele;<br />

19 995<br />

Housing Projects 255005 17, 14 BSDID01 Gwentshe; Velwano; Mathemba HSDG 0 9 664 250<br />

000<br />

Vuso) P5<br />

Cluster 3 (Fynbos1; Fynbos2;<br />

Housing Projects 255005 5, 10 BSDID01<br />

HSDG 0 9 664 250 19 995 000<br />

Ndancama)P5<br />

DVRI Pilot Project (Mekeni, Haven<br />

Housing Projects 255005 6, 8 BSDID01<br />

HSDG 0 11 797 050 19 995 000<br />

Hills, Competition Site) P5<br />

Cambridge 1 & 2 (Kei Road Dawn)<br />

Housing Projects 255005 15 BSDID01<br />

HSDG 465 000 0 0<br />

P2<br />

Housing Projects 255005 16 BSDID01 N2 Road Reserve HSDG 340 000 0 0<br />

“a <strong>City</strong> Growing with you”


STRATEGY<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Cost<br />

Source of<br />

Directorate<br />

Ward No. CODE FROM<br />

Project Name<br />

Opex Opex Opex<br />

Centre<br />

Funding<br />

THE IDP<br />

Budget Budget Budget<br />

Ford Msimango 1 (LU Housing Nomp<br />

Housing Projects 255005 6 BSDID01<br />

HSDG 165 000 0 0<br />

School)<br />

Housing Projects 255005 19 BSDID01 Second Creek – P5 HSDG 17 662 250 200 000 0<br />

Housing Needs Database and<br />

Housing Projects 255005 1-50 BSDID01<br />

HSDG 16 697 979 27 327 914 29 818 705<br />

Accreditation<br />

Housing Projects 255005 45, 46, 18, 19, 10 BSDID02 Beneficiary Education ( All USDG P4) USDG 300 000 250 000 250 000<br />

Relocation of beneficiaries to formal<br />

Housing Projects 255005 1 - 50 BSDID01 houses for all housing programmes Own funds 500 000 4 447 500 7 140 000<br />

– All Projects<br />

Housing Projects 255005 12 BSDID01 Dacawa P4 USDG 2 960 0 0<br />

Housing Projects 255005 10 BSDID01 Fynbos Informal 1-P4 USDG 27 488 0 0<br />

Housing Projects 255005 10 BSDID01 Fynbos Informal 2-P4 USDG 210 230 0 0<br />

Housing Projects 255005 12 BSDID01 Ilinge-P4 USDG 118 087 0 0<br />

Ilitha - Eradication of Wooden Houses<br />

Housing Projects 255005 45 BSDID01<br />

USDG 200 000 200 000 0<br />

to Formal Houses<br />

Housing Projects 255005 17 BSDID01 Masibambane-P4 USDG 20 038 0 0<br />

Housing Projects 255005 17 BSDID01 Masibulele-P4 USDG 20 553 0 0<br />

Housing Projects 255005 21 BSDID01 Mdantsane Zone 18 CC Phase 2-P4 USDG 256 425 0 0<br />

Housing Projects 255005 10 BSDID01 Ndacama-P2 USDG 160 000 0 0<br />

Housing Projects 255005 10 BSDID01 Ndacama-P4 USDG <strong>13</strong>8 308 0 0<br />

Housing Projects 255005 11 BSDID01 Sisulu Village-P4 USDG 19 636 0 0<br />

Housing Projects 255005 31 BSDID01 Sunny South-P4 USDG 112 7<strong>13</strong> 0 0<br />

Housing Projects 255005 14 BSDID01 Velwano-P4 USDG 81 999 0 0<br />

Housing Projects 255005 17 BSDID01 Winnie Mandela-P4 USDG 38 535 0 0<br />

Housing Projects 255005 9 BSDID01 Amalinda (Co-op) - P2 (EIA) USDG 200 000 0 0<br />

Housing Projects 255005 23,24 BSDID01 Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100 000 0 0<br />

Housing Projects 255005 23, 24 BSDID01 Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100 000 0 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

26<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Opex<br />

Budget<br />

20<strong>13</strong>/2014<br />

Opex<br />

Budget<br />

2012/20<strong>13</strong><br />

Opex<br />

Budget<br />

Source of<br />

Funding<br />

Project Name<br />

STRATEGY<br />

CODE FROM<br />

THE IDP<br />

Ward No.<br />

Cost<br />

Centre<br />

Directorate<br />

Housing Projects 255005 23, 24 BSDID01 Potsdam North Kanana - P2 (EIA) USDG 100 000 0 0<br />

Potsdam Village Rural Phase 1 &<br />

Housing Projects 255005 23 BSDID01<br />

USDG 100 000 0 0<br />

2 - P2 (EIA)<br />

Housing Projects 255005 21 BSDID01 Potsdam Unit P Stage 2 - P4 USDG 3 000 0 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

Housing Projects 255005 19 BSDID01 Second Creek P4 USDG 3 000 0 0<br />

Water, Sanitation and<br />

Caretakers - Duncan Village and<br />

520005 1, 2, 5, 6, 7, 8, 10<br />

Own Funds 2 000 000 2 000 000 0<br />

Scientific services<br />

Information Settlements<br />

Water, Sanitation and<br />

520005 18 BSDID06 East Bank WWTW ACIP Funding DWA -ACIP 1 525 000 125 000 0<br />

Scientific services<br />

Water, Sanitation and<br />

DWA –<br />

520005 N/A BSDID06 Water Services Business Plan<br />

400 000 0 0<br />

Scientific services<br />

Province<br />

520005 BSDID06 Dimbaza WWTW inlet Screen DWA – ACIP 450 000 0 0<br />

Implementation of Water<br />

Conservation and Demand<br />

Water, Sanitation and<br />

34, <strong>13</strong>, 9, 5, 28,<br />

Management(Dimbaza, Duncan Villa DWAF -<br />

520005<br />

BSDID06<br />

1 283 000 0 0<br />

Scientific services<br />

7, 41<br />

ge,Mdantsane,Reeston,Scenery Park DoRA<br />

,Nompumelelo,Mzamomhle,Sweetwa<br />

ters,Phakamisa,Zwelitsha)<br />

Roads and Stormwater<br />

Development of the BCMM Roads<br />

525025 N/A BSDID06<br />

USDG 3 000 000 5 000 000 0<br />

Drainage<br />

Masterplan<br />

Reeston Phase 3: Stage 2 – P4<br />

Land Admin 615080 12 BSDID01<br />

HSDG 788 800 480 000 480 000<br />

(Transfers)<br />

Reeston Phase 1 & 2 – Stage 1B –<br />

Land Admin 615080 12 BSDID01<br />

HSDG 200 000 46 400 0<br />

P4 (Transfers)<br />

Reeston Phase 3 Stage 1 – P4<br />

Land Admin 615080 12 BSDID01<br />

HSDG 500 000 86 800 0<br />

(Transfers)<br />

Land Admin 615080 43 BSDID01 Tyutyu Phase 1 – P4 (Transfers) HSDG 28 000 1 000 0<br />

Water, Sanitation and<br />

Scientific services<br />

27<br />

“a <strong>City</strong> Growing with you”


STRATEGY<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Cost<br />

Source of<br />

Directorate<br />

Ward No. CODE FROM<br />

Project Name<br />

Opex Opex Opex<br />

Centre<br />

Funding<br />

THE IDP<br />

Budget Budget Budget<br />

Land Admin 615080 43 BSDID01 Tyutyu 2 – P4 (Transfers) HSDG 34 000 1 000 0<br />

Land Admin 615080 45 BSDID01 Ilitha South – 439 Units (Transfers) HSDG 8 000 30 000 40 400<br />

Land Admin 615080 34, 36 BSDID01 Dimbaza Phase 2 P4 (Transfers) HSDG 5 000 12 500 0<br />

Potsdam Stage 2 Stage 1 – P4<br />

Land Admin 615080 <strong>13</strong> BSDID01<br />

HSDG 241 150 5 000 0<br />

(Transfers)<br />

Land Admin 615080 29 BSDID01 Nompumelelo – P4 (Transfers) HSDG 914 400 3 000 0<br />

Land Admin 615080 16 BSDID01 Amalinda Simanyene – P4 (Transfers) HSDG 15 000 1 000 0<br />

Land Admin 615080 48 BSDID01 Z Soga – P4 (Transfers) HSDG <strong>13</strong>6 000 1 000 0<br />

Land Transactions – upgrading of<br />

Land Admin 615080 Mdantsane BSDID22<br />

Own Funds 350 000 500 000 500 000<br />

former R293 & CPA Areas<br />

Airport / Phase 2A Construction of<br />

Land Admin 615080 46<br />

HSDG 441 200 10 000 0<br />

new units – P4<br />

Subdivision of Municipal leased<br />

Land Survey 615070 N/A BSDID21<br />

Own Funds 500 000 400 000 300 000<br />

properties<br />

Land Survey 615070 10 BSDID21 Ndancama P2 USDG 160 000 0 0<br />

Land Survey 615070 10 BSDID21 Fynbos Informal 1- P2 USDG 120 000 0 0<br />

Land Survey 615070 10 BSDID21 Fynbos Informal 2 – P2 USDG 110 000 0 0<br />

Land Survey 615070 9 BSDID21 Amalinda Fairlands Projects – P2 USDG 200 000 235 000 0<br />

Cambridge 1 & 2 (Kei Road) Dawn<br />

Land Survey 615070 15 BSDID21<br />

HSDG 465 000 0 0<br />

– P 2<br />

615070 16 BSDID21 N2 Road Reserve P 2 HSDG 340 000 0 0<br />

Ford Msimango 1 (LU Housing Nomp<br />

615070 6 BSDID21<br />

HSDG 165 000 0 0<br />

School) – P2<br />

<strong>City</strong> Planning 615070 16 BSDID17 DVRI Township Establishment LGH 77 000 0 0<br />

<strong>City</strong> Planning 615070 40926 BSDID17 Mdantsane Township Establishment USDG 0 500 000 600 000<br />

East Bank Restitution Township<br />

<strong>City</strong> Planning 615070 16 BSDID17<br />

RLCC 300 000 300 000<br />

Establishment<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

28<br />

“a <strong>City</strong> Growing with you”


STRATEGY<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Cost<br />

Source of<br />

Directorate<br />

Ward No. CODE FROM<br />

Project Name<br />

Opex Opex Opex<br />

Centre<br />

Funding<br />

THE IDP<br />

Budget Budget Budget<br />

Land Identification study for<br />

<strong>City</strong> Planning 615080 N/A BSDID21 Relocation of High Priority Informal Own Funds 300 000 0 0<br />

Settlements<br />

<strong>City</strong> Planning 615005 15 BSDID18 BCMM Township Establishment Own Funds 0 1 600 000 1 700 000<br />

Township Establishment for<br />

<strong>City</strong> Planning 615070 28 BSDID18<br />

Own Funds 400 000 0 0<br />

Mzamomhle Informal Settlement<br />

<strong>City</strong> Planning 615070 N/A BSDID18 Rural Settlement Planning Phase Own Funds 300 000 0 0<br />

Local Spatial Development<br />

<strong>City</strong> Planning 615070 27 BSDID19<br />

Own Funds 0 1 100 000 1 200 000<br />

framework<br />

<strong>City</strong> Planning 615070 4, 15, 18 BSDID19 Vincent, Berea LSDF Review Own Funds 500 000 0 0<br />

<strong>City</strong> Planning 615070 29 BSDID19 Home Hill LSDF Own Funds 233 408 0 0<br />

<strong>City</strong> Planning 615070 27, 29 BSDID19 Gonubie Main road LSDF Own Funds 34 735 0 0<br />

<strong>City</strong> Planning 615070 27, 29 BSDID19 Kwelera LSDF Own Funds 29 469 0<br />

BCMM SDF Comprehensive Update<br />

<strong>City</strong> Planning 615070 N/A BSDID19<br />

Own Funds 58 561 0 0<br />

and Review<br />

<strong>City</strong> Planning 615070 30, 38-45 BSDID19 Bhisho/King Williams Town LSDF Own Funds 43 827 0 0<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

29<br />

Development Planning<br />

615005 N/A BSDID20 Aerial Photography Own Funds 1 000 000 0 0<br />

Administration<br />

Development Planning<br />

615005 N/A MTOD05 GIS on the internet Own Funds 350 000 350 000 0<br />

Administration<br />

Transportation 620005 N/A BSDID23 ITP Review Own Funds 500 000 2 000 000 2 000 000<br />

KPA 3: LOCAL ECONOMIC DEVELOPMENT<br />

635005 N/A LED02 Destination Marketing Programme Own Funds 6 880 000 11 700 000 12 300 000<br />

635005 N/A LED03 Business Support Unit Programme Own Funds 2 000 000 6 300 000 5 900 000<br />

635005 N/A LED03 Economic Infrastructure Programme USDG 2 585 200 4 260 000 5 000 000<br />

Local Economic<br />

Development<br />

Local Economic<br />

Development<br />

Local Economic<br />

Development<br />

“a <strong>City</strong> Growing with you”


2014/2015<br />

Opex<br />

Budget<br />

20<strong>13</strong>/2014<br />

Opex<br />

Budget<br />

2012/20<strong>13</strong><br />

Opex<br />

Budget<br />

Source of<br />

Funding<br />

Project Name<br />

STRATEGY<br />

CODE FROM<br />

THE IDP<br />

Ward No.<br />

Cost<br />

Centre<br />

Directorate<br />

KPA 4: MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT<br />

Debtors Management<br />

330015 N/A MFVM01 Billing Data Cleanup Own Funds 400 000 1 000 000 500 000<br />

Office<br />

Debtors Management<br />

Meter Tampering Audit (Electricity &<br />

330015 N/A MFVM01<br />

Own Funds 2 000 000 3 000 000 1 500 000<br />

Office<br />

Water) - Municipal Services<br />

Budget Office 315005 N/A MFVM03 Budget Reforms FMG 1 500 000 1 500 000 1 500 000<br />

Budget Office 315005 N/A MFVM06 Accounting Reforms Project Own Funds 720 000 720 000 720 000<br />

KPA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION<br />

Strategic Support 105025 N/A MTOD03 IT Business Process Re-engineering Own Funds 1 000 000 3 000 000 0<br />

Public Relations &<br />

Ward Committee meetings (Out of<br />

120010 N/A GGPP09<br />

Own Funds 3 000 000 3 000 000 3 000 000<br />

International Events<br />

Pocket Expenses)<br />

Office of the Municipal<br />

205005 N/A GGPP07 Intergovernmental Relations Own Funds 50 000 80 000 80 000<br />

Manager<br />

Special Programmes 105030 N/A GGPP12 Municipal Bursaries Own Funds 1 200 000 1 200 000 1 200 000<br />

Office of the Municipal<br />

205005 N/A GGPP05 Documentation of case studies Own Funds 300 000 300 000 300 000<br />

Manager<br />

Office of the Municipal<br />

205005 N/A GGPP12 MDG Framework Rollout Own Funds 100 000 100 000 100 000<br />

Manager<br />

Office of the Municipal<br />

205005 N/A GGPP01 Risk Assessment Own Funds 200 000 200 000 200 000<br />

Manager<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

30<br />

205005 N/A MFMV06 Audit Turnaround Plan Own Funds 6 000 000 8 000 000 8 000 000<br />

205005 N/A GGPP01 Combined Assurance Model Own Funds 3 500 000 3 000 000 3 000 000<br />

Office of the Municipal<br />

Manager<br />

Office of the Municipal<br />

Manager<br />

“a <strong>City</strong> Growing with you”


6.5 MAJOR PROJECTS FOR 2012-15<br />

2012-2015<br />

DRAFT<br />

CAPITAL<br />

BUDGET<br />

SOURCE<br />

OF<br />

FUNDING<br />

PROJECT NAME<br />

Reeston Phase 3 Stage 2 -P1 & P3 USDG 31,500,000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

Mdantsane Zone 18 CC Phase 2 - P1 & P3 USDG 27,343,400<br />

Manyano & Thembelihle Phase 2 - P1 & P3 USDG 8,200,000<br />

Second Creek (Turn Key) - P1 & P3 USDG 8,100,000<br />

Block Yard TRA - P 1& P3 USDG 1,000,000<br />

DVRI PILOT PROJECT (Mekeni, Haven Hills, Competition Site) P1 & P3 USDG 2,500,000<br />

Cluster 1 (Chris Hani, Ilinge, Mahlangu Village, Sisulu Village, Winnie Mandela, Deluxolo Village & Francis Mei) P1 & P3 USDG 24,701,823<br />

Cluster 2 (Masibambane, Masibulele, Velwano, Gwentshe Village, Mathemba Vuso) P1 & P3 USDG 15,424,800<br />

Cluster 3 (Fynbos Informal 1, Fynbos Informal 2, Ndancama) P1 & P3 USDG 32,892,525<br />

Sunny South - P1 & P3 USDG 3,600,000<br />

Potsdam Ikhwezi Block 1 - P1 & P3 USDG 2,415,950<br />

Potsdam Ikhwezi Block 2 - P1 & P3 USDG 2,415,950<br />

Potsdam Ikhwezi Block 2- P1 USDG 2,415,950<br />

Potsdam North Kanana - P1 USDG 2,415,950<br />

Amalinda Co-op P1 & P3 USDG 2,757,312<br />

Amalinda Fairlands P1 & P2 USDG 2,757,312<br />

Dacawa P4 USDG 2,960<br />

Fynbos Informal 1-P4 USDG 27,488<br />

31<br />

“a <strong>City</strong> Growing with you”


2012-2015<br />

DRAFT<br />

CAPITAL<br />

BUDGET<br />

SOURCE<br />

OF<br />

FUNDING<br />

PROJECT NAME<br />

Fynbos Informal 2-P4 USDG 210,230<br />

Ilinge-P4 USDG 118,087<br />

Ilitha - Eradication of Wooden Houses to Formal Houses USDG 400,000<br />

Masibambane-P4 USDG 20,038<br />

Masibulele-P4 USDG 20,553<br />

Mdantsane Zone 18 CC Phase 2-P4 USDG 256,425<br />

Ndacama-P2 USDG 160,000<br />

Ndacama-P4 USDG <strong>13</strong>8,308<br />

Sisulu Village-P4 USDG 19,636<br />

Sunny South-P4 USDG 112,7<strong>13</strong><br />

Velwano-P4 USDG 81,999<br />

Winnie Mandela-P4 USDG 38,535<br />

Amalinda (Co-op) - P2 (EIA) USDG 200,000<br />

Fynbos Informal 1-P2 USDG 120,000<br />

Fynbos Informal 2-P2 USDG 110,000<br />

Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100,000<br />

Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100,000<br />

Potsdam North Kanana - P2 (EIA) USDG 100,000<br />

Potsdam Village Rural Phase 1 & 2 - P2 (EIA) USDG 100,000<br />

Amalinda Fairlands Projects - P2 USDG 435,000<br />

Potsdam Unit P Stage 2 - P4 USDG 3,000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

32<br />

“a <strong>City</strong> Growing with you”


2012-2015<br />

DRAFT<br />

CAPITAL<br />

BUDGET<br />

SOURCE<br />

OF<br />

FUNDING<br />

PROJECT NAME<br />

Second Creek P4 USDG 3,000<br />

Dacawa P4 USDG 800,000<br />

HOUSING 174,118,944<br />

Development of the BCMM Roads Masterplan 8,000,000<br />

Mdantsane Roads USDG 265,903,392<br />

West Bank Restitution USDG 53,000,000<br />

Quenera Main Roads USDG 5,000,000<br />

BCMM Roads Upgrade USDG 110,000,000<br />

Rehabilitation of Rural Roads Upgrade USDG 45,000,000<br />

ROADS 486,903,392<br />

Nord Avenue Pump station USDG 4,000,000<br />

Quinera Treatment Works USDG 19,000,000<br />

Waste Water Treatment Capacity (Zwelitsha) USDG 116,000,000<br />

Reeston Phase 3 Bulk Services Sewer USDG 50,000,000<br />

Bufferstrip Sanitation - Mdantsane USDG 1,108,250<br />

Mdantsane Sewers - Refurbishment USDG 17,000,000<br />

Diversion of Amalinda and Wilsonia effluent to Reeston USDG 80,000,000<br />

Inland Rural Sanitation - (Coastal Midland & Inland) USDG 103,208,000<br />

Eastern Beach Sewers USDG 45,000,000<br />

Sludge Handling Facility USDG 9,000,000<br />

KWT and Bhisho Infrastructure (Water) USDG 64,000,000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

33<br />

“a <strong>City</strong> Growing with you”


2012-2015<br />

DRAFT<br />

CAPITAL<br />

BUDGET<br />

SOURCE<br />

OF<br />

FUNDING<br />

PROJECT NAME<br />

Relocation of Midblocks in Mdantsane USDG 15,000,000<br />

Amahleke Water Supply USDG 9,000,000<br />

SEWERAGE 532,316,250<br />

Augmentation of Water Treatment Capacity - Umzonyana/Raising Upper weir USDG 56,000,000<br />

Upgrade water networks in terms of densification and augmentation USDG 38,000,000<br />

Bulk Water Supply Newlands and Other Areas USDG 1,000,000<br />

Ward 33 Bulk Water Supply Scheme USDG 3,000,000<br />

Bulk Water Supply Coastal Areas USDG 6,276,293<br />

Winterstrand Water Supply USDG 1,000,000<br />

WATER 105,276,293<br />

Mdantsane Township Establishment USDG 1,100,000<br />

ITP implementation USDG 9,000,000<br />

Taxi Ranks USDG 80,000,000<br />

Gonubie Main Road USDG 60,000,000<br />

N2/R72 link road survey USDG 26,200,000<br />

TRANSPORT PLANNING 176,300,000<br />

BCM Urban Agriculture Infrastructure Development USDG 8,000,000<br />

Economic Development Infrastructure (Heritage Route Development; Rollout of Informal Traders Stalls) USDG 62,254,978<br />

Economic Infrastructure Programme USDG 11,845,200<br />

LED 82,100,178<br />

Development of Community Parks(Mdantsane, Potsdam, Reeston) USDG 10,000,000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

34<br />

“a <strong>City</strong> Growing with you”


2012-2015<br />

DRAFT<br />

CAPITAL<br />

BUDGET<br />

SOURCE<br />

OF<br />

FUNDING<br />

PROJECT NAME<br />

Development and Upgrading of Cemeteries(Inland, Midland and Coastal) USDG 37,040,943<br />

Development and Upgrading of Community Halls USDG 54,000,000<br />

Sport & Recreation Facilities USDG 69,000,000<br />

COMMUNITY SERVICES 170,040,943<br />

Central Transfer Station (EL CBD) USDG 33,000,000<br />

Construction of a new cell - Roundhill Regional Landfill Site USDG 5,764,000<br />

Construction of Collection points Ward 10,5 &12 USDG 3,000,000<br />

Establishment of Central Transfer Station, Construction of Refuse Drop off Points, Establish and Upgrade<br />

USDG 17,000,000<br />

Garden Transfer Stations<br />

Construction of 4th Cell USDG 9,000,000<br />

REFUSE 67,764,000<br />

Coastal and Midland Infrastructure USDG 9,000,000<br />

KWT Fire Station USDG 6,000,000<br />

Tsholomnqa Fire Station USDG 15,500,000<br />

FIRE 30,500,000<br />

BCMM Integrated Development Plan<br />

Review • 2012 - 20<strong>13</strong><br />

35<br />

TOTAL MAJOR PROJECTS 1,825,320,000<br />

“a <strong>City</strong> Growing with you”


37<br />

XHOSA


uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

ISIQULATHO<br />

Imbula mbethe nguMeya wesiGqeba 39<br />

Amagqabantshintshi nguMlawuli wesiXeko 41<br />

1. UMBONO, IMISHINI & NEXABISO LE-BCMM 43<br />

1.1 Umbono we-BCMM 43<br />

1.2 Imishini ye- BCMM 43<br />

1.3 Ixabiso elingundoqo kwi-BCMM 43<br />

2. YINTONI I-IDP? 44<br />

3. YINTONI UHLAHLO LWABIWO-MALI? 45<br />

4. INKQUBO YE-IDP ELANDELWAYO 46<br />

5. IDP INFORMANTS AND STRATEGIC FOCAL AREAS 49<br />

5.1 Umazisi we-IDP 49<br />

5.2 Iinjongo ezingundoqo zengcebo 49<br />

5.3 Imimandla yoqwalaselo kwingcebo 50<br />

6. 2012/<strong>13</strong> – 2014/15 UHLAHLO MALI LWE-MTREF 55<br />

6.1 Isishwankathelo sohlahlo mali sezinto zexesha elide 55<br />

6.2 Ushwankathelo kuhlahlo mali lwemali yokusebenza 56<br />

6.3 Iiprojekthi zokusebenza zika-2012/<strong>13</strong> – 2014/15 58<br />

6.4 IiProjekthi zokusebenza zika-2012/<strong>13</strong> -2014/15 65<br />

6.5 Iiprojekthi ezinkulu zika- 2012-15 74<br />

38 “Isixeko esikhula kunye nawe”


IMBULA MBETHE NGUMEYA WESIGQEBA<br />

Utshintsho kunye nokushenxa kwemiba yokuhlala noqoqosho<br />

kwimpilo ye-<strong>Buffalo</strong> <strong>City</strong> iye yafuna ukuba kwakhona<br />

kwenziwe ulungiso kwengcebo kwiinkqubo zophuhliso<br />

kunye nezo zokuhanjiswa kweenkonzo kunye neenjongo,<br />

injongo ikukuqinisekisa ukuba ezi nkqubo zikhawulelana<br />

neemfuno eziphindwe zahlelwa zabo babandakanyekayo<br />

kunye noluntu.<br />

Ukuphelisa oku, kuye kwayimfuneko ukuba kuphindwe<br />

kujongwe isiCwangciso esiHlangeneyo sesiXeko esiMbaxa,<br />

ukuphonononga izalathiso zophuhliso lwethu kunye<br />

nemigomo kuNyaka-mali ka-2012/20<strong>13</strong>.<br />

Umxholo wolu xwebhu lophononongo lwe-IDP lukhokelwa ziimbono ezintsha nezivelayo<br />

kunye neemfuno zabantu be-<strong>Buffalo</strong> <strong>City</strong>, zichazwe kwiintlanganiso ezenziwe kuluntu kwiindawo<br />

ezohlukeneyo kwakunye nabo babandakanyekayo ababethe babizelwa le njongo.<br />

Siya kholelwa ukuba, njengenqanaba likaRhulumente elikufutshane ebantwini, sinoxanduva<br />

olucacileyo lokuba masiphendule ngqo, ngokukhawuleza kwanangokulungileyo kwiimfuno<br />

nakwiingxaki zababandakanyekayo kunye noluntu.<br />

Xa kusithiwa dakaca uxwebhu loPhononongo lwe-IDP, ngoko, ndifuna ukubulela uluntu lwe-<br />

<strong>Buffalo</strong> <strong>City</strong> ngokusabela ngokungenamikhinqi kwikhwelo nokunceda iBhunga lesiXeko esiMbaxa<br />

ekuhleleni umbono wayo wophuhliso kunye nokuhanjiswa kweenkonzo kwisixeko<br />

kunye noluntu lwayo olwahlukeneyo. Besingasayi kuphumelela iinjongo zethu ukuba ibingekuko<br />

ukudlamka nokuthatha inxaxheba koluntu lwethu kwinkqubo yokwalatha indlela<br />

nokulawula isatya kwiinkqubo neeprojekthi zophuhliso.<br />

Imimandla yengcebo engundoqo ekolu Phononongo lwe-IDP kuquka ukuhlengahlengiswa<br />

kweziko kunye nozinzo, ukudalwa kwemisebenzi, ukwakha uluntu oluzinzileyo, ukuvala<br />

isikhewu sezobuchwephesha, ukuphuculwa korhulumente kunye nozinzo kwezezimali<br />

nokwakha ukuzithemba kubemi.<br />

Eli xwebhu luveza elubala iiprojekthi ezithile kunye neenkqubo emazenziwe. Oku kuquka,<br />

kwezinye, amalungiselelo okwakhiwa kwezindlu, ukufakelwa kombane kunye namanzi kwiindawo<br />

zokuhlala ezingamatyotyombe, izakhono kunye neenkqubo zophuhliso zamacandelo<br />

ukunceda kunye nokugcina uphuhliso loqoqosho, kunye nokusekwa kwemeko evumayo<br />

yokusingqongileyo kumaqela angakwazi kuzenzela nto ukuze azuze kwimbono zentlalo noqoqsho<br />

zikaMasipala oMbaxa.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

39<br />

“Isixeko esikhula kunye nawe”


Xa ndiqukumbela, ndifuna ukuphinda ndinikele kwakhona kwiinzame ezihlangeneyo<br />

zeenkokheli zezopolitiko kunye nolawulo loMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> kumsebenzi<br />

wokwanelisa iimfuno zoluntu kanye kwizinto ezibalulekileyo zesizwe ekuzameni ukudalwa<br />

ubomi obungcono kubantu bethu bonke.<br />

ZUKISWA NCITHA<br />

UMeya wesiGqeba<br />

UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong><br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

40<br />

“Isixeko esikhula kunye nawe”


AMAGQABANTSHINTSHI NGUMLAWULI WESIXEKO<br />

UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uthe wagqiba unyaka-mali<br />

wakhe wokuqala njengomasipala ombaxa,<br />

ethe waphumelela ukuba kudidi ‘A’ okanye umgangatho<br />

wokuba Mbaxa ngoMeyi ka-2011, kanye emva konyulo<br />

lukaRhulumente waseKhaya.<br />

Ezi nyanga zilishumi elinambini (12) zokugqibela zithe<br />

zaphawulwa ngokungenakunqandeka ziinxaxheba zotshintsho<br />

ezibalulekileyo ezinjonga zazo ekubekeni isiseko<br />

esitsha somasipala ombaxa. Umasipala uye wabona ukumiselwa<br />

kweenkokeli ezintsha kwezopilitiko kwisiseko<br />

seBhunga lomthetho nakwelolawulo. Umasipala ombaxa<br />

uthe wenza unyulo lweewadi kunye nokusekwa kweekomiti<br />

zeewadi kuzo zonke iiwadi ezohlulwe ngokutsha ezingama-50. Ngokuhambelana nemimiselo<br />

yoMthetho weZiseko zikaMasipala ka-1998, uMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uthe<br />

wadibanisa iinkokheli zemveli ezingamashumi amabini (20) kwiBhunga likaMasipala.<br />

Xa ujonge ngakwicala lengcebo, umasipala ombaxa uthe wathathela kuye isiCwangciso soHlanganiso<br />

soPhuhliso sika-2011-2016 ngomhla wama-30 Juni ka-2011. Amalungiselelo esi<br />

sicwangciso athi enziwa liBhunga elingaphambili. Nangona kunjalo, inkqubo yophononongo<br />

ethe yenziwa kwisiqingatha sokugqibela sonyaka ka-2011 kunye nokuqala kuka-2012 senze<br />

kwalula ukuba iBhunga elitsha likwazi ukuqwalasela kwakhona imbono yengcebo echazwe<br />

kwi- IDP yangaphambili eyayamkelwe.<br />

Inkqubo yophononongo ka-2012/<strong>13</strong> ye-IDP ithe yakhokelwa zezi mpawu kunye neenxaxheba<br />

ezifana nemiba ebalulekileyo yeBhunga; imiba ebalulekileyo ye-Mayoral Lekgotla; imiba<br />

ebalulekileyo yeWadi; iziPhumo ezili-12 zikaRhulumente; iziPhumo ezisi-7 kwiziphumo ezili-9<br />

kuRhulumente waseKhaya; Uyilo lwesiCwangciso seSizwe soPhuhliso esenziwe yiKhomishini<br />

yoCwangciso yeSizwe; iiMigomo yoPhuhliso yeNkulungwane; isiCwangciso sokuKhula<br />

kwePhondo kunye noPhuhliso; kunye nemMbono yeSizwe yoPhuhliso lweeNdawo<br />

UPhononongo olwenziweyo lungqina iinjongo ezintandathu (6) zebhunga ngale ndlela ilandelayo:<br />

1. Ukuze ibe liziko elinemali ngokufanelekileyo elikwaziyo ukulawula iziseko zayo<br />

ngokufezekileyo;<br />

2. Ukuba liziko lesiXeko elifezekileyo neliphunyeziweyo elithi liquke imisebenzi kunye noluntu;<br />

3. Ukudala imo yokusingqongileyo elungele ezoqoqosho olukhulayo, oluhlukeneyo, nokwandisa<br />

amathuba emisebenzi eyandayo kunye nokuba negalelo ekwandiseni imivuzo<br />

kunye nolingano;<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

41<br />

“Isixeko esikhula kunye nawe”


4. Ukunikezela ngezakhiwo ezilondolozekayo ezixhasa uphuhliso lwentlalo kunye noqoqosho;<br />

5. Ukuba liziko elimile ngendlela nelikwaziyo ukusebenza linikezela ngeenkonzo ezifezekileyo<br />

neziphunyeziweyo kubo bonke abntu ngowe-2016;<br />

6. Ukukhulisa nokukhusela zonke ii-asethi zokusingqongileyo kunye neziseko zendalo ku-<br />

Masipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> ngowe-2016.<br />

Uphononongo luthe lwachonga le mimandla engqalileyo yengcebo ukuba ifakwe kwaye ilungelelwaniswe<br />

ne-IDP<br />

1. Ukuhlengahlengiswa kweziko kunye noZinzo<br />

2. Ukuphuculwa koBudlelwana phakathi kooRhulumente<br />

3. Ukwakha iNgqiniseko kubemi<br />

4. Ukuvala umsantsa kwezobuchwephesha<br />

5. Ukuphucula indlela yokusebenza, ukuhambelana nomthetho, iinkqubo kunye neemixokelelwano<br />

6. Ukwakha uLuntu oluZinzileyo<br />

7. Ukudala imisebenzi<br />

8. Ukuphuculwa kuRhulumento<br />

9. Uzinzo kwezeziMali<br />

Iinkqubo, iiprojekthi kunye neenxaxheba zikamasipala kunyaka-mali ka-2012/<strong>13</strong> zithe<br />

zalungelelwaniswa kwezi njongo zingentla zengcebo kunye nemimandla engundoqo<br />

yengqwalaselo. Inkqubela yomasipala ombaxa ekujongeni imiba ebalulekileyo yeBhunga<br />

kunyaka-mali iya kuthi ichazwe kwiingxelo zenyanga, zekota, zaphakathi enyakeni kunye<br />

nakwezo zonyaka ngokwemiqathango yoMgaqo-nkqubo nesiKhokelo sokuSebenza kweBhunga<br />

kunye nezinye iingxelo ezimayela nokulandelwa komthetho.<br />

UMasipala oMbaxa uyazama ukuphendula iimfuno zokuhanjiswa kweenzkono kuluntu kunye<br />

nokuqinisekisa ukuphumelela okuhlangeyo kwenkqubo yeBhunga kuhanjiso lweenkonzo<br />

njengoko kuchaziwe kwisiCwangcso esiPhononongiweyo esiHlangeneyo soPhuhliso sika-<br />

(2012/<strong>13</strong>).<br />

A. FANI<br />

Umlawuli wesiXeko<br />

UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong><br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

42<br />

“Isixeko esikhula kunye nawe”


1. IMBONO, IMISHINI KUNYE NEXABISO LE-BCMM<br />

1.1 UMBONO WE-BCMM<br />

Ngeeseshini zocwangciso-ngcebo abalawuli bakamasipala bathe bahlalutya umbono kunye<br />

nemishini yeziko ukuba ibe yethathe unyawo, yeqondekayo kwaye inyaniseke, oko kwenze<br />

ukuba ibe sisixhobo esisebenzisekayo ekukhokeleni iintshukumo zesiXeko, abami baso<br />

kunye nababandakanyekayo abangundoqo kwinkqubo yophuhliso.<br />

Imbono kaMasipala oMbaxa we- <strong>Buffalo</strong> <strong>City</strong> kukuba:<br />

“kukusabela, engqale ebantwini kunye nokuphuhliso lwesiXeko”<br />

1.2 IMISHINI YE-BCMM<br />

Ekuqondeni imbono kaMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uyazama ukuba abesisiXeko esi:<br />

• Khuthaza imo yorhulumento olulungileyo;<br />

• Inika iinkonzo zikamasipala ezifezekileyo neziphunyeziweyo;<br />

• Ukuxhobisa kuphuhliso kunye nolondolozo lwabasebenzi ukuba banikezele ngenkonzo<br />

kwisiXeko nakuluntu;<br />

• Ukukhulisa uphuhliso loluntu kunye noqoqosho olulinganayo;<br />

• Ukuqiniseka ulondolozeko lukamasipala kunye nokuzinza kwizimali;<br />

• Ukudala imo yokusingqongileyo ekhuselekileyo kunye nesempilweni; kunye<br />

• Nokusebenzisa iinqobo zikaBatho Pele zibe sembindini wokuhanjiswa kweenkonzo<br />

1.3 IXABISO ELINGUNDOQO KWI-BCMM<br />

UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uxhasa lamaxabiso nokuzinikela kulandelayo ekusebenzeleni<br />

nasekunikeni iinkonzo kuluntu ngendlela ehambelanayo:<br />

(i) Ubulungisa<br />

(ii) URhulumento oLulungileyo<br />

(iii) Ukucaca gca ebala<br />

(iv) Ukuba noxanduva<br />

(v) Okufanelekileyo kunye noLingano<br />

(vi) Ubuchule<br />

(vii) Intembeko<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

43<br />

“Isixeko esikhula kunye nawe”


(viii) Unikelo lwenkonzo ngokugqwesileyo<br />

(ix) Imbeko kwiyantlukwano kwinkcubeko<br />

(x) Umanyano kwinjongo<br />

(xi) Ubuntu<br />

2. YINTONI I-IDP?<br />

Ngokwemiqathango yoMthetho weeNkqubo zikaMasipala nomb. 32 ka-2000 (njengoko<br />

ulungisiwe) i-IDP ichazwa njengesicwangciso sengcebo esithi sikhokele lonke uphuhliso<br />

lukamasipala esiXekweni. Sisixhobo esingundoqo esithi sazise umasipala ukuba asebenzele<br />

ukuphumelela iinjongo zakhe zophuhliso njengoko zithiwe dakanca kuMgaqo siseko.<br />

Iqulathe imbono yexesha elide. Ithi ichaze banzi ngemiba ebalulekileyo yophuhliso kunye<br />

neenjongo ezithi zibe negalelo ekuphumeleleni le mbono. Ithi iveze iingcebo ezithe zachazwa<br />

kuhlahlo lwabiwo-mali, olumele ukuba lwayanyaniswe ne-IDP.<br />

I-IDP ethe yamkelwa liBhunga likaMasipala sisixhobo esingondoqo kwisicwangciso sengcebo<br />

esithi sikhokele zonke izigqibo zocwangciso kunye nophuhliso kummandla kamasipala.<br />

ICandelo lama-34 loMthetho weeNkqubo zikaMasipala uchaza ukuba i-IDP imele<br />

ukuphononongwa rhoqo ngonyaka ngovavanyo lwemilinganiselo yokusebenza kwayo de<br />

kube kwinqanaba lokujika imeko xa kuyimfuneko. IBhunga kufuneka ukuba libhale phantsi,<br />

inkqubo emayilandelwe kuphononongo lwe-IDP. Isicwangciso seNkqubo kumele siquke:<br />

• Inkqubo echaza amaxesha amiselweyo.<br />

• Isikhokelo seenkqubo kunye neendlela zokusebenza kucetyiswano.<br />

• Ukuchongwa kwezicwangciso kunye neemfuno-zicwangciso ezibophelela uMasipala.<br />

• Iinkqubo ze-IDP kunye noHlahlo lwabiwo-mali/ iinkqubo zilungelelaniswe.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

44<br />

“Isixeko esikhula kunye nawe”


Uphononongo lwe-IDP ejonge unyaka ka-2012/20<strong>13</strong> lwenziwa njengenxalenye yesicwangciso<br />

somjikelezo oqhubayo, ukuphunyezwa kunye nokuhlowa njengoko kubonisiwe akulo Mboniso<br />

ungezantsi.<br />

ULAWULO LOKUSEBENZA<br />

UPHUNYEZO LWE-IDP<br />

Umboniso A.1: Inkqubo ye-IDP yoPhuhliso<br />

1. UKULUNGISELELA UKUQWLASELA I-IDP<br />

2. UHLOLO & NOKUNIKA IXABISO –<br />

UHLALUTYO OLUHLAZIYIWEYO<br />

3. IINJONGO EZIHLELIWEYO, IINGCEBO, IZALATHISO<br />

& IPROJEKTHI & IINKQUBO (ZIHLANGANISIWE<br />

KUHLAHLO LWABIWO MALIUDGET)<br />

4. UKUHLANGANISA I-IDP<br />

(KUQUKA IZICWANGCISO ZOKUSEBENZA)<br />

5. UKUVUNYWA – IBHUNGA LAMKELA I- IDP &<br />

NOHLAHLO LWABIWO-MALI<br />

3. YINTONI UHLAHLO LWABIWO-MALI?<br />

Uhlahlo lwabiwo-mali siscwangciso esithi sishwankathele ngokwezezimali iinxaxheba<br />

ezicwangcisiweyo kunyaka mali ozayo ngokuseka inkcitho-mali eya kuthi yenziwe xa<br />

kusenziwa imisebenzi kunye nengeniso neemfuno zemali yokusebenza kuhlawulwa inkcitho.<br />

Kukho iindidi ezimbini zohlahlo mali: uhlahlo mali lwemali yokusebenza kunye nohlahlo mali<br />

lwenkcitho-mali enkulu.<br />

UHlahlo mali lwenkcitho-mali kwizinto zexeshana ibandakanya ukuthengwa kwezinto<br />

neenkonzo zona ziya kusebenza ixeshana. Iindleko zokusebenza ezifana nemivuzo,<br />

izibonelelo, ukulungiswa kwezinto ezonakeleyo kunye nokulondolozwa kwazo, iminxeba<br />

kunye nemathiriyeli.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

45<br />

INTATHO-NXAXHEBA YOLUNTU<br />

“Isixeko esikhula kunye nawe”


Imali yenkcitho kwizinto zexeshana ifunyanwa kwimali eziinkozo kwii-akhawunti zikamasipala<br />

ezifana nokuhlawulwa kwamanzi, umbane, iireyithi kunye nezinye iinkonzo.<br />

Uhlahlo mali lokuthenga izinto zexesha elide lubhekise kwinkcitho ekuthengeni izinto ezihlala<br />

ixesha elide kunye notyalo-mali kwizinto ezifana nomhlaba, izakhiwo, iinqwelo, iplanti kunye<br />

nezixhobo kanye nefenitshala njl njl. Ithi ishwankathele inkcitho kwizinto ezi zakuthi zisebenze<br />

kudlule kunyaka mali omnye. Kuquka ukulungiswa kweendlela, izakhiwo kunye neenqwelo.<br />

Indlela elula yokwahlula phakathi kwezi ndlela zohlahlo mali kukucinga ngokuthenga inqwelo.<br />

Inqwelo yinkcitho enkulu kuba kunqwenelwa ukuba ingasebenza ngaphezulu konyaka<br />

omnye. Amafutha okuhambisa le nqwelo kunye nokuyigcina isemgangathweni ziindleko<br />

zexeshana ezo ngoko zona zingena kuhlahlo mali lokusebenza ixeshana.<br />

Kurhulumente wasekhaya ophuhlayo, i-IDP kunye noHlahlo mali mazihlanganiswe kwaye<br />

ziphononongwe rhoqo ngonyaka ukuqinisekisa ukuba uhlanganiso kunye nokuvuma koluntu<br />

kwinkqubo yesiXeko.<br />

UHLAHLO MALI 2012/<strong>13</strong> – 2014/15<br />

Uhlahlo mali<br />

lwezinto zexeshana<br />

uhlahlo mali<br />

lwezinto zexesha<br />

elide<br />

isixa mali sohlahlomali<br />

2011/12<br />

M/Y UHLENG<br />

LOHLAHLO MALI<br />

R000<br />

2012/<strong>13</strong><br />

R000<br />

46<br />

20<strong>13</strong>/14<br />

R000<br />

2014/15<br />

R000<br />

3,448,368,587 3,966,637,294 4,453,7<strong>13</strong>,893 4,924,341,303<br />

725,646,383 749,097,271 879,840,714 876,057,416<br />

4,174,014,970 4,715,734,565 5,333,554,607 5,774,398,719<br />

4. INKQUBO YE-IDP ELANDELWAYO<br />

ICandelo lama-28 (1) oMthetho weeNkqubo zikaMasipala ufuna ukuba umasipala ngamnye<br />

avume inkqubo ngokubhaliweyo ukuba ikhokele ucwangciso, uyilo kunye nophononongo<br />

kwesicwangciso sayo esihlangeneyo sophuhliso. Xa kulandelwa umthetho kule mfuno<br />

uMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uvume esi isicwangiso ngoma-26 Oktobha 2011.<br />

Iinxaxheba ezingundoqo ezithe zenziwa ngokuhambelana nophononongo lwe-IDP/ noHlahlo<br />

mali ukuya kunyaka ka-2012/<strong>13</strong> kuquka oku kulandelayo:<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

“Isixeko esikhula kunye nawe”


• 11 Oktobha ka-2011 – Kwenziwa ucweyo kunye nooCeba be-BCMM kunye nabaLawuli<br />

abaphezulu. Injongo yolo cweyo, lwalubandakanya, ukucazulula kwesicwangciso esiHlangenyo<br />

soPhuhliso kunye nokunika isikhokelo kwindima yooCeba, iiKomiti zeWadi<br />

kunye nabanye ababandakanyekayo; ukuchazwa kwenkqubo yophononongo ye-<br />

IDP/uHlahlo mali/i-PMS kunyaka mali ka-2012/<strong>13</strong> kunye nokuhlumisa imvisiswano<br />

ngenkqubo kwanokuqala inkqubo yokuchongwa imiba ebalulekileyo yeewadi eza<br />

kuthi kukhokele uphononongo lwe-IDP/uHlahlo mali/i-PMS luka-2012/20<strong>13</strong>.<br />

• 26 Oktobha ka-2011 – IBhunga lavuma iNkqubo yesiCwangciso se-IDP/uHlahlo mali/<br />

i-PMS ka-2012/<strong>13</strong>;<br />

• 4 Novemba ka-2011 – IForam yebammeli bangaphandle be-IDP/uHlahlo mali/i-PMS<br />

yaba nentlanganiso eyayenzelwe ukuqwalasela ukusebenza kweziko kunyaka mali<br />

odlulileyo kunye nokulungiswa kwababandakanyekayo bangaphandle kwinkqubo<br />

yophuhliso lwe-IDP ezayo;<br />

• 11 kunye 14 November ka-2011 – Intlanganiso ye-IDP/uHlahlo mali/i-PMS yeQela<br />

lokuSebenza ngobuChule yenziwa, apho iitshatsheli zesicwangciso secandelo zathi<br />

dakaca isishwankathelo zesicwangciso zalo ngenjongo yokuchonga ulwazi olu kuza<br />

kunceda kwimeko yokuhlalutywa kwesigaba.<br />

• Amaqela okuSebenza eNgcebi ye-IDP athi abize iintlanganiso ngenjongo zokuxoxa<br />

kwaye kugqitywe imeko yeengxelo zohlalutyo lwemeko. Ezo ntlanganiso zenziwa<br />

ngale ndlela:<br />

* EyeziMali kunye neeNkonzo zokuXhasa: 23 Novemba ka-2011<br />

* Iinkonzo zikaMasipala: 25 Novemba ka- 2011<br />

* IsiCwangciso soPhuhliso kunye noLawulo: 30 Novemba- 2011<br />

* Uququzelelo loPhuhliso kunye neNtsebenziswano: 20 Desemba- 2011<br />

• 28 Novemba ka- 2011 – Iseshini yoBuchule kubuDlelwane boRhulumente<br />

oHlangeneyo ithe yenziwa sisiXeko kunye namasebe ephondo nawesizwe kunye<br />

namaqumhru oluntu ukuba angenele kwintsebenziswano yocwangciso kunye<br />

nokwabelana ngolwazi malunga namaphulo athi enziwe kummandla kamazipala;<br />

• 19-21 Februwari ka- 2012 – I-Mayoral Lekgotla yenziwa ukuqwalasela uhlalutyo<br />

lwemeko yesiXeko kunye nokwandlala indlela eya phambili mayela nemiba<br />

ebalulekileyo yengcebo eza kuthi ikhokele uphononongo lwe-IDP kunye noHlahlo<br />

mali ukuya kunyaka mali ka-2012/<strong>13</strong><br />

• 11-<strong>13</strong> Matshi ka-2012 – Iseshini yobuChule yoCwagciso yenzelwa uku:<br />

– Ukuveza ingxaki kuphuhliso olukhawulezileyo loMasipala oMbaxa<br />

– Ukulungelelanisa umyalelo wepolitiki (izimvo zeLekgotla) kunye neenjongo<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

47<br />

“Isixeko esikhula kunye nawe”


zengcebo ukuze kuphendulwe kwimingeni yoMasipala oMbaxa<br />

– Ukuqinisekisa ulungelelwaniso lwesicwangciso phakathi kwe-BCMM kunye<br />

namanye amanqanaba karhulumente;<br />

– Ukuhluza imimandla engundoqo yengcebo kunyaka-2012 kunye nangaphaya<br />

eyakuthi ikhokele indlela yophuhliso kuMasipala oMbaxa.<br />

• 23 Matshi ka-2012: Iseshini yooCeba ye-IDP/uHlahlo mali eyayenziwe e-Regent Hotel<br />

kuqwalaselwa uyilo loHlalutyo lweMeko ye-BCMM, iziPhumo ze-Mayoral Lekgotla<br />

kunye neSeshini yobuChule yoCwangciso, uyilo lwe- IDP 2012/<strong>13</strong> kunye noHlahlo<br />

mali lwe-MTREF<br />

• 28 Matshi ka- 2012 – Ukuthiwa dakaca kwiBhunga uyilo luka-2012/<strong>13</strong> loPhononongo<br />

lwe- IDP kunye nokuvunywa kwe-MTREF ka-2012/<strong>13</strong>;<br />

• 16-17 Epreli ka-2012: Iseshini yooCeba ne-IDP/noHlahlo mali kuqwalaselwe uyilo<br />

lwe-IDP/uHlalo mali kunye noMboniso oCetywayo we-IDP/noHlahlo mali.<br />

• 23-30 Eprili ka-2012 – Imiboniso ye-IDP/noHlahlo mali yenziwa kwiindawo ezilishumi<br />

elinesihlanu kuMasipala oMbaxa.<br />

• 4 Meyi ka-2012 – Isidlo sakusasa esimayela noshishino saye senziwa ukuba<br />

kuthethwane nababandakanyekayo kummandla wezoshishino kuyilo lwe-IDP<br />

2012/<strong>13</strong> kunye noHlahlo mali lwe-MTREF.<br />

• 25 Meyi ka-2012 – Usuku oluVuleleke kuwonke wonke leBhunga kunikwa ingxelo<br />

kwababandakanyekayo abangaphandle ngeziphumo zeMiboniso ye-IDP/uHlahlo<br />

mali.<br />

• 29 Meyi ka-2012 – Ukwamkelwa koPhononongo lwe-IDP ka-2012/<strong>13</strong> kunye noHlahlo<br />

mali lwe-MTREF.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

48<br />

“Isixeko esikhula kunye nawe”


5. UMAZISI WE-IDP KUNYE NEMIMANDLA<br />

YENGQWALASELA YENGCEBO<br />

5.1 UMAZISI WE-IDP<br />

Inkqubo ye-IDP yathi yenziwa ngokuhambelana nesikhokelo semigaqo-nkqubo nemithetho<br />

yesizwe, yephondo kunye neseeNgingqi. Uphononongo lwe-IDP/noHlahlo mali olujonge<br />

kunyaka ka-2012/<strong>13</strong> luthe lwaziswa kwaye lwaqwalasela ezi zinto zilandelayo:<br />

• Imiba ebalulekileyo yeWadi;<br />

• Imiba ebalulekileyo evela kwi-Mayoral Lekgotla eyebziwe nge-19-21 Februwari ka-<br />

2012;<br />

• IziPhumo zikaRhulumenye ezili-12;<br />

• IziPhumo zeSheshini yobuChule yoCwangciso eyenziwe nge-11-<strong>13</strong> Matshi ka- 2012;<br />

• Uyilo lwesiCwangciso seSizwe soPhuhliso esenziwe yi-NPC;<br />

• Imigomo yeNkulungwane yePhuhliso;<br />

• IsiCwangciso soKukhula kwePhondo kunye noPhuhliso; kunye<br />

• neMbono yeSizwe yeNdawo yoPhuhliso.<br />

5.2 IINJONGO EZINGUNDOQO ZENGCEBO<br />

Evela kuhlalutyo lwemeko oluthe lwenziwa xa kuphuhliswa i-IDP, uMasipala oMbaxa we-<br />

<strong>Buffalo</strong> <strong>City</strong> othe waqaphela inani lemingeni kunye neembopheleleko ezithi zibe nempembelelo<br />

ngendlela umasipala athi asebenze ngayo kwanokuzalisekisa umyalelo njengoko ubekiwe<br />

kwicandelo lama-152 oMgaqo-siseko woMzantsi Afrika. Imingeni ejongene noMasipala<br />

oMbaxa iquka ukwehla kwengeniso kunye nolawulo kakubi lweziseko, ukungafezeki okuthi<br />

kunciphise indlela isiXeko esithi sisebenzisane ngayo noluntu, izakhiwo ezidala kunye<br />

nokungagcinwa kakuhle, ukungafezeki kweziseko ezibangela imigangatho yokuhanjiswa<br />

kweenkonzo okungalunganga, ukukhula kancinci koqoqosho kunye nenqanaba elikhulu<br />

lokungafumani imisebenzi, ii-asethi zokusingqongileyo ezibuthathaka kunye neziseko<br />

zendalo.<br />

Ukujongana nemingeni echaziweyo kuze kusetyenzwe kukhawulelwana nokuqonda imbono,<br />

isiXeko sithe sachonga imimandla esixhenxe engqalileyo yengcebo yaze yaseka ezi njongo<br />

zengcebo zexesha elide:<br />

1.4.1 BCMM 1: ukuba liziko eliqingqayo kwizimali elithi lilawule isiseko zalo kakuhle;<br />

1.4.2 BCMM 2: ukuba liziko elifezekileyo leziphunyeziweyo lesiXeko esithi sisebenze<br />

kunye noluntu;<br />

1.4.3 BCMM 3: ukwenza imeko elungileyo kuqoqosho olukhulayo, olwahlunekenyo,<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

49<br />

“Isixeko esikhula kunye nawe”


ekukhuliseni inani elininzi labantu abasebenzayo kunye nokuba negalelo<br />

ekukhuliseni imivuzo kunye nolingano;<br />

1.4.4 BCMM 4: ukwakha izakhiwo ezilondolozekayo eziza kuxhasa uphuhliso loluntu<br />

kunye noqoqoqsho;<br />

1.4.5 BCMM 5: Ukumila ngendlela kunye neziko elikwaziyo ukusebenza lihambise iinkonzo<br />

ezifezekileyo neziphunyeziweyo kubo bonke abantu ukuya kutsho kunyaka<br />

ka-2016<br />

1.4.6 BCMM 6: ukukhuthaza kunye nokukhusela zonke ii-asethi kunye nesiseko zendalo<br />

ezikuMasipala oMbaxa we- <strong>Buffalo</strong> <strong>City</strong> kunyaka ka-2016.<br />

UMasipala oMbaxa ulungelelanisa iinjongo ezingundoqo zengcebo kwaye uya kuzama<br />

ukulandela indlela yemimandla emihlanu engundoqo karhulumente wasekhaya.<br />

5.3 IMIMANDLA YENGQWALASELA YENGCEBO<br />

Ukungalibali imeko yokusingqongileyo kwezoqoqosho kunye neemeko zehlabathi ezithe<br />

zaba nempembelelo kuphuhliso, isiXeko siye senza imida emikhulu ekujongeni imingeni<br />

kuphuhliso olungundoqo kumasipala. Ngoko, kukho umsebenzi omkhulu omawenziwe<br />

ekujongeni imimandla yengqwalaselo echongiweyo.<br />

Kule minyaka mihlanu izayo, isiXeko siza kujongana nemimandla elithoba yengqwalaselo<br />

yengcebo ethe yachazwa apha ngezantsi.<br />

5.3.1 Ukuhlenga hlengiswa kweziko kunye nozinziso<br />

UMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> ngoku ujongene nenkqubo yohlangahlengiso nozinziso<br />

kulalwulo. Oku kuquka ukuzaliswa kwezithuba ezivunyiweyo kwisakhiwo esikhulu seziko<br />

o.k.t uMlawuli wesiXeko kunye nabaLawuli beCandelo lama-56.<br />

Injongo ephakathi ukuya kweyexesha elide kuMasipala oMbaxa ikhulisa imfezeko kwiziko<br />

ngokukhulisa abasebenzi kunye nokuseka iinkqubo ezibangela abasebenzi bakwazi<br />

ukusebenza ngemfezeko kwimisebenzi yabo kwaye ilungelelaniswe kunye nemisebenzi<br />

kaMasipala oMbaxa.<br />

5.3.2 Ukuphuculwa kobuDlelwane borhulumente ohlangeneyo<br />

ICandelo le-41 loMgaqo-siseko woMzantsi Afrika ka-1996 ubonisa iinqobo zorhulumnete<br />

lwentsebenziswano kunye norhulumento oluhlangenyo, oko kunika isikhokelo esibanzi<br />

sokuba bangasebenza njani amanqanaba karhulumente. ICandelo lesi-4 loMthetho nomb.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

50<br />

“Isixeko esikhula kunye nawe”


<strong>13</strong> ka-2005 wobuDlelwane boRhulumnete oHlangeneyo ugqitha uchaze ukuba injongo yalo<br />

mthetho kukunika isikhokelo kurhulumente wesizwe, owephondo nowasekhaya, kunye<br />

namaqumrhu esizwe kwabo rhulumente ukuba baququzelele uphunyezo lomgaqo-nkqubo<br />

kunye nomthetho. UMthetho uthi kwakhona ufune ukusekwa kweeforam zephondo kunye<br />

nezengingqi kurhulumente ohlangeneyo ukukhuthaza nokuququzelela i-IGR phakathi<br />

kwamaphondo, iingingqi kunye noomasipala.<br />

ICandelo lesi-loMthetho weeNkqubo zikaMasipala lama-32 ka-2000 (njengoko ulungisiwe)<br />

uthi uchaze ukuba urhulumente wasekhaya makaphuhlise iindlela zentsebenziswano<br />

kurhulumente, ekwabeleni ngeziseko kunye nasekusombululeni iingxaki kanye kubudlelwane<br />

borhulumente ohlangeneyo.<br />

Nangona kunjalo kule mithetho ingentla, ubudlelwane kurhulumente ohlangeneyo phakathi<br />

kwe-BCMM kunye namanqanaba karhulumente kubafuna ukujongwa ngeso elibanzi,<br />

njengoko kusekho iimpawu zokungaququzelelwa kakhulu:<br />

• Ulungelelaniso lwesicwangciso kunye nophunyezo;<br />

• INtsebenziswano kumanqanaba ahlangeneyo kunye noququzelelo;<br />

• Ukwabelana ngolwazi kwiinkqubo zophuhliso kunye neeprojekthi;<br />

• Ukuthatha inxaxheba kwiindawo ezifanele ukuba kubekho intsebenziswano; kunye<br />

• Nendlela yokudibana nothethwano noluntu.<br />

5.3.3 Ukwakha ingqiniseko kubemi<br />

Ukusebenza kakubi ngokwemiqathango yokuhanjiswa kweenkonzo, ulawulo kunye<br />

nokungazinzi kwezopolitiko, kunye nopapasho olungelulo kuthi kube nempembelelo embi<br />

kakhulu ekudaleni ukungaqiniseki kubemi kwesi siXeko.<br />

Ukubuyisela umva lo monakalo kwanokwakha kwakhona ukuqiniseka kubemi kuya kufuneka<br />

imizamo ehlangeneyo kuMasipala oMbaxa. Iya kufuna utyalo lwendlela entsha yomsebenzi<br />

kusebenza kubo bonke abo basebenzela umasipala kwanokusebenzisa urhulumento<br />

olulungileyo kwaneenqobo zolawulo, ukuzinikela kwanokusebenza ngobuchule.<br />

5.3.4 Ukuvala umsantsa kwezoChwephesha<br />

Umsantsa kwezobuChwephesha kubhekisele kukungalingani phakathi kwamaqela ekuhlaleni<br />

ngokufikelela, ukusetyenziswa, kwanolwazi kunye nonxibelelwano ngobuchwephesha.<br />

umsantsa kummandla kamasipala sithetha ngokungalingani phakathi kwabantu, emakhaya,<br />

kushishino kunye nakwiindawo zokuhlala kumanqanaba awohlukeneyo entlalo noqoqosho<br />

kunye neendawo zokuhlala, isini nobuhlanga. Kuba uMasipala oMbaxa ikakhulu ezele ziilali<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

51<br />

“Isixeko esikhula kunye nawe”


lo msantsa ubonakala kakhulu ngokwendlela ezimbini emaphandleni nasezidolophini mayela<br />

nokufikelela kunxibelelwano ngomnxeba kunye neenkqubo ze- IT.<br />

Injongo ephambili kukuqinisekisa ukuba unxibelelwano nomnxeba kunye neenkqubo<br />

ze-IT ziya lungelelana, kwaye kukho ufikeleleko kwinethiwekhi ebanzi kunye / okanye<br />

kubuchwephesha obukwinqanaba eliphezulu kubemi besiXeko kunye nommandla waso.<br />

5.3.5 Ukuphuculwa kwendlela yokusebenza, ukulandela umthetho, iinkqubo<br />

kunye neenkqubo nemixokelelwano<br />

Obunye ubuthathaka buthi bube nempembelelo embi kwindlela yokusebenza kuMasipala<br />

oMbaxa ngenxa yokungahambelani kwemixokelelwano, ulawulo olungaphakathi olungalunganga,<br />

ukusilela kwabasebenzi ekuxhotyisweni ngokusebenza, abasebenzi abathe sa kunye<br />

nokungachazwa kakuhle kweenkqubo kunye nezixhokelelwano zokusebenza.<br />

• Makwenziwe iindlela zokusebenza zokunika ingxelo ethe ngqo negqibeleleyo<br />

ngezimali njengoko kufunwa yi-NT kunye nemiGangatho yezoPhicotho zincwadi.<br />

• Makwenziwe iindlela zokuqiniseka ukuba iindlela zokusebenza zenziwa ngendlela<br />

kuhambelane neemfuno zomthetho.<br />

• Ukunika indlela yokuhanjiswa kweerekhodi kunye nokuthathwa kweerekhodi ngendlela<br />

enye yogcino ngokwemigangantho echazwe kuMthetho yokuGcina izinto ezindala<br />

kunye nokuqinisekisa ukuba iirekhodi ziya kwazi ukufumankea kwixa elizayo.<br />

5.3.6 Ukwakha uLuntu oluZinzileyo<br />

Ingqwalasela kule minyaka idlulileyo ibe yejonge ekuhanjiswa kweemfuno ezisisiseko kunye<br />

nezindlu. Ngaphandle komsebenzi ongekenziwa amanyathelo abanzi enziwe kulo mmandla,<br />

nangona kunjalo, kusekho umngeni omkhulu ngokubhekisele ekuqinisekiseni ukuba asakhi<br />

zindlu kuphela koko sidala izindlu ezihlangeneyo kwaye ezikwaziyo ukulondolozeka.<br />

Umngeni awukho ekubeni kufuneka kuziswe iinkonzo nezindlu kuphela, kodwa kusekubeni<br />

kwakhiwe iindawo zokuhlala ezinokulondolozeka ngcono apho abahlali baza kukwazi<br />

ukufikelela kwizakhiwo zokuhlala nezoluntu, kumathuba ezoqoqosho, kunye nemeko<br />

yokusingqongileyo esempilweni nelondolozekayo apho abantu banokukwazi ukufikelela kula<br />

mathuba ngokusebenzisa izithuthi zikawonke wonke kunye neendlela ezikhuselekileyo.<br />

Kuyimfuneko ukudala ‘iindawo zokuhlala zabantu’, kunye nokuhlanganiswa kwesicwangciso<br />

kunye nophunyezo. UMasipala oMbaxa ngoku wenza inkqubo yokuphuhlisa ‘isiCwangciso<br />

esiHlangeneyo sokuLondoloza iindawo zokuhlala’ esi kuthi sikhokele utyalo mali oluzayo<br />

kunye nophuhliso.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

52<br />

“Isixeko esikhula kunye nawe”


Ukudalwa kweendawo zokuhlala ezihlangenyo nezilondolozekayo kuya kuba negalelo elithe<br />

ngqo ekwakheni uluntu oluhlangeneyo nolomeleleyo oluya kuthi lwenze uqilima kwiingxaki<br />

zokuhlala, zoqoqoqsho kwanezendalo.<br />

5.3.7 Ukudala imisebenzi<br />

IsiXeko siyazi ngokukhula kancinci kwezoqoqosho kunye nenqanaba elikhulu lokungaqeshwa<br />

kwabantu ukuba oko kusekho kwaye kubangela umngeni omkhulu. Oku kuchaza kumanqanaba<br />

aphezulu entlupheko athe tshitshilili kwesi siXeko. Inqanaba elikhulu lentlupheko liye<br />

libonakale kakhulu kumanani oBalo enziwe ngonyaka ka-2001 apha malunga nama-70%<br />

amakhaya kwesi siXeko abonisa ukwamkela umvuzo engaphatsi kwe-R1 500 ngenyanga,<br />

kunye nama-28% amakhaya angenawo kwaphela umvuzo. Ukungaqesheki kuMasipala oMbaxa<br />

kubalelwa kuma - 24%.<br />

Enye yezoyikiso kuphuhliso loMasipala oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> kukusilela kumanqanaba<br />

emfundo kunye nezakhono. Isixa esivakalayo sabasebenzi bakaMasipala oMbaxa abayanga<br />

esikolweni okanye abagqibanga amabanga asezantsi. Ukongeza apho, xa kukhangelwa uBalo<br />

olwenziwa ngowama-2001 kuphela ngama-21% kwiminyaka engama-20 esiXekweni kunye<br />

nangaphezulu, abanalo ibanga lika-12, li-16% banayo imfundo engaphaya kweyesikolo ze<br />

ibe li-17% abaneminyaka eli-15 - 24 abathe babhalisela izifundo ezingaphaya kwesikolo.<br />

Uphando lwakutsha nje lwangowama-2007 lubonise ukuphucuka okuncinci.<br />

Ukunqanda le meko kule minyaka mihlanu izayo, isiXeko ziza kwenza iinzame, ngeenkqubo<br />

ezohlukenye, ingakumbi kuphuhliso loqoqosho lwasekhaya, ukuba kutsalwe umdla<br />

wabatyali-mali kwesi siXeko ukuze bakwazi ukudala imisebenzi oko kuyimfuno yesizwe.<br />

UMasipala we<strong>Buffalo</strong> <strong>City</strong> unawo amandla kwezinye iindawo ekukhuleni nasekuphuhleni.<br />

Ukusekeka elunxwemeni, indalo esulungekileyo, imizi mveliso esebenza kakuhle kunye<br />

nemeko yokuba ibe likomkhulu laseMpuma Koloni zizo izinto ezimbalwa ezinokusetyenziswa<br />

ukulwa nentlupheko kunye nokudala imisebenzi.<br />

5.3.8 Ukuphuculwa koRhulumento<br />

Urhwaphilizo kunye nokuhanjiswa kakubi kweenkzono kusengela phantsi isidima sesizwe.<br />

isidima esiphantsi sesizwe sikhokelela ekungaphumelelini kokawulo lwentando yesininzi<br />

oluthi lusengele phantsi ulawulo lwentando yesininzi kunye nokuqiniseka kutyalo-mali.<br />

Urhulumente wasekhaya obhetyebhetye ukhokelela ekwehleni kwenqanaba lengqiniseko<br />

kwizigqibo zotyalo-mali kwisizwe nakumacandelo abucala. Urhulumento olubhetyebhetye<br />

lukhokelela ekusebenzeni kwezoqoqosho nzima.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

53<br />

“Isixeko esikhula kunye nawe”


Isixeko esinorhulumento olulungileyo sithetha ukuba izicwangciso zicacile kwaye ziyaziswa<br />

kwingcebo yokusebenza ngentsebenziswano nabo bonke ababandakanyekayo kwaye kunxityelelwane<br />

nawo onke amacala athi achaphazeleke kuphuhliso. Isixeko esinorhulumento olulungileyo<br />

sixhomekeke kwindlela ekuphindwa kuzuzwe kuyo ngamanqanaba karhulumente<br />

kunye nee-arhente. Ukwanda kwengxelo evela kuluntu, intsebenziswano kunye nokuphuculwa<br />

kwembuyekezo evela kubathengi ngamanye amalungiselelo okuthintela amele ukusetyenziswa<br />

kwisixeko esilawulwa ngesininzi kwaneso sinorhulumento olulungileyo.<br />

Oko kukwatsho ukuba iinkonzo ezizizo ezisisiseko ziyanikezelwa ngokuhambelana<br />

nesikhokelo esibonisa izimali ezilungileyo kunye notyalo-mali olucacileyo oluthi lulungelelaniswe<br />

kunye neenjongo ngabanye abaniki nkonzo babucaIa. Ukuya phambili, uMasipala<br />

oMbaxa we-<strong>Buffalo</strong> <strong>City</strong> uza kuzama ukuba abe sisixeko esinorhulumente olulungileyo.<br />

5.3.9 Uzinzo kwezezimali<br />

Ukuze uMasipala oMbaxa akwazi ukuzalisekisa umyalelo njengoko uchazizwe kuMgaqosiseko<br />

wesizwe, kukho imfuno yokulondoloza uzinzo kwizimali kunye nokwandisa ingeniso<br />

esekwe kwinkcitho. Oku kufuna iingcebo ezimandla ukujika imeko ekhoyo yokuxhomekeka<br />

kwizibonelelo kunye nokuqiniseka ukuba isiXeko sikwimo elungileyo yezimali kule minyaka<br />

mihlanu izayo nangaphezulu.<br />

Ukuze kuphunyelelwe uzinzo kwezezimali isiXeko siza kwenza iindlela zokurekhodisha<br />

nokulawula iziseko zezimali zikaMasipala kunye nokuphandwa nophuhliso lweendlela<br />

ezintsha zokungenisa imali ukunika uzinzo kwezezimali kuMasipala oMbaxa.<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

54<br />

“Isixeko esikhula kunye nawe”


6. 2012/<strong>13</strong>-2014/15 UHLAHLO MALI LWE-MTREF<br />

6.1 ISISHWANKATHELO SOHLAHLO MALI SEZINTO ZEXESHA ELIDE<br />

2012/20<strong>13</strong> - 2014/2015 UHLAHLO MALI LWEZINTO ZEXESHA ELIDE NGENKXASO<br />

NGANYE<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

UHlahlo mali UHlahlo mali UHlahlo mali<br />

INkxaso<br />

lwezinto lwezinto lwezinto<br />

zexesha zexesha zexesha<br />

elide elide elide<br />

INkxaso yakhe 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />

Isixa seNkxaso yakhe 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />

Inkqubo ehlangeneyo yeSizwe yokufakela<br />

umbane (INEP)<br />

30 000 000 30 000 000 20 000 000<br />

Isibonelelo solawulo lwemfudo yombane<br />

osecaleni<br />

10 000 000 0 0<br />

Isibonelelo seNtsebenziswano<br />

yobuMelwane kuPhuhliso<br />

0 0 8 828 000<br />

Isibonelelo seziXokelelwano zezakhiwo<br />

zoThutho lukaWonke wonke (PTIS)<br />

78 702 000 78 762 000 0<br />

Isibonelelo siPhuhliso lweeNdawo zokuHlala 491 145 828 602 860 000 680 691 000<br />

Isibonelelo siPhuhliso lweeNdawo zokuHlala 19 170 420 35 495 714 16 318 416<br />

Isixa seziBonelelo 629 018 248 747 117 714 725 837 416<br />

ISIXA NGENKXASO NGANYE 749 097 271 879 840 714 850 057 416<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

55<br />

“Isixeko esikhula kunye nawe”


2012/20<strong>13</strong> - 2014/2015 ICANDELO LOHLAHLO MALI LWEZINTO ZEXESHA ELIDE<br />

NGENKXASO NGANYE<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Icandelo<br />

Uhlahlo mali<br />

lwezinto<br />

Uhlahlo mali<br />

lwezinto<br />

Uhlahlo mali<br />

lwezinto<br />

zexesha elide zexesha elide zexesha elide<br />

1. Iinkonzo zeNkxaso yesiGqeba 4 500 000 2 000 000 0<br />

2. I-ofisi yoMlawuli kaMasipala 0 0 0<br />

2. Igosa eliyiNtloko kwimiSebenzi 72 089 020 1<strong>13</strong> 700 478 111 064 024<br />

3. ICandelo leenkonzo zezimali 3 600 000 3 000 000 3 000 000<br />

4. ICandelo leenkonzo zoshishino 32 600 000 23 250 000 25 750 000<br />

5. ICandelo lweenkonzo zeeNjineli 411 259 273 473 614 293 484 773 392<br />

6. ICandleo loCwangciso loPhuhliso 191 920 978 210 762 000 107 000 000<br />

7. ICandelo lwezeMpilo & NoKhuseleko<br />

loluNtu<br />

10 128 000 8 473 000 <strong>13</strong> 470 000<br />

8. ICandelo leenkzono zoLuntu 23 000 000 45 040 943 105 000 000<br />

749 097 271 879 840 714 850 057 416<br />

6.2 USHWANKATHELO LOHLAHLO MALI LWEMALI YOKUSEBENZA<br />

2012/20<strong>13</strong> - 2014/2015 UHLAHLO MALI LWE-OPEX NGENKXASO NGANYE<br />

I-OPEX<br />

2012/20<strong>13</strong><br />

Uhlahlo mali<br />

lwe-Opex<br />

56<br />

20<strong>13</strong>/2014<br />

Uhlahlo mali<br />

lwe-Opex<br />

2014/2015<br />

Uhlahlo mali<br />

lwe-Opex<br />

Inkxaso yayo 38 800 000 55 647 500 50 340 000<br />

Isixa mali senkxaso yayo 38 800 000 55 647 500 50 340 000<br />

IsiBonelelo soLawulo lweziMali 1 500 000 1 500 000 1 500 000<br />

IsiBonelelo soPhuhliso lweZakhono 3 000 000 3 800 000 4 000 000<br />

IsiBonelelo soPhuhliso lweeNdawo zokuhlala 8 328 172 10 445 000 5 850 000<br />

Ikhomishini yokuPhinda kubangwe umhlala 300 000 300 000 0<br />

URhulumente waseKhaya kunye neziNdlu 77 000 0 0<br />

IsiBonelelo soPhuhlso lweeNdawo zokuHlala 111 645 824 168 849 664 179 337 305<br />

ISebe leMicimbi yaManzi – DoRA 1 283 000 0 0<br />

ISebe leMicimbi yaManzi - iPhondo 400 000 0 0<br />

ISebe leMicimbi yaManzi - ACIP 1 975 000 125 000 0<br />

Isixa mali seziBonelelo 128 508 996 185 019 664 190 687 305<br />

ISIXA NGENKXASO NGANYE 167 308 996 240 667 164 241 027 305<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

“Isixeko esikhula kunye nawe”


2012/20<strong>13</strong> - 2014/2015 UHLAHLO MALI LWE-OPEX ICANDELO NGALINYE<br />

57<br />

2012/20<strong>13</strong><br />

UHlahlo mali<br />

ye-Opex<br />

20<strong>13</strong>/2014<br />

UHlahlo mali<br />

ye-Opex<br />

2014/2015<br />

UHlahlo mali<br />

ye-Opex<br />

1. Iinkonzo zeNkxaso yesiGqeba 5 650 000 7 680 000 4 680 000<br />

2. I-Ofisi yoMlawuli kaMasipala 6 200 000 8 200 000 8 200 000<br />

3. IGosa eliyiNtloko lokuSebenza 110 458 446 173 079 464 186 206 905<br />

4. ICandelo leenkonzo zezimali 4 620 000 6 220 000 4 220 000<br />

5. ICandleo leenkonzo zeShishini 9 150 000 8 450 000 7 700 000<br />

6. ICandelo leenkonzo zeeNjineli 8 658 000 7 125 000 0<br />

7. ICandelo locwangciso loPhuhliso 22 572 550 29 912 700 30 020 400<br />

8. ICandelo lwezeMpilo & noKhuseleko<br />

loLuntu<br />

0 0 0<br />

9. ICandelo lweenkonzo zoLuntu 0 0 0<br />

167 308 996 240 667 164 241 027 305<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

“Isixeko esikhula kunye nawe”


6.3 IIPROJEKTHI ZEZINTO ZEXESHA ELIDE 2012/<strong>13</strong> – 2014/15<br />

2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

2 500 000 1 500 000 1 000 000<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

20 000 000 20 750 000 23 750 000<br />

58<br />

4 600 000 0 0<br />

4 500 000 0 0<br />

500 000 1 000 000 1 000 000<br />

KPA 1: UTSHINTSHO KUMASIPALA KUNYE NOPHUHLISO LWEZIKO<br />

Uxokelelwano lolawulo lokungena Inkxaso-mali<br />

Ulawulo lwabaSebenzi 420005 MTOD03 N/A<br />

emsebenzini ngombane<br />

yayo<br />

Uxokelelwano lwe-IT (ulawulo<br />

lwee-asethi , i-SCM, uhlahlo mali<br />

lwemibono kunye nezibonelo,<br />

Inkxaso-mali<br />

Iinkonzo zolawulo lolwazi 415025 MTOD06 N/A uxokelelwano lolawulo lweemfuno,<br />

yayo<br />

uxokelelwano lolawlo lwemafutha<br />

enqwelo kunye nemixokelwano<br />

lwekhowudi zempahla<br />

Inkxaso-mali<br />

Iinkonzo zolawulo lolwazi 415025 MTOD07 N/A Isakhiwo senethiwekhi ye-IT<br />

yayo<br />

Inkxaso-mali<br />

Iinkonzo zolawulo lolwazi 415025 MTOD07 N/A Iziko le-ICT lokusindisa kwintlekele<br />

yayo<br />

Inkxaso-mali<br />

Iinkonzo zolawulo lolwazi 415025 MTOD07 N/A Isixhobo seKhompyutha – BCMM<br />

yayo<br />

Inkxaso-mali<br />

500 000 0 0<br />

yayo<br />

ISIXA MALI 32 600 000 23 250 000 25 750 000<br />

Ukuhlaziywa kwewebhusayithi ye-<br />

BCMM (kuquka i-GIS kwintanethi)<br />

Iinkonzo zolawulo lolwazi 415205 MTOD08 N/A<br />

KPA 2: UHANJISO LWEENKONZO EZISISISEKO KUNYE NOPHUHLISO LWESAKHIWO<br />

USDG 10 000 000 21 500 000 0<br />

Reeston isiGaba 3 iNqanaba 2 -P1<br />

& P3<br />

ISebe lezeziNdlu 255005 BSDID01 12<br />

USDG 2 000 000 7 412 400 17 931 000<br />

Mdantsane Zone 18 CC IsiGaba<br />

2 - P1 & P3<br />

ISebe lezeziNdlu 255005 BSDID01 21<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

Manyano &Thembelihle IsiGaba<br />

ISebe lezeziNdlu 255005 BSDID01 17<br />

USDG 8 000 000 200 000 0<br />

2 - P1 & P3<br />

ISebe lezeziNdlu 255005 BSDID01 19 Second Creek (Turn Key) - P1 & P3 USDG 8 000 000 100 000 0<br />

ISebe lezeziNdlu 255005 BSDID01 6 Block Yard TRA - P 1& P3 USDG 1 000 000 0 0<br />

DVRI PILOT PROJECT (Mekeni, Haven<br />

ISebe lezeziNdlu 255005 BSDID01 19<br />

USDG 2 500 000 0 0<br />

Hills, Competition Site) P1 & P3<br />

IQela 1 (Chris Hani, Ilinge,<br />

48, 12, 21,<br />

Mahlangu Village, SisuluVillage,<br />

ISebe lezeziNdlu 255005 BSDID01 11, 17, 11,<br />

USDG 3 706 200 9 265 500 11 730 123<br />

WinnieMandela, Deluxolo Village &<br />

20<br />

Francis Mei) P1 & P3<br />

IQela 2 (Masibambane, Masibulele,<br />

ISebe lezeziNdlu 255005 BSDID01 17,14, Velwano, Gwentshe Village,<br />

USDG 600 000 5 559 300 9 265 500<br />

MathembaVuso) P1 & P3<br />

IQela 3 (Fynbos Informal 1, Fynbos<br />

ISebe lezeziNdlu 255005 BSDID01 5, 10<br />

USDG 7 412 400 11 859 840 <strong>13</strong> 620 285<br />

Informal 2, Ndancama) P1 & P3<br />

ISebe lezeziNdlu 255005 BSDID01 31 Sunny South - P1 & P3 USDG 600 000 1 000 000 2 000 000<br />

ISebe lezeziNdlu 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 1 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />

ISebe lezeziNdlu 255005 BSDID01 23, 24 Potsdam Ikhwezi Block 2 - P1 & P3 USDG 0 <strong>13</strong>8 650 2 277 300<br />

ISebe lezeziNdlu 255005 BSDID01 23,24 Potsdam Ikhwezi Block 2- P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />

ISebe lezeziNdlu 255005 BSDID01 23,24 Potsdam North Kanana - P1 USDG 0 <strong>13</strong>8 650 2 277 300<br />

ISebe lezeziNdlu 255005 BSDID01 9 Amalinda Co-op P1 & P3 USDG 0 1 126 562 1 630 750<br />

ISebe lezeziNdlu 255005 BSDID01 9 AmalindaFairlands P1 & P2 USDG 0 1 126 562 1 630 750<br />

Reeston IsiGaba 3: INqanaba 2 – P1<br />

ISebe lezeziNdlu 255005 BSDID01 12<br />

HSDG 15 000 000 25 000 000 0<br />

& P3<br />

Reeston IsiGaba 3: INqanaba 3 – P1<br />

ISebe lezeziNdlu 255005 BSDID01 12<br />

HSDG 1 000 000 5 559 300 5 559 300<br />

& P3<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

59<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

ISebe lezeziNdlu 255005 BSDID01 2 Braelyn ext 10 – P1 & P3 HSDG 300 000 1 476 096 3 570 436<br />

HSDG 270 420 2 500 000 4 594 340<br />

C Section and Triangular Site – P1<br />

& P3<br />

ISebe lezeziNdlu 255005 BSDID01 7, 8<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

ISebe lezeziNdlu 255005 BSDID01 7, 8 D Hostel – P1 & P3 HSDG 100 000 860 318 2 594 340<br />

HSDG 2 500 000 100 000 0<br />

DVRI Pilot Project (Mekeni, Haven<br />

Hills, Competition Site)<br />

0 8 828 000<br />

0<br />

3 500 000 4 000 000<br />

3 100 000<br />

60<br />

6 000 000 15 000 000 15 000 000<br />

10 000 000 0 0<br />

5 000 000 50 000 000 50 000 000<br />

ISebe lezeziNdlu 255005 BSDID01 6, 8<br />

Ukuvuselelwa<br />

Ingcebo yoVuselelo lweDolophu ne<br />

255005 BSDID27 N/A<br />

kweeDolophu<br />

& CBD NDPG<br />

Ulawulo lwezoThutho –<br />

Inkxaso-mali<br />

530020 BSDID29 N/A BCM Ulawulo lwezoThutho<br />

Braelyn<br />

yayo<br />

Ulawulo lwezoThutho –<br />

Inkxaso-mali<br />

530020 BSDID29 N/A Iizthuthi ze-BCMM<br />

Braelyn<br />

yayo<br />

Isibonelelo<br />

11, 12, 14,<br />

UCwangciso ngombane<br />

Ukufakela umbane – Izibane<br />

sombane<br />

535025 BSDID04 17, 20, 21,<br />

& noYilo<br />

zezitalato ezonga umbane<br />

oyimfuneko<br />

22, 23, 30<br />

wabucala<br />

UCwangciso ngombane<br />

Uhlaziyo lwezakhiwo zombane Inkxaso-mali<br />

535025<br />

16, 18<br />

& noYilo<br />

BSDID04<br />

zininzi<br />

yayo<br />

30 000 000 30 000 000 20 000 000<br />

DoE (Inkqubo<br />

eHlangeneyo<br />

yesizwe<br />

yokufakela<br />

umbane)<br />

Ukufakela umbane - Reeston,<br />

Potsdam unit P, Infills mdantsane,<br />

Dimbaza, Zwelitsha, Pakamisa, Bisho<br />

and Duncan Village<br />

<strong>13</strong>, 25, 43,<br />

34, 36,<br />

535025 BSDID04<br />

UCwangciso ngombane<br />

& noYilo<br />

5 000 000 20 000 000 20 000 000<br />

Inkxaso-mali<br />

yayo<br />

Ukufakela umbane kwiindawo<br />

zogobityholo – Imimandla<br />

yaseDuncan Village<br />

1, 2, 7, 8,<br />

9, 10<br />

535025 BSDID04<br />

UCwangciso ngombane<br />

& noYilo<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

27 851 023 0 0<br />

Inkxaso-mali<br />

yayo<br />

Inetwekhi yokufakela umbane<br />

kwizakhiwo(2.47% Ukunyuswa<br />

kwamaxabiso – ubiyo)<br />

2, 7, 15,<br />

16, 44<br />

535025 BSDID04<br />

UCwangciso ngombane<br />

& noYilo<br />

125 419<br />

392<br />

525025 BSDID06 21, 22, 23 Iindlela zaseMdantsane USDG 60 000 000 80 484 000<br />

Iindlela noHanjiso<br />

lwamanzi ezaNdyondyo<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

Uyilo lweNdlela 525020 BSDID06 46 West Bank Restitution USDG 15 000 000 10 000 000 28 000 000<br />

Uyilo lweNdlela 525020 BSDID06 28 Quenera Main Roads USDG 5 000 000 0 0<br />

Uhlaziyo lweendlela ze-BCMM USDG 30 000 000 30 000 000 50 000 000<br />

29, <strong>13</strong>, 25,<br />

39, 34, 36,<br />

44, 41, 1,<br />

Uyilo lweNdlela 525020 BSDID06<br />

2, 7,8<br />

61<br />

USDG 10 000 000 10 000 000 25 000 000<br />

Ukulungiswa kweendlela<br />

Zasemaphandleni<br />

23, 38, 43,<br />

31, 32, 24,<br />

32<br />

28, 4, 41, <strong>13</strong>,<br />

16, 14, 21,<br />

22, 5, 16, 27,<br />

31, 32,33,<br />

525025 BSDID06<br />

Iindlela noHanjiso<br />

Lwamanzi ezaNdyondyo<br />

99 854 000<br />

155 854<br />

000<br />

152 608<br />

250<br />

Ulungiselelo logutyulo oluninzi USDG<br />

515026 BSDID07<br />

Ugutyulo lweliNdle-<br />

Nxwemeni<br />

47, 11<br />

USDG 7 000 000 37 000 000 20 000 000<br />

Iizakhiwo zamanzi eQonce, Dimbaza<br />

kunye Bisho<br />

34, 37, 38,<br />

39, 40, 41,<br />

43, 44, 49,<br />

35<br />

11, 12, <strong>13</strong>,<br />

14, 42, 48,<br />

50, 17, 20,<br />

23<br />

Ulawulo lwamanzi 520005 BSDID07<br />

USDG 5 000 000 5 000 000 5 000 000<br />

Ukususwa kwe-Midblocks<br />

eMdantsane<br />

Ulawulo lwamanzi 515010 BSDID07<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

USDG 3 000 000 3 000 000 3 000 000<br />

Ulawulo lwamanzi 515010 BSDID07 36<br />

USDG 12 000 000 22 000 000 22 000 000<br />

520015 BSDID07 5, <strong>13</strong><br />

USDG 6 000 000 17 000 000 15 000 000<br />

520020 BSDID07 N/A<br />

Iizitishi ezimpompa<br />

kakhulu<br />

Umsebenzi wococo<br />

lwaManzi<br />

USDG 1 000 000 0 0<br />

520020 BSDID07 N/A<br />

Umsebenzi wococo<br />

lwaManzi<br />

USDG 3 000 000 0 0<br />

Ucoco lwaManzi 520020 BSDID07 33<br />

62<br />

USDG 5 000 000 1 276 293 0<br />

520020 BSDID07 31,33<br />

USDG 1 000 000 0 0<br />

UNikezelo lwamanzi lwase-<br />

Amahleke<br />

Ukuncedisa Ucoco lwaManzi -<br />

Umzonyana/Raising Upper weir<br />

Uhlaziyo lwenetwekhi yamanzi<br />

ngokwengxinano nokuncedisa<br />

Ukunikelwa kwamanzi amaninzi<br />

eNewlands kunye neminye<br />

imiMmandla<br />

IWadi 33 iskimu sokunikezela<br />

ngamanzi<br />

Imimandla yaseNxwemeni<br />

yoNikezelo ngamanzi amaninzi<br />

UNikezelo ngamanzi eWinterstrand<br />

Water<br />

Uhlaziyo lwesakhiwo seLebhu kunye<br />

nezixhobo<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

520020 BSDID07 31<br />

2 800 000 2 000 000 1 500 000<br />

Inkxaso-mali<br />

yayo<br />

520020 BSDID07 N/A<br />

Umsebenzi wococo<br />

lwaManzi<br />

Umsebenzi wococo<br />

lwaManzi<br />

Umsebenzi wococo<br />

lwaManzi<br />

78 702 000 78 762 000 0<br />

Public<br />

Transport<br />

Infrastructure<br />

and Systems<br />

Grant<br />

UThutho oluKhawulezayo ngeeBhasi<br />

1, 10, 11, 12,<br />

<strong>13</strong>, 14, 15,<br />

16, 17, 18,<br />

19, 2, 20, 21,<br />

22, 23, 24,<br />

25, 28, 3, 4,<br />

5, 6, 7, 8, 9<br />

620005 BSDID23<br />

UCwangciso lwezoThutho<br />

& uLawulo lweMisebenzi<br />

620005 BSDID23 N/A Ukuphunyezwa kwe-ITP USDG 3 000 000 3 000 000 3 000 000<br />

620005 BSDID24 37 Izakhiwo zoThutho zoLuntu USDG 23 000 000 22 000 000 30 000 000<br />

UCwangciso lwezoThutho<br />

& uLawulo lweMisebenzi<br />

UCwangciso lwezoThutho<br />

& uLawulo lweMisebenzi<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

UCwangciso lwezoThutho<br />

620005 BSDID24 27,28 Gonubie Main Road USDG 15 000 000 30 000 000 10 000 000<br />

& uLawulo lweMisebenzi<br />

UCwangciso lwezoThutho<br />

46, 31, 10, N2/R72 uphando lwendlela<br />

620005 BSDID24<br />

USDG 1 200 000 0 0<br />

& uLawulo lweMisebenzi<br />

16, 8, 19 edibanisyo<br />

Ulawulo loMhlaba 615080 BSDID21 1 -50 Ukubangwa komhlaba USDG 12 764 000 42 500 000 29 500 000<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

USDG 2 000 000 3 000 000 5 000 000<br />

UPhuhliso loLuntu(Inland, Mbindini<br />

kunye neNxwemeni)<br />

755010 BSDID16 <strong>13</strong>, 21, 23<br />

USDG 5 000 000 12 040 943 20 000 000<br />

Uphuhliso kunye noHlaziyo<br />

lwamaNgcwaba(Inland, Mbindini<br />

755025 BSDID16 N/A<br />

kunye neNxwemeni)<br />

Inkxaso yoLawulo<br />

lokuCoca<br />

Izinto ezimana<br />

ukwenziwa ngamaxesha<br />

athile<br />

USDG 4 000 000 20 000 000 30 000 000<br />

Uphuhliso kunye noHlaziyo<br />

lwamaHolo oLuntu<br />

Amaholo 760025 BSDID16 5<br />

63<br />

770030 BSDID09 1 – 50 Uyilo lwesititshi sotshintsho USDG 3 000 000 0 0<br />

770030 BSDID09 1 – 50 UKwakhiwa kweSeli yesiThathu USDG 10 000 000 0 0<br />

USDG 5 000 000 0 0<br />

Ukulungiswa kwemimandla ye-<br />

Landfill<br />

770030 BSDID09 1 – 50<br />

Ummandla we-E.L. Itiphu<br />

& nesititshi sotshintsho<br />

Ummandla we-E.L. Itiphu<br />

& nesititshi sotshintsho<br />

Ummandla we-E.L. Itiphu<br />

& nesititshi sotshintsho<br />

USDG 9 000 000 10 000 000 50 000 000<br />

Ukuhlaziya kwezakhiwo zemidlalo &<br />

nolonwabo<br />

7, 12, <strong>13</strong>, 28,<br />

29, 35, 37,<br />

38, 41, 44<br />

Amabala omdlala 765010 BSDID16<br />

USDG 3 000 000 3 000 000 3 000 000<br />

IsiTitshi soMlilo saseNxwemeni<br />

kunye neMbindini Fire Station<br />

Iinkonzo zoMlilo noNcedo 725010 BSDID12 1 to 50<br />

IsiTitshi soMlilo saseQONCE USDG 6 000 000 0 0<br />

25, 35, 37,<br />

38, 39, 40,<br />

41, 43, 44,<br />

45, 49<br />

Iinkonzo zoMlilo noNcedo 725010 BSDID12<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mlai<br />

lwezinto<br />

zexesha<br />

elide<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali<br />

lwezinto<br />

zexesha<br />

elide<br />

Indlela<br />

yenkxasomali<br />

Igama leProjekthi<br />

Inomb.<br />

yeWadi<br />

IKHOWU-DI<br />

YENGCE-BO<br />

(UKUSU-KA KWI-<br />

IDP)<br />

Inomb.<br />

yeziko<br />

elihlawulwayo<br />

IGama leziko<br />

elihlawulwayo<br />

Iinkonzo zoMlilo noNcedo 725010 BSDID12 31, 32, 33 IsiTitshi soMlilo eTsholomnqa USDG 500 000 5 000 000 10 000 000<br />

KPA 3: UPHUHLISO LOQOQOSHO LWASEKHAYA<br />

USDG 12 254 978 20 000 000 30 000 000<br />

Isakhiwo soPhuhliso loQoqosho<br />

(UPhuhliso lweNdlela yamafa,<br />

ukwenziwa kwezitandi zethutyana)<br />

63005 LED03 N/A<br />

Uphuhliso loQoqoqsho<br />

lwasekhaya<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

Uphuhliso loQoqoqsho<br />

Uphuhliso lwezakhiwo zolimo<br />

635005 LED03 N/A<br />

USDG 3 000 000 3 000 000 3 000 000<br />

lwasekhaya<br />

ezidolophini kwi-BCMM<br />

KPA 4: UZINZO KWIZIMALI KUNYE NOLAWULO<br />

IFenitshala ye-Ofisi – ULawulo Inkxaso-mali<br />

Ulawulo lwamatyala 330015 MFVM01 N/A<br />

1 100 000 1 000 000 1 000 000<br />

lweNgeniso<br />

yayo<br />

I-Ofisi yokuhlawula<br />

OoMatshini bokuhlawula kuqala Inkxaso-mali<br />

330025 MFVM02 N/A<br />

1 000 000 500 000 500 000<br />

kuqala kwabathengisayo<br />

kwabathengisayo<br />

yayo<br />

Isixhobo sekhompyutha – uLawulo Inkxaso-mali<br />

Iinkonzo zoLawulo lolwazi 415025 MTOD07 N/A<br />

1 500 000 1 500 000 1 500 000<br />

lweNgeniso<br />

yayo<br />

IReyithi kunye ne-Ofisi<br />

Inkxaso-mali<br />

330005 MFVM05 N/A Iziniki-maxabiso jikelele<br />

29 000 000 <strong>13</strong> 500 000 4 500 000<br />

enika amaxabiso<br />

yayo<br />

Uhlaziyo lweHolo lokuhlawula<br />

Ulwakhiwo 615075 MFVM01 N/A<br />

USDG 4 000 000 1 000 000 0<br />

eQonce<br />

KPA 5: URHULUMENTO OLULUNGILEYO KUNYE NENTATHO-NXAXHEBA YOLUNTU<br />

Inkxaso-mali<br />

Ulawulo lweNgcebo 105035 MTOD12 N/A Injini elilalela – kwiHolo lwesiXeko<br />

1 500 000 0 0<br />

yayo<br />

Inkxaso-mali<br />

Ulawulo lweNgcebo 105035 MTOD12 N/A Uhlaziyo lweHolo lwesiXeko<br />

3 000 000 000 000 0<br />

yayo<br />

64<br />

“Isixeko esikhula kunye nawe”


6.4 IIPROJEKTHI ZOKUSEBENZA 2012/<strong>13</strong> – 2014/15<br />

2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

ICandelo<br />

KPA 1: UTSHINTSHO LUKAMASIPALA KUNYE NOPHUHLISO LWEZIKO<br />

300 000 100 000 0<br />

Inkxaso-mali<br />

yayo<br />

Ukususwa kwamaxwebhu e-BCMM<br />

esiwe kwi-EDMS<br />

220005 N/A MTOD11<br />

EzoMthetho kunye<br />

neLawulo<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

700 000 0 0<br />

Inkxaso-mali<br />

yayo<br />

615005 N/A MTOD10 I-GIS kwi-intanethi<br />

ULawulo loCwangciso<br />

loPhuhliso<br />

2 7000 000 0<br />

Inkxaso-mali<br />

yayo<br />

Uhlaziyo lwemifanekiso ethathwa<br />

phezu kwezindlu<br />

615005 N/A MTOD06<br />

ULawulo loCwangciso<br />

loPhuhliso<br />

500 000 500 000 500 000<br />

Inkxaso-mali<br />

yayo<br />

Uphuhliso nophononongo loMthetho<br />

kaMasipala<br />

220005 N/A MTOD11<br />

EzoMthetho kunye<br />

neLawulo<br />

Inkxaso-mali<br />

yayo<br />

EzoMthetho kunye<br />

neLawulo<br />

65<br />

600 000 0 0<br />

220005 N/A MTOD11 Umgaqo-nkqubo wokulondoloza<br />

750 000 750 000 0<br />

Inkxaso-mali<br />

yayo<br />

Uhlaziyo lweendawo ezingaphandle<br />

ze-BCMM zokugcina amaxwebhu<br />

abalulekileyo kunye neseva<br />

yokugcina ulwazi (umz. Bisho /<br />

Qonce<br />

Iinkonzo zolawulo lolwazi 415025 N/A MTOD08<br />

750 000 750 000 0<br />

Inkxaso-mali<br />

yayo<br />

Ukusungulwa kwenkqubo yolawulo<br />

lokusebenza kwabasebenzi<br />

Ulawulo lwabasebenzi 420005 N/A GGPP02<br />

Ulawulo lwabasebenzi 420005 N/A MTOD02 Izakhiwo - uPhuhliso lwezakhono ISDG 3 000 000 3 800 000 4 000 000<br />

KPA 2: UHANJISO LWEENKONZO EZISISISEKO KUNYE NOPHUHLISO LWEZAKHIWO<br />

255005 <strong>13</strong>, 43, 45, 46 BSDID01 Reeston IsiGaba 3: INqanaba 2 - P5 HSDG 0 20 000 000 29 992 500<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

HSDG 163 515 0 0<br />

Reeston IsiGaba 3: INqanaba 3 – P4<br />

(Registration<br />

255005 <strong>13</strong>, 43, 45, 46 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

ICandelo<br />

HSDG 19 995 000 31 992 000 11 330 500<br />

Ilitha ukupheliswa kwezindlu<br />

zamaplanga kwakhiwe izindlu<br />

ezifanelekileyo<br />

255005 45 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

HSDG 6 665 000 500 000 0<br />

Tyutyu IsiGaba 2 – P5 (Izakhiwo<br />

ezikudidi oluphezulu - Top<br />

Structures)<br />

255005 43 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

HSDG 5 398 650 200 000 0<br />

Isikhululo seNqelo moya / IsiGaba<br />

2A Ukwakhiwa kweeyunithi ezintsha<br />

-P4<br />

255005 31 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

255005 45 BDSID01 Ilitha NgeZantsi– 439 iiyunithi P5 HSDG 2 500 000 3 797 800 5 000 000<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

HSDG 20 000 000 30 000 000 15 862 700<br />

Ukwakhiwa okutsha kwezindlu<br />

ezatshatyalaliswa sisichotho<br />

BSDID01<br />

17, 24, 26, 33, 39,<br />

40, 43, 36, 37<br />

255005<br />

66<br />

255005 31 BSDID01 Sunny eZantsi – P5 HSDG 500 000 10 797 300 17 162 500<br />

255005 23 BSDID01 Potsdam Village IsiGaba 1 & 3 – P5 HSDG 0 500 000 500 000<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

HSDG 5 811 880 17 395 650 26 660 000<br />

IQela 1 (Chris Hani 3; Winnie<br />

Mandela; Ilinge; Deluxolo Village;<br />

Sisulu Village; Francis Mei; Mahlangu<br />

BSDID01<br />

48, 12, 21, 11, 17,<br />

11, 20<br />

255005<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

Village) P5<br />

19 995<br />

000<br />

HSDG 0 9 664 250<br />

IQela 2 (Masibambane; Masibulele;<br />

Gwentshe; Velwano; MathembaVuso)<br />

P5<br />

255005 17, 14 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

HSDG 0 9 664 250 19 995 000<br />

255005 5, 10 BSDID01<br />

HSDG 0 11 797 050 19 995 000<br />

IQela 3 (Fynbos1; Fynbos2;<br />

Ndancama)P5<br />

DVRI Pilot Project (Mekeni, Haven<br />

Hills, Competition Site) P5<br />

255005 6, 8 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

ICandelo<br />

HSDG 465 000 0 0<br />

Cambridge 1 & 2 (Kei Road Dawn)<br />

P2<br />

255005 15 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

255005 16 BSDID01 N2 Road Reserve HSDG 340 000 0 0<br />

HSDG 165 000 0 0<br />

Ford Msimango 1 (LU Housing Nomp<br />

School)<br />

255005 6 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

255005 19 BSDID01 Second Creek – P5 HSDG 17 662 250 200 000 0<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

HSDG 16 697 979 27 327 914 29 818 705<br />

Housing Needs Database and<br />

Accreditation<br />

255005 1-50 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

USDG 300 000 250 000 250 000<br />

Inzuzo kwezeMfundo( Zonke ii-<br />

USDG P4)<br />

255005 45, 46, 18, 19, 10 BSDID02<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

67<br />

500 000 4 447 500 7 140 000<br />

Inkxaso-mali<br />

yayo<br />

Ukususwa kwabaza kuzuza izindlu<br />

basiwe kwindawo yesigxina kuzo<br />

zonke iinkqubo zezindlu– Zonke<br />

iiProjekthi<br />

255005 1 - 50 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

255005 12 BSDID01 Dacawa P4 USDG 2 960 0 0<br />

255005 10 BSDID01 Fynbos Informal 1-P4 USDG 27 488 0 0<br />

255005 10 BSDID01 Fynbos Informal 2-P4 USDG 210 230 0 0<br />

255005 12 BSDID01 Ilinge-P4 USDG 118 087 0 0<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

USDG 200 000 200 000 0<br />

Ilitha – Ukupheliswa kwezindlu<br />

zamaplanga kuyiwe kwizindlu<br />

zesigxina<br />

255005 45 BSDID01<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

255005 17 BSDID01 Masibambane-P4 USDG 20 038 0 0<br />

255005 17 BSDID01 Masibulele-P4 USDG 20 553 0 0<br />

255005 21 BSDID01 Mdantsane Zone 18 CC IsiGaba 2-P4 USDG 256 425 0 0<br />

255005 10 BSDID01 Ndacama-P2 USDG 160 000 0 0<br />

255005 10 BSDID01 Ndacama-P4 USDG <strong>13</strong>8 308 0 0<br />

255005 11 BSDID01 Sisulu Village-P4 USDG 19 636 0 0<br />

ICandelo<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

68<br />

255005 31 BSDID01 Sunny South-P4 USDG 112 7<strong>13</strong> 0 0<br />

255005 14 BSDID01 Velwano-P4 USDG 81 999 0 0<br />

255005 17 BSDID01 Winnie Mandela-P4 USDG 38 535 0 0<br />

255005 9 BSDID01 Amalinda (Co-op) - P2 (EIA) USDG 200 000 0 0<br />

255005 23,24 BSDID01 Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100 000 0 0<br />

255005 23,24 BSDID01 Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100 000 0 0<br />

255005 23,24 BSDID01 Potsdam North Kanana - P2 (EIA) USDG 100 000 0 0<br />

USDG 100 000 0 0<br />

Potsdam Village Rural IsiGaba 1 &<br />

2 - P2 (EIA)<br />

255005 23 BSDID01<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

ICandelo<br />

255005 21 BSDID01 Potsdam Unit P INqanaba 2 - P4 USDG 3 000 0 0<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

255005 19 BSDID01 Second Creek P4 USDG 3 000 0 0<br />

IiProjekthi zokwakha<br />

iziNdlu<br />

2 000 000 2 000 000 0<br />

Inkxaso mali<br />

yayo<br />

Caretakers - Duncan Village<br />

namatyotyombe (Informal<br />

Settlements)<br />

Inkxaso mali ye-East Bank WWTW<br />

ACIP<br />

520005 1, 2, 5, 6, 7, 8, 10<br />

Iinkonzo zamanzi, zelindle<br />

nenzulu lwazi<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

DWA -ACIP 1 525 000 125 000 0<br />

520005 18 BSDID06<br />

Iinkonzo zamanzi, zelindle<br />

nenzulu lwazi<br />

400 000 0 0<br />

DWA –<br />

iPhondo<br />

IsiCwangciso soShishino seeNkonzo<br />

zamanzi<br />

520005 N/A BSDID06<br />

Iinkonzo zamanzi, zelindle<br />

nenzulu lwazi<br />

520005 BSDID06 Dimbaza WWTW inlet Screen DWA – ACIP 450 000 0 0<br />

Iinkonzo zamanzi,<br />

zelindle nenzululwazi<br />

69<br />

Ukuphunyezwa kolondolozo<br />

lwamanzi kunye noLawulo<br />

Iinkonzo zamanzi,<br />

34, <strong>13</strong>, 9, 5, 28,<br />

lwemfuno (Dimbaza, Duncan Village, DWAF –<br />

520005<br />

BSDID06<br />

1 283 000 0 0<br />

zelindle nenzululwazi<br />

7, 41<br />

Mdantsane, Reeston, SceneryPark, DoRA<br />

Nompumelelo, Mzamomhle,<br />

Sweetwaters, Phakamisa, Zwelitsha)<br />

Iindlela noHanjiso<br />

Ukuphuhliswa kwesicwangciso<br />

525025 N/A BSDID06<br />

USDG 3 000 000 5 000 000 0<br />

lwamanzi ezaNdyondyo<br />

esisio seeNdlela ze-BCMM<br />

Reeston IsiGaba 3: INqanaba 2 – P4<br />

Ulawulo loMhlaba 615080 12 BSDID01<br />

HSDG 788 800 480 000 480 000<br />

(UTshintsho)<br />

Reeston IsiGaba 1 & 2 – INqanaba<br />

Ulawulo loMhlaba 615080 12 BSDID01<br />

HSDG 200 000 46 400 0<br />

1B – P4 (UTshintsho)<br />

Reeston IsiGaba 3 INqanaba 1 – P4<br />

Ulawulo loMhlaba 615080 12 BSDID01<br />

HSDG 500 000 86 800 0<br />

(UTshintsho)<br />

Ulawulo loMhlaba 615080 43 BSDID01 Tyutyu IsiGaba 1 – P4 (UTshintsho) HSDG 28 000 1 000 0<br />

“Isixeko esikhula kunye nawe”


IKHOWUDI<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Iziko<br />

YENGCEBO<br />

Inkxaso Uhlahlo Uhlahlo Uhlahlo<br />

ICandelo eliHlawu- IWadi Nomb.<br />

Igama leProjekthi<br />

EVELA KWI-<br />

ivela phi mali lwe- mali lwe- mali lwelayo<br />

IDP<br />

Opex Opex Opex<br />

Ulawulo loMhlaba 615080 43 BSDID01 Tyutyu 2 – P4 (UTshintsho) HSDG 34 000 1 000 0<br />

Ilitha South – 439 iiyunitho<br />

Ulawulo loMhlaba 615080 45 BSDID01<br />

HSDG 8 000 30 000 40 400<br />

(utshintsho)<br />

Ulawulo loMhlaba 615080 34, 36 BSDID01 Dimbaza IsiGaba 2 P4 (utshintsho) HSDG 5 000 12 500 0<br />

Potsdam INqanaba 2 INqanaba 1 –<br />

Ulawulo loMhlaba 615080 <strong>13</strong> BSDID01<br />

HSDG 241 150 5 000 0<br />

P4 (UTshintsho)<br />

Ulawulo loMhlaba 615080 29 BSDID01 Nompumelelo – P4 (UTshintsho) HSDG 914 400 3 000 0<br />

AmalindaSimanyene – P4<br />

Ulawulo loMhlaba 615080 16 BSDID01<br />

HSDG 15 000 1 000 0<br />

(UTshintsho)<br />

Ulawulo loMhlaba 615080 48 BSDID01 Z Soga – P4 (UTshintsho) HSDG <strong>13</strong>6 000 1 000 0<br />

Land Transactions – upgrading of Inkxaso-mali<br />

Ulawulo loMhlaba 615080 Mdantsane BSDID22<br />

350 000 500 000 500 000<br />

former R293 & CPA Areas<br />

yayo<br />

Isikhululo senqwelo moyat / IsiGaba<br />

Ulawulo loMhlaba 615080 46<br />

2A Ukwakhiwa okutsha kwe-unithi HSDG 441 200 10 000 0<br />

– P4<br />

Icandelwana lwepropati<br />

Inkxaso mali<br />

UPhononongo loMhlaba 615070 N/A BSDID21<br />

500 000 400 000 300 000<br />

zikamasipala eziqeshisayo<br />

yayo<br />

UPhononongo loMhlaba 615070 10 BSDID21 Ndancama P2 USDG 160 000 0 0<br />

Fynbos (Amatyotyombe) Informal<br />

UPhononongo loMhlaba 615070 10 BSDID21<br />

USDG 120 000 0 0<br />

1- P2<br />

Fynbos (Amatyotyombe) Informal<br />

UPhononongo loMhlaba 615070 10 BSDID21<br />

USDG 110 000 0 0<br />

2 – P2<br />

UPhononongo loMhlaba 615070 9 BSDID21 Amalinda Fairlands Projects – P2 USDG 200 000 235 000 0<br />

Cambridge 1 & 2 (Kei Road) Dawn<br />

UPhononongo loMhlaba 615070 15 BSDID21<br />

HSDG 465 000 0 0<br />

– P 2<br />

615070 16 BSDID21 N2 Road Reserve P 2 HSDG 340 000 0 0<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

70<br />

“Isixeko esikhula kunye nawe”


IKHOWUDI<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

Iziko<br />

YENGCEBO<br />

Inkxaso Uhlahlo Uhlahlo Uhlahlo<br />

ICandelo eliHlawu- IWadi Nomb.<br />

Igama leProjekthi<br />

EVELA KWI-<br />

ivela phi mali lwe- mali lwe- mali lwelayo<br />

IDP<br />

Opex Opex Opex<br />

Ford Msimango 1 (LU Housing Nomp<br />

615070 6 BSDID21<br />

HSDG 165 000 0 0<br />

School) – P2<br />

UCwangciso lwesiXeko 615070 16 BSDID17 DVRI Ukusekwa kwedolophu LGH 77 000 0 0<br />

UCwangciso lwesiXeko 615070 40926 BSDID17 Mdantsane UKusekwa kwedolophu USDG 0 500 000 600 000<br />

East Bank Ukubuyiselwa nokusekwa<br />

UCwangciso lwesiXeko 615070 16 BSDID17<br />

RLCC 300 000 300 000<br />

kwedolophu<br />

UKuchongwa komhlaba wophando<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615080 N/A BSDID21 ukuze kususwe amatyotyombe<br />

300 000 0 0<br />

yayo<br />

akwindawo ekumba ophambili<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615005 15 BSDID18 BCMM Ukusekwa kwedolophu<br />

0 1 600 000 1 700 000<br />

yayo<br />

Ukusekwa kwedolophu<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 28 BSDID18<br />

400 000 0 0<br />

kumatyotyombe ase-Mzamomhle yayo<br />

IsiGaba socwangciso lwendawo Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 N/A BSDID18<br />

300 000 0 0<br />

zokuhlala emaphandleni<br />

yayo<br />

Isikhokelo soPhuhliso yeNdawo Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 27 BSDID19<br />

0 1 100 000 1 200 000<br />

yokuhlala ekhaya<br />

yayo<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 4, 15, 18 BSDID19 Vincent, Berea LSDF Review<br />

500 000 0 0<br />

yayo<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 29 BSDID19 Home Hill LSDF<br />

233 408 0 0<br />

yayo<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 27, 29 BSDID19 Gonubie Main road LSDF<br />

34 735 0 0<br />

yayo<br />

Inkxaso-mali<br />

UCwangciso lwesiXeko 615070 27, 29 BSDID19 Kwelera LSDF<br />

29 469 0<br />

yayo<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

71<br />

58 561 0 0<br />

Inkxaso-mali<br />

yayo<br />

BCMM SDF Ukunikezwa kwengxelo<br />

nohlolo - Comprehensive Update<br />

and Review<br />

UCwangciso lwesiXeko 615070 N/A BSDID19<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

ICandelo<br />

43 827 0 0<br />

UCwangciso lwesiXeko 615070 30, 38-45 BSDID19 Bhisho/King Williams Town LSDF<br />

1 000 000 0 0<br />

615005 N/A BSDID20 Imifanekiso yaphezulu<br />

350 000 350 000 0<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

615005 N/A MTOD05 I-GIS kwi-intanethi<br />

ULawulo loCwangciso<br />

loPhuhliso<br />

ULawulo loCwangciso<br />

loPhuhliso<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

500 000 2 000 000 2 000 000<br />

UThutho 620005 N/A BSDID23 Uphononongo lwe-ITP<br />

6 880 000 11 700 000 12 300 000<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

KPA 3: UPHUHLISO LOQOQOSHO LWASEKHAYA<br />

Inkqubo yoMaketho ngeNdawo<br />

635005 N/A LED02<br />

yokufikela<br />

2 000 000 6 300 000 5 900 000<br />

Inkqubo ngeYunithi yeNkxaso<br />

yoShishino<br />

635005 N/A LED03<br />

Uphuhliso loQoqosho<br />

lwaseKhaya<br />

Uphuhliso loQoqosho<br />

lwaseKhaya<br />

Uphuhliso loQoqosho<br />

lwaseKhaya<br />

72<br />

635005 N/A LED03 Inkqubo ngeZakhiwo zoQoqosho USDG 2 585 200 4 260 000 5 000 000<br />

KPA 4: UZINZO KWIZIMALI ZIKAMASIPALA KUNYE NOLAWULO<br />

400 000 1 000 000 500 000<br />

Inkxaso-mali<br />

yayo<br />

Ucoco lweData yokukhupha<br />

amatyala<br />

330015 N/A MFVM01<br />

I-Ofisi yolawulo<br />

lwamatyala<br />

2 000 000 3 000 000 1 500 000<br />

Inkxaso-mali<br />

yayo<br />

Uphicotho lwemitha<br />

ezichukunyisiweyo (Umbane &<br />

amanzi) – Iinkonzo zikaMasipala<br />

330015 N/A MFVM01<br />

I-Ofisi yolawulo<br />

lwamatyala<br />

I-Ofisi yohlahlo mali 315005 N/A MFVM03 Utshintsho loHlahlo mali FMG 1 500 000 1 500 000 1 500 000<br />

iProjekthi yoTshintsho yoPhicotho Inkxaso-mali<br />

I-Ofisi yohlahlo mali 315005 N/A MFVM06<br />

720 000 720 000 720 000<br />

ziNcwadi<br />

yayo<br />

KPA 5: URHULUMENTO OLULUNGILEYO KUNYE NENTATHO NXAXHEBA YOLUNTU<br />

1 000 000 3 000 000 0<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso yeNgcebo 105025 N/A MTOD03 Uguqulo lwenkqubo zoshishino ze-IT<br />

“Isixeko esikhula kunye nawe”


2014/2015<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

20<strong>13</strong>/2014<br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

2012/20<strong>13</strong><br />

Uhlahlo<br />

mali lwe-<br />

Opex<br />

Inkxaso<br />

ivela phi<br />

Igama leProjekthi<br />

IKHOWUDI<br />

YENGCEBO<br />

EVELA KWI-<br />

IDP<br />

IWadi Nomb.<br />

Iziko<br />

eliHlawulayo<br />

ICandelo<br />

3 000 000 3 000 000 3 000 000<br />

Iintlanganiso zeWadi Komiti<br />

(yinkcitho evela engxoweni)<br />

120010 N/A GGPP09<br />

UbuDlelwana noLuntu &<br />

neZiganeko zamazwe<br />

50 000 80 000 80 000<br />

205005 N/A GGPP07 Ubudlelwane boorhulumente<br />

I-Ofisi yoMlawuli<br />

kaMasipala<br />

1 200 000 1 200 000 1 200 000<br />

300 000 300 000 300 000<br />

100 000 100 000 100 000<br />

200 000 200 000 200 000<br />

6 000 000 8 000 000 8 000 000<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

Inkxaso-mali<br />

yayo<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

Iinkqubo eziKhethekileyo 105030 N/A GGPP12 IBhasari kaMasipala<br />

I-Ofisi yoMlawulo<br />

205005 N/A GGPP05 Ukubhalwa kwezibonelo studies<br />

kaMasipala<br />

I-Ofisi yoMlawuli<br />

205005 N/A GGPP12 Usungulo lwesikhokelo se-MDG<br />

kaMasipala<br />

I-Ofisi yoMlawuli<br />

205005 N/A GGPP01 Uvavanyo loMngcipheko<br />

kaMasipala<br />

I-Ofisi yoMlawuli<br />

IsiCwangciso soPhicotho zincwadi<br />

205005 N/A MFMV06<br />

kaMasipala<br />

sokujika izinto<br />

73<br />

3 500 000 3 000 000 3 000 000<br />

IModeli yokudityaniswa<br />

kweNgqiniseko<br />

205005 N/A GGPP01<br />

I-Ofisi yoMlawuli<br />

kaMasipala<br />

“Isixeko esikhula kunye nawe”


6.5 IPROJEKTHI EZINKULU ZIKA-2012-15<br />

2012-2015 UYILO<br />

LOHLAHLO MALI<br />

LWEZINTO ZEXESHA<br />

ELIDE<br />

IMVELAPHI<br />

YENKXASO<br />

IGAMA LEPROJEKTHI<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

Reeston IsiGaba 3 INqanaba 2 -P1 & P3 USDG 31,500,000<br />

Mdantsane Zone 18 CC IsiGaba 2 - P1 & P3 USDG 27,343,400<br />

Manyano & Thembelihle IsiGaba 2 - P1 & P3 USDG 8,200,000<br />

Second Creek (Turn Key) - P1 & P3 USDG 8,100,000<br />

Block Yard TRA - P 1& P3 USDG 1,000,000<br />

DVRI PILOT PROJECT (Mekeni, Haven Hills, Competition Site) P1 & P3 USDG 2,500,000<br />

IQela 1 (Chris Hani, Ilinge, Mahlangu Village, Sisulu Village, Winnie Mandela, Deluxolo Village &<br />

USDG 24,701,823<br />

Francis Mei) P1 & P3<br />

IQela 2 (Masibambane, Masibulele, Velwano, Gwentshe Village, Mathemba Vuso) P1 & P3 USDG 15,424,800<br />

IQela 3 (Fynbos Informal 1, Fynbos Informal 2, Ndancama) P1 & P3 USDG 32,892,525<br />

Sunny South - P1 & P3 USDG 3,600,000<br />

Potsdam Ikhwezi Block 1 - P1 & P3 USDG 2,415,950<br />

Potsdam Ikhwezi Block 2 - P1 & P3 USDG 2,415,950<br />

Potsdam Ikhwezi Block 2- P1 USDG 2,415,950<br />

Potsdam North Kanana - P1 USDG 2,415,950<br />

Amalinda Co- op P1 & P3 USDG 2,757,312<br />

Amalinda Fairlands P1 & P2 USDG 2,757,312<br />

Dacawa P4 USDG 2,960<br />

Fynbos Informal 1-P4 USDG 27,488<br />

74<br />

“Isixeko esikhula kunye nawe”


2012-2015 UYILO<br />

LOHLAHLO MALI<br />

LWEZINTO ZEXESHA<br />

ELIDE<br />

IMVELAPHI<br />

YENKXASO<br />

IGAMA LEPROJEKTHI<br />

Fynbos Informal 2-P4 USDG 210,230<br />

Ilinge-P4 USDG 118,087<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

Ilitha – Ukupheliswa kwezindlu zamaplanga kwnziwe ezisezingeni -Eradication of Wooden Houses<br />

USDG 400,000<br />

to Formal Houses<br />

Masibambane-P4 USDG 20,038<br />

Masibulele-P4 USDG 20,553<br />

Mdantsane Zone 18 CC IsiGaba 2-P4 USDG 256,425<br />

Ndacama-P2 USDG 160,000<br />

Ndacama-P4 USDG <strong>13</strong>8,308<br />

Sisulu Village-P4 USDG 19,636<br />

Sunny South-P4 USDG 112,7<strong>13</strong><br />

Velwano-P4 USDG 81,999<br />

Winnie Mandela-P4 USDG 38,535<br />

Amalinda (Co-op) - P2 (EIA) USDG 200,000<br />

Fynbos Informal 1-P2 USDG 120,000<br />

Fynbos Informal 2-P2 USDG 110,000<br />

Potsdam Ikhwezi Block 1 - P2 (EIA) USDG 100,000<br />

Potsdam Ikhwezi Block 2- P2 (EIA) USDG 100,000<br />

Potsdam North Kanana - P2 (EIA) USDG 100,000<br />

Potsdam Village Rural IsiGaba 1 & 2 - P2 (EIA) USDG 100,000<br />

Amalinda Fairlands Projects - P2 USDG 435,000<br />

75<br />

“Isixeko esikhula kunye nawe”


2012-2015 UYILO<br />

LOHLAHLO MALI<br />

LWEZINTO ZEXESHA<br />

ELIDE<br />

IMVELAPHI<br />

YENKXASO<br />

IGAMA LEPROJEKTHI<br />

Potsdam Unit P4 INqanaba 2 - P4 USDG 3,000<br />

Second Creek P4 USDG 3,000<br />

Dacawa P4 USDG 800,000<br />

IZINDLU 174,118,944<br />

Uphuhliso lwesiCwangciso esiKhulu seeNdlela ze-BCMM 8,000,000<br />

Iindlela zaseMdantsane USDG 265,903,392<br />

West Bank Restitution USDG 53,000,000<br />

Quenera Main Roads USDG 5,000,000<br />

BCMM Roads Upgrade USDG 110,000,000<br />

Rehabilitation of Rural Roads Upgrade USDG 45,000,000<br />

IINDLELA 486,903,392<br />

Nord Avenue Isitishi Sempompo - Pump station USDG 4,000,000<br />

Quinera Ukucocwa kwamanzi amdaka - Treatment Works USDG 19,000,000<br />

Ukuxhotyiswa kococo lwaManzi amdaka (Zwelitsha) USDG 116,000,000<br />

Reeston IsiGaba 3 INkonzo yelindle oluninzi USDG 50,000,000<br />

Bufferstrip Ukucocwa Kwamanzi - Sanitation – Mdantsane USDG 1,108,250<br />

Mdantsane Sewers – Refurbishment USDG 17,000,000<br />

Diversion of Amalinda and Wilsonia effluent to Reeston USDG 80,000,000<br />

UGutyulo lwaseMbindini emaphandleni - (Nxwemeni Mbindini & Inland) USDG 103,208,000<br />

Ilindle laseEastern Beach USDG 45,000,000<br />

Izakhiwo wokumelana nelindle USDG 9,000,000<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

76<br />

“Isixeko esikhula kunye nawe”


2012-2015 UYILO<br />

LOHLAHLO MALI<br />

LWEZINTO ZEXESHA<br />

ELIDE<br />

IMVELAPHI<br />

YENKXASO<br />

IGAMA LEPROJEKTHI<br />

Izakhiwo eQonce naseBisho (zamanzi) USDG 64,000,000<br />

Ukususwa kweMidblocks eMdantsane USDG 15,000,000<br />

Ukunikezelwa kwamanzi e-Amahleke USDG 9,000,000<br />

lLINDLE 532,316,250<br />

Uxhotyiso lokuncedisa kucoco lwaManzi - Umzonyana/Raising Upper weir USDG 56,000,000<br />

Uhlaziyo lwezixokelelwano zamanzi ngokwengxinano nokwandiswa USDG 38,000,000<br />

Unikezelo ngamanzi amaninzi eNewlands kunye neminye imimandla USDG 1,000,000<br />

Wadi 33 Isikimu sokunikezala ngamanzi USDG 3,000,000<br />

Unikezelo ngamanzi amaninzi kummandla wase-Nxwemeni USDG 6,276,293<br />

Unikezelo ngamanzi eWinterstrand USDG 1,000,000<br />

AMANZI 105,276,293<br />

UKusekwa kweDolophu yaseMdantsane USDG 1,100,000<br />

Ukuphunyezwa kwe-ITP USDG 9,000,000<br />

IRenki zeeteksi USDG 80,000,000<br />

Gonubie Main Road USDG 60,000,000<br />

N2/R72 uphando ngendlela elikhonkco USDG 26,200,000<br />

UCWANGCISO LWEZOTHUTHO 176,300,000<br />

UPhuhliso lwezakhiwo zolimo eziDolophini e-BCM USDG 8,000,000<br />

Izakhiwo zoPhuhliso loQoqoqsho(Uphuhliso lomzila yamaFa; usungulo lwezitandi zethutyana) USDG 62,254,978<br />

Ikqubo yezakhiwo zoQoqosho USDG 11,845,200<br />

I-LED 82,100,178<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

77<br />

“Isixeko esikhula kunye nawe”


2012-2015 UYILO<br />

LOHLAHLO MALI<br />

LWEZINTO ZEXESHA<br />

ELIDE<br />

IMVELAPHI<br />

YENKXASO<br />

IGAMA LEPROJEKTHI<br />

Ukuphuhliswa kweePaka zoLuntu (Mdantsane, Potsdam, Rheeston) USDG 10,000,000<br />

Uphuhliso nohlaziyo lwamaNgcwaba(Inland, Mbindini and Nxwemeni) USDG 37,040,943<br />

Uphuhliso nohlaziyo lwamaHolo oluntu USDG 54,000,000<br />

Izakhiwo zemidlalo & nolonwabo USDG 69,000,000<br />

IINKONZO ZOLUNTU 170,040,943<br />

IsiTitshi soTshinstho esiseMbindini (EL CBD) USDG 33,000,000<br />

UKwakhiwa kweseli entsha – Indawo yeRoundhill Regional Landfill USDG 5,764,000<br />

UKwakhiwa kwendawo yokuqokelela kwa-Wadi 10,5 &12 USDG 3,000,000<br />

Ukusekwa kwesititshi sotshintsho eMbindini, ukwakhiwa kwendawo yokuchitha inkunkuma, kunye<br />

USDG 17,000,000<br />

nokusekwa nokuhlaziywa kwesititshi soTshintsho<br />

Ukwakhiwa kweSel ye-4 USDG 9,000,000<br />

INKUNKUMA 67,764,000<br />

Izakhiwo eNxwemeni kunye naseMbindini USDG 9,000,000<br />

Isikhululo somlilo eQonce USDG 6,000,000<br />

Isikhululo somlilo eTsholomnqa USDG 15,500,000<br />

UMLILO 30,500,000<br />

uMasipala Ombaxa we<strong>Buffalo</strong> <strong>City</strong>:<br />

Uhlolo lwesicwangciso sophuhliso<br />

oluhlangeneyo • 2012 - 20<strong>13</strong><br />

78<br />

ISIXA MALI SEEPROJEKTHI EZINKULU 1,825,320,000<br />

“Isixeko esikhula kunye nawe”


79<br />

AFRIKAANS


BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

INHOUDSOPGAWE<br />

Voorwoord deur Uitvoerende Burgemeester 81<br />

Oorsig deur die Stadsbestuurder 83<br />

1. BCMM SE VISIE, MISSIE & WAARDES 85<br />

1.1 BCMM se Visie 85<br />

1.2 BCMM se Missie 85<br />

1.3 BCMM se Kernwaardes 85<br />

2. WAT IS ‘N GEÏNTEGREERDE ONTWIKKELINGSPLAN (GOP)? 86<br />

3. WAT IS ‘N BEGROTING? 87<br />

4. DIE GOP-PROSES WAT GEVOLG IS 88<br />

5. GOP-INLIGTINGSBRONNE EN STRATEGIESE FOKUSGEBIEDE 90<br />

5.1 Inligtingsbronne vir die GOP 90<br />

5.2 Sleutel- strategiese doelstellings 91<br />

5.3 Strategiese Fokusgebiede 92<br />

6. 2012/<strong>13</strong> – 2014/15 BEGROTING: MEDIUMTERMYN- INKOMSTE-EN-<br />

BESTEDINGSRAAMWERK (‘MTREF’)<br />

6.1 Opsomming van Kapitaalbegroting 97<br />

6.2 Opsomming van Bedryfsbegroting 98<br />

6.3 Kapitaalprojekte (2012/<strong>13</strong> – 2014/15) 99<br />

6.4 Bedryfsprojekte (2012/<strong>13</strong> – 2014/15) 109<br />

6.5 Groot projekte (2012/<strong>13</strong> – 2014/15) 121<br />

80<br />

97<br />

“’n Stad wat met u groei”


VOORWOORD DEUR UITVOERENDE<br />

BURGEMEESTER<br />

Die veranderende en verskuiwende sosio-ekonomiese<br />

dinamika van bestaan in <strong>Buffalo</strong>stad het nogmaals die<br />

strategiese herposisionering van ons ontwikkelings-<br />

en diensleweringsprogramme en -doelstellings nodig<br />

gemaak sodat seker gemaak kan word dat sodanige<br />

programme ingestel is op die hersiene behoeftes van ons<br />

belangegroepe en gemeenskappe.<br />

In dié verband het dit nodig geword om weer na die Metro<br />

se Geïntegreerde Ontwikkelingsplan te kyk, ons ruimtelike<br />

ontwikkelingsraamwerk in heroorweging te neem, en ons<br />

ontwikkelingsaanwysers en -mikpunte vir die 2012/<strong>13</strong><br />

finansiële jaar te hersien.<br />

Die inhoud van hierdie GOP-hersieningsdokument is dus opgestel aan die hand van die nuwe<br />

en opkomende aspirasies en behoeftes van die mense van <strong>Buffalo</strong>stad, soos uitgespreek<br />

op die behoorlik saamgestelde vergarderings van die verskillende gemeenskappe en<br />

belangegroepe wat vir dié doel belê is. Ons glo dat, as die regeringsfeer wat die naaste<br />

aan die mense is, ons ‘n sterk verpligting het om regstreeks, onmiddellik en positief op die<br />

behoeftes en frustrasies van ons belangegroepe en gemeenskappe te reageer.<br />

In die voorlegging van hierdie GOP-hersieningsdokument wil ek die inwoners van <strong>Buffalo</strong>stad<br />

dus bedank vir hulle positiewe reaksie op die oproep om die Metroraad by te staan met<br />

die hersiening van sy ontwikkeling-en-diensleweringsagenda vir die Stad en sy diverse<br />

gemeenskappe. Ons sou nooit dié doelstelling kon verwesenlik het as dit nie was vir die<br />

aktiewe en volgehoue deelname van ons gemeenskappe in die rigting- en tempobepaling van<br />

ons ontwikkelingsprogramme en -projekte nie.<br />

Die strategiese fokusgebiede wat in hierdie GOP-hiersieningsdokument vervat word, sluit die<br />

volgende in: institutionele herstrukturering en stabilisering, werkskepping, die ontwikkeling<br />

van volhoubare gemeenskappe, die oorbrugging van die digitale kloof, die verbetering van<br />

regerings- en finansiële lewensvatbaarheid, asook die opbou van vertroue onder inwoners.<br />

Hierdie document sit ook die spesifieke projekte en programme wat onderneem moet word,<br />

uiteen. Dit sluit onder meer in die voorsiening van bykomende menslike nedersettings,<br />

‘n elektrisiteits- en watertoevoer aan informele nedersettings, vaardigheids- en<br />

sektorontwikkelingsprogramme om ekonomiese ontwikkeling te bevorder en te volhou, en<br />

die skep van ‘n omgewing waarin kwesbare groepe baat kan vind by die Metro se sosioekonomiese<br />

agenda.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

81<br />

“’n Stad wat met u groei”


Ten slotte herbevestig ek graag die verbintenis van die politieke leierskap en bestuur van<br />

die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit tot die taak om die plaaslike belange van ons<br />

mense te dien, binne die konteks van die nasionale prioriteit om ‘n beter lewe vir al ons<br />

mense te skep.<br />

ZUKISWA NCITHA<br />

UITVOERENDE BURGEMEESTER<br />

BUFFALOSTAD METROPOLITAANSE MUNISIPALITEIT<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

82<br />

“’n Stad wat met u groei”


OORSIG DEUR DIE STADSBESTUURDER<br />

Die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit het pas sy<br />

eerste finansiële jaar as ‘n metropolitaanse munisipaliteit<br />

afgesluit, nadat dit in Mei 2011, kort na afloop van die<br />

plaaslike regeringsverkiesing, kategorie ‘A’ of Metrostatus<br />

opgelê is.<br />

Die afgelope twaalf (12) maande is noodwendig gekenmerk<br />

deur kritiese oorgangsaktiwIteite wat daarop gerig was<br />

om ‘n grondslag vir die nuwe metropolitaanse munisipale<br />

organisasie te lê. ‘n Nuwe politieke leierskap is in beide<br />

die wetgewende en uitvoerende strukture van die Raad<br />

ingehuldig. Die Metro het ook wyksverkiesings gehou en<br />

wykskomitees in al die pas afgebakende 50 wyke gestig.<br />

Ingevolge die bepalings van die Wet op Munisipale Strukture (1998) het die <strong>Buffalo</strong>stad<br />

Metropolitaanse Munisipaliteit ook twintig (20) tradisionele leiers in die munisipale Raad<br />

opgeneem.<br />

Uit ‘n strategiese oogpunt het die Metro sy Geïntegreerde Ontwikkelingsplan 2011-2016 op<br />

30 Junie 2011 aanvaar. Die Plan is deur die vorige Raad opgestel. Die hersiening van die<br />

Plan, wat deur die laaste helfte van 2011 en die begin van 2012 gedoen is, het die nuwe Raad<br />

egter in staat gestel om die strategiese agenda wat in die voorheen aanvaarde GOP vervat<br />

is, te heroorweeg.<br />

Die 2012/<strong>13</strong> GOP-hersieningsproses het die volgende faktore en aktiwiteite as grondslag<br />

gehad: Raadsprioriteite; prioriteite wat tydens die Burgemeester se Lekgotlas bepaal is;<br />

Wyksprioriteite: twaalf regeringsuitkomste; sewe uitsette ten opsigte van Uitkoms 9<br />

(plaaslike regering); die Konsep- Nasionale Ontwikkelingsplan wat deur die Nasionale<br />

Beplanningskommissie opgestel is; Millennium-ontwikkelingsdoelstellings; die Provinsiale<br />

Groei-en-Ontwikkelingsplan; en die Nasionale Ruimtelike Ontwikkelingsperspektief.<br />

Die hersiening wat gedoen is, het bevestig dat die Raad se ses (6) strategiese doelstellings<br />

die volgende is:<br />

1. Om ‘n finansieel gesonde organisasie wat sy middele doeltreffend bestuur, te wees;<br />

2. Om ‘n institusioneel doeltreffende en doelmatige Stad wat inklusief met gemeenskappe<br />

saamwerk, te wees;<br />

3. Om ‘n omgewing te skep waarin die ekonomie kan groei, diversifiseer, ‘n groeiende<br />

getal volhoubare werksgeleenthede skep, en tot hoer inkomste en gelykheid bydra;<br />

4. Om volhoubare infrastruktuur te voorsien wat sosiale en ekonomiese ontwikkeling<br />

ondersteun;<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

83<br />

“’n Stad wat met u groei”


5. Om, teen 2016, ‘n goed gestruktureerde en bevoegde instansie te wees wat doeltreffende<br />

en doelmatige dienste aan almal voorsien;<br />

6. Om, teen 2016, alle omgewingsbates en natuurlike hulpbronne binne die <strong>Buffalo</strong>stad<br />

Metropolitaanse Munisipaliteit te verbeter en te beskerm.<br />

Gedurende die hersiening is die volgende nege (9) strategiese fokusgebiede vir insluiting en<br />

inlynbringing met die GOP geïdentifiseer:<br />

1. Institusionele herstrukturering en stabilisering.<br />

2. Verbetering van tussenregeringsbetrekkinge.<br />

3. Bou van vertroue onder inwoners.<br />

4. Oorbrugging van digitale kloof.<br />

5. Verbetering van prestasie, voldoening, prosesse en stelsels.<br />

6. Bou van volhoubare gemeenskappe.<br />

7. Werkskepping.<br />

8. Verbetering van regering.<br />

9. Finansiële lewensvatbaarheid.<br />

Die programme, projekte en aktiwiteite van die Munisipaliteit in die 2012/<strong>13</strong> finansiële jaar<br />

staan in lyn met bogemelde strategiese doelstellings en sleutelfokusgebiede. Ingevolge<br />

die Raad se Prestasiebestuursbeleid en raamwerk, asook ander voldoeningsgebaseerde<br />

verslagdoening sal daar op ‘n maandelikse, kwartaallikse, halfjaarlikse en jaarlikse grondslag<br />

oor die vordering van die Metro en die hantering van die Raad se prioriteite vir die finansiële<br />

jaar verslag gedoen word.<br />

Die Metro se administratiewe pogings om in die diensleweringsbehoeftes van sy gemeenskappe<br />

te voorsien en die kollektiewe verwesenliking van die Raad se leweringsprogram te verseker,<br />

word in hierdie hersiene Geïtegreerde Ontwikkelingsplan (2012/<strong>13</strong>) vervat.<br />

ANDILE FANI<br />

STADSBESTUURDER<br />

BUFFALOSTAD METROPOLITAANSE MUNISIPALITEIT<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

84<br />

“’n Stad wat met u groei”


1. BCMM SE VISIE, MISSIE & WAARDES<br />

1.1 BCMM sE VISIE<br />

Deur strategiese beplanningsessies het die leierskap van die Munisipaliteit die visie en<br />

missie van die organisasie hersien om dit meer robuust, verstaanbaar en realisties te maak,<br />

waardeur dit ‘n nuttige instrument geword het om die aksies van die Stad, sy inwoners en<br />

sleutelbelanghebbendes in die ontwikkelingsproses te lei.<br />

’n Lantermynvisie van die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit is om die volgende te<br />

wees:<br />

1.2 BCMM sE MISSIE<br />

“’n responsiewe, mens- en ontwikkelingsgerigte Stad”<br />

In nastrewing van dié visie streef die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit daarna om<br />

‘n stad te wees wat:<br />

• ‘n Kultuur van goeie regering bevorder;<br />

• Doeltreffende en doelmatige munisipale dienste verskaf;<br />

• Belê in die ontwikkeling en behoud van menslike kapitaal om die stad en sy<br />

gemeenskap te dien;<br />

• Maatskaplike en gelyke ekonomiese ontwikkeling bevorder;<br />

• Munisipale volhoubaarheid en finansiële lewensvatbaarheid verseker;<br />

• ‘n Veilige en gesonde omgewing skep; en<br />

• Batho Pele-beginsels die kern van dienslewering maak.<br />

1.3 BCMM SE KERNWAARDES<br />

Die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit streef die volgende waardes na en is daartoe<br />

verbind om sy gemeenskappe te dien en dienste te lewer op ‘n wyse wat die volgende<br />

weerspieël:<br />

(i) Integriteit<br />

(ii) Goeie regering<br />

(iii) Deursigtigheid<br />

(iv) Rekenpligtigheid<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

85<br />

“’n Stad wat met u groei”


(v) Billikheid en gelykheid<br />

(vi) Professionalisme<br />

(vii) Getrouheid<br />

(viii) Uitmuntende diens<br />

(ix) Respek vir kulturele diversiteit<br />

(x) Eenheid van doel<br />

(xi) Ubuntu<br />

2. WAT IS ‘N GOP?<br />

Ingevolge die Wet op Munisipale Stelsel (32 van 2000) word ‘n GOP omskryf as ‘n strategiese<br />

beplanningsinstrument wat alle munisipale ontwikkeling in die Stad lei en informeer. Dit<br />

is die sleutelinstrument wat die Munisipaliteit in staat stel om die verwesenliking van sy<br />

ontwikkelingsdoelstellings, soos in die Grondwet geskets, na te streef.<br />

Dit bestaan uit ‘n langtermynvisie. Dit verstrek besonderhede van die ontwikkelingsprioriteite<br />

en -doelstellings wat tot die verwesenliking van hierdie visie bydra. Dit weerspieël strategieë<br />

wat deur die besonderhede in die begroting onderskryf word, wat aan die GOP gekoppel<br />

moet wees.<br />

‘n GOP wat deur die Raad van ‘n munisipaliteit aanvaar is, dien as daardie munisipaliteit<br />

se hoof- strategiese beplanningsinstrument wat alle beplannings- en ontwikkelingsbesluite<br />

binne die munisipale gebied lei en informeer.<br />

Artikel 34 van die Wet op Munisipale Stelsels bepaal dat Geïntegreerde Ontwikkelingsplanne<br />

jaarliks hersien word ingevolge ‘n evaluering van die prestasiemaatreëls wat daarin vervat<br />

word en in die mate wat deur veranderende omstandighede vereis word. Daar word ook van<br />

die Raad verlang om die proses wat vir die hersiening van die GOP gevolg sal word, op skrif<br />

te stel. Die Prosesplan moet die volgende insluit:<br />

• ‘n Program wat die tydsraamwerke uiteensit.<br />

• Die konsultasieprosesse en -prosedures.<br />

• Geidentifiseerde planne en beplanningsvereistes wat bindend op die Munisipaliteit is.<br />

• GOP- en Begrotingsprosesse/-programme wat in lyn gebring moet word.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

86<br />

“’n Stad wat met u groei”


Die GOP-hersiening vir 2012/<strong>13</strong> is onderneem as deel van die deurlopende siklus van<br />

beplanning, implementering en monitoring, soos geïllustreer in onderstaande Figuur.<br />

PRESTASIE-<br />

BESTUUR<br />

GOP-<br />

IMPLEMENTERING<br />

FIGUUR A.1: GOP-ontwikkelingsproses<br />

3. WAT IS ‘N BEGROTING?<br />

1. VOORBEREIDING VIR GOP<br />

HERSIENINGSDOKUMENT<br />

2. MONITERING & EVALUERING –<br />

BYGEWERKTE ONTLEDING<br />

3. VERFYNDE DOELSTELLINGS, STRATEGIEË,<br />

AANWYSERS & PROJEKTE & PROGRAMME<br />

(GEKOPPEL AAN BEGROTING)<br />

4. KONSOLIDEER GOP<br />

(INSLUITEND BEDRYFSPLANNE)<br />

5. GOEDKEURING - RAAD AANVAAR GOP &<br />

BEGROTING<br />

‘n Begroting is ‘n plan wat die aktiwiteite wat vir die komende finansiële jaar beplan word,<br />

in finansiële terme opsom deur die besteding uiteen te sit wat aangegaan sal word om<br />

uitvoering aan gemelde aktiwiteite te gee, asook die inkomste en kapitaal wat nodig is om<br />

gemelde besteding te finansier.<br />

Daar is twee tipes begrotings: Die bedryfsbegroting en die kapitaalbegroting.<br />

Die bedryfsbegroting behels die aankoop van goedere en dienste, waarvoor daar ‘n<br />

korttermynvoordeel sal wees. Bedryfsuitgawes sluit in salarisse, lone, herstelwerk en<br />

instandhouding, telefone en materiaal.<br />

Bedryfsinkomste is kontant verkry uit munisipale handelsrekenings, soos water, elektrisiteit,<br />

belasting en ander dienste.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

87<br />

OPENBARE DEELNAME<br />

“’n Stad wat met u groei”


Die kapitaalbegroting spesifiseer die besteding aan langtermyn-aankope en -beleggings,<br />

soos grond en geboue, motorvoertuie, masjinerie en toerusting, asook kantoormeubels. Dit<br />

sit die besteding aan goedere wat wesenlik vir langer as een finansiële jaar gebruik sal word,<br />

uiteen en sluit in die bou van paaie, geboue en voertuie.<br />

‘n Maklike manier om tussen die twee begrotings te onderskei, is om aan die aankoop van<br />

‘n motor te dink. ‘n Motor word onder die kapitaalbegroting aangekoop, omdat dit vir langer<br />

as een jaar gebruik sal word. Die brandstof waarop die motor loop en die onderhoud, is<br />

bedryfskoste en maak dus deel van die bedryfsbegroting uit.<br />

In ontwikkelings- plaaslike regering moet die GOP en Begroting gekoppel wees en word dit<br />

dus jaarliks hersien om skakeling met en die gemeenskap se goedkeuring vir die Stad se<br />

program te verkry.<br />

Totale Begroting 2012/<strong>13</strong> – 2014/15<br />

2011/12<br />

M/J HERSIENINGS-<br />

BEGROTING<br />

R000<br />

2012/<strong>13</strong><br />

R000<br />

88<br />

20<strong>13</strong>/14<br />

R000<br />

2014/15<br />

R000<br />

Bedryfsbegroting 3,448,368,587 3,966,637,294 4,453,7<strong>13</strong>,893 4,924,341,303<br />

Kapitaalbegroting 725,646,383 749,097,271 879,840,714 876,057,416<br />

Totale Begroting 4,174,014,970 4,715,734,565 5,333,554,607 5,774,398,719<br />

4. DIE GOP-PROSES WAT GEVOLG IS<br />

Artikel 28(1) van die Wet op Munisipale Stelsels vereis dat elke munisipaliteit ‘n proses op<br />

skrif stel en aanvaar wat as gids by die beplanning, opstel, aanvaarding en hersiening van<br />

sy Geïntegreerde Ontwikkelingsplan (GOP) moet dien. Ter voldoening aan hierdie vereiste<br />

het die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit die Plan op 26 Oktober 2011 aanvaar.<br />

Sleutelaktiwiteite wat ingevolge die hersiening van die GOP-begroting vir 2012/<strong>13</strong> onderneem<br />

is, sluit die volgende in:<br />

• 11 Oktober 2011 – ‘n werkwinkel is met BCMM-Raadslede en topbestuur belê.<br />

Die doel van die werkswinkel was onder meer om die konsep van geïntegreerde<br />

ontwikkelingsbeplanning te verduidelik en die rol van Raadslede, wykskomitees en ander<br />

belangegroepe te verduidelik; die GOP-begrotings-/ prestasiebestuurshersieningsproses<br />

vir die 2012/<strong>13</strong> finansiële jaar bekend te stel en ‘n gedeelde begrip van die proses<br />

te bevorder; en om ‘n proses in te stel waarvolgens wyksprioriteite wat die GOPbegrotingshersiening<br />

vir 2012/<strong>13</strong> sal informeer, geïdentifiseer word.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

“’n Stad wat met u groei”


• 26 Oktober 2011 – Raad het die GOP/Begroting/Prestasiebestuurstelsel-prosesplan<br />

aanvaar.<br />

• 4 November 2011 – ‘n Vergadering is oor die GOP/Begroting/Prestasiebestuurstelsel se<br />

Forum van Eksterne Verteenwoordigers gehou om institusionele prestasie oor die vorige<br />

finansiële jaar te oorweeg en om eksterne belanghebbendes voor te berei op die GOPontwikkelingsproses<br />

wat voorlê;<br />

• 11 en 14 November 2011 – ‘n Tegniese Werkgroepvergadering oor die GOP/Begroting/<br />

Prestasiebestuurstelsel is belê, waartydens sektorplankampioene ‘n samevatting van<br />

hul planne aangebied het ten einde inligting te verkry wat tydens die situasionele<br />

ontledingsfase geïntegreer kan word;<br />

• GOP strategiese werkgroepe het vergaderings belê om hul situasionele ontledingsverslae<br />

te bespreek en te voltooi. Die volgende vergaderings is in dié verband gehou:<br />

* Strategiese Werkgroep vir Finansies en Ondersteuningsdienste: 23 November 2011<br />

* Strategiese Werkgroep vir Munisipale Dienste: 25 November 2011<br />

* Strategiese Werkgroep vir Ontwikkelingsbeplanning en Bestuur: 30 November 2011<br />

* Strategiese Werkgroep vir Ontwikkelingsfasilitering en Vennootskappe: 20 Desember<br />

2011<br />

• 28 November 2011 – Die Stad het ‘n tegniese tussenregeringsbetrekkinge-sessie met<br />

provinsiale en nasionale regerings-departemente asook instansies in die burgerlike<br />

gemeenskap gehou om gesamentlike beplanning te bevorder en om inligting uit te ruil<br />

oor inisiatiewe wat binne die munisipale gebied onderneem word.<br />

• 19-21 Februarie 2012 – Die Burgemeester se Lekgotla is gehou om ‘n situasionele<br />

ontleding van die Stad te bespreek en om die weg vorentoe te bepaal ten opsigte van<br />

sleutel- strategiese prioriteite wat die hersiening van die GOP en begroting vir die<br />

2012/<strong>13</strong> finansiële jaar sal lei.<br />

• 11-<strong>13</strong> Maart 2012 –‘n Tegniese beplanningsessie is belê met die volgende oogmerke:<br />

* Om ‘n probleemverklaring oor die ontwikkelingsbaan (‘trajectory’) van die Metro op te<br />

stel.<br />

* Om die politieke mandaat (Lekgotla-lewerbares) met strategiese doelstellings in lyn<br />

te bring ten einde die Metro se uitdagings die hoof te bied.<br />

* Om die BCMM en ander regeringsfere se beplanning in lyn te bring.<br />

* Om sleutel- strategiese fokusgebiede vir 2012 en verder, wat die ontwikkelingsbaan<br />

van die Metro sal lei, te bepaal.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

89<br />

“’n Stad wat met u groei”


• 23 Maart 2012 – ‘n GOP/Begrotingsessie vir Raadslede is by die Regent-hotel gehou om<br />

die volgende te oorweeg:<br />

* Die konsep- situasionele ontleding van die BCMM.<br />

* Die uitkomste van die Burgemeester se lekgotla en die tegniese beplanningsessie.<br />

* Die Begroting vir die Konsep-GOP 2012/<strong>13</strong> en Mediumtermyn-inkomste-enbestedingsraamwerk<br />

(‘MTREF’)<br />

• 28 Maart 2012 – Tabulering in Raad van die Konsep-2012/<strong>13</strong> GOP-hersiening en<br />

2012/<strong>13</strong> Mediumtermyn-inkomste-en-bestedingsraamwerk (‘MTREF’) vir goedkeuring;<br />

• 16-17 April 2012 – ‘n GOP/Begrotingsessie vir Raadslede om wysigings aan die Konsep-<br />

GOP/Begroting en die beoogde GOP/Begroting- openbare sessies (‘roadshows’) te<br />

oorweeg.<br />

• 23-30 April 2012 – GOP/Begroting- openbare sessies (‘roadshows’) is in 15 lokale<br />

regdeur die Metro gehou.<br />

• 4 Mei 2012 – ‘n GOP/Begroting-sakeontbyt is gehou om met belanghebbendes<br />

uit die sakesektor oor die Konsep-GOP 2012/<strong>13</strong> en Mediumtermyn-inkomste-enbestedingsraamwerk<br />

(‘MTREF’) oorleg te pleeg.<br />

• 25 Mei 2012 – Die Raad se Ope Dag om terugvoering oor die uitkoms van die GOP/<br />

Begroting- openbare sessies (‘roadshows’) aan eksterne belangegroepe te gee.<br />

• 29 Mei 2012 – Aanvaarding van die GOP-hersiening 2012/<strong>13</strong> en Begroting vir die<br />

Mediumtermyn-inkomste-en-bestedingsraamwerk (‘MTREF’).<br />

5. GOP-INLIGTINGSBRONNE EN STRATEGIESE<br />

FOKUSGEBIEDE<br />

5.1 INLIGTINGSBRONNE VIR DIE GOP<br />

Die GOP-proses is binne die raamwerk van Nasionale, Provinsiale en Distriksbeleidsrigtings<br />

en –wetgewing onderneem. Die volgende het as inligtingsbronne vir die ontwikkeling van<br />

die GOP gedien:<br />

• Wyksprioriteite;<br />

• Prioriteite van die Burgemeester se lekgotla, wat op 19 tot 21 Februarie 2012 gehou is;<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

90<br />

“’n Stad wat met u groei”


• 12 uitkomste van die regering;<br />

• Uitkomste van die tegniese beplanningsessie wat op 11 tot <strong>13</strong> Maart 2012 gehou is;<br />

• Die Konsep-nasionale ontwikkelingsplan wat deur die Nasionale Beplanningskommissie<br />

opgestel is;<br />

• Millennium-ontwikkelingsdoelstellings;<br />

• Provinsiale Groei-en-Ontwikkelingsplan;<br />

• Nasionale Ruimtelike Ontwikkelingsperspektief.<br />

5.2 SLEUTEL- STRATEGIESE DOELSTELLINGS<br />

Voortspruitend uit ‘n situasionele ontleding wat met die oog op die ontwikkeling van die<br />

GOP gedoen is, het die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit ‘n aantal uitdagings en<br />

struikelblokke geïdentifiseer wat ‘n uitwerking het op die wyse waarop die Munisipaliteit<br />

funksioneer en uitvoering gee aan sy mandaat ingevolge Artikel 152 van die Suid-Afrikaanse<br />

Grondwet. Uitdagings wat die Metro in die gesig staar, sluit in die krimpende inkomstebasis<br />

en swak bestuur van hulpbronne, ondoeltreffendhede wat die manier beperk waarop die Stad<br />

in wisselwerking met die gemeenskappe tree, verouderende infrastruktuur en uitgestelde<br />

instandhoudingswerk, strukturele ondoeltreffendhede wat swak diensleweringstandaarde<br />

tot gevolg het, swak ekonomiese groei en ‘n hoë werkloosheidsyfer, en kwesbare<br />

omgewingsbates en natuurlike hulpbronne.<br />

Om die geïdentifiseerde uitdagings die hoof te bied en tot die verwesenliking van die visie te<br />

werk, het die Stad sewe strategiese fokusgebiede geïdentifiseer en die volgende langtermyn-<br />

strategiese doelstellings gestel:<br />

1.4.1 BCMM 1: Om ‘n finansieel gesonde organisasie te wees wat sy hulpbronne<br />

doeltreffend bestuur;<br />

1.4.2 BCMM 2: Om ‘n institusioneel doeltrefffende en doelmatige Stad te wees wat<br />

inklusief met gemeenskappe saamwerk;<br />

1.4.3 BCMM 3: Om ‘n bevorderlike omgewing te skep vir ‘n groeiende ekonomie<br />

wat besig is om te diversifiseer en ‘n groeiende aantal volhoubare<br />

werksgeleenthede genereer en wat tot verhoogde inkomste en gelykheid<br />

lei;<br />

1.4.4 BCMM 4: Om volhoubare infrastruktuur te verskaf wat maatskaplike en<br />

ekonomiese ontwikkeling steun;<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

91<br />

“’n Stad wat met u groei”


1.4.5 BCMM 5: Om ‘n goed gestruktureerde en bevoegde organisasie te skep wat teen<br />

2016 doeltreffende en doelmatige dienste aan almal lewer;<br />

1.4.6 BCMM 6: Om alle omgewingsbates en natuurlike hulpbronne binne die <strong>Buffalo</strong>stad<br />

Metropolitaanse Munisipaliteit teen 2016 te verbeter en te beskerm.<br />

Die Metro het die sleutel- strategiese doelstellings in lyn gebring en sal daarna streef om dit<br />

binne die konteks van die vyf sleutelprestasiegebiede van plaaslike regering te verwesenlik.<br />

5.3 STRATEGIESE FOKUSGEBIEDE<br />

Indien die heersende ekonomiese omgewing en die globale faktore wat ‘n uitwerking op<br />

ontwikkeling het, in aanmerking geneem word, het die Stad wesenlike vordering gemaak om<br />

die sleuteluitdagings wat die Munisipaliteit in sy ontwikkeling in die gesig staar, die hoof te<br />

bied. Meer werk moet egter gedoen word ten opsigte van die geïdentifiseerde fokusgebiede.<br />

Oor die volgende vyfjaartermyn sal die Stad op die volgende nege strategiese fokusgebiede<br />

konsentreer:<br />

5.3.1 Institusionele herstrukturering en stabilisering<br />

Die <strong>Buffalo</strong>stad Metropolitaanse Munisipaliteit is tans besig met ‘n proses om sy administrasie<br />

te herstruktureer en te stabiliseer. Dit behels die vul van poste op die goedgekeurde<br />

makrostruktuur, d.w.s. die Stadsbestuurder en Artikel 56-bestuurders.<br />

Die medium- tot langtermyndoelstelling van die Metro is om organisatoriese doeltreffendheid<br />

te bevorder deur personeel meer bevoeg te maak en stelsels in te stel om personeel in staat<br />

te stel om hul pligte doeltreffend te verrig, in lyn met die nuwe Metro-funksies.<br />

5.3.2 Verbetering van tussenregeringsbetrekkinge<br />

Artikel 41 van die Suid-Afrikaanse Grondwet van 1996 bevat die beginsels van kooperatiewe<br />

regering en tussenregeringsbetrekkinge; dit verskaf ‘n breë raamwerk van hoe die<br />

verskillende regeringsfere moet saamwerk. Artikel 4 van die Wet op die Raamwerk vir<br />

Tussenregeringsbetrekkinge (Nr. <strong>13</strong> van 2005) lui voorts dat die doel van die Wet is om<br />

‘n raamwerk te bied waarbinne die nasionale regering, provinsiale regerings en plaaslike<br />

regerings, asook alle regeringsorganisasies binne daardie regerings, koördinasie in die<br />

implementering van Beleidsrigtings en Wetgewing kan bevorder. Die Wet vereis voorts dat<br />

provinsiale en distrik-tussenregeringsforums gestig word om tussenregeringsbetrekkinge<br />

tussen provinsies, distrikte en munisipaliteite te bevorder en te fasiliteer.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

92<br />

“’n Stad wat met u groei”


Artikel 3 van die Wet op Munisipale Stelsels (Nr. 32 van 2000), soos gewysig, omskryf voorts<br />

hoe plaaslike regering koöperatiewe benaderings tot die regering, die deel van middele en die<br />

oplossing van verskille binne die konteks van tussenregeringsbetrekkinge moet ontwikkel.<br />

Ten spyte van die bepalings van bogemelde wetgewing laat tussenregeringsbetrekkinge<br />

tussen die BCMM en ander regeringsfere steeds veel te wense oor, aangesien die betrekkinge<br />

steeds gekenmerk word deur die ongekoördineerde:<br />

• Inlynbringing van beplanning en implementering.<br />

• Samewerking tussen die sfere.<br />

• Deel van inligting oor ontwikkelingsprogramme en -projekte.<br />

• Deelname aan platforms vir oorlegpleging en samewerking; en<br />

• Benadering tot oorlegpleging met en konsultering van gemeenskappe.<br />

5.3.3 Bou van vertroue onder inwoners<br />

Swak prestasie in terme van dienslewering, administratiewe en politieke onstabiliteit, en<br />

negatiewe mediadekking het grootliks bygedra tot ‘n lae vlak van vertroue onder inwoners<br />

in die Stad.<br />

Die omswaai van hierdie tendens en die bou van vertroue onder inwoners sal ‘n doelgerigte<br />

poging aan die kant van die Metro vereis. Dit sal ook vereis dat ‘n nuwe werksetiek posvat<br />

onder almal wat die naam en merk (‘brand’) van die Munisipaliteit dra, asook die toepassing<br />

van goeie regerings- en bestuursbeginsels, toewyding en professionaliteit.<br />

5.3.4 Oorbrugging van die digitale kloof (‘digital divide’)<br />

Die digitale kloof verwys na enige ongelykhede tussen sosiale groepe ten opsigte van<br />

hul toegang tot, gebruik van, of kennis van inligtings- en kommunikasietegnologieë. Die<br />

kloof (“divide”) binne die munisipale gebied verwys na ongelykhede tussen individue,<br />

huishoudings, sakeondernemings en geografiese gebiede wat op verskillende sosioekonomiese<br />

en ander demografiese vlakke verkeer. Aangesien die Metro hoofsaaklik landelik<br />

is, manifesteer die kloof in die groot verskil tussen stedelike en landelike gebiede in toegang<br />

tot telekommunikasie- en inligtingtegnologiestelsels.<br />

‘n Sleuteldoelstelling van die Metro is om die internasionale versoenbaarheid van<br />

telekommunikasie- en inligtingtegnologiestelsels te verseker, waardeur toegang tot<br />

breëband- en/of ander moderne tegnologieë vir die inwoners van die Stad en streek<br />

gefasiliteer sal word.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

93<br />

“’n Stad wat met u groei”


5.3.5 Verbetering van prestasie, voldoening, prosesse en stelsels<br />

Sommige van die tekortkominge wat ‘n negatiewe uitwerking op die prestasie van die Metro<br />

het, het betrekking op gedisintegreerde stelsels, tekortkominge in interne kontrole, ‘n tekort<br />

aan personeel met die vereiste bevoegdhede, ‘n ruimtelik gefragmenteerde werksmag, asook<br />

‘n gebrek aan duidelik omskrewe prosesse en stelsels.<br />

Die volgende is nodig:<br />

• Ontwikkeling van meganismes vir die akkurate en volledige rapportering van finansiële<br />

inligting, soos vereis deur Nasionale Tesourie en Rekeningkundige Standaarde.<br />

• Ontwikkelingvanmeganismesomteversekerdatvoorsieningskettingbestuursprosesse<br />

(‘SCM operations’) streng aan regsvereistes voldoen.<br />

• Voorsiening moet gemaak word vir die migrasie van bestaande rekords en die<br />

vaslegging van lopende rekords binne ‘n enkele bewaarplek, ooreenkomstig die<br />

standaarde wat deur die Argiewewet en ander betrokke wetgewing voorgeskryf<br />

word en daar moet seker gemaak word dat sodanige rekords vir toekomstige gebruik<br />

getrek kan word.<br />

5.3.6 Ontwikkeling van volhoubare gemeenskappe<br />

Die fokuspunt oor die afgelope jare was op die lewering van basiese dienste en behuising. Ten<br />

spyte van die oorblywende agterstande is groot vordering in dié verband gemaak. ‘n Groot<br />

uitdaging is steeds om te verseker dat ons nie bloot huise voorsien nie, maar geïntegreerde<br />

en volhoubare nedersettings skep.<br />

Die uitdaging lê nie net daarina om basiese dienste en behuising te lewer nie, maar ook om<br />

volhoubare menslike nedersettings te bou waarin inwoners toegang geniet tot sosiale en<br />

gemeenskapsfasiliteite, ekonomiese geleenthede, ‘n gesonde en volhoubare omgewing en<br />

waarin gerieflike openbare vervoer- en veilige padnetwerke dit vir inwoners moontlik maak<br />

om toegang tot geleenthede te kry.<br />

Integraal tot die skepping van ‘volhoubare menslike nedersettings’ is geïntegreerde beplanning<br />

en implementering. Die Metro is tans in die proses om ‘n ‘Geïntegreerde Volhoubare Menslike<br />

Nedersettingsplan’ te ontwikkel, wat rigting aan toekomstige beleggings en ontwikkeling sal<br />

gee.<br />

Die skep van geïntegreerde en volhoubare menslike nedersettings sal regstreeks bydra<br />

tot die bou van sterk en geïntegreerde gemeenskappe wat weerstandig teen ongunstige<br />

maatskaplike, ekonomiese en natuurlike faktore is.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

94<br />

“’n Stad wat met u groei”


5.3.7 Werkskepping<br />

Die Stad erken dat swak ekonomiese groei en ‘n hoë werkloosheidsyfer steeds geld en groot<br />

uitdagings verteenwoordig. ‘n Uitvloeisel hiervan is ‘n betreklik hoë vlak van armoede, wat<br />

wydverspreid binne die Stad voorkom. Die hoë armoedevlak blyk duidelik uit statistiek in die<br />

2001 Sensus, waarvolgens ongeveer 70% van die huishoudings in die Stad ‘n inkomste van<br />

minder as R1500 per maand verdien, met 28% van alle huishoudings wat geen inkomste<br />

hoegenaamd ontvang nie. Die werkloosheidsyfer binne die Metro word op ongeveer 24%<br />

geraam.<br />

Een van die uitdagings in die toekomstige ontwikkeling van die <strong>Buffalo</strong>stad Metro is ‘n gebrek<br />

aan toepaslike onderwys- en vaardigheidsvlakke. ‘n Wesenlike persentasie van die Metro<br />

se potensiële arbeidsmag het nie skoolonderrig ontvang of hul primêre skoolfase voltooi<br />

nie. Daarbenewens, volgens die jongste Sensus, wat in 2001 gehou is, beskik net 21% van<br />

die Stad se inwoners wat 20 jaar of ouer is oor ‘n Graad 12-kwalifikasie; 16% het naskoolse<br />

onderrig ontvang; terwyl net 17% van diegene in die ouderdomsgroep 15 - 24 jaar met<br />

naskoolse studie besig was. Die 2007-gemeenskapsopname het ‘n geringe verbetering<br />

aangetoon.<br />

Die Stad sal homself oor die volgende vyf jaar daarop toespits om die situasie deur ‘n<br />

aantal programme te verbeter, veral deur plaaslike ekonomiese ontwikkelingsprogramme,<br />

om beleggers na die Stad te lok en daardeur die nasionale opdrag van werkskepping te<br />

gehoorsaam.<br />

<strong>Buffalo</strong>stad beskik oor ‘n aantal sterk punte wat stukrag aan groei en ontwikkeling kan verleen.<br />

‘n Paar van die voordele wat ontgin kan word om armoede te bestry en werksgeleenthede te<br />

skep, is die Stad se ligging aan die kus, die ongerepte natuur, ‘n presterende motorbedryf en<br />

die status dat dit die hoofstad van die Oos-Kaapprovinsie is.<br />

5.3.8 Verbetering van Regering<br />

Korrupsie en swak dienslewering ondermyn die geloofwaardigheid van die regering. As ‘n<br />

regering swak geloofwaardigheid het, ontwikkel ‘n demokratiese agterstand, wat demokrasie<br />

en beleggersvertroue ondermyn. Swak plaaslike regering lei tot lae beleggersvertroue in<br />

sowel regerings- as privaatsektorbesluite. Swak regering lei tot swak ekonomiese prestasie.<br />

‘n Stad wat goed bestuur word, het ‘n duidelike en deursigtige agenda vir langtermyn-<br />

strategiese werk in samewerking met alle belangegroepe geformuleer en dit aan alle partye<br />

wat deur die ontwikkelingsproses geraak word, gekommunikeer. ‘n Stad wat goed bestuur<br />

word, is afhanklik van ‘n wederkerige benadering deur ander regeringsfere en agentskappe.<br />

Verhoogde terugvoering van en oorlegpleging met die gemeenskap en groter terugvoer van<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

95<br />

“’n Stad wat met u groei”


klante is ander positiewe maatreëls wat in ‘n demokratiese en goed bestuurde stad aangetref<br />

word.<br />

Dit beteken ook dat basiese dienste van gehalte voorsien word deur ‘n finansieel gesonde en<br />

duidelike beleggingsraamwerk, wat in lyn is met die intervensies van ander verskaffers van<br />

basiese dienste in die openbare sektor.<br />

5.3.9 Finansiële volhoubaarheid<br />

Ten einde dit vir die Metro moontlik te maak om uitvoering te gee aan sy mandaat, soos wat<br />

in die Grondwet van Suid-Afrika vervat word, moet finansiële volhoubaarheid gehandhaaf<br />

word en moet sy inkomstebasis teenoor uitgawes vergroot word. Robuuste strategieë is<br />

nodig om die bestaande dilemma van ‘n afhanklikheid van toelaes om te swaai en te verseker<br />

dat die Stad oor die volgende vyf jaar en verder in ‘n finansieel gesonde posisie sal verkeer.<br />

Ten einde finansieel volhoubaar te word, sal die Stad meganismes vir die optekening en<br />

bestuur van die finansiële middele van die Munisipaliteit instel en nuwe inkomstestrome<br />

ondersoek en ontwikkel.<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

96<br />

“’n Stad wat met u groei”


6. 2012/<strong>13</strong> – 2014/15 BEGROTING:<br />

MEDIUMTERMYN- INKOMSTE-EN-<br />

BESTEDINGSRAAMWERK (‘MTREF’)<br />

6.1 OPSOMMING VAN<br />

2012/20<strong>13</strong> - 2014/2015 KAPITAALBEGROTING PER BEFONDSING<br />

Befondsing<br />

97<br />

2012/20<strong>13</strong><br />

Kapitaalbegroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

begroting<br />

2014/2015<br />

Kapitaal-<br />

begroting<br />

Eie fondse 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />

Totale Eie Befondsing 120 079 023 <strong>13</strong>2 723 000 124 220 000<br />

Geïntegreerde Nasionale Elektrifiseringsprogram (INEP) 30 000 000 30 000 000 20 000 000<br />

Elektrisiteit: Vraagkantbestuurstoelae 10 000 000 0 0<br />

Buurtontwikkelings-vennootskaptoelae 0 0 8 828 000<br />

Openbare Vervoerinfrastruktuur en Stelseltoelae (PTIS) 78 702 000 78 762 000 0<br />

Stedelike Nedersettings: Ontwikkelingstoelae 491 145 828 602 860 000 680 691 000<br />

Menslike Nedersettings: Ontwikkelingstoelae 19 170 420 35 495 714 16 318 416<br />

Totale toelaes 629 018 248 747 117 714 725 837 416<br />

TOTAAL PER BEFONDSING 749 097 271 879 840 714 850 057 416<br />

2012/20<strong>13</strong> - 2014/2015 KAPITAALBEGROTING PER DIREKTORAAT<br />

Direktoraat<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

begroting<br />

2014/2015<br />

Kapitaal-<br />

begroting<br />

1. Uitvoerende Ondersteuningsdienste 4 500 000 2 000 000 0<br />

2. Kantoor van die Munisipale Bestuurder 0 0 0<br />

3. Hoofbedryfsbeampte 72 089 020 1<strong>13</strong> 700 478 111 064 024<br />

4. Direktoraat: Finansiële Dienste 3 600 000 3 000 000 3 000 000<br />

5. Direktoraat: Korporatiewe Dienste 32 600 000 23 250 000 25 750 000<br />

6. Direktoraat: Ingenieursdienste 411 259 273 473 614 293 484 773 392<br />

7. Direktoraat: Ontwikkelingsbeplanning 191 920 978 210 762 000 107 000 000<br />

8. Direktoraat: Gesondheid en Openbare Veiligheid 10 128 000 8 473 000 <strong>13</strong> 470 000<br />

9. Direktoraat: Gemeenskapsdienste 23 000 000 45 040 943 105 000 000<br />

749 097 271 879 840 714 850 057 416<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

“’n Stad wat met u groei”


6.2 OPSOMMING VAN BEDRYFSBEGROTING<br />

2012/20<strong>13</strong> - 2014/2015 BEDRYFSBEGROTING PER BEFONDSING<br />

BEDRYFSBEGROTING<br />

98<br />

2012/20<strong>13</strong><br />

Bedryfs-<br />

begroting<br />

20<strong>13</strong>/2014<br />

Bedryfs-<br />

begroting<br />

2014/2015<br />

Bedryfsbegroting<br />

Eie fondse 38 800 000 55 647 500 50 340 000<br />

Totale Eie Befondsing 38 800 000 55 647 500 50 340 000<br />

Finansiesbestuurstoelae 1 500 000 1 500 000 1 500 000<br />

Ontwikkelingstoelae: Infrastrukturele vaardighede 3 000 000 3 800 000 4 000 000<br />

Stedelike Nedersettings: Ontwikkelingstoelae 8 328 172 10 445 000 5 850 000<br />

Terugeise: Grondeisekommissie 300 000 300 000 0<br />

Plaaslike regering en behuising 77 000 0 0<br />

Ontwikkelingstoelae: Menslike Nedersettings 111 645 824 168 849 664 179 337 305<br />

Departement van Waterwese – DoRA 1 283 000 0 0<br />

Departement van Waterwese – Provinsiaal 400 000 0 0<br />

Departement van Waterwese – Versnelde Gemeenskapinfrastruktuurprogram<br />

(‘ACIP’)<br />

1 975 000 125 000 0<br />

Totale toelaes 128 508 996 185 019 664 190 687 305<br />

TOTAAL PER BEFONDSING 167 308 996 240 667 164 241 027 305<br />

2012/20<strong>13</strong> - 2014/2015 BEDRYFSBEGROTING PER BEFONDSING<br />

2012/20<strong>13</strong><br />

Bedryfs-<br />

begroting<br />

20<strong>13</strong>/2014<br />

Bedryfs-<br />

begroting<br />

2014/2015<br />

Bedryfs-<br />

begroting<br />

1.Uitvoerende Ondersteuningsdienste 5 650 000 7 680 000 4 680 000<br />

2. Kantoor van die Munisipale Bestuurder 6 200 000 8 200 000 8 200 000<br />

3. Hoofbedryfsbeampte 110 458 446 173 079 464 186 206 905<br />

4. Direktoraat: Finansiële Dienste 4 620 000 6 220 000 4 220 000<br />

5. Direktoraat: Korporatiewe Dienste 9 150 000 8 450 000 7 700 000<br />

6. Direktoraat: Ingenieursdienste 8 658 000 7 125 000 0<br />

7. Direktoraat : Ontwikkelingsbeplanning 22 572 550 29 912 700 30 020 400<br />

8. Direktoraat: Gesondheid en Openbare Veiligheid 0 0 0<br />

9. Direktoraat: Gemeenskapsdienste 0 0 0<br />

167 308 996 240 667 164 241 027 305<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

“’n Stad wat met u groei”


6.3 KAPITAALPROJEKTE 2012/<strong>13</strong> – 2014/15<br />

2014/2015<br />

Kapitaal-<br />

Begroting<br />

KosteStrategie- 2012/20<strong>13</strong> 20<strong>13</strong>/2014<br />

Wyks-<br />

Bron van<br />

sentrumkode (uit die<br />

Naam van projek<br />

Kapitaal- Kapitaalnommer<br />

befondsing<br />

nommer GOP)<br />

Begroting Begroting<br />

SLEUTELPRESTASIE-AANWYSER 1: MUNISIPALE TRANSFORMASIE EN ORGANISATORIESE ONTWIKKELING<br />

Naam van<br />

kostesentrum<br />

Eie fondse 2 500 000 1 500 000 1 000 000<br />

Electroniese<br />

bywoningsbeheerstelsel<br />

420005 MTOD03 NVT<br />

Menslikehulpbronadministrasie<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Eie fondse 20 000 000 20 750 000 23 750 000<br />

IT-stelsels (batebestuur,<br />

voorsienings-kettingbestuur<br />

(SCM), begrotingsraming<br />

en -modellering,<br />

aanvraagbestuurstelsel,<br />

brandstofbestuurstelsel en<br />

voorraadkoderingstelsel<br />

415025 MTOD06 NVT<br />

Bestuursinligtingsdienste<br />

415025 MTOD07 NVT IT-Infrastruktuurnetwerk Eie fondse 4 600 000 0 0<br />

Bestuursinligtingsdienste<br />

99<br />

Eie fondse 4 500 000 0 0<br />

Rampherstelsentrum<br />

(inligting- en<br />

kommunikasietegnologie)<br />

415025 MTOD07 NVT<br />

Bestuursinligtingsdienste<br />

415025 MTOD07 NVT Rekenaartoerusting – BCMM Eie fondse 500 000 1 000 000 1 000 000<br />

Bestuursinligtingsdienste<br />

Eie fondse 500 000 0 0<br />

Opgradering van BCMMwebtuiste<br />

(insluitend GIS op<br />

internet<br />

415205 MTOD08 NVT<br />

Bestuursinligtingsdienste<br />

TOTAAL 32 600 000 23 250 000 25 750 000<br />

SLEUTELPRESTASIE-AANWYSER 2: BASIESE DIENSVERSKAFFING EN INFRASTRUKTUURONTWIKKELING<br />

10 000 000 21 500 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Reeston Fase 3, Stadium 2<br />

-P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 12<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

2 000 000 7 412 400 17 931 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Mdantsane Sone 18 CC Fase<br />

2 - P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 21<br />

Nedersettings<br />

8 000 000 200 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Manyano &Thembelihle Fase<br />

2 - P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 17<br />

Nedersettings<br />

8 000 000 100 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Second Creek (Sleutelklaar)<br />

- P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 19<br />

Nedersettings<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

1 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsdepartement 255005 BSDID01 6 Blokwerf TRA - P 1& P3<br />

Nedersettings<br />

2 500 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

DVRI-loodsprojek (Mekeni,<br />

Haven Hills, Competition Site)<br />

Behuisingsdepartement 255005 BSDID01 19<br />

P1 & P3<br />

100<br />

3 706 200 9 265 500 11 730 123<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Kluster 1 (Chris Hani, Ilinge,<br />

Mahlangu Village, Sisulu<br />

Village, Winnie Mandela,<br />

Deluxolo Village & Francis<br />

48, 12,<br />

21, 11,<br />

17, 11,<br />

20<br />

Behuisingsdepartement 255005 BSDID01<br />

Mei) P1 & P3<br />

600 000 5 559 300 9 265 500<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Kluster 2 (Masibambane,<br />

Masibulele, Velwano,<br />

Gwentshe Village,<br />

MathembaVuso) P1 & P3<br />

Kluster 3 (Fynbos Informeel<br />

1, Fynbos Informeel 2,<br />

Ndancama) P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 17,14,<br />

7 412 400 11 859 840 <strong>13</strong> 620 285<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsdepartement 255005 BSDID01 5, 10<br />

Nedersettings<br />

600 000 1 000 000 2 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Behuisingsdepartement 255005 BSDID01 31 Sunny Suid - P1 & P3<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

0 <strong>13</strong>8 650 2 277 300<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Potsdam Ikhwezi Blok 1 - P1<br />

& P3<br />

Behuisingsdepartement 255005 BSDID01 23,24<br />

Nedersettings<br />

0 <strong>13</strong>8 650 2 277 300<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Potsdam Ikhwezi Blok 2 - P1<br />

& P3<br />

Behuisingsdepartement 255005 BSDID01 23,24<br />

Nedersettings<br />

0 <strong>13</strong>8 650 2 277 300<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsdepartement 255005 BSDID01 23,24 Potsdam Ikhwezi Blok 2- P1<br />

Nedersettings<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

0 <strong>13</strong>8 650 2 277 300<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsdepartement 255005 BSDID01 23,24 Potsdam Noord Kanana - P1<br />

Nedersettings<br />

0 1 126 562 1 630 750<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsdepartement 255005 BSDID01 9 Amalinda Ko-op P1 & P3<br />

Nedersettings<br />

101<br />

0 1 126 562 1 630 750<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsdepartement 255005 BSDID01 9 Amalinda Fairlands P1 & P2<br />

Nedersettings<br />

15 000 000 25 000 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fase 3: Stadium<br />

2 – P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 12<br />

Nedersettings<br />

1 000 000 5 559 300 5 559 300<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fase 3: Stadium<br />

3 – P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 12<br />

Nedersettings<br />

300 000 1 476 096 3 570 436<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Behuisingsdepartement 255005 BSDID01 2 Braelyn Uitbr. 10 – P1 & P3<br />

Nedersettings<br />

270 420 2 500 000 4 594 340<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

C Seksie en Driehoekperseel<br />

– P1 & P3<br />

Behuisingsdepartement 255005 BSDID01 7, 8<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

100 000 860 318 2 594 340<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Behuisingsdepartement 255005 BSDID01 7, 8 D Hostel – P1 & P3<br />

2 500 000 100 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

DVRI-loodsperseel (Mekeni,<br />

Haven Hills, Competition Site)<br />

Behuisingsdepartement 255005 BSDID01 6, 8<br />

0 0 8 828 000<br />

Buurtontwikkelingvennootskapstoelae<br />

Regenerasiestrategie:<br />

Dorpsgebied en sentrale<br />

sakegebied<br />

255005 BSDID27 NVT<br />

Regenerasie van<br />

dorpsgebiede<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Vlootbestuur - Braelyn 530020 BSDID29 NVT BCMM Vlootbestuurstelsel Eie fondse 3 100 000 3 500 000 4 000 000<br />

Vlootbestuur - Braelyn 530020 BSDID29 NVT BCMM Vloot Eie fondse 6 000 000 15 000 000 15 000 000<br />

102<br />

10 000 000 0 0<br />

Elektrisiteitvraagkantbestuurstoelae<br />

Elektrifisering –<br />

Energiedoeltreffende<br />

straatbeligting<br />

11, 12,<br />

14, 17,<br />

20, 21,<br />

22, 23,<br />

30<br />

535025 BSDID04<br />

Elektrisiteitsbeplanning<br />

en -ontwerp<br />

Eie fondse 5 000 000 50 000 000 50 000 000<br />

Grootmaatelektrisiteitsinfrastruktuur:<br />

Opgradering<br />

535025 BSDID04 16, 18<br />

Elektrisiteitsbeplanning<br />

en -ontwerp<br />

30 000 000 30 000 000 20 000 000<br />

Departement<br />

van Onderwys<br />

(Geïntegreerde<br />

Nasionale<br />

Elektrisiferingsprogram)<br />

Elektrifisering - Reeston,<br />

Potsdam-eenheid P,<br />

Infillsmdantsane, Dimbaza,<br />

Zwelitsha, Pakamisa, Bhisho<br />

en Duncan Village<br />

<strong>13</strong>, 25,<br />

43, 34,<br />

36<br />

535025 BSDID04<br />

Elektrisiteitsbeplanning<br />

en -ontwerp<br />

Eie fondse 5 000 000 20 000 000 20 000 000<br />

Elektrifisering van Informele<br />

nedersettings – Duncan<br />

Village-gebiede<br />

1,2, 7, 8,<br />

9, 10<br />

535025 BSDID04<br />

Elektrisiteitsbeplanning<br />

en -ontwerp<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

Eie fondse 27 851 023 0 0<br />

Elektrisiteitsinfrastruktuurnetwerk<br />

(2.47% tariefverhoging<br />

– ‘ring fenced’)<br />

2, 7, 15,<br />

16, 44<br />

535025 BSDID04<br />

Elektrisiteitsbeplanning<br />

en -ontwerp<br />

60 000 000 80 484 000 125 419 392<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Mdantsane-paaie<br />

21, 22,<br />

23<br />

525025 BSDID06<br />

Paaie en Stormwaterdreinering<br />

15 000 000 10 000 000 28 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Ontwerp van paaie 525020 BSDID06 46 West Bank-restitusie<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

5 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Ontwerp van paaie 525020 BSDID06 28 Quenera-hoofpaaie<br />

29, <strong>13</strong>,<br />

25, 39,<br />

34, 36,<br />

44, 41,<br />

1, 2,<br />

7, 8<br />

103<br />

30 000 000 30 000 000 50 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

BCMM- opgradering van<br />

paaie<br />

Ontwerp van paaie 525020 BSDID06<br />

10 000 000 10 000 000 25 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Rehabilitering van landelike<br />

paaie<br />

23, 38,<br />

43, 31,<br />

32, 24,<br />

32<br />

525025 BSDID06<br />

Paaie en Stormwaterdreinering<br />

152 608 250 155 854 000 99 854 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Grootmaatsanitasievoorsiening<br />

28, 4,<br />

41, <strong>13</strong>,<br />

16, 14,<br />

21, 22,<br />

5, 16,<br />

27, 31,<br />

32,33,<br />

47, 11<br />

515026 BSDID07<br />

Rioolbehandeling:<br />

Kusgebied<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

7 000 000 37 000 000 20 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

KWT, Dimbaza en Bhisho –<br />

Infrastruktuur (Water)<br />

34, 37,<br />

38, 39,<br />

40, 41,<br />

43, 44,<br />

49, 35<br />

Wateradministrasie 520005 BSDID07<br />

5 000 000 5 000 000 5 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Hervestiging van mid-blokke<br />

in Mdantsane<br />

11, 12,<br />

<strong>13</strong>, 14,<br />

42, 48,<br />

50, 17,<br />

20, 23<br />

Wateradministrasie 515010 BSDID07<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

3 000 000 3 000 000 3 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Wateradministrasie 515010 BSDID07 36 Amahleke-watertoevoer<br />

Versterking van<br />

waterbehandelingsvermoë<br />

- Umzonyana/Styggang<br />

(boonste dam)<br />

104<br />

12 000 000 22 000 000 22 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Grootmaat-pompstasies 520015 BSDID07 5, <strong>13</strong><br />

6 000 000 17 000 000 15 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Opgradering van<br />

waternetwerke ingevolge<br />

densifisering en versterking<br />

520020 BSDID07 NVT<br />

Waterbehandelingswerke<br />

1 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Grootmaat-watertoevoer:<br />

Newlands en ander gebiede<br />

520020 BSDID07 NVT<br />

Waterbehandelingswerke<br />

3 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Wyk 33 Grootmaatwatertoevoerskema<br />

520020 BSDID07 33<br />

Waterbehandelingswerke<br />

5 000 000 1 276 293 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Grootmaat-watertoevoer:<br />

Kusgebiede<br />

520020 BSDID07 31,33<br />

Waterbehandelingswerke<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

1 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

520020 BSDID07 31 Winterstrand-watertoevoer<br />

Waterbehandelingswerke<br />

Eie fondse 2 800 000 2 000 000 1 500 000<br />

Opgradering van<br />

laboratoriuminfrastruktuur en<br />

-toerusting<br />

520020 BSDID07 NVT<br />

Waterbehandelingswerke<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

78 702 000 78 762 000 0<br />

Toelae:<br />

Openbarevervoerinfrastruktuur<br />

en<br />

Stelsels<br />

Snelvervoerstelsel: Busse<br />

(‘Bus Rapid Transit’)<br />

1, 10,<br />

11, 12,<br />

<strong>13</strong>, 14,<br />

15, 16,<br />

17, 18,<br />

19, 2,<br />

20, 21,<br />

22, 23,<br />

24, 25,<br />

28, 3, 4,<br />

5, 6, 7,<br />

8, 9<br />

620005 BSDID23<br />

Vervoerbeplanning en<br />

Operasionale Admin<br />

105<br />

3 000 000 3 000 000 3 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Implementering<br />

van Geïntegreerde<br />

Vervoerbeplanning<br />

620005 BSDID23 NVT<br />

Vervoerbeplanning en<br />

Operasionale Admin<br />

Nedersettings<br />

23 000 000 22 000 000 30 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

620005 BSDID24 37 Openbarevervoer-fasiliteite<br />

Vervoerbeplanning en<br />

Operasionale Admin<br />

Nedersettings<br />

15 000 000 30 000 000 10 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

620005 BSDID24 27, 28 Gonubie-hoofpad<br />

Vervoerbeplanning en<br />

Operasionale Admin<br />

1 200 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

N2/R72 skakelpad: opname<br />

46, 31,<br />

10, 16,<br />

8, 19<br />

620005 BSDID24<br />

Vervoerbeplanning en<br />

Operasionale Admin<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

12 764 000 42 500 000 29 500 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Grondadministrasie 615080 BSDID21 1 -50 Grondaankope<br />

2 000 000 3 000 000 5 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Ontwikkeling van<br />

gemeenskapsparke<br />

(Binneland, Middelland en<br />

<strong>13</strong>, 21,<br />

23<br />

755010 BSDID16<br />

Reiniging:<br />

Administratiewe<br />

Ondersteuning<br />

Kusgebied)<br />

5 000 000 12 040 943 20 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Ontwikkeling en opgradering<br />

van begraafplase (Binneland,<br />

Middelland en Kusgebied)<br />

Begrafnisse 755025 BSDID16 NVT<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Nedersettings<br />

4 000 000 20 000 000 30 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Ontwikkeling en opgradering<br />

van Gemeenskapsale<br />

Verkope 760025 BSDID16 5<br />

O.L. Streek<br />

Vulliswegdoeningsperseel<br />

en<br />

-oorplasingstasie<br />

106<br />

3 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Ontwerp van sentrale<br />

oorplasingstasie<br />

770030 BSDID09 1 – 50<br />

10 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

770030 BSDID09 1 – 50 Bou van die derde sel<br />

O.L. Streek<br />

Vulliswegdoeningsperseel<br />

en<br />

-oorplasingstasie<br />

5 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Rehabilitering van<br />

grondopvulpersele<br />

770030 BSDID09 1 – 50<br />

O.L. Streek<br />

Vulliswegdoeningsperseel<br />

en<br />

-oorplasingstasie<br />

9 000 000 10 000 000 50 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Opgradering van sport- en<br />

rekreasiefasiliteite<br />

7, 12,<br />

<strong>13</strong>, 28,<br />

29, 35,<br />

37, 38,<br />

41, 44<br />

Sportvelde 765010 BSDID16<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

3 000 000 3 000 000 3 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Brandweerstasie: Kusgebied<br />

en Middelland<br />

725010 BSDID12 1 to 50<br />

Brandweer en<br />

reddingsdienste<br />

6 000 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

KWT-brandweerstasie<br />

25, 35,<br />

37, 38,<br />

39, 40,<br />

41, 43,<br />

44, 45,<br />

49<br />

725010 BSDID12<br />

Brandweer en<br />

reddingsdienste<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

500 000 5 000 000 10 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Tsholomnqa-brandweerstasie<br />

31, 32,<br />

33<br />

725010 BSDID12<br />

Brandweer en<br />

reddingsdienste<br />

SLEUTELPRESTASIE-AANWYSER 3: PLAASLIKE EKONOMIESE ONTWIKKELING<br />

Infrastruktuur-ekonomiese<br />

ontwikkeling (Erfenisroeteontwikkeling,<br />

aanbring<br />

van stalletjies vir informele<br />

handelaars)<br />

107<br />

12 254 978 20 000 000 30 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

63005 LED03 NVT<br />

Plaaslike Ekonomiese<br />

Ontwikkeling<br />

3 000 000 3 000 000 3 000 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

BCMM<br />

Infrastruktuurontwikkeling:<br />

Stedelike landbou<br />

635005 LED03 NVT<br />

Plaaslike Ekonomiese<br />

Ontwikkeling<br />

SLEUTELPRESTASIE-AANWYSER 4: FINANSIËLE VOLHOUBAARHEID EN BESTUUR<br />

Eie fondse 1 100 000 1 000 000 1 000 000<br />

Kantoormeubels –<br />

Inkomstebestuur<br />

Debiteursbestuur 330015 MFVM01 NVT<br />

Eie fondse 1 000 000 500 000 500 000<br />

Masjiene:<br />

Vooruitbetaalverkope<br />

330025 MFVM02 NVT<br />

Kantoor:<br />

Vooruitbetaalverkope<br />

Eie fondse 1 500 000 1 500 000 1 500 000<br />

Rekenaartoerusting –<br />

Inkomstebestuur<br />

415025 MTOD07 NVT<br />

Bestuursinligtingsdienste<br />

“’n Stad wat met u groei”


2014/2015<br />

Kapitaal-<br />

Begroting<br />

20<strong>13</strong>/2014<br />

Kapitaal-<br />

Begroting<br />

2012/20<strong>13</strong><br />

Kapitaal-<br />

Begroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Wyksnommer<br />

Strategiekode<br />

(uit die<br />

GOP)<br />

Kostesentrumnommer<br />

Naam van<br />

kostesentrum<br />

330005 MFVM05 NVT Algemene waardasies Eie fondse 29 000 000 <strong>13</strong> 500 000 4 500 000<br />

Belasting-en-<br />

Waardasiekantoor<br />

4 000 000 1 000 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Opgradering van KWTbetaallokaal<br />

Argitektuur 615075 MFVM01 NVT<br />

SLEUTELPRESTASIE-AANWYSER 5: GOEIE REGERING EN OPENBARE DEELNAME<br />

Rugsteun-opwekker –<br />

Strategiese bestuur 105035 MTOD12 NVT<br />

Eie fondse 1 500 000 0 0<br />

Stadsaal<br />

Strategiese bestuur 105035 MTOD12 NVT Opgradering van Stadsaal Eie fondse 000 000 1 000 000 0<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

108<br />

“’n Stad wat met u groei”


6.4 BEDRYFSPROJEKTE 2012/<strong>13</strong> – 2014/15<br />

2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

SLEUTELPRESTASIE-AANWYSER 1: MUNISIPALE TRANSFORMASIE EN ORGANISATORIESE ONTWIKKELING<br />

Eie fondse 300 000 100 000 0<br />

Migrasie van BCMMdokumente<br />

na Elektroniese<br />

Dokumentbestuurstelsel<br />

220005 NVT MTOD11<br />

Regs- en Administratiewe<br />

dienste<br />

Ontwikkelingsbeplannings-administrasie<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

615005 NVT MTOD10 GIS op die internet Eie fondse 700 000 0 0<br />

615005 NVT MTOD06 Bygewerkte lugfotografie Eie fondse 2 7000 000 0<br />

Ontwikkelingsbeplannings-administrasie<br />

Eie fondse 500 000 500 000 500 000<br />

Ontwikkeling en hersiening<br />

van verordening<br />

220005 NVT MTOD11<br />

Regs- en Administratiewe<br />

dienste<br />

109<br />

220005 NVT MTOD11 Bywerking: Beleidsrigtings Eie fondse 600 000 0 0<br />

Regs- en Administratiewe<br />

dienste<br />

Eie fondse 750 000 750 000 0<br />

Opgradering van<br />

BCMM-gebou om<br />

belangrike dokumente<br />

en rugsteunbediener (bv.<br />

Bhisho/KWT) te bewaar<br />

Bestuursinligtingsdienste 415025 NVT MTOD08<br />

Eie fondse 750 000 750 000 0<br />

Implementering van<br />

Prestasiebestuurstelsel vir<br />

werknemers<br />

420005 NVT GGPP02<br />

Menslikehulpbronadministrasie<br />

3 000 000 3 800 000 4 000 000<br />

Ontwikkelingstoelae:Infrastruktuurdienste<br />

Infrastruktuur -<br />

vaardigheidsontwikkeling<br />

420005 NVT MTOD02<br />

Menslikehulpbronadministrasie<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

SLEUTELPRESTASIE-AANWYSER 2: BASIESE DIENSVERSKAFFING EN INFRASTRUKTUURONTWIKKELING<br />

0 20 000 000 29 992 500<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fase 3: Stadium<br />

2 - P5<br />

Behuisingsprojekte 255005 <strong>13</strong>,43,45,46 BSDID01<br />

Nedersettings<br />

163 515 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fase 3: Stadium<br />

3 – P4 (Registrasie)<br />

Behuisingsprojekte 255005 <strong>13</strong>,43,45,46 BSDID01<br />

Nedersettings<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

19 995 000 31 992 000 11 330 500<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Ilitha: Houthutte tot formele<br />

huise<br />

Behuisingsprojekte 255005 45 BSDID01<br />

Nedersettings<br />

6 665 000 500 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Tyutyu Fase 2 – P5 (Top<br />

strukture)<br />

Behuisingsprojekte 255005 43 BSDID01<br />

Nedersettings<br />

110<br />

5 398 650 200 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Lughawe / Fase 2A Bou van<br />

nuwe eenhede-P4<br />

Behuisingsprojekte 255005 31 BSDID01<br />

Nedersettings<br />

2 500 000 3 797 800 5 000 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Ilitha-Suid – 439 eenhede<br />

P5<br />

Behuisingsprojekte 255005 45 BDSID01<br />

Nedersettings<br />

20 000 000 30 000 000 15 862 700<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Herbou van<br />

stormbeskadigde huise<br />

BSDID01<br />

17, 24, 26,<br />

33, 39, 40,<br />

43, 36, 37<br />

Behuisingsprojekte 255005<br />

Nedersettings<br />

500 000 10 797 300 17 162 500<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Behuisingsprojekte 255005 31 BSDID01 Sunny Suid – P5<br />

0 500 000 500 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Potsdam Village Fases 1 &<br />

3 – P5<br />

Behuisingsprojekte 255005 23 BSDID01<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

5 811 880 17 395 650 26 660 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Kluster 1 (Chris Hani 3;<br />

Winnie Mandela; Ilinge;<br />

Deluxolo Village; Sisulu<br />

Village; Francis Mei;<br />

BSDID01<br />

48, 12, 21,<br />

11, 17, 11,<br />

20<br />

Behuisingsprojekte 255005<br />

Mahlangu Village) P5<br />

0 9 664 250 19 995 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Kluster 2 (Masibambane;<br />

Masibulele; Gwentshe;<br />

Velwano; MathembaVuso)<br />

P5<br />

Behuisingsprojekte 255005 17, 14 BSDID01<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

0 9 664 250 19 995 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Kluster 3 (Fynbos1;<br />

Fynbos2; Ndancama)P5<br />

Behuisingsprojekte 255005 5, 10 BSDID01<br />

Nedersettings<br />

0 11 797 050 19 995 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

DVRI-loodsprojek (Mekeni,<br />

Haven Hills, Competition<br />

Site) P5<br />

Behuisingsprojekte 255005 6, 8 BSDID01<br />

111<br />

Nedersettings<br />

465 000 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Cambridge 1 & 2 (Keiweg<br />

Dawn) P2<br />

Behuisingsprojekte 255005 15 BSDID01<br />

Nedersettings<br />

340 000 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Behuisingsprojekte 255005 16 BSDID01 N2 Padreserwe<br />

Nedersettings<br />

165 000 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Ford Msimango 1 (LUbehuising<br />

Nomp-skool)<br />

Behuisingsprojekte 255005 6 BSDID01<br />

Nedersettings<br />

17 662 250 200 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Behuisingsprojekte 255005 19 BSDID01 Second Creek – P5<br />

Nedersettings<br />

16 697 979 27 327 914 29 818 705<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Behuisingsprojekte 255005 1-50 BSDID01 Behuisingsbehoeftes:<br />

Databasis en akkreditasie<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

300 000 250 000 250 000<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Opvoeding van begunstigdes<br />

(Alle Ontwikkelingstoelae:<br />

Stedelike Nedersettings P4)<br />

Hervestiging van<br />

begunstigdes na<br />

formele huise vir alle<br />

behuisingsprogramme – alle<br />

projekte<br />

BSDID02<br />

45, 46, 18,<br />

19, 10<br />

Behuisingsprojekte 255005<br />

Eie fondse 500 000 4 447 500 7 140 000<br />

Behuisingsprojekte 255005 1 - 50 BSDID01<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

2 960 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 12 BSDID01 Dacawa P4<br />

Nedersettings<br />

27 488 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 10 BSDID01 Fynbos Informeel 1-P4<br />

Nedersettings<br />

112<br />

210 230 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 10 BSDID01 Fynbos Informeel 2-P4<br />

Nedersettings<br />

118 087 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 12 BSDID01 Ilinge-P4<br />

Nedersettings<br />

200 000 200 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Ilitha – Houthutte na formele<br />

huise<br />

Behuisingsprojekte 255005 45 BSDID01<br />

Nedersettings<br />

20 038 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 17 BSDID01 Masibambane-P4<br />

Nedersettings<br />

20 553 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Behuisingsprojekte 255005 17 BSDID01 Masibulele-P4<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

256 425 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Mdantsane Sone 18 CC<br />

Fase 2-P4<br />

Behuisingsprojekte 255005 21 BSDID01<br />

Nedersettings<br />

160 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 10 BSDID01 Ndacama-P2<br />

Nedersettings<br />

<strong>13</strong>8 308 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 10 BSDID01 Ndacama-P4<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Nedersettings<br />

19 636 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 11 BSDID01 Sisulu Village-P4<br />

Nedersettings<br />

112 7<strong>13</strong> 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 31 BSDID01 Sunny Suid-P4<br />

1<strong>13</strong><br />

Nedersettings<br />

81 999 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 14 BSDID01 Velwano-P4<br />

Nedersettings<br />

38 535 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 17 BSDID01 Winnie Mandela-P4<br />

Nedersettings<br />

200 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Behuisingsprojekte 255005 9 BSDID01 Amalinda (Ko-op) - P2 (EIA)<br />

Nedersettings<br />

100 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Potsdam Ikhwezi Blok 1 - P2<br />

(Omgewingsimpakevaluering)<br />

Potsdam Ikhwezi Blok 2- P2<br />

(Omgewingsimpakevaluering)<br />

Behuisingsprojekte 255005 23,24 BSDID01<br />

Nedersettings<br />

100 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Behuisingsprojekte 255005 23,24 BSDID01<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

100 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Potsdam Noord Kanana - P2<br />

(Omgewingsimpakevaluering)<br />

Behuisingsprojekte 255005 23,24 BSDID01<br />

Nedersettings<br />

100 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Potsdam Village (Landelik)<br />

Fases 1 & 2 - P2 (Omgewingsimpakevaluering)<br />

Behuisingsprojekte 255005 23 BSDID01<br />

Nedersettings<br />

3 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Potsdam Eenheid P Stadium<br />

2 - P4<br />

Behuisingsprojekte 255005 21 BSDID01<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Nedersettings<br />

3 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Behuisingsprojekte 255005 19 BSDID01 Second Creek P4<br />

Eie fondse 2 000 000 2 000 000 0<br />

Opsigters - Duncan Village<br />

en Informele Nedersettings<br />

1, 2, 5, 6, 7,<br />

8, 10<br />

520005<br />

Water-, sanitasie- en<br />

wetenskaplike dienste<br />

114<br />

1 525 000 125 000 0<br />

Departement<br />

Waterwese<br />

- Versnelde<br />

Gemeenskapsinfrastruktuur<br />

East Bank-Vuilwaterbehandelingswerke<br />

– Befondsing:<br />

Versnelde Gemeenskapsinfrastruktuurprogram<br />

(‘ACIP’)<br />

520005 18 BSDID06<br />

Water-, sanitasie- en<br />

wetenskaplike dienste<br />

program<br />

400 000 0 0<br />

Departement<br />

Waterwese –<br />

520005 NVT BSDID06 Sakeplan: Waterdienste<br />

Water-, sanitasie- en<br />

wetenskaplike dienste<br />

Provinsie<br />

450 000 0 0<br />

Departement<br />

Waterwese<br />

– Versnelde<br />

Gemeenskapsinfrastruktuurprogram<br />

Dimbaza Vuilwaterbehandelingswerke:<br />

Inlaatskerm<br />

520005 BSDID06<br />

Water-, sanitasie- en<br />

wetenskaplike dienste<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

1 283 000 0 0<br />

Departement<br />

Waterwese en<br />

Bosbou - DoRA<br />

Implementering van<br />

waterbesparing en<br />

aanvraagbestuur (Dimbaza,<br />

Duncan Village, Mdantsane,<br />

Reeston, Scenery Park,<br />

Nompumelelo, Mzamomhle,<br />

Sweetwaters, Phakamisa,<br />

Zwelitsha)<br />

BSDID06<br />

34, <strong>13</strong>, 9, 5,<br />

28, 7, 41<br />

520005<br />

Water-, sanitasie- en<br />

wetenskaplike dienste<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

3 000 000 5 000 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Ontwikkeling van BCMM<br />

Meesterplan vir Paaie<br />

525025 NVT BSDID06<br />

Paaie en Stormwaterdreinering<br />

Nedersettings<br />

788 800 480 000 480 000<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fase 3: Stadium<br />

2 – P4 (Oorplasings)<br />

Grondadministrasie 615080 12 BSDID01<br />

Nedersettings<br />

115<br />

200 000 46 400 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fases 1 &<br />

2 – Stadium 1B – P4<br />

(Oorplasings)<br />

Grondadministrasie 615080 12 BSDID01<br />

Nedersettings<br />

500 000 86 800 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Reeston Fase 3 Stadium 1 –<br />

P4 (Oorplasings)<br />

Grondadministrasie 615080 12 BSDID01<br />

Nedersettings<br />

28 000 1 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Tyutyu Fase 1 – P4<br />

(Oorplasings)<br />

Grondadministrasie 615080 43 BSDID01<br />

Nedersettings<br />

34 000 1 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Grondadministrasie 615080 43 BSDID01 Tyutyu 2 – P4 (Oorplasings)<br />

Nedersettings<br />

8 000 30 000 40 400<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Ilitha Suid – 439 eenhede<br />

(Oorplasings)<br />

Grondadministrasie 615080 45 BSDID01<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

5 000 12 500 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Dimbaza Fase 2 P4<br />

(Oorplasings)<br />

Grondadministrasie 615080 34, 36 BSDID01<br />

241 150 5 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Potsdam Stadium 2 Stadium<br />

1 – P4 (Oorplasings)<br />

Grondadministrasie 615080 <strong>13</strong> BSDID01<br />

914 400 3 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Nompumelelo – P4<br />

(Oorplasings)<br />

Grondadministrasie 615080 29 BSDID01<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

15 000 1 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

AmalindaSimanyene – P4<br />

(Oorplasings)<br />

Grondadministrasie 615080 16 BSDID01<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

116<br />

<strong>13</strong>6 000 1 000 0<br />

Grondadministrasie 615080 48 BSDID01 Z Soga – P4 (Oorplasings)<br />

Eie fondse 350 000 500 000 500 000<br />

Grondtransaksies –<br />

Opgradering van voormalige<br />

gebiede R293 & KPAgebiede<br />

Grondadministrasie 615080 Mdantsane BSDID22<br />

441 200 10 000 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Lughawe / Fase 2A Bou van<br />

nuwe eenhede – P4<br />

Grondadministrasie 615080 46<br />

Eie fondse 500 000 400 000 300 000<br />

Onderverdeling van<br />

gehuurde munisipale<br />

eiendomme<br />

Grondopmeting 615070 NVT BSDID21<br />

160 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Nedersettings<br />

Grondopmeting 615070 10 BSDID21 Ndancama P2<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

120 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Grondopmeting 615070 10 BSDID21 Fynbos Informeel 1- P2<br />

Nedersettings<br />

110 000 0 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

Grondopmeting 615070 10 BSDID21 Fynbos Informeel 2 – P2<br />

Nedersettings<br />

200 000 235 000 0<br />

Ontwikkelingstoelae:<br />

Stedelike<br />

AmalindaFairlands-projekte<br />

– P2<br />

Grondopmeting 615070 9 BSDID21<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Nedersettings<br />

465 000 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Cambridge 1 & 2 (Keiweg)<br />

Dawn – P 2<br />

Grondopmeting 615070 15 BSDID21<br />

Nedersettings<br />

340 000 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

615070 16 BSDID21 N2 Padreserwe P2<br />

117<br />

Nedersettings<br />

165 000 0 0<br />

Ontwikkelingstoelae:<br />

Menslike<br />

Nedersettings<br />

Ford Msimango 1 (LU<br />

Behuising Nomp-skool) – P2<br />

615070 6 BSDID21<br />

Stadsbeplanning 615070 16 BSDID17 DVRI-dorpsgebiedstigting LGH 77 000 0 0<br />

Stadsbeplanning 615070 40926 BSDID17 MdantsaneOntwikkelingstoelae:<br />

Stedelike<br />

0 500 000 600 000<br />

dorpsgebiedstigting<br />

Nedersettings<br />

East Bank Restitusie-<br />

Stadsbeplanning 615070 16 BSDID17<br />

RLCC 300 000 300 000<br />

dorpsgebiedstigting<br />

Grondidentifiseringstudie<br />

vir hervestiging van<br />

Stadsbeplanning 615080 NVT BSDID21<br />

Eie fondse 300 000 0 0<br />

hoëprioriteit- informele<br />

nedersettings<br />

Stadsbeplanning 615005 15 BSDID18 BCMM-dorpsgebiedstigting Eie fondse 0 1 600 000 1 700 000<br />

“’n Stad wat met u groei”


2014/2015<br />

Bedryfsbegroting<br />

20<strong>13</strong>/2014<br />

Bedryfsbegroting<br />

2012/20<strong>13</strong><br />

Bedryfsbegroting<br />

Bron van<br />

befondsing<br />

Naam van projek<br />

Strategie-kode<br />

(uit die<br />

GOP)<br />

Wyksnommer<br />

Kostesentrum<br />

Direktoraat<br />

Eie fondse 400 000 0 0<br />

Stadsbeplanning 615070 28 BSDID18<br />

Eie fondse 300 000 0 0<br />

Stadsbeplanning 615070 NVT BSDID18<br />

Eie fondse 0 1 100 000 1 200 000<br />

Stadsbeplanning 615070 27 BSDID19<br />

Eie fondse 500 000 0 0<br />

Stadsbeplanning 615070 4, 15, 18 BSDID19<br />

Eie fondse 233 408 0 0<br />

Stadsbeplanning 615070 29 BSDID19<br />

118<br />

Eie fondse 34 735 0 0<br />

Dorpsgebiedstigting vir<br />

Mzamomhle- Informele<br />

Nedersetting<br />

Beplanningsfase: Landelike<br />

Nedersetting<br />

Plaaslike Ruimtelike<br />

Ontwikkelingsraamwerk<br />

Vincent, Berea: Hersiening<br />

van Plaaslike Ruimtelike<br />

Ontwikkelingsraamwerk<br />

Home Hill: Plaaslike<br />

Ruimtelike<br />

Ontwikkelingsraamwerk<br />

Gonubie Hoofweg:<br />

Plaaslike Ruimtelike<br />

Ontwikkelingsraamwerk<br />

Kwelera Plaaslike Ruimtelike<br />

Ontwikkelingsraamwerk<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Stadsbeplanning 615070 27, 29 BSDID19<br />

Eie fondse 29 469 0<br />

Stadsbeplanning 615070 27, 29 BSDID19<br />

Eie fondse 58 561 0 0<br />

BCMM: Ruimtelike<br />

Ontwikkelingsraamwerk:<br />

Omvattende bywerking en<br />

Stadsbeplanning 615070 NVT BSDID19<br />

hersiening<br />

Eie fondse 43 827 0 0<br />

Bhisho/King Williams<br />

Town: Plaaslike Ruimtelike<br />

Ontwikkelingsraamwerk<br />

Stadsbeplanning 615070 30, 38-45 BSDID19<br />

615005 NVT BSDID20 Lugfotografie Eie fondse 1 000 000 0 0<br />

615005 NVT MTOD05 GIS op internet Eie fondse 350 000 350 000 0<br />

OntwikkelingsbeplanningsadministrasieOntwikkelingsbeplanningsadministrasie<br />

“’n Stad wat met u groei”


Strate-<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

KosteWyksnomgie-kode Bron van<br />

Direktoraat<br />

Naam van projek<br />

BedryfsBedryfsBedryfssentrummer (uit die<br />

befondsing<br />

begrotingbegrotingbegroting GOP)<br />

Hersiening van<br />

Vervoer 620005 NVT BSDID23 geïntegreerde<br />

Eie fondse 500 000 2 000 000 2 000 000<br />

vervoerbeplanning<br />

SLEUTELPRESTASIE-AANWYSER 3: PLAASLIKE EKONOMIESE ONTWIKKELING<br />

Plaaslike Ekonomiese<br />

Bestemmingsbemarking-<br />

635005 NVT LED02<br />

Eie fondse 6 880 000 11 700 000 12 300 000<br />

Ontwikkeling<br />

sprogram<br />

Plaaslike Ekonomiese<br />

Besigheidsondersteuning-<br />

635005 NVT LED03<br />

Eie fondse 2 000 000 6 300 000 5 900 000<br />

Ontwikkeling<br />

seenheid-programOntwikkelings-<br />

Plaaslike Ekonomiese<br />

Ekonomiese<br />

635005 NVT LED03<br />

toelae: Stedelike 2 585 200 4 260 000 5 000 000<br />

Ontwikkeling<br />

Infrastruktuurprogram<br />

Nedersettings<br />

SLEUTELPRESTASIE-AANWYSER 4: FINANSIËLE VOLHOUBAARHEID EN BESTUUR<br />

Skoonmaak van<br />

Debiteursbestuurskantoor 330015 NVT MFVM01<br />

Eie fondse 400 000 1 000 000 500 000<br />

faktureringsdata<br />

Oudit van meterpeutery<br />

Debiteursbestuurskantoor 330015 NVT MFVM01 (elektrisiteit en water) - Eie fondse 2 000 000 3 000 000 1 500 000<br />

munisipale dienste<br />

Begrotingskantoor 315005 NVT MFVM03 Begrotingshervormings FMG 1 500 000 1 500 000 1 500 000<br />

Rekeningkundige<br />

Begrotingskantoor 315005 NVT MFVM06<br />

Eie fondse 720 000 720 000 720 000<br />

hervormingsprojek<br />

SLEUTELPRESTASIE-AANWYSER 5: GOEIE REGERING EN OPENBARE DEELNAME<br />

Strategiese<br />

Herontwerp van IT-<br />

105025 NVT MTOD03 Eie fondse 1 000 000 3 000 000 0<br />

ondersteuning<br />

sakeproses<br />

Skakeldienste en<br />

internasionale<br />

120010 NVT GGPP09<br />

gebeurtenisse<br />

Wykskomiteevergaderings<br />

Eie fondse 3 000 000 3 000 000 3 000 000<br />

(los-uitgawes)<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

119<br />

205005 NVT GGPP07 Tussenregeringsbetrekkinge Eie fondse 50 000 80 000 80 000<br />

Kantoor van die<br />

Munisipale Bestuurder<br />

“’n Stad wat met u groei”


Strate-<br />

2012/20<strong>13</strong> 20<strong>13</strong>/2014 2014/2015<br />

KosteWyksnomgie-kode Bron van<br />

Direktoraat<br />

Naam van projek<br />

BedryfsBedryfsBedryfssentrummer (uit die<br />

befondsing<br />

begrotingbegrotingbegroting GOP)<br />

Spesiale programme 105030 NVT GGPP12 Munisipale beurse Eie fondse 1 200 000 1 200 000 1 200 000<br />

Kantoor van die<br />

Dokumentering van<br />

205005 NVT GGPP05<br />

Eie fondse 300 000 300 000 300 000<br />

Munisipale Bestuurder<br />

gevallestudies<br />

Kantoor van die<br />

Implementering van MDG-<br />

205005 NVT GGPP12<br />

Eie fondse 100 000 100 000 100 000<br />

Munisipale Bestuurder<br />

raamwerk<br />

205005 NVT GGPP01 Risiko-evaluering Eie fondse 200 000 200 000 200 000<br />

205005 NVT MFMV06 Oudit-omswaaiplan Eie fondse 6 000 000 8 000 000 8 000 000<br />

Kantoor van die<br />

Munisipale Bestuurder<br />

Kantoor van die<br />

Munisipale Bestuurder<br />

Kantoor van die<br />

Munisipale Bestuurder<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Eie fondse 3 500 000 3 000 000 3 000 000<br />

Gekombineerde<br />

Versekeringsmodel<br />

205005 NVT GGPP01<br />

120<br />

“’n Stad wat met u groei”


6.5 GROOT PROJEKTE VIR 2012-2015<br />

2012 - 2015<br />

KONSEPKAPITAAL-<br />

BEGROTING<br />

NAAM VAN PROJEK BRON VAN BEFONDSING<br />

31,500,000<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Reeston Fase 3 Stadium 2 -P1 & P3<br />

27,343,400<br />

Mdantsane Sone 18 CC Fase 2 - P1 & P3<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

8,200,000<br />

Manyano & Thembelihle Fase 2 - P1 & P3<br />

8,100,000<br />

Second Creek (Sleutelklaar) - P1 & P3<br />

1,000,000<br />

Blokwerf TRA - P 1& P3<br />

121<br />

2,500,000<br />

DVRI-loodsprojek (Mekeni, Haven Hills, Competition Site) P1 & P3<br />

24,701,823<br />

15,424,800<br />

Kluster 1 (Chris Hani, Ilinge, Mahlangu Village, Sisulu Village,Winnie<br />

Mandela,Deluxolo Village & Francis Mei) P1 & P3<br />

Kluster 2 (Masibambane, Masibulele, Velwano, Gwentshe Village, Mathemba<br />

Vuso) P1 & P3<br />

32,892,525<br />

Kluster 3 (Fynbos Informeel 1, Fynbos Informeel 2, Ndancama) P1 & P3<br />

3,600,000<br />

Sunny Suid - P1 & P3<br />

2,415,950<br />

Potsdam Ikhwezi Blok 1 - P1 & P3<br />

“’n Stad wat met u groei”


2012 - 2015<br />

KONSEPKAPITAAL-<br />

BEGROTING<br />

NAAM VAN PROJEK BRON VAN BEFONDSING<br />

2,415,950<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Potsdam Ikhwezi Blok 2 - P1 & P3<br />

2,415,950<br />

Potsdam Ikhwezi Blok 2- P1<br />

2,415,950<br />

Potsdam Noord Kanana - P1<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

2,757,312<br />

Amalinda Ko-op P1 & P3<br />

2,757,312<br />

Amalinda Fairlands P1 & P2<br />

2,960<br />

Dacawa P4<br />

122<br />

27,488<br />

Fynbos Informeel 1-P4<br />

210,230<br />

Fynbos Informeel 2-P4<br />

118,087<br />

Ilinge-P4<br />

400,000<br />

Ilitha – Houthutte tot formele huise<br />

20,038<br />

Masibambane-P4<br />

20,553<br />

Masibulele-P4<br />

“’n Stad wat met u groei”


2012 - 2015<br />

KONSEPKAPITAAL-<br />

BEGROTING<br />

NAAM VAN PROJEK BRON VAN BEFONDSING<br />

256,425<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Mdantsane Sone 18 CC Fase 2-P4<br />

160,000<br />

Ndacama-P2<br />

<strong>13</strong>8,308<br />

Ndacama-P4<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

19,636<br />

Sisulu Village-P4<br />

112,7<strong>13</strong><br />

Sunny Suid-P4<br />

81,999<br />

Velwano-P4<br />

123<br />

38,535<br />

Winnie Mandela-P4<br />

200,000<br />

Amalinda (Ko-op) - P2 (Omgewingsimpakevaluering)<br />

120,000<br />

Fynbos Informeel 1-P2<br />

110,000<br />

Fynbos Informeel 2-P2<br />

100,000<br />

Potsdam Ikhwezi Blok 1 - P2 (Omgewingsimpakevaluering)<br />

100,000<br />

Potsdam Ikhwezi Blok 2- P2 (Omgewingsimpakevaluering)<br />

“’n Stad wat met u groei”


2012 - 2015<br />

NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />

BEGROTING<br />

Ontwikkelingstoelae: Stedelike<br />

Potsdam Noord Kanana - P2 (Omgewingsimpakevaluering)<br />

100,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Potsdam Village (Landelik) Fase 1 & 2 - P2 (Omgewingsimpak-evaluering)<br />

100,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Amalinda Fairlands-projekte - P2<br />

435,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Potsdam Eenheid P Stadium 2 - P4<br />

3,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Second Creek P4<br />

3,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Dacawa P4<br />

800,000<br />

Nedersettings<br />

BEHUISING 174,118,944<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

124<br />

Ontwikkeling van Meesterplan vir BCMM-paaie 8,000,000<br />

Ontwikkelingstoelae: Stedelike<br />

Mdantsane-Paaie<br />

265,903,392<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

West Bank-restitusie<br />

53,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Quenera-hoofpaaie<br />

5,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Opgradering van BCMM-paaie<br />

110,000,000<br />

Nedersettings<br />

“’n Stad wat met u groei”


2012 - 2015<br />

NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />

BEGROTING<br />

Ontwikkelingstoelae: Stedelike<br />

Rehabilitering van landelike paaie (opgradering)<br />

45,000,000<br />

Nedersettings<br />

PAAIE 486,903,392<br />

4,000,000<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Nord-laan (pompstasie)<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

19,000,000<br />

Quinera-behandelingswerke<br />

116,000,000<br />

Kapasiteit van vuilwaterbehandelingswerke (Zwelitsha)<br />

50,000,000<br />

Reeston Fase 3: Grootmaatdienste - riolering<br />

125<br />

1,108,250<br />

Bufferstrook-sanitasie (Mdantsane)<br />

17,000,000<br />

Opknapping van Mdantsane-riolering<br />

80,000,000<br />

Afvoer van uitloop van Amalinda en Wilsonia na Reeston<br />

103,208,000<br />

Binnelandse/landelike sanitasie (Kusgebied, Middelland en Binneland)<br />

45,000,000<br />

Oosstrand: Riole<br />

9,000,000<br />

Slikhanteringsfasiliteit<br />

“’n Stad wat met u groei”


2012 - 2015<br />

NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />

BEGROTING<br />

Ontwikkelingstoelae: Stedelike<br />

Infrastruktuur: KWT en Bhisho (Water)<br />

64,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Verskuifing van Midblokke in Mdantsane<br />

15,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Amahleke-watertoevoer<br />

9,000,000<br />

Nedersettings<br />

RIOLERING 532,316,250<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Versterking van waterbehandelingskapasiteit - Umzonyana/ Styggang: Ontwikkelingstoelae: Stedelike<br />

56,000,000<br />

Boonste dam<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Opgradering van waternetwerke ingevolge densifikasie en versterking<br />

38,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Grootmaat-watertoevoer: Newlands en ander gebiede<br />

1,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Wyk 33: Grootmaat-watertoevoerskema<br />

3,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Grootmaat-watertoevoer: Kusgebiede<br />

6,276,293<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Winterstrand-watertoevoer<br />

1,000,000<br />

Nedersettings<br />

WATER 105,276,293<br />

126<br />

1,100,000<br />

Ontwikkelingstoelae: Stedelike<br />

Nedersettings<br />

Mdantsane-dorpsgebiedstigting<br />

“’n Stad wat met u groei”


2012 - 2015<br />

NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />

BEGROTING<br />

Ontwikkelingstoelae: Stedelike<br />

Implementering van geïntegreerde vervoerplan<br />

9,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Taxihaltes<br />

80,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Gonubie-hoofweg<br />

60,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

N2/R72 Skakelpad-opname<br />

26,200,000<br />

Nedersettings<br />

VERVOERBEPLANNING 176,300,000<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Ontwikkelingstoelae: Stedelike<br />

BCM: Infrastruktuurontwikkeling vir stedelike landbou<br />

8,000,000<br />

Nedersettings<br />

Infrastruktuur vir ekonomiese ontwikkeling (Erfenisroete ontwikkeling; Ontwikkelingstoelae: Stedelike<br />

62,254,978<br />

voorsiening van stalletjies vir informele handelaars)<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Ekonomiese-infrastruktuurprogram<br />

11,845,200<br />

Nedersettings<br />

PLAASLIKE EKONOMIESE ONTWIKKELING 82,100,178<br />

Ontwikkelingstoelae: Stedelike<br />

Ontwikkeling van gemeenskapsparke (Mdantsane, Potsdam, Rheeston)<br />

10,000,000<br />

Nedersettings<br />

Opgradering en ontwikkeling van begraafplase (Binneland, Middelland en Ontwikkelingstoelae: Stedelike<br />

37,040,943<br />

Kusgebiede)<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Ontwikkeling en opgradering van Gemeenskapsale<br />

54,000,000<br />

Nedersettings<br />

127<br />

“’n Stad wat met u groei”


2012 - 2015<br />

NAAM VAN PROJEK BRON VAN BEFONDSING KONSEPKAPITAAL-<br />

BEGROTING<br />

Ontwikkelingstoelae: Stedelike<br />

Sport- en rekreasiefasiliteite<br />

69,000,000<br />

Nedersettings<br />

GEMEENSKAPSDIENSTE 170,040,943<br />

BCMM Geïntegreerde Ontwikkelings Plan<br />

Hersieningsdokument • 2012 - 20<strong>13</strong><br />

Ontwikkelingstoelae: Stedelike<br />

Sentrale Oorplasingstasie (Sentrale sakegebied van Oos Londen)<br />

33,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Bou van ‘n nuwe sel – Roundhill-Streek-Grondopvullingsperseel<br />

5,764,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Bou van versamelpunte (Wyke 5, 10 en 12)<br />

3,000,000<br />

Nedersettings<br />

Stigting van sentrale oorplasingstasie, bou van vullis-aflaaipunte, en stigting Ontwikkelingstoelae: Stedelike<br />

17,000,000<br />

en opgradering van tuinvullis-oorplasingstasies<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Bou van vierde sel<br />

9,000,000<br />

Nedersettings<br />

VULLIS 67,764,000<br />

128<br />

Ontwikkelingstoelae: Stedelike<br />

Infrastruktuur: Kusgebiede en Middelland<br />

9,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

KWT-brandweerstasie<br />

6,000,000<br />

Nedersettings<br />

Ontwikkelingstoelae: Stedelike<br />

Tsholomnqa-brandweerstasie<br />

15,500,000<br />

Nedersettings<br />

BRANDWEER 30,500,000<br />

TOTAAL: GROOT PROJEKTE 1,825,320,000<br />

“’n Stad wat met u groei”


BUFFALO CITY METROPOLITAN<br />

MUNICIPALITY<br />

East London • King William’s Town • Bhisho<br />

BarryMakhan@MakinwaMedia • Tel: 043 722 3312

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!