30.04.2013 Views

ventilated façades - Butech

ventilated façades - Butech

ventilated façades - Butech

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22<br />

start section. invisible fi xing<br />

1. Angle bracket<br />

2. Vertical T-profi le<br />

3. Thermal insulation<br />

4. STON-KER® ceramic tile<br />

5. Concrete<br />

6. Start/end clip – invisible fi xing<br />

7. Self-drilling screw in slotted hole<br />

8. Mechanical anchor<br />

9. Anti-rodent grille<br />

invisible fi xing system. coping<br />

1. Angle bracket<br />

2. Vertical T-profi le<br />

3. Thermal insulation<br />

4. STON-KER® ceramic tile<br />

5. Concrete<br />

6. Start/end clip – invisible fi xing<br />

7. Self-drilling screw in slotted hole<br />

8. Mechanical anchor<br />

9. Aluminium sheeting<br />

4<br />

7<br />

8<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

9<br />

6 5 3 2 7 8 1 9<br />

invisible fi xing system. vertical section<br />

1. Angle bracket<br />

2. Vertical T-profi le<br />

3. Thermal insulation<br />

4. STON-KER® ceramic tile<br />

5. Concrete<br />

6. Invisible fi xing clip<br />

7. Self-drilling screw in slotted hole<br />

8. Mechanical anchor<br />

invisible fi xing system. horizontal section<br />

1. Angle bracket<br />

2. Vertical T-profi le<br />

3. Thermal insulation<br />

4. STON-KER® ceramic tile<br />

5. Concrete<br />

6. Invisible fi xing clip<br />

7. Self-drilling screw in slotted hole<br />

8. Mechanical anchor<br />

1<br />

8<br />

7<br />

5 ó 8 mm<br />

6<br />

2<br />

3<br />

4<br />

5<br />

5 4 3<br />

6 8<br />

5 ó 8 mm<br />

2<br />

1 7<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!