02.05.2013 Views

MKS Implementer 2006 Administration Guide

MKS Implementer 2006 Administration Guide

MKS Implementer 2006 Administration Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Controlling Remote Job Schedules<br />

In the Time range fields, specify exact from and to times, or specify *CURRENT to<br />

default the time value of the system.<br />

To create a job that issues the move request<br />

1 Use the Add Job Schedule Entry (ADDJOBSCDE) command to add an entry to the<br />

OS/400 job scheduler.<br />

An example daily job schedule entry is:<br />

ADDJOBSCDE JOB(IMAUTOSCH)<br />

CMD(IMOVRMTRQS RQSNUM(*ALL))<br />

FRQ(*WEEKLY)<br />

SCDDATE(*NONE<br />

SCDDAY(*ALL)<br />

SCDTIME(150000)<br />

JOBD(IMPJOBD)<br />

2 If you need to modify the job schedule entry or view a current list of job schedule entries,<br />

use the Work with Job Schedule Entry (WRKJOBSCDE) command.<br />

Change Remote Request (ICHGRMTRQS) Command<br />

The Change Remote Request (ICHGRMTRQS) command communicates schedule changes<br />

for each target remote system on a promotion request. The command can be issued at any<br />

point once the request is created (the request does not have to be at a Move-Pend status).<br />

To use the Change Remote Request (ICHGRMTRQS) command<br />

1 Use the Create Request function to submit a request to a remote environment, or select<br />

an existing request.<br />

2 Type the command ICHGRMTRQS on the command line and press F4=Prompt.<br />

3 Define the command parameters based on your environment and as described next in<br />

“ICHGRMTRQS Command Parameters”.<br />

4 Press ENTER.<br />

ICHGRMTRQS Command Parameters<br />

Request number (RQSNUM)<br />

Specify the request number of the request you created or selected.<br />

185

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!