Date : 23/01/2009<br />

To,<br />

The Respectable Collector,<br />

Sub : Regarding <strong>Pollution</strong><br />

Our village named Bhayala, which is far around 1 to 2 kilometers from the project (1)<br />

M/s Zen Oncology (2) M/s Unimark Remedies Ltd. They have analyzed some samples,<br />

which is totally wrong against the pollution control measures prescribed for air, water.<br />

We would like to further state that due to these ongoing projects of the said company, we<br />

are facing lot of bad effects for air / water.<br />

Therefore this is our request from the entire Bhayala and surrounding areas that your<br />

attention is very much needed to make necessary action for both the projects for which<br />

we shall feel highly oblige.<br />

Hasmukh D. Parmar


Answer: Hasmukh D. Parmar<br />

It has been mentioned in our report that to control the pollution necessary scrubber is<br />

installed and in the future also the same procedure will be maintained, if necessary.


Date : 23/01/2009<br />

To,,<br />

The Respectable Collector Saheb,<br />

Ahmedabad.<br />

We would like to inform you that the company M/s Unimark Remedies Ltd., located at<br />

Kerala. In that the biggest question is the pollution, which discharges dangerous gas and<br />

it is harmful for human being. While discharging water from the company, it is dangerous<br />

for the crop as well as health.<br />

Some samples are taken from the submitted reports and made analysis by Independent<br />

Agency. The company has taken a necessary step for recycling the generator water using<br />

(Utility and during process) Zero Discharge concepts.<br />

Sarpanch Shree<br />

Chapaben Devabhai Pagi


Answer : Sarpanch Shree Chapaben Devabhai Pagi<br />

It has been mentioned in our report that to control the pollution necessary scrubber is<br />

installed and in the future also the same procedure will be maintained, if necessary.


To,<br />

Dist. Collector,<br />

Ahmedabad.<br />

C. K. Parmar<br />

Member<br />

Pharmacetical Advisory Forum<br />

Government of India<br />

Mini. of Chemicals & Fertilizers<br />

Dept. of Chemicals & Petrochemicals<br />

New Delhi<br />

Sub.: MoEF notification no. S.O. 1533 dated 14.09.2006 about public hearing.<br />

Respected Sir,<br />

As per above subject M/s Zen oncology Pvt. Ltd. & M/s. Unimark Remedies Pvt. Ltd.<br />

Submitted E. I. A.(Environment Impact Assessment) through Govt. approved consultant,<br />

but there is not mention or copy of certificate of examine by any department of govt. and<br />

also not attached reference of other environment agencies. We submitting here for<br />

peoples benefit that about this E. I. A. govt. take action only after some active agencies’<br />

neutral report.<br />

People complain that they asked information for environment from related department<br />

but till today they doesn’t get it due to that people can not study about information. So I<br />

request you to postpone the date of public hearing.<br />

Thanks,<br />

Yours truly,<br />

Sd. /+++++<br />

C. K. Parmar


Ans.:<br />

All reports submitted by our company through notified consultant and all information<br />

mentioned as per forest ministry guide line. So there is no question about postpone of<br />

public hearing.


Date : 23/01/2008<br />

Becharbhai Patel<br />

Naranpura<br />

Ahmedabad<br />

To: The <strong>Gujarat</strong> Polution <strong>Control</strong> <strong>Board</strong><br />

Navrangpura<br />

Ahmedabad<br />

OBJECTION APPLICATION<br />

In regards with proposed M/S Zen Oncology Pvt Ltd, we have objection because the<br />

Present Unit is spreading more <strong>Pollution</strong>, and if the same is expanded than it will not be<br />

possible to say the ratio of <strong>Pollution</strong>. Hence you are requested not to give OK for the<br />

same.<br />

Sd/xxxx<br />

Becharbahi Patel


Answer: Becharbahi Patel<br />

As per specifications of submitted EIA report company will provide necessary<br />

equipments to prevent pollution hence no question comes to reach at higher pollution.


To<br />

The Chairman,<br />

District Environmental Public-Hearing Committee,<br />

Ahmedabad District.<br />

Harisinh Jagmalbhai Gohil,<br />

At. Kochariya,<br />

Taluka, Bavla.<br />

Dist>Ahmedabad.<br />

Date:23/01/02009<br />

Sub: Representation in public Hearing of Unimark Remedies: Ltd. Being held on<br />

23/01/2009.<br />

Dear Sir,<br />

I wish you well,<br />

1. People of this company are very much disturbed because of the Air-<strong>Pollution</strong>. During<br />

daytime also the bad smell of gas is felt which i9s released by the company. The data<br />

shown in the report as in approved proportion is wrong.<br />

2. During night this company releases very intense bad smelling poisonous gas. This gas<br />

creates very adverse effects. It should be studied first.<br />

3. For noise pollution, the standard for day and night are proper but according to the study<br />

in summary page No.7, it is shown 51.7 to 60.9 decimal during the day time and 38.8 to<br />

57.7 decimal during night time. Why the noise of the company is lesser during night?.<br />

4. This company is a pollution producing company. How many closer notices are given<br />

by G.P.C.B. and according to which Acts? Please inform this.<br />

5. This Company has received three various notices regarding pollution on 26 th June-2006<br />

by <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>. And many other such closer notices have been<br />

received regarding pollution matter to this company. Then how this present company’s<br />

pollution is stopped and how an environmental consent can be given to such polluted<br />

Company?<br />

Thanking you,<br />

Yours faithfully,<br />

Harisinh J Gohil.<br />

C.C To<br />

Member Secretary and Regional Officer,<br />

<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Gandhinagar.


Answer : Harisinh Jagmalbhai Gohil,<br />

1. The company has made all the instruments for pollution <strong>Control</strong>. And they are<br />

running successfully.<br />

2. Our company is ever active. Moreover created gas during process is being<br />

scrubbed. We a have attached scrubber-hood for the transit of the raw materials.<br />

And we have studied this.<br />

3. During the night time additional noise level like transportation , loading,<br />

unloading were not carried out , So cumulative noise level were observed less<br />

then day time.<br />

4. A detail of this has been enclosed in the appendix.<br />

5. A detail of this has been enclosed in the appendix.


To,<br />

The Chairman<br />

District Environmental Public Hearing Committee<br />

Ahmedabd District<br />

The President of a Village Panchayat<br />

Jaydeepsingh Motibhai Sagar<br />

Village : Kalyangadh,<br />

Town: Bavla<br />

District: Ahmedabad<br />

23 rd January 2009<br />

Subject: Representation in public hearing of Unimark Remedies Ltd. Being held on 23.01.2009.<br />

Sir,<br />

I wish you well.<br />

(1) This company stores collected solid waster material outside of the factory by making shade,<br />

whose is this site? And why it is at outside of the factory?<br />

(2) In its old plant, the company has developed Green Belt in the area of 20,000 square meter.<br />

But in fact this is not true. We also demand to get this place be visited by the committee.<br />

(3) Is this company doing green belt in the area of 20000 Square Meter in its new plant? Will it<br />

do? How may trees it will grow? Of which types of tress it will grow? Will these trees be<br />

capable of controlling the pollution by this company? Or the company will grow fast growing<br />

trees?<br />

(4) What planning has been done for the use of fly ass occurring from the company? Has an<br />

agreement been done with any bricks making company?<br />

(5) As shown in E.I.A. summary on page no.3, habitations of wild animals are not there at the<br />

distance of 10 kilometers from the indicated project place, which is wrong because behind the<br />

area of the company the groups of Nil cows are habitated. And therefore it is necessary to<br />

clarify this which is mentioned in the study.<br />

(6) According to the belief of the people, in the ancient time Bhim killed the Devil called Jaimala<br />

and years old temple of Bhim also is existed at present in the Kochariya village. Will such<br />

historical place be destroyed or will it be damaged? It is also not proper that such places are<br />

also not mentioned.<br />

(7) What employment is given in an old project? How many people you will employ in the new<br />

project? How may local and affected people will be given employment?<br />

(8) How many works you will do of local development? Of which kind? How much fund will be<br />

provided? One committee should be made in which there should be a representative and also<br />

representative of Gram Panchayat as well as of the affected People.<br />

Thanking you,<br />

Yours faithfully,<br />

Jaydeepsinh Motibhai Sagar<br />

Copy to : Member secretary and Regional officer<br />

<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>,<br />

Gandhinagar


Answer: The President of a Village Panchayat<br />

Jaydeepsingh Motibhai Sagar<br />

1. This company has kept collected sold waste in Hazardous storage area.<br />

2. The details of the Green belt developed by the company is mentioned in the report.<br />

3. The company will develop green belt which is mentioned in the report and it will proceed<br />

accordingly.<br />

4. Fly ass, produced by the company will be used within company itself. We have made an<br />

agreement with bricks making company.<br />

5. Nil Cows – According to the advise of Mahendrabhai<br />

6. We do not know about this.<br />

7. The details of the employment of the old project is included in the report and the opportunities<br />

of employment in the new project also is mentioned in the report. (IN the old project about<br />

600 and in the new project about 300)<br />

8. Out company believe in accepting social responsibility. Upto now we have fulfilled many<br />

responsibilities which are mentioned in the report. And the future also we will fulfill our<br />

responsibility.


To,<br />

The Officer,<br />

<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>,<br />

Navrang Pura, Ahmmedabad.<br />

From: Trivedi Anil Kumar Babubhai Vanechar<br />

24, Klin Tenament,<br />

Nr, Bhavna Tenament,<br />

Vasna, Ahmedabad.<br />

Dt. 23.01.2009<br />

Sub: Public hearing for environmental related issues of proposed expansion of M/s. Zen<br />

Oncology Pvt. Ltd. On 23.01.09 at Bavla<br />

Dear Sir,<br />

I am Anil B. Trivedi is giving information evidence to you about M/ Unimark Remedies<br />

Ltd and M/s Zen Oncology P. Ltd. May engage in manufacturing of anti cancer drugs.<br />

1. Which type of technology and steps will be taken by the company for Safety<br />

Health and Environmental Protection? And which type of standards follow in<br />

UK, US, Europ and Japan for such protection.<br />

2. With rererence to the news published in daily news paper “ DIVYA<br />

BHASKER “ dated 21.01.07 on page No. 13 that Dr. Vouter frans man –<br />

jurmany explained that exposure of ante cancer drug may cause premature<br />

delivery and weight loss of child.<br />

3. Which steps will be taken by the company in proposed project/ unit for<br />

workmen and surrounding population?<br />

The company should give information about which steps will be taken for<br />

prevention of emission of dust of anti cencer drug due to dusting of powder<br />

may possible in such project?<br />

4. Is there given any information to surrounding villagers who are staying within<br />

ten km. by M/s. Unimark Remedies Ltd and Zen Oncology for the<br />

manufacturing of anti censer drug at propose project.<br />

Yours truly,<br />

Sd/ ++++++++<br />

A. B. Trivedi


Ans.;<br />

1. The information wants by you about UK, US, Europe and Japan etc<br />

country which safety related information we doesn’t have it.<br />

2. The safety measures are already mentioned in our E.I. A. report.<br />

3. We follow safety measures which are given by our safety experts and<br />

we often given training to employees who are engaged in chemical<br />

handling for use of personal protective equipment.<br />

4. All necessary information submitted in our E. I. A. report.


To<br />

The Regional Officer<br />

<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>,<br />

Navrang pura Ahmedabad.<br />

Anilkumar R Trivedi Canechar,<br />

24, Kulim Tenament,<br />

Nr. Bhavna Tenament, Vsana,<br />

Ahmedabad-380007.<br />

Tel:079-26600153<br />

Date:23/01/2009<br />

Sub: Public hearing on dtd. 23.01.09 of M/s UNIMARK REMEDIES LIMITED at<br />

Bavla, Ahmedabad.<br />

Dear sir,<br />

I am Anil Trivedi here by informed and given avidence .<br />

With reference to the page no. 1-4 of draft report of M/s UNIMARK REMEDIES<br />

LIMITED is indicated that “ there is no surface water body within 10 Km radious from<br />

industry” . In this regards my request that that is not correct and insuficient information<br />

given to the govt. for leading midsguid to fulfill their buisness purpose and made crime .<br />

There is ntiantialy suspected the information of villgelack and checkdam.<br />

It is true that this area is cover under area of bavla FATEH WADI Canal system. As per<br />

Drawing no. 32 dtd . 29.06.2000 of NARMADA WATER RESOURCE & SUPPLY<br />

DEPARTMENT 26 villages are covered within 10 Km distance form village KERALA.<br />

M/s UNIMARK REMEDIES LIMITED it self proposed in this area which is under<br />

Bhaila dam, Hirashar lack and bhimnath water “CANCH MENT”.<br />

This is for your records and reject the draft EIA report of M/s UNIMARK REMEDIES<br />

LIMITED, which is prepared by San Enviro Tech. Pvt. Ltd. – Paldi , Ahmedabad and<br />

public hearing.<br />

You are kindly requested that take reassessment of draft report and then conduct further<br />

public hearing will get justic by affected villagers.<br />

Yours truly,<br />

Anil B. Trivedi.


Answer : 8/UAnil B. Trivedi<br />

1. Information given in our EIA report is correct of M/s UNIMARK REMEDIES<br />

LIMITED<br />

2. This area is water logging area and there is no any permanent water bodies, in this<br />

study area only seasonal temporary ponds were found and it is always dry after<br />

month of December so we have not consider as regular water reservoir.


To,<br />

The Respected Collector,<br />

Ahmedabad<br />

Agnihotri Dineshkumar O<br />

“Santoshi Nivas” Gopalnagar<br />

Amraiwadi<br />

Ahmedabad – 380 025<br />

23 rd January, 2009<br />

Subject: Regarding commentaries in public hearing of declaration no. 5.0. 1533, dated<br />

14.09.2006 of Environment and Forest Ministry, New Delhi.<br />

Respected Sir,<br />

We, applicant of <strong>Gujarat</strong>, stay in Ahmedabad at Santoshi Nivas” Gopalnagar, Amraiwadi,<br />

Ahmedabad -26 and of Indian citizen. According to Indian constitution article – 19 (1)(k) we<br />

have a right of Freedom of Speech and expression. Moreover, according to Indian constitution<br />

Article 51 (k), part 4 (k), every Indian citizen is imposed of fundamental duty of maintaining<br />

environment. For the above mentioned subject we request you to extend the date of public<br />

hearing taking the following reasons into consideration.<br />

Regarding the declaration No. 5.0 1533, dated 14.09.2006 of Environment and Forest Ministry,<br />

New Delhi, M/s. Zen Oncology Private Limited and M/s. Unimark Remedies Ltd at Kerala,<br />

Town: Bavla, Dist. Ahmedabad gave an advertisement in <strong>Gujarat</strong> Samachar dated 16.01.2009 for<br />

the bulk-drugs production. Afterwards, on 20.12.2009, to get an information of the both the units,<br />

we applied to the Public Information Officer of the Collectorate office under information right<br />

act-2005. We attach herewith the enclosure.<br />

We have not received the reply of our RTI application of dated 20.12.2008 and so we can not<br />

present our ideas in the public hearing of these companies and therefore we request you to extend<br />

the date of this public hearing by favouring us.<br />

Thanking you,<br />

Yours faithfully,<br />

(Agnihotri Dineshkumar O)<br />

Encl: Our T.T.I. Application of dated 20.12.2008 (Xerox copy)<br />

1


Sir,<br />

We request you to inform you that on dated 11.12.2008, by public notice, shri Sanjv Tyagi, State<br />

Secretary, <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, <strong>Gujarat</strong> State, Gandhinagar, in connection with the<br />

declaration no. 5.0. 1533, dated 14.09.2006 of Environment and Forest Ministry, New delhi of the<br />

Government of India, the company has declared (1) M/s. Zen Oncology Private Limited, and (2)<br />

M/s. Unimark Remedies Ltd. Situated in Plot No. 337,338,269,294,296, 297 and 300 at Village<br />

Kerala, Town: Bavla, District Ahmedabad, for the production of bulk drugs for the project<br />

category “A” for the new plant by the Indian Government at C.G.O. Complex, Lodhi Road, New<br />

Delhi-110003 and declared as <strong>Control</strong> Authority to cover the present environment and forest<br />

ministry in category “A”.<br />

Above declaration has been found and read on page No.2 of the daily the <strong>Gujarat</strong> Samachar,<br />

Ahmedabad of <strong>Gujarat</strong> State b y us.<br />

Regarding the above mentioned declaration, public hearing has been held on 23.01.2009 to get<br />

public opinion at District Collectorate in Ahmedabad. So in connection with all above matters,<br />

we request you to provide the information and answers of the question which are mentioned as<br />

below:<br />

Under information right Act, 2005, as we have to represent the comments, remarks and objections<br />

in writing before dated 23.01.2009 against the above company for the all above matters. Please<br />

provide this information as soon as possible:<br />

(1) Inform us in details, the names, addresses, Residential and office telephone numbers,<br />

Mobile numbers, email address, fax no. etc. of Managing Directors and Directors of<br />

the above companies.<br />

(2) How many kinds of trees are there at present in the plot of the above mentioned<br />

company and of how much of age? Inform the number of trees.<br />

(3) How many trees have cut off legally or illegally, from the present plot in last years?<br />

Please provide us the copies of permission given in this regard. And have<br />

applications or complaints been done by persons or institutions regarding cutting off<br />

the trees legally? What procedure has been done against the company by the<br />

responsible authority? Which procedure? When? By whom? You are to give in<br />

details all the information regarding all the applications, complaints, permission letter<br />

for cutting the trees and its disposal.<br />

(4) If any application is done by the company for cutting the trees in the compound or<br />

plot in about units and if government has given permission for that we want to know<br />

under which rules and conditions, the permission has been given? And who has<br />

accepted the responsibility to maintain the conditions and rules? And on what base?<br />

Give information in details of all above matters.<br />

(5) Is the construction of the factory, done in the plot of the above company, legal or<br />

illegal? Any if it is legal, on what base, proofs and certificates and approval of<br />

construction has been given? Provide us in details the copies of proofs. And if the<br />

construction is illegal, how these factories, at present are active? According to which<br />

rules, regulations, conditions and certificates are these factories active? And are these<br />

conditions and rules to be followed or not? If yes, provide information. If the<br />

answer is no, then give the reasons for that.<br />

1


(6) Which kinds of productions have been done by the both above companies at present?<br />

From whom? Which kinds of the processes are being done? And due to these<br />

processes, what kinds of pollutions have been created regarding noise, gas and health<br />

in the atmosphere? And upto today, how many persons and institutions have<br />

complained and done applications? And of which kinds? Give in details, classified<br />

all the information regarding all above matters. Regarding these complaints which<br />

kinds of action have been taken? Give the full details.<br />

(7) Is there any possibility of the pollution regarding noise, gas, air and health by giving<br />

permission to above both the companies for the new project of bulk drugs production<br />

for project category “A” and of which kinds? What kinds of strict steps will be<br />

taken? Give in detail the classified information.<br />

(8) By whose responsibility and guidance, the planting of the trees will be done against<br />

the damage to be done to the environment by the above units? In which plots? In<br />

how much time? Give the details.<br />

(9) Give the copy of audit report of environmental matters of the above company from<br />

April 2008 upto today according to the rules by G.P.C.B. represented by the<br />

Company.<br />

(10) Give the maps with survey number of the land of the above mentioned plot numbers.<br />

(11) How many trees will be cut off to make this unit? Give details.<br />

(12) Give the application copy and copies of its report of the account (description) of<br />

E.I.A (Environment Inspect assessment) of this unit.<br />

(13) If any review of the thin layers investigation (mar and chemical) of the lands of the<br />

surrounding villages and of all the plots mentioned for the above company, has been<br />

done, give the copies of the report.<br />

(14) Has any plan or map has been made for the disposal of industrial waste and water<br />

waste occurred during the production process in the above company? Give the<br />

information with proofs.<br />

(15) How much cubic water will be necessitated for the production process in above<br />

company? Scarcity of how much cubic water will be created in the surrounding areas<br />

due to draining of water? Give information (with proofs) if any arrangement or the<br />

reports of survey have been prepared for dealing with scarcity.<br />

(16) By whose permission, by whom and from which place, can be gained the samples<br />

given for investigations of water waste released from these units at present? Give in<br />

detail the classified information.<br />

We want to get all above-mentioned information according to the Information Right Act. We<br />

request you to provide information as soon as possible in public interest.<br />

Thanking you,<br />

Ahmedabad<br />

20.12.2008<br />

2


Answer : Mr. Agnihotry Dinesh Kumar<br />

1. It is not relevant with pollution.<br />

2. Total area of green belt is 20,000 sq. meter and we have planted native pieces<br />

having average height 3 meter to 10 meter.<br />

3. We have not cut off any trees because of no expansion carried out in last year.<br />

4. Not applicable.<br />

5. Not related to environmental problem.<br />

6. All the details covered in our EIA report. Please see the web site of GPCB<br />

7. All the details covered in our EIA report. Please see the web site of GPCB<br />

8. Language is not clear<br />

9. We have submitted to GPCB and we are not suppose the audit report to you.<br />

10. The information is included in our EIA report.<br />

11. Not a single tree cut.<br />

12. For that you may visit to web site of GPCB .<br />

13. Point is not clear<br />

14. Our unit is Zero Discharge unit.<br />

15. The details are included in EIA report.<br />

16. Point is Not clear.


To<br />

The Collector,<br />

Ahmedabad Dist.<br />

Anilkumar R Trivedi Canechar,<br />

24, Kulim Tenament,<br />

Nr. Bhavna Tenament, Vsana,<br />

Ahmedabad-380007.<br />

Tel:079-26600153<br />

Date:23/01/2009<br />

Matter: Giving presentation proofs regarding the matter of Public- Hearing.<br />

Dated: 23/01/2009, Bavla, Ahmedabad of Environment subject of M/s.<br />

Unimark Remedies Ltd.,<br />

Respected Sir,<br />

I, Anilkumar B Trivedi, is givingt you my presentation proof to you.<br />

The draft of M/S. Unimark Remedies Ltd., has been presented by E.I.A. Report San<br />

Envirotech Pvt. Ltd., Paldi, Ahmedabad. In which company mentions that the project of<br />

extension in plot No.337,338,269,299,294,296,297,300 is to be implemented.<br />

Through you give the information of the points mentioned as under:<br />

(1) Give the details of any legal procedure done according to Environment<br />

Protection Act-1986 and Water (Prevention and <strong>Control</strong> of <strong>Pollution</strong>) Act.1974<br />

and Air (prevention and control of pollution) Act-1981 on M/s. Unimark<br />

Remedies Ltd., during the time of last ten Years by <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong><br />

<strong>Board</strong>. For example permission given to Start Production under which conditions<br />

and the procedure done to stop production, notice show-cause Notice.<br />

(2) How much construction area of the present production Unit will be and according<br />

to Factory Act, how many and of which kind of trees will be planted and will be<br />

maintained in the Factory plot for the permanent greenery and maintenance of<br />

Environment. Give the complete details<br />

(3) Habitants of the Bhayala village have presented that M/s/. Unimark Remedies<br />

Ltd., Factory has made a small pond to keep polluted water. Polluted water is<br />

being kept in this pond. After the first-second of the rain, the water of this pond is<br />

released by opening the valve of this pond and this water comes into the Bhayla<br />

dam and pollutes the water of the dam keeping this matter in view, inform<br />

alternate steps which are taken by factory.<br />

(4) According to the REIA Report (Page No.3,37), Figure:3.2 (Wind rose diagram)<br />

when the direction of Air is South-West, West-South, West-East, West-North,<br />

North-North-West, this polluted air of the factory affects the health of the<br />

habitants of the Bhayala village. In this matter inform us necessary steps taken by<br />

factory.<br />

1


(5) In the coming productions of the company, Medicine against cancer is going to be<br />

produced I bulk. In big proportion the manpower is to be used. So inform in<br />

detail regarding the Employee’s health protection and the protection of the<br />

Environment as well.<br />

Yours faithfully,<br />

Anilkumar B. Trivedi Vanechar.<br />

2


Answer : Anilkumar R Trivedi Canechar,<br />

1. The details of the legal procedure is included in the report.<br />

2. The area constructed activities are not related with environment as per as green<br />

belt area is consulted. W have planted native (Local) pieces as per the advice of<br />

<strong>Gujarat</strong> Agriculture University. Total green belt area is 20,000 Sq. Meter.<br />

3. We are having Zero discharge company within our company so there is no<br />

question of releasing polluted water.<br />

4. Area distance of Bhayla Village is from our factory is 206 Km. and there is no<br />

health or environment related problem because maximum ground level<br />

concentration of toxic gas is predicted 1 Km. from the factory site and<br />

concentration of toxic gas is 0.368 μg/M 3 which is very negligible.<br />

5. We are followed the instruction and guideline given by our Environment , Health<br />

and Safety (EHS) expert and adhered EHS management system. And also from<br />

time to the employees are given training for using the instruments of protection.<br />

They are also given training while using Chemical.


To<br />

The Collector,<br />

Ahmedabad Dist.<br />

Anilkumar R Trivedi Canechar,<br />

24, Kulim Tenament,<br />

Nr. Bhavna Tenament, Vsana,<br />

Ahmedabad-380007.<br />

Tel:079-26600153<br />

Date:23/01/2009<br />

Matter: Giving presentation proofs regarding the matter of Public- Hearing.<br />

Dated: 23/01/2009, Bavla, Ahmedabad of Environment subject of M/s.<br />

Unimark Remedies Ltd.,<br />

Respected Sir,<br />

I, Anilkumar B Trivedi, is givingt you my presentation proof to you.<br />

The draft of M/S. Unimark Remedies Ltd., has been presented by E.I.A. Report San<br />

Envirotech Pvt. Ltd., Paldi, Ahmedabad. In which company mentions that the project of<br />

extension in plot No.337,338,269,299,294,296,297,300 is to be implemented.<br />

Through you give the information of the points mentioned as under:<br />

(1) Give the details of any legal procedure done according to Environment<br />

Protection Act-1986 and Water (Prevention and <strong>Control</strong> of <strong>Pollution</strong>) Act.1974<br />

and Air (prevention and control of pollution) Act-1981 on M/s. Unimark<br />

Remedies Ltd., during the time of last ten Years by <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong><br />

<strong>Board</strong>. For example permission given to Start Production under which conditions<br />

and the procedure done to stop production, notice show-cause Notice.<br />

(2) How much construction area of the present production Unit will be and according<br />

to Factory Act, how many and of which kind of trees will be planted and will be<br />

maintained in the Factory plot for the permanent greenery and maintenance of<br />

Environment. Give the complete details<br />

(3) Habitants of the Bhayala village have presented that M/s/. Unimark Remedies<br />

Ltd., Factory has made a small pond to keep polluted water. Polluted water is<br />

being kept in this pond. After the first-second of the rain, the water of this pond is<br />

released by opening the valve of this pond and this water comes into the Bhayla<br />

dam and pollutes the water of the dam keeping this matter in view, inform<br />

alternate steps which are taken by factory.<br />

(4) According to the REIA Report (Page No.3,37), Figure:3.2 (Wind rose diagram)<br />

when the direction of Air is South-West, West-South, West-East, West-North,<br />

North-North-West, this polluted air of the factory affects the health of the<br />

habitants of the Bhayala village. In this matter inform us necessary steps taken by<br />

factory.<br />

1


(5) In the coming productions of the company, Medicine against cancer is going to be<br />

produced I bulk. In big proportion the manpower is to be used. So inform in<br />

detail regarding the Employee’s health protection and the protection of the<br />

Environment as well.<br />

Yours faithfully,<br />

Anilkumar B. Trivedi Vanechar.<br />

2


Answer : Anilkumar R Trivedi Canechar,<br />

1. The details of the legal procedure is included in the report.<br />

2. The area constructed activities are not related with environment as per as green<br />

belt area is consulted. W have planted native (Local) pieces as per the advice of<br />

<strong>Gujarat</strong> Agriculture University. Total green belt area is 20,000 Sq. Meter.<br />

3. We are having Zero discharge company within our company so there is no<br />

question of releasing polluted water.<br />

4. Area distance of Bhayla Village is from our factory is 206 Km. and there is no<br />

health or environment related problem because maximum ground level<br />

concentration of toxic gas is predicted 1 Km. from the factory site and<br />

concentration of toxic gas is 0.368 μg/M 3 which is very negligible.<br />

5. We are followed the instruction and guideline given by our Environment , Health<br />

and Safety (EHS) expert and adhered EHS management system. And also from<br />

time to the employees are given training for using the instruments of protection.<br />

They are also given training while using Chemical.


To.<br />

The Chairman,<br />

Dist. Environmental Public Hearing Committee,<br />

Dist.Ahmedabad.<br />

The President of a village Panchayat,<br />

Hasmukhbhai Dhoribhai Parmar,<br />

Deputy President of Village President,<br />

Narendrasinh Ranchhodbhai Rathod,<br />

Village: Bhayala, Tal: Bavla.<br />

Dist. Ahmedabad.<br />

Date: 23/01/2009<br />

Sub: Representation in public Hearing of Unimark Remedies Ltd., being held on<br />

23/01/2009<br />

Sir,<br />

I wish you well.<br />

(1) This company mentions in its E.I.A. report that in the studied area of 10 Kilo<br />

meter there is no surface water. But in our this area there are check-dams and<br />

ponds. There is cannel also. Such serious mistake in the report is not mistake. But<br />

it is an effort to hide the information knowingly. Therefore we demand to cancel<br />

the E.I.A. Report and wish to held public- Hearing again.<br />

(2) The company is going to do the construction in the area where there are ways of<br />

the disposal of the rainy water. If company will construct and will prevent ‘water<br />

by building walls, our villager will be drowned. Surrounding water will disturb<br />

the life of the people and the plague will be spread over. The company has not<br />

mentioned what arrangement it has done regarding this matter. We strictly<br />

demand to change the site for new extension of company.<br />

(3) Company releases its dirty water into the Dam/Cannel from which Farmers uses<br />

water for agriculture. This dirty water pollutes dam/Cannel.<br />

(4) It is a serious matter that this company releases dirty water by gutter/ small<br />

cannels in open and outward area of the company. We have paid attention to the<br />

administration regarding this matter and G.P.C.B. have issued notices also. So<br />

how can such polluted company be given permission?<br />

(5) This company make ponds in its plant and accumulates dirty water and make the<br />

place dirty. Due to this the water underneath also is polluted and every year the<br />

company releases the p0olluted water with the rainy water; which is not proper<br />

and we demand strictly that be stopped soon.<br />

1


(6) The company is going to use 859 Kil0-litres of water every day, which is<br />

mentioned on Page N0.E-9 of summary. It is too much. If the water of such big<br />

proportion is going to be sucked by its bore-well, there will be an adverse effect to<br />

the water underneath. Questions like decrease of underneath water and decrease<br />

of the quality of water will arise. There is not alternate except bore-well. If the<br />

company let the polluted water go underneath by reverse bore-well, it is very<br />

difficult to examine that matter and it is expensive also. What is the assurance of<br />

this matter?<br />

(7) This company is going to use the water and out of this water there will be<br />

produced 554 Kilo-liter dirty water and after treatment this dirty water will be<br />

used in washing machinery and again this dirty water will be more dirty and<br />

everyday dirty water will be increased. How much capacity company has to<br />

storage such too much dirty water? Where will company dispose storage of dailypolluted<br />

water? What method of examining this matter?<br />

(8) Where you will discharge the underneath water? How will do this? How much<br />

fund will you use? Have you will do bore-well, ponds, check dam, well etc.?<br />

Thanking you,<br />

Yours faithfully,<br />

(Hasmukhbhai D. Parmar).<br />

C.c. To<br />

Member Secretary and Regional Officer,<br />

<strong>Gujarat</strong> pollution <strong>Control</strong> <strong>Board</strong>, Gandhinagar.<br />

2


Answer: The President of a village Panchayat, -<br />

Hasmukhbhai Dhoribhai Parmar,<br />

1. This area is water logging area and there is no any permanent water bodies, in<br />

this study area only seasonal temporary ponds were found and it is always dry<br />

after month of December so we have not consider as regular water reservoir.<br />

2. The site belongs to the company where it is going to do the construction,<br />

which is not off water<br />

3. Our company is of zero discharge company, we do not release water into<br />

gutter or rivulet.<br />

4. We do not release any type of water into gutter or rivulet<br />

5. Company does not accumulate dirty water in its plant. We use the water after<br />

giving treatment<br />

6. We have water harvesting system in the company. The roof top water is<br />

diverted in the harvesting system hence there is no possibility of<br />

contamination. This will increase under earth water level and improve under<br />

earth water quality. The details of water treatment facilities like full fledge<br />

effluent treatment plant, 7 stage multiple effective evaporator, RO plants,<br />

recycle and reuse of treated water. All the details are given in our EIA report.<br />

7. Our company will do the treatment of dirty water and after passing the dirty<br />

water into reverse osmosis plant, we will use it again. This recycling is<br />

constant so there is no question of accumulating water.<br />

8. To recharge the underneath water we will deposit the fund according to the<br />

necessity required.


From:<br />

Rakesh kumar Kishorebhai Suthar<br />

46, Ganesh Society<br />

Near Mohannagar<br />

Naroda, Ahmedabad – 382 330<br />

To,<br />

The District Collector<br />

O/o. the District Collector<br />

Ahmedabad.<br />

Dear Sir,<br />

Sub: Objection application<br />

Ref: RTI Ref. No. 152 dated 20.12.08, GPCB, Gandhinagar<br />

Ministry of Environment and Forest, Govt. of India, New Delhi, Notification No.<br />

SO 1533 dated 14.09.2006 – Zen Oncology Pvt. Ltd and Unimark Remedies Ltd<br />

I, the undersigned Rakesh Kumar Kishorebhai Suthat, would like to state that in<br />

connection with the public hearing, we are objecting against the above said company<br />

namely Zen Oncology Pvt. Ltd and Unimark Remedies Ltd as under:<br />

In connection with the public hearing advertisement given by the company in the news<br />

paper, we have approached the <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong> for getting information<br />

about the proposed project report under Right to Information act. But I regret to inform<br />

you that I have not received the sufficient information from the GPCB officials.<br />

Therefore, request you to provide the necessary information in this regard.<br />

I therefore request you to provide necessary information about the above said company to<br />

the public regarding environmental problems due to pollution so that the peoples can<br />

understand about the environmental situations. I would like to further inform you that<br />

without knowledge of chemicals, how the peoples can raise the problems. Therefore,<br />

kindly adjourn the public hearing.<br />

Thanking you,<br />

Yours faithfully,<br />

Rakesh kumar Kishorebhai Suthar


Answer : Rakesh kumar Kishorebhai Suthar<br />

We have provided all the necessary informative reports to all surrounding villages and<br />

informed about the same as per the standards prescribed by the Government.<br />

We have included the details regarding the proposed products and required raw materials<br />

in the EIA reports for general public.


From:<br />

Dinesh Chauhan<br />

All India Youth Federation<br />

Ahmedabad District Council<br />

41-Shanti Nivas Bldg,<br />

Nr. Vijay Mill, Naroda Road<br />

Ahmedabad – 25<br />

To:<br />

The Member Secretary<br />

<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong><br />

Gandhinagar<br />

Dear Sir,<br />

Sub: Information – Public Hearing<br />

Ref: Unimark Remedies Ltd<br />

Zen Oncology Pvt. Ltd , plot no. 337, 338,269,299,295, 296, 297, 300<br />

<strong>Gujarat</strong> State Road & Development Nigam Limited – Bagodara – Valabhipura,<br />

Bhavngar, Sarkhej – Vataman – Bhavnagar<br />

Please note that we are actively working with All India Youth Federation in Ahmedabad.<br />

With reference to the above subject, we would like to request to note our objection<br />

application regarding public hearing dated 23.01.2009.<br />

We would like to further inform you that if we will not get any information about the<br />

environmental impact due to the proposed projects of the above said company, on what<br />

basis we can raise an objection. We therefore request you to provide the EIA report and<br />

Audit Report (last five years) in <strong>Gujarat</strong>i version at our above mentioned address, so that<br />

we can give necessary suggestions and take objections.<br />

We request you to do the needful in the above matter.<br />

Thanking you,<br />

Dinesh Chauhan<br />

C.C. To: The Secretary<br />

Ministry of Environment and Forest<br />

CGO Complex, New Delhi<br />

The District Collector, Ahmedabad


From:<br />

Dinesh Chauhan<br />

All India Youth Federation<br />

Ahmedabad District Council<br />

41-Shanti Nivas Bldg,<br />

Nr. Vijay Mill, Naroda Road<br />

Ahmedabad – 25<br />

Date: 23.01.2009<br />

To:<br />

The District Collector<br />

O/o. the District Collector<br />

Ahmedabad<br />

Dear Sir,<br />

Sub: Objection application for Public Hearing<br />

Ref: Notification No. SO 1533 dated 14.09.2006 of Ministry of Environment and<br />

Forest, New Delhi, Government of India.- Unimark Remedies Ltd and Zen<br />

Oncology Pvt. Ltd , Village: Kerala, Tal: Bavla, Dist. Ahmedabad<br />

Please note that we are actively working with All India Youth Federation in Ahmedabad<br />

for resolving the environmental problem.<br />

With reference to the above mentioned subject, we hereby object to the proposed project<br />

to put in category “A”.<br />

As you may be aware that almost all the major chemical industries are permitted by<br />

Government in <strong>Gujarat</strong> State of India. Due to the chemical process, most of the problems<br />

are arrived in air and water. The crisis of trees can also resulted in uncertain rain every<br />

year and increasing more pollution of air and water in <strong>Gujarat</strong> State Hence, people of<br />

Guajrat, suffered from polluted air, Asthma, Kidney related disease.<br />

We have requested GPCB on dated 5.1.2009 for providing possible environmental impact<br />

and human disease before public hearing of proposed project of the above company.<br />

However, till date GPCB officials has not provided the information. Also no steps are<br />

taken by the GPCB for plantation.<br />

Considering all the above points in mind and also giving permission for chemical<br />

industries, we will oppose with a help of public for the same.<br />

Hope to get a favourable action.<br />

Dinesh Chauhan


Answer : All India Youth Federation<br />

We are not responsible for that.


From:<br />

Premsingh B. Rathod<br />

Municipal Corporator smt. Jankidevi Chauhan<br />

Vishnu ni Chali<br />

Bapunagar, Ahmedabad<br />

Date: 23.01.2009<br />

To,<br />

The Collector,<br />

Dist. Ahmedabad<br />

Ahmedbaad<br />

Dear Sir,<br />

Sub: Notification No. SO 15033 dated 14.09.06 of Ministry of Environment and<br />

Forest, New Delhi<br />

Ref: Application dated 05.01.2009, Shri Sanjiv Tyagi, Member Secretary, GPCB.<br />

Paryavaran Bhavan, Sector 10, Gandhinagar – 382010<br />

With reference to the above mentioned subject and public hearing dated 23.01.2009<br />

would like to raise my objection and suggestion for the same.<br />

1. We would like to have clarification regarding the advertisement given by Member<br />

Secretary, GPCB for the public hearing in <strong>Gujarat</strong> Samachar dated 11.12.2008 for<br />

M/s. Unimark Remedies Limited and Zen Oncology Pvt. Ltd separately. But the<br />

both company have mentioned the plot no. 337, 338, 269, 299, 294, 296, 297 and<br />

300, Village Kerala, Dist. Ahmedabad. Is the company have taken permission for<br />

individual construction as the address given in the advertisement are same for<br />

both company.<br />

2. As per point no. 1, if the company is having same plot, then the construction will<br />

be the same for the both the unit or not?<br />

3. As per the point no. 1, on which plot, the company is going to make a<br />

construction.<br />

4. As per our knowledge, the company M/s. Unimark Remedies Ltd is in operation<br />

since long. If the company is also would like to make an expansion in the same<br />

plot, on what basis the company has obtained the permission? From whom?<br />

1


5. There is no explanation given for the construction / manufacturing activities of<br />

M/s. Zen Onocology Pvt. Ltd, if they want to make a construction in the same<br />

plot.<br />

6. Please provide all the documents pertaining to construction activities of Zen<br />

Oncology Pvt. Ltd.<br />

7. If both the company is ready to make a manufacturing activities in the same plot,<br />

in future, how we can come to know that by whose mistake the incidents is taken<br />

place?<br />

Thanking you,<br />

Yours faithfully,<br />

Premsingh Rathod<br />

2


ANS: Premsingh B. Rathod<br />

Municipal Corporator smt. Jankidevi Chauhan<br />

1. M/s. Unimark Remedies Ltd is a working unit. We would like to start the<br />

operations activities of M/s.Zen Oncology Pvt. Ltd in the same premises. The plot<br />

no. of the same is mentioned in our report.<br />

2. This question is not related to pollution. So it is not necessary to give any answer.<br />

Point No. 3,4,5,6,7 are not related to pollution.


20 th January, 2009<br />

To,<br />

Mahesh Pandya<br />

CENTRE FOR SOCIAL JUSTICE – JANVIKAS<br />

Ahmedabad<br />

Dear Sir,<br />

Sub: Environmental Public Hearing of Unimark remedies Ltd. at Bavla,<br />

Ahmedabad on 23/01/2009<br />

Ref: Your letter PM/MP/188/2009, dated 9 th January, 2009.<br />

We are in receipt of a copy of your letter addressed to Shri Sanjiv Tyagi, Member<br />

Secretary, <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Gandhinagar. We have studied the points<br />

contained in this letter and would like to send our reply/ clarifications as under.<br />

1. Whether company has Environment clearance for its existing unit? If yes, Give<br />

copy of clearance and compliance report thereof. When latest compliance report<br />

according to the Environmental clearance submitted to MoEF as well as GPCB?<br />

Please give date of submission. Is it uploaded on your official website?<br />

Yes, Unit has obtained Environmental Clearance.<br />

2. Whether company has valid consolidated consent and Authorization of GPCB<br />

under various acts for its existing unit? Please give copy of it and copy of<br />

compliance report of consent and Authorization. What is date of validation of<br />

CCA?<br />

Yes, company has valid Consent and Authorization of GPCB under various<br />

acts for its existing unit. Copy of CC & A and its compliance are enclosed for<br />

your reference as Annexure -A.<br />

3. Please give copy of GPCB visit report and air/water/solid waste sample analysis<br />

report for existing unit in last two years.<br />

Enclosed as Annexure-B.<br />

4. Please give copy of MoEF regional office visit report in last two years, if any.<br />

Not available because MoEF regional officer were not visited our plant.<br />

5. Whether company had been issued show cause notice/ closure order/notice under<br />

water act 1974 or Air act 1981 or Environment protection act 1986 since starting


of existing unit? If yes give copy of it. Also what remedies had been taken for<br />

restarting operation?<br />

6. Whether unit has submitted Environmental Audit reports regularly to GPCB for<br />

existing plant? What were suggestions of Auditor in last two years report?<br />

Yes, unit has submitted Environmental Audit reports regularly to GPCB for<br />

existing plant. Points of suggestions are enclosed as Annexure-C.<br />

7. Whether GPCB has issued NOC for proposed expansion of project?<br />

Not applied for NOC. We have applied very soon for consent to<br />

establishment<br />

8. When will be the phases implemented as expansion and omission?<br />

9. Please justify coal as fuel for captive power plant in the wake of climate change<br />

and global warming<br />

Considering the non availability of Natural gas in this region and feasibility<br />

of project, we have select lignite/coal as fuel for our CPP.<br />

10. Is there any agreement between unimark and brick manufacturer to utilize fly ash?<br />

11. How much water from rain water harvesting system is expected to collect in one<br />

season? Do you have water harvesting plan? Our suggestion is do not harvest rain<br />

water in your campus. Please carry out this plan to nearby villages. Reason is if<br />

you are harvesting rain water in your campus, than toxic waste might be<br />

percolated to the soil.<br />

12. What is source of water for existing and proposed plant?<br />

Source of water is groundwater for existing and proposed plant. The area of<br />

unit is not falls under the dark Zone hence necessary permission for<br />

extraction of ground water is not required.<br />

13. Water balance diagram for both existing and proposed plants are not properly<br />

balanced. So report is inadequate. It is a serious lacuna in EIA.


14. What is final discharge point of treated effluent?<br />

15. What would be odor control measures after expansion?<br />

The unit has also installed fumes hood to suck fugitive’s emissions during<br />

charging of Raw materials/Centrifuge/Packing of products and same will be<br />

scrubbed by suitable scrubbing systems.<br />

16. Why baseline monitoring was carried out before finalization of terms and<br />

reference for the project?<br />

To saving the time for obtaining permission of EC, we have started our<br />

baseline study at planning stage i.e. with application of TORs.<br />

17. Please give name of CPCB authorized recycler/trader to whom waste oil and other<br />

solid hazardous waste is given for existing unit<br />

Bombay barrel supply Co, Unity Petroleum Co. is register recycler with<br />

CPCB and we are selling our used lubricating oil.<br />

18. How many skilled and unskilled people from surrounding are will get<br />

employment in proposed expansion project?<br />

The total manpower for the plant operations is around 600 hundred and<br />

after expansion 300 men force will be added.<br />

skilled and unskilled workers will get employment in proposed expansion<br />

project. Most of will be from local surrounding area.<br />

We hope the details/clarifications given by us will help you assess our proposal and EIA<br />

report in proper perspective.<br />

Regards<br />

For, Unimark remedies Ltd.<br />

Managing Director


January 23, 2009<br />

To,<br />

Chairman / Member Secretary<br />

Environmental Public Hearing Committee,<br />

Ahmedabad<br />

Sub: Environmental Public Hearing of M/s Unimark Remedies<br />

Limited.<br />

Respected sir,<br />

We are in receipt of above cited letter addressed to your office and<br />

have noted the content mentioned therein.<br />

With regard to above, we hereby clarify for questions raised by Mr.<br />

Manish rana, Editor of Paryavaran Mitra <strong>Gujarat</strong> concerning to our new<br />

project at village Kerala as under:<br />

With regard to above, we hereby clarify for questions raised by you.<br />

1. What will be steps to be taken to protect environment by<br />

deputing environment expert?<br />

This company will appoint environmental expert for the<br />

prevention of pollution and it will be installed ETP, RO and multi<br />

effect evaporation plant for prevention of pollution.<br />

2. What will be steps taken by unit to take care of social<br />

responsibility?<br />

We regularly provide voluntary donations to social, religious<br />

activities. We understand the concept of social responsibility /<br />

security.<br />

3. We suggest that this unit will give the priority to local<br />

employment.<br />

Company will give the first priority for employment to local<br />

people from the surrounding area.


4. We suggest earmarking necessary budgets for protection<br />

and prevention of the environment.<br />

This company will do all the efforts for the prevention of<br />

environmental pollution and will provide budget of Rs. 1.5 crore.<br />

5. We suggest that this unit will provide a best example for<br />

prevention of pollution.<br />

Company will obey all the rules of GPCB and CPCB and becoming<br />

a good example for others<br />

6. We recommended to provide reasonable budge for the<br />

development of nearby area as well as to give help to<br />

school, widows and poor people.<br />

Project proponent of the company will help to the people of the<br />

surrounding by providing budget for school, widows and poor<br />

people.<br />

Thanking you,<br />

For M/s Unimark Remedies Limited<br />

Authorized Signatory


January 23, 2009<br />

To,<br />

Pravinbhai Sheth<br />

A-8, Kalandi Apartment,<br />

Chikuwadi, Ankleshwar-393001<br />

<strong>Gujarat</strong>.<br />

Sub:-Environment public hearing of proposed project of<br />

Unimark Remedies Limited .on 23-01-2009 at Bavla, Dist:-<br />

Ahmedabad.<br />

Respected Sir,<br />

We are in receipt of a copy of your letter addressed to Member<br />

Secretary, <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Gandhinagar. We have<br />

studied the points contained in this letter and would like to send our<br />

reply/ clarifications as under.<br />

Views, Comments& Suggestions<br />

Sr.<br />

No.<br />

Findings Measures<br />

1 AS REGARDS RAW MATERIALS USAGE,PLEASE FURNISH<br />

a Facility available for major solvent YES<br />

fire extinguishing.<br />

b Do you have your own in house YES<br />

fire foam tender?<br />

c What will be inventory of foam? 300 - 400 Ltr.<br />

d What reserve stock of water will<br />

be kept for fire fighting & storage<br />

capacity?<br />

e Where is risk analysis of<br />

carcinogenic, hazardous chemicals<br />

& explosive chemicals, if any what<br />

will be mitigation measures to<br />

handle these to safeguard<br />

employees from health hazards.<br />

f What fire fighting facility available<br />

for mutual aid in study area?<br />

Water reservoir for fire water<br />

is 600 KL<br />

Company has prepared ON<br />

SITE EMERGENCY PLAN and<br />

mitigation action of potential<br />

emergencies available at site.<br />

Mutual aid carried out with<br />

neighboring industries.


g What type of fire alarm system<br />

with details of 'sensors' installed?<br />

h How you will neutralize static<br />

charge before unloading solvents<br />

tankers at the entry point? What<br />

is solvent tanker unloading<br />

procedure?<br />

i Is there any carcinogenic<br />

chemical? How do you safeguard<br />

your employees from health<br />

hazards?<br />

2 How many polluting industries are<br />

already there in study area?<br />

3 You propose to use "Coal" as fuels<br />

for boiler, how do you ensure on<br />

to control 'CO' <strong>Pollution</strong> as<br />

present-data is 0.44 mg. / m3<br />

4 What is noise monitoring data at<br />

Environment sensitive places?<br />

5 Map on page 123 is misguiding,<br />

project site is shown in gulf of<br />

cam bay, and corrective action is<br />

needed.<br />

6 Please furnish membership letters<br />

with validity period of the<br />

organizations, where organic<br />

residues shall be sent for<br />

incineration. Any dioxan or furan<br />

likely to get emitted in vent<br />

Company has provided<br />

emergency siren.<br />

Yes, Checklist available<br />

including earthning continuity.<br />

1. Company has provided<br />

dedicated safety cup boards to<br />

all dept. for put in Personal<br />

Protective equipments (PPEs),<br />

While handling of hazardous<br />

chemicals concerned dept. in<br />

charge ensured the safe use of<br />

PPEs. Periodically medical<br />

2. Hazardous chemical<br />

handling activities are followed<br />

in close condition.<br />

3. Periodical medical check up<br />

followed once in every six<br />

month.<br />

Majority engineering and rice<br />

mills are available within 5- 10<br />

Km range.<br />

We ensure to provide sufficient<br />

Oxygen/Air for complete<br />

combustion of fuel.<br />

Noise monitoring carried out<br />

regularly and found within<br />

limit. Same is included in our<br />

EIA report.<br />

It was the conversion mistake<br />

of computer software and<br />

assures to correct it.<br />

Company has valid member<br />

ship of BEIL, GAPIL letter is<br />

enclosed herewith. Dioxin or<br />

furan will not emitted from<br />

stack/vent.


during incineration?<br />

7 Solvents will be used in no. of<br />

processes, What will be %<br />

evaporation loss & how you will<br />

reduce if further?<br />

8 Where is decontamination<br />

procedure for discarded barrels<br />

before reuse / sell?<br />

9 As regards green belt<br />

environment<br />

a What types of tress will be<br />

planted?<br />

Very negligible, chilled<br />

condenser provided at vent to<br />

control the losses.<br />

Yes<br />

Azadirachta India,<br />

Kena,Termininaliac catappa,<br />

Moringa oleiaera, Casuarina<br />

equisepofolia,Nerium indicum,<br />

Thevatia peruviana,<br />

Neriumspecaies etc.<br />

b How many trees will be planted? 2105<br />

c What will be APTR of trees? Don’t know meaning of PTRA<br />

d To protect environment from There will no vaporization of<br />

Bromin & Chlorine vapour Bromine & Chlorine.<br />

pollution. What special trees will<br />

be planted? What will be height of<br />

the trees?<br />

e What will be fresh water 48 cu.m/day present, 130<br />

consumption?<br />

proposed.<br />

10 As regards waste minimization<br />

concept.<br />

a Which bye products you will We are recovering mainly<br />

recover & reuse? What will be solvents and quantities will be<br />

monthly quantity?<br />

depending<br />

solvent.<br />

on the use of<br />

b Where is rain water harvesting Yes, we have facilities for<br />

schematic diagram? How much rainwater harvesting. Average<br />

rain water will he harvested? How quantity of water recharge per<br />

much fresh water consumption season will be around 15968<br />

will be reduced? on yearly basis. m 3 .<br />

11 As regards occupational health &


safety.<br />

a What is last three years safety<br />

health & environment track record<br />

of "Unimark" for all locations?<br />

b For either location during periodic<br />

health check-up any serious case<br />

of infections, disease or<br />

carcinogenic disorder was<br />

reported? If so what are details &<br />

what health care facilities offered<br />

to such employees.<br />

12 How many ammonia torches will<br />

be kept as reserved stock?<br />

13 What Chemicals / Vapors will lead<br />

to Chemical Poisoning & what<br />

antidotes will be kept in ready<br />

stock.<br />

14 What is decontamination<br />

procedure before charging any<br />

new batch?<br />

15 How do you ensure that in<br />

summer, hot water will not flow<br />

through pipeline connected to eye<br />

wash fountain?<br />

16 Is there any exothermic<br />

reactions? If so, what safety<br />

measures will be adopted?<br />

17 In order to justify project<br />

sustainability, what will be pay<br />

back period of Rs. 36 Crores<br />

project cost?<br />

SUGGESTIONS<br />

18 As regards green belt, please<br />

monitor periodically CO2 & O2<br />

level for ascertaining green belt<br />

effectiveness.<br />

One fatal accident report<br />

during the last three years.<br />

No<br />

Two Ammonia torch available<br />

& 10 gas cylinder (50Kg.) of<br />

Ammonia stored at site<br />

Major hazardous chemicals<br />

which will be used for the<br />

process and its antidotes are<br />

available at site.<br />

It is necessary for API<br />

manufacturing process which<br />

depends on the reagent used<br />

for the process.<br />

In summer safety shower lines<br />

are flushes regularly i.e.<br />

frequency of line flushing is<br />

three times and for laboratory<br />

dedicated eye wash unit<br />

provided.<br />

Yes, Reactor cooling, chilling<br />

facility is provided.<br />

Not related with Environment<br />

related activities.<br />

Good suggestion and we will<br />

evaluate and consider.


19 Before constructing building<br />

blocks requiring air conditioning /<br />

refrigeration, please ensure to<br />

calculate proper R value & U<br />

factor for slab, roof, side walls,<br />

glasses to achieve maximum<br />

power saving.<br />

20 Please encourage timber free<br />

construction wherever possible &<br />

use eco-friendly construction<br />

material.<br />

21 In order to encourage energy<br />

conservation drive, please use<br />

solar system (street lights, garden<br />

lantern, heater, pumping water to<br />

overhead tank etc.) Also use CFL<br />

lamps (with due care to handle<br />

discarded lamps to avoid mercury<br />

pollution).<br />

22 Restrict use of CFC & alternates<br />

should be encouraged to avoid<br />

Global Warming & to honour<br />

national drive campaign. Other<br />

green house gases emission<br />

should be kept at minimum<br />

possible level.<br />

23 It would have been appreciated if<br />

baseline studies would have been<br />

incorporated for whole year all<br />

seasons (except monsoon) data<br />

to understand predicated pollution<br />

load in a better way which would<br />

rather help for an effective EMP to<br />

overcome negative adverse<br />

impacts.<br />

24 Please budget some amount<br />

towards donation to uplift society<br />

weaker class persons like needy,<br />

widows, handicapped, blind,<br />

orphans, senior citizen likewise.<br />

25 Please avail of carbon credit by<br />

adopting cleaner / Green<br />

Our project team will take care<br />

for the same.<br />

Valid suggestion and do best<br />

for it.<br />

Valid suggestion and do best<br />

for it.<br />

Valid suggestion and do best<br />

for it.<br />

It is Rapid EIA study and one<br />

season monitoring suggested<br />

by MoEF.<br />

Company has considered<br />

corporate responsible care.<br />

Point noted, we will take<br />

benefit.


Technology.<br />

I hope the detailed clarification given by us will help you to assess our<br />

proposal and EIA report in proper perspective.<br />

Thanks & Regards<br />

For, Unimark Remedies Limited,<br />

Authorized Signatory


Baayalaa gaàma pMcaayat hsamauKBaa[ DI.prmaar<br />

rIpaoT-naI AMdr savao- krolaa jo namaunaa laIQaola Co jo svatM~ AojnsaIAo laIQaola Co Anao<br />

AonaalaIsaIsa krola Co. baIju jNaavavaanauM ko Aa pàojokTnaI AMdr jo p`duYaIt paNaI<br />

naIkLvaanauM Co tonao saMpUNa- pNao rIsaayakla krvaanaa CIAo.³yauTIlaITI Anao pàosaosa naI AMdr´<br />

zero Dischage concept.<br />

PàduYaNanaa inayaM~Na maaTo jrurI sk`bar lagaavaola Co Anao ivastrNa pCI pNa jruiryaat<br />

p`maaNao sk`bar lagaavavaamaaM AavaSao.AovauM Amaara rIpaoT-maaM dSaa-vaola Co.


PàitEaIÊ<br />

klaokTr saahobaÊ<br />

ivaYaya:p`duYaNa baabat<br />

AmaarI nama` ivanaMtI Co Amaara gaama BaayalaaqaI bao qaI ~Na iklaaomaITr dur ³1´<br />

mao.Jona AaonkaolaaoŸ ³2´ mao.yaunaImaak- romaoDIJ pàojokT banao Co.tao toAao naa savao- krola<br />

namaunaa baIlakula KaoTa Co. jovaa ko hvaamaanaÊ paNaInao lagata jo AaMkDa toAaoAo dSaa-vyaa<br />

Co to KaoTa Co Anao Aa caalau pàojokT qaI jo Amaara gaamanaI Aajubaaju hvaamaana Anao<br />

paNaI maaM Kubaj Kraba Asar qa[ Co.tao Aap saahoba nao AmaarI Baayalaa gaama tqaa<br />

Aajubaajunaa gaamanaa laaokaonaI nama` ivanaMtI Co.Aa baMnnao pàojokT Amaara ivastarmaaM Kuba<br />

naukSaana kta- Co. tao GaTtuM krvaa ivanaMtI.<br />

hsamauKBaa[ QaaorIBaa[ prmaar<br />

Baayalaa


PàitEaI<br />

klaokTr saahoba<br />

Amadavaad.<br />

Aap saahobanao jNaavavaanauM ko koraLa jo yaunaImaak- karKanauM AavaolauM Co tonaao Kasa pÈna<br />

p`duYNa naao Co.jo gaosa Kuba j Kraba Aavao Co jo jnatanaI ihtnao naukSaana krnaar Co<br />

toma j paNaI naa inakala kro Co tomaaMqaI KotInaa pak nao naukSaana qa[ Sako Co tomaj<br />

Aaraogya AMgao naukSaana qa[ Sako Co.]praokt baabat QyaanamaaM la[ AagaL kaya-vaahI<br />

krvaa ivanaMtI.<br />

caMpabaona dovaaBaa[<br />

sarpMca<br />

ZoZaL gaàma pMcaayat


jvaaba : sarpMca caMpabaona dovaaBaa[<br />

rIpaoT-naI AMdr savao- krolaa jo namaunaa laIQaola Co jo svatM~ AojnsaIAo laIQaola Co Anao<br />

AonaalaIsaIsa krola Co. baIju jNaavavaanauM ko Aa pàojokTnaI AMdr jo p`duYaIt paNaI<br />

naIkLvaanauM Co tonao saMpUNa- pNao rIsaayakla krvaanaa CIAo.³yauTIlaITI Anao pàosaosa naI AMdr´<br />

zero Dischage concept.<br />

PàduYaNanaa inayaM~Na maaTo jrurI sk`bar lagaavaola Co Anao ivastrNa pCI pNa jruiryaat<br />

p`maaNao sk`bar lagaavavaamaaM AavaSao.AovauM Amaara rIpaoT-maaM dSaa-vaola Co.


PàitEaI<br />

maa. Ÿllaa klaokTrEaI<br />

Amadavaad.<br />

ivaYaya : Baart sarkarnaa pyaa-varNa Anao vana maM~alayanaa jahornaamaaM k`maaMk<br />

Aosa.Aao.1533 ta.14.09.2006 naI laaok saunaavaNaI baabato.<br />

mao.saahobaEaI<br />

saivanaya jNaavavaanauM ko ]praok


jvaaba : saI.ko.prmaar<br />

Aa kMpnaI wara jo kMa[ rIpaoT- rju krvaamaaM Aavaola Co Ao sarkar wara naaoTIfa[D<br />

knsalaTnT wara j banaavaola Co Anao jo kaM[ maaihtI faorosT maInaIsT/Iga gaa[D laa[na<br />

p`maaNao jrurI Co.to Amaara irpaoT-maaM dSaa-vaola Co. toqaI laaok saunaavaNaInaaM tarIK AagaL<br />

laMbaavavaanaao pÈna j naqaI.


p`itEaIÊ<br />

gaujrat paolyauSana baaoD-Ê<br />

navarMgapura Amadavaad.<br />

vaaMQaa ArŸ<br />

baocarBaa[ pTolaÊ<br />

naarNapuraÊ<br />

Amadavaad.<br />

ta.23.01.09<br />

saivanaya saaqao jNaavavaanauM ko Jaona AaonkaolaaoŸ p``a[vaoT laImaIToD nauM ivastrNa krvaa<br />

baabat saamao Amaao Aa ArŸ krI saKt vaaMQaao naaoMQaavaIAo CIAo.karNa ko sadrhu<br />

ivastrNamaaM p`duYaNa nao lagatI baabat samaayaolaI Co.halamaaM jo kMpnaI caalaI rhI Co to<br />

Kuba j p`duYaNa folaavao Co Anao jao ivastrNa krvaa dovaamaaM Aavao tao p`duYaNa<br />

prakaYzaAo phaoMcao joqaI Aapnao nama` Arj Co ko sadrhu kMpnaI nao ivastrNa maaTo<br />

prvaanagaI AapvaamaaM na Aavao.<br />

AaBaar EaIÊ<br />

baocarBaa[ pTola


jvaaba : baocarBaa[ pTola<br />

kMpnaIAo rjuAat kyaa- p`maaNao ³[.Aa[.Ao p`maaNao´p`duYaNa inayaM~Nanaa saaQanaao<br />

lagaavavaanauM jNaavaola Co joqaI p`duYaNa prakaYzaAo phaocavaanaoa pÈna j ]pisqat qatao<br />

naqaI.


pìtEaI<br />

ijllaa pyaa-varNaIya laaok saunaavaNaI saimait<br />

Amadavaad ijllaa.<br />

hrIisaMh jagamaala gaoaihla<br />

kaocarIyaa ta:baavaLa<br />

ij.Amadavaad<br />

ta:23.01.08<br />

ivaYaya:yauinamaak- romaoDIHa ila.naI ta:23.01.09 naa raoj yaaojanaar laaok saunaavaNaI maaM<br />

rjUAat.<br />

EaImaana<br />

kUSaL hSaao.<br />

³1´Aa kMpnaInaa hvaa p`dUYaNaqaI laaokao GaNaaM proSaana Co.idvasa drimayaana pNa kMpnaI wara<br />

CUTta[ gaosanaI vaasa AnauBavaaya Co.irpaoT-maaM maanya maa~a p`maaNao j DoTa batavavaamaaM<br />

Aavyaa Co.to KaoTa Co.<br />

³2´rai~ drimayaana tIva` gaMQa maartao JorI gaosa Aa kMpnaI wara CaoDvaamaaM Aavao Co.jo<br />

gaosanaI bahu ivaprIt Asarao qaaya Co.tonaao pholaa AByaasa qavaao jao[Ao.<br />

³3´Avaaj p`dUYaNa maaTo rai~ Anao idvasanaa QaaorNaao barabar Co.prMtu AByaasa qayaao Co tomaa<br />

[samarI poj naMbar [ 7 idvasa drimayaana 51.7 qaI 60.9 DosaIbala Anao rai~ drimayaana<br />

38.8 qaI 57.7 DosaIbala batavaola Co.rai~ drimayaana kMpnaInaao Avaaj AaoCao qavaanauM<br />

karNa SauMÆ<br />

³4´Aa kMpnaI p`dUYaNa krtI kMpnaI Co tonao Ÿ.pI.saI.baI Ao kyaaM kyaaM AokT maujba<br />

klaaoJr naaoTIsaao Aapola CoÆ to jNaavavaa ivanaMtIÆ<br />

³5´Aa kMpnaInao p`dUYaNa baabato gaujrat p`dUYaNa inayaM~Na baaoD- ta.26 jUna 2006 naa raoj<br />

~Na Alaga Alaga klaaoJr naaoiTsaao maLola Co Anao ta.6.09.05naa raoj pNa klaaoJr<br />

naaoiTsa p`dUYaNa baabato AavaI GaNaI klaaoJr naaoiTsaao Aa kMpnaInao maLola Co.tao hyaat<br />

kMpnaInauM p`dUYaNa raokaya Anao AavaI p`dUYaNa kMpnaI nao k[ pyaa-varNaIya saMmait AapI<br />

SakayaÆ<br />

AaBaar sah<br />

Aapnaao<br />

hirisaMh jo.gaaoihla<br />

nakla rvaanaa:saBya saicavaEaI Anao pàdoSaIk AiQakarIEaI gaujrat p`dUYaNa inayaM~Na baaoD-<br />

gaaMQaInagar


jvaaba : hirisaMh jo.gaaoihla<br />

1.kMpnaIAo p`dUYaNa inayaM~Na maaTonaa baQaaj saaQanaao lagaavaola Co.Anao safLtapUva-k caalaI<br />

rhyaa Co.<br />

2.AmaarI kMpnaI satt pìk`yaavaaLI Co.td\]praMt pìk`yaa drimayaana ]d\Bavata vaayauAao<br />

sk`ba krvaamaaM Aavao Co kacaamaalanaI horfor (Chavgig) maaTo sk`bar huD lagaavaola Co.jonaao<br />

Amao AByaasa krola Co.<br />

3.rai~ drimayaana vaQaara naao GaaoMGaaT T/anspaoToSana ,maalanaI horaforI jovau kama krvaamaaM<br />

Aavatu na haovaaqaI saroraSa AvaajnauM p`maaNa idvasa krtaM AaoCu maalauMma pDola Co.<br />

4.AanaI ivagat piriSaYT maaM jaoDola Co.


pìtEaI<br />

AQyaxa<br />

ijllaa pyaa-varNaIya laaok saunaavaNaI saimait<br />

Amadavaad ijllaa.<br />

sarpMcaEaIÊ<br />

jgadIpisaMh maaotIBaa saagarÊ<br />

mau:klyaaNagaZÊta:baavaLaÊ<br />

ij.Amadavaad.<br />

ta:23.1.2009<br />

ivaYaya: yauinamaak- romaIDIJ ila.naI ta23.01.09 naa raoj yaaojanaar laaok saunaavaNaImaaM<br />

rjUAat.<br />

EaImaana<br />

kUSaL hSaao.<br />

1.Aa kMpnaI Gana kcaranao Aokzao krI fokTrInaI baharnaI jgyaaAo SaoD banaavaI Aokzao<br />

krvaanaI Co to jgyaa kaonaI CoÆAnao baharnaI jgyaaAo komaÆ<br />

2.kMpnaIAo jUnaa PlaanTmaaM 20000 caaorsa maITr ivastarmaaM gaÌna baolT ivaksaavyaao CoÆ tovauM<br />

kho Co jo hikktmaaM qayaola naqaI.to pNa kimaTI wara sqaL maulaakat krvaamaaM Aavao tovaI<br />

AmaarI tIva` maaMgaNaI Co.<br />

3.navaa PlaanTmaaM baIja 20000 caaorsa maITr ivastarmaaM Aa kMpnaI gaÌna baolT krvaanaI CoÆ<br />

SauM to krSaoÆ koTlaa JaD vaavaSaoÆkyaaM p`kar naa JaD vaavaSaoÆ to JaDao Aa kMpnaI wara<br />

inakLta p`dUYaNanao kMnT/aola krvaanaI xamatavaaLa hSaoÆ ko pCI jldI ]gaI jaya tovaa JaD<br />

vaavaSaoÆ<br />

4.Aa kMpnaImaaMqaI flaaya AoSa naIkLSao tonaa ]pyaaoga maaTo SauM Aayaaojna krvaamaaM Aavaola<br />

CoƳkao[ [MTao banaavatI kMpnaI pasao AogaÌmaonT krola Co ko komaÆ´<br />

5.[.Aa[.Ao samarI poj naMbar 3 maaM batavaola Co ko saUicat krola pàojokTnaa sqaLoqaI 10<br />

iklaaomaITrnaa ivastar sauQaImaaM jMgalaI pàNaIAaonaa inavaasa Aavata naqaI to KaoTuM CoÆ koma<br />

ko kMpnaI paCL j Anao ivastarmaaM naIla gaayanaa TaoLa Anao JUMDao inavaasa kro Co maaTo<br />

AByaasamaaM KaoTao ]llaoK krvaamaaM Aavyaao Co tonaI spYTta krvaamaaM AavaoÆ<br />

6.Aa ivastarmaaM Aok laaok vaa[ka p`maaNao BaImao j[malaa d


jvaaba : jgadIpisaMh maaotIBaa saagar<br />

1.Aa kMpnaIAo Gana kcarao jo Aokzao krola krola Co tonao Hazardose Storage Area maaM<br />

raKola Co.<br />

2. Aa kMpnaIAo Gana kcarao jo Aokzao krola krola Co tonao Hazardose Storage Area maaM<br />

raKola Co.<br />

3.kMpnaIAo jo gaÌna baolT ivaksaavaola Co tonaI ivagat rIpaoT-maaM Aapola Co.<br />

4.kMpnaIAo rIpaoT-maaM jNaavaola p`maaNao jo kaM[ gaÌna baolT ivaksaavavaanaao Co to p`maaNao<br />

kaya-vaahI krSao.<br />

5.kMpnaImaaMqaI inakLtI falya AoSanaao ]pyaaoga kMpnaInaI AMdr j krvaanaI Co.AmaaoAo<br />

kao[ [Mtao banaavatI kMpnaI saaqao AogaÌmaonT krola Co.<br />

6.sTDI AorIyaanaI Aasapasa kayamaI QaaorNao naIla gaaya jovaa pàNaIAaonaao vasavaaT jaovaa<br />

maLola naqaI.<br />

7.AmaarI jaNamaaM Aa vaat naqaI<br />

8.jUnaa pàojokTnaI raojgaarInaI ivagat irpaoT-maaM saamaola Co Anao navaa pàojokTmaaM jo kaM[<br />

raojgaarInaI tkao ]BaI qavaanaI Co to pNa irpaoT-maaM dSaa-vaola Co.³junaamaaM 600 Anao navaamaaM<br />

AaSaro 300´<br />

9.AmaarI kMpnaI saamaaijk jvaabadarI svaIkarvaamaaM maanao Co.A%yaar sauQaI Amao GaNaI<br />

jvaabadarI inaBaavaI Co to irpaoT-maaM dSaa-vaola Co Anao BaivaYyamaaM pNa AmaarI jvaabadarI<br />

inaBaavaISauM.


pìtEaIÊ<br />

klaokTrEaIÊ<br />

Amadavaad ijllaaÊ<br />

AnaIlakumaar baI.i~vaodIÊ<br />

vanaocarÊ<br />

24ÊkUlaIna TonaamaonTÊ<br />

Baavanaa TonaamaonT naI baajUmaaMÊ<br />

vaasaNaaÊAmadavaad.380007<br />

Faona:079 26600153<br />

tarIK:23.01.09<br />

baabat:mao.yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunaavaNaI<br />

ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />

maananaIya EaIÊ<br />

huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />

mao.yaunaImaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao.rIpaoT- saana AonavaayaraoTok<br />

pà.ila.palaDIÊAmadavaad wara rjU qayaao Co tomaaM kMpnaI jNaavao Co ko PlaaoT naMbar<br />

:337Ê338Ê269Ê294Ê296Ê299Ê297Ê300 maaM ivastrNanaI yaaojnaa AmalamaaM laavanaar Co.<br />

AapEaI naaM maaQyama qaI naIcao jNaavaola mau_aAao maaTo naI maaihtI AapSaao….<br />

1.gaujrat p`dUYaNa inayaM~Na baaoD- wara Collaa dsa vaYa- naaM samayagaaLa maaM mao.yaunaImaak-<br />

romaoDIJ laImaIToD ]pr AonvaayarmaonT pàoToxana AokT 1986 tomaj vaaoTr ³pÌvaonSana AonD<br />

kMTa/ola Aaof paolyauSana´AokT:1974 tqaa Aor³ p`IvaonSana AonD kMTa/ola Aaof paolyauSana´<br />

AokT:1981 AnaUsaar kao[ kayadoSarnaI kaya-vaahI qa[ haoya tao tonaI ivagatao<br />

jNaavaSaao.da.t.naaoiTsa À SaaokaoJ naaoiTsa À]%padna baMQa raKvaa maaTonaI kaya-vaahI tqaa<br />

k[ Satao- nao AaQaIna ]%padna Saru krvaanaI prvaanagaI AapI haoya.<br />

2.halanauM ]%padna AokmanauM baaQakama xao~fL koTlaUM rhoSao Anao fokT/I AokT maUjba<br />

baaMQakama naaM xao~fL naaM koTlaa Tka ivastarmaaM kayamaI laIlaao~I pyaa-varNa naI jaLvaNaI<br />

maaTo fokT/I naaM PlaaoTmaaM koTlaa Anao kovaa p`karnaaM GaTadar vaRxaao nauM vaavaotr Anao jaLvaNaI<br />

naI ivagatao AapSaao.<br />

3.Baayalaa gaama naaM vaasaIAao naI rjUAat Co ko mao.yaunaImaak- romaIDIJ laImaIToD fokT/ImaaM<br />

p`dUYaIt paNaI BarI raKvaa maaTo naanaUM tLava banaavaola Co jomaa fokT/I wara p`dUYaIt paNaI<br />

BarI raKolauM haoya Co.caaomaasaa naI ?tumaaM pholaa baIja varsaad baad caalaU varsaadmaaM fokT/I<br />

wara p`dUYaIt paNaInaaM tLava naao vaalva KaolaI naaKvaaqaI to paNaI Baayalaa baMQamaaM Aavao<br />

Co.Anao baMQa nauM paNaI p`dUYaIt kro Co.tao Aa baabat nao Qyaana maaM laota fokT/I wara<br />

vaOklpIk pgalaa jNaavaSaao.<br />

4.REIA rIpaoT-naa panaa naMbar 3 –37 ifgar 3.2 ³Wind rose diagram´p`maaNao hvaa naI<br />

idSaa d.5 Ê5.d Ê5 Ê5 Ê5 Ê]p Ê].].p haoya Co %yaaro ÊfokT/InaI p`dUYaIt hvaa Baayalaa<br />

vaasaIAaonaa svaasqya nao Asar kro Co.tao Aa baabato fokT/I wara jrurI pgalaa jNaavaSaao.<br />

5.fokT/Inaa AagaamaI ]%padnaaomaaM konsar vaIraoQaI dvaaAaonauM ]%padna maaoTa payao qanaar<br />

Co.jomaaM Kasaa maaoTa p`maaNa maaM maanavaEama qanaar Co taoAa drok kma-caarIAaonaa svaasqya<br />

naI saurxaa tqaa pyaa-varNa naI saurxaa baabato ivastRt maaM jNaavaSaao.<br />

Aapnaao ivaEvaasau Ê


jvaaba : AnaIlakumaar baI.i~vaodI.<br />

1.kayadosarnaI kaya-vaahInaI ivagatao rIpaoT-maaM saamaola Co.<br />

2.saurxaa AMgaonaI ivagatao [.Aa[.Ao irpaoT- saamaola Co.<br />

3.AmaarI kMpnaI naI AMdr JIrao DIscaaj- kMpnaI Co joqaI p`dUYaIt paNaI CaoDvaanaao pÈna<br />

]pisqat qatao naqaI.<br />

4.tmaama ivagatao Amaara [.Aa[.Ao irpaoT-maaM saamaola krola Co.<br />

5.Amao raKola saurxaanaa tj&Ao saUcavaola saurxaanaa ]payaaonauM caust pNao palana krvaamaaM<br />

Aavao Co tqaa kma-caarIAao nao saUrxaanaa saaQanaao vaaprvaa ivaSao T/oinaMga Avaar navaar<br />

AapvaamaaM Aavao Co.jo rsaayaNa vaaprtI vaKto krvaa naa ]pyaaoga ivaSao talaIma AapvaamaaM<br />

Aavao Co.


pìtEaIÊ<br />

mau#ya AiQakarIEaIÊ<br />

pàdoiSak kcaorIÊ<br />

Ÿ.pI.saI.baI.<br />

gaujrat inayaM~Na baaoD-<br />

navarMgapuraÊAmadavaad.<br />

AnaIlakumaar baI.i~vaodIÊ<br />

vanaocarÊ<br />

24ÊkUlaIna TonaamaonTÊ<br />

Baavanaa TonaamaonT naI baajUmaaMÊ<br />

vaasaNaaÊAmadavaad.380007<br />

Faona:079 26600153<br />

tarIK:23.01.09<br />

baabat: mao. yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunavaNaI<br />

ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />

maananaIya EaIÊ<br />

huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />

mMao. yauinamaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao rIpaoT- saana<br />

AonavaayaraoTok pà.ila.palaDIÊAmadavaad wara rjU qayaao Co.tonaa panaa naM.1–4 ]pr<br />

dSaa-vaola Co ko “there is no surface water body within 10 km.radius from industry.”Aa<br />

baabato AapEaI nao maarI rjUAat Co ko Aa hkIkt KaoTI Co Anao sarkrI maaQyamanao<br />

ApUrta Anao ]pjavaI kaZolaa pUravaa rjU krI gaor maagao- daorI paotanaaM vaoparI svaaqa-nao pUraM<br />

krvaanauM gaUnaahIt kaya- krola Co.gaama tLavaao ivaSaonaI maaihtI [rada pUrva-k Cupavaola Co.<br />

hkIktAo Co ko baavaLa ivastar ftohvaaDI konaala saIsTma AMtga-t Aavatao KotI<br />

ivastar Co.gaujrat sarkar naaM nama-da vaaoTr rIsaaosa- Anao vaaoTr saPlaaya DIpaT-maonT naaM<br />

D/ao[Mga naMbar: 32 ta:29.06.2000 AnaUsaar koralaagaama qaI 10ikmaI.i~jyaa vatU-L AavarI<br />

laota ivastarmaaM 26 gaama Aavaola Co Anao tonaI saIcaa[ tomaj gaama ]pyaaogamaaM AavataM<br />

tLava Anao Doma naI ivagat Aa saaqao jaoDola ivagatmaaM dSaa-vaola Co.<br />

mao. yauinamaak- romaoDIJ laImaIToD paoto Baayalaa gaama naaM Baayalaa Doma tqaa kaocarIyaa<br />

gaamanaaM hIrasar tLava tomaj BaImakuMD DomanaaM vaaoTr kocamaonT ivastarmaaM Aavaola Co.<br />

]praokt hkIktnao rokaoD- ]pr laoSaao Anao mao. yauinamaak- romaoDIJ laImaIToD naao<br />

T/fT [.Aa[.Ao rIpaoT- saana AonavaayaraoTok pà.ila.palaDI Amadavaad wara rjU qayaao<br />

Co.tonao naamaMjUr krI forvaIcaarNaa Anao saUQaara maaTo pCI maaoklaSaao.pyaa-varNa baabat naI<br />

Aa laaok saUnavaNaI rd krSaao.<br />

AapEaInao maarI nama` ivanaMtI Co ko mao. yauinamaak- romaoDIJ laImaIToD naao Ta/fT [.Aa[.Ao<br />

rIpaoT- maaM jrurI saUQaarao qayaa baad puna:maUlyaaMkna kyaa- pCI navaosar qaI pyaa-varNa baabatnaI<br />

laaok saUnavaNaI yaaojnaamaaM Aavao tao Asarga`st gaa`majnaaonao nyaaya maLSao.<br />

Apnaao ivaEvaasau.<br />

AnaIlakumaar baI.i~vaodI<br />

vanaocar


jvaaba : AnaIlakumaar baI.i~vaodI<br />

1. yauinamaak- romaoDIJ laImaIToD naaM D/afT EIA rIpaoT-maaM jo maaihtI AapvaamaaM Aavao Co to<br />

sacaaoT maaihtI Co.<br />

2.Aa ivastarmaaM kayamaI QaaorNao paNaInauM tLava banaola rhota naqaI.Aa sTDI ivastarmaaM<br />

saIJna drimayaana paNaI jaovaa maLola htu prMtu iDsaombar maihnaa pCI Aa ivastar saamaanya<br />

rIto saUkao rho Co.joqaI Amaaonao kayamaI QaaorNao paNaInaa sTaoroj trIko laIQaola naqaI.


pìtEaIÊ<br />

klaokTrEaIÊ<br />

Amadavaad ijllaaÊ<br />

Aignahao~I idnaoSakumaar AaoÊ<br />

“saMtaoYaI inavaasa”gaaopalanagarÊ<br />

Amara[vaaDI<br />

Amadavaad.380026<br />

ta:23.01.2009<br />

ivaYaya: pyaa-varNa Anao vana maM~alaya navaI idllaInaa jahornaamaaM k`maaMk Aosa.Aao.1533<br />

ta:14.9.2006 Anvayao laaok saunaavaNaI maaM iTka iTPPaNaI baabato.<br />

Mmao.saahobaÊ<br />

Amaao Arjdar gaujrat naa Amadavaad Sahor maaM “saMtaoYaI inavaasa” gaaopalanagar<br />

Amara[vaaDI Amadavaad 26 Kato rhIAo CIAo Anao BaartIya naagairk CIAo.Baartnaa<br />

baMQaarNa AaTI-kla 19 ³1´³k´ maujba vaaNaI Anao AiBavyaikt naa mauLBaUt AiQakar<br />

QaravaIAo CIAo.Aa ]praMt Baartnaa baMQaarNa Baaga 4 k naa AaTI_kla 51 k³ca´maujba<br />

pyaa-varNa jaLvavaanaI mauLBaUt frj pNa drok BaartIya naagarIk ]pr Baartnaa baMQaarNa maaM<br />

laadolaI Co.maaTo ]praokt ivaYaya baabato jNaavaola karNaao nao QyaanamaaM la[ Aa laaok<br />

saunaavaNaI naI tarIK laMbaavavaa yaaogya krvaa AmaarI AapEaI nao Arj Co.<br />

Payaa-varNa Anao vana maM~alaya navaI idllaI naa jahornaamaa k`maaMk Aosa.Aao 1533<br />

ta.14.09.2006 Anvayao mao.Jona AaonkaolaaojI p`yavaoT laImaIToD Anao mao.yaunaImaak-<br />

romaoDIJ laImaIToD gaama koralaa ta:baavaLa ij.Amadavaad Wara balk D/gsa ]%padna maaTo jo<br />

jahorat dOinak “gaujrat samaacaar”ta.16.01.2009maaM jahor krvaa maaM AavaI htI.Ao<br />

pCI Amao ta.2012.2008 naa raoj klaokTr kcaorI naa jahornaamaaM AiQakarEaInao maaihtI<br />

AiQakar AiQainayama 2005 AMtga-t Aa baMnao AqaI saMbaMQaIt maaihtI maoLvavaa maaTo ArjI<br />

krola Co. jonauM baIDaNa Aa ArjI saaqao krIAo CIAo.<br />

AmaarI ta:20.12.2008naI Aar.TI.Aa[ ArjInauM jvaaba Aajraoj sauQaI Amanao<br />

maLola na haovaaqaI Amao Aa kMpnaIAao naI laaok saunaavaNaImaaM paotanaa ivacaar rju krI<br />

Sakta na haoyaI AapEaI nao AmaarI Arj Co ko Aa laaok saunaavaNaI naI tarIK laMbaavavaa<br />

maaTo yaaogya krvaa kRpa krSaaojI.<br />

AaBaar<br />

AapnaaoivaEvasanaIya<br />

idnaoSakumaar Aao.Aignahao~I<br />

baIDaNa:ta.20.12.2008 naI AmaarI Aar.TI.Aa[ naI ArjI naI Joraoxa


Aignahao~I baIDaNa<br />

mahaSayaEaI<br />

namaskar<br />

ivanaMtI sah jNaavavaanauM ko ta.11.12.2009 naa raoj paolyauSana kMT/aola baaoD- gaujrat<br />

rajya gaaMQaInagar naa rajya saicavaEaI saMjIva %yaagaI wara jahor saUcanaa wara Baart sarkar<br />

pyaa-varNa Anao vana maM~alaya navaI idllaI naa jahor naamaa k`maaMk Aosa.Aao.1533<br />

ta.14.09.2006 Anvayao gaama:koralaa , ta:baavLa ij.Amadavaad maukamao Aavaola PlaaoT naM<br />

337Ê338Ê269Ê299Ê294Ê296Ê297 Anao 300 naMbar naaM PlaaoTmaaM 1.mao.Jona AaonkaolaaojI<br />

pà/ila.Anao 2.yaunaImaak- romaoDIJ laImaIToD wara balk D/gsa naa ]%padna maaTo navaa PlaanT<br />

maaTonaI piryaaojnaa koTogarI “Ao”maaTo kMpnaIAo Baart sarkar wara saI.jI.Aao kaomplaoxa<br />

laaoQaI raoD navaI idllaI.110003 Kato kaya-rt pyaa-varNa Anao van maM~alaya nao koTogarI<br />

“Ao”maaM AavarI laovaa maaTo inayaM~Na AaoqaaorITI trIko jahor krola Co.<br />

]praokt jahornaamauM Amaaonao gaujrat rajya naaM Amadavaad SahornaaM jahor AKbaar<br />

“gaujrat samaacaar”maaM panaa naM.2 ]pr vaaMcavaa maLola Co.<br />

]praokt jahornaamaanaI baabatmaaM ijllaa klaokTrEaI Amadavaad ta.23.10.2009 naa<br />

raoj laaok AiBapàya maoLvavaanaI laaok saunaavaNaI raKvaamaaM Aavaola Co.joqaI ]praokt tmaama<br />

baabatao Ao ]praokt kMpnaI naI ivaruQQamaaM Amao ta.23.01.2009naaM pholaaM laoiKt maaM<br />

TIka iTPpNaI vaaMQaaAao rju krvaanaaM ko maaoklavaanaaM hao[ maaihtI AiQakar AiQainayama<br />

2005naI jaogavaa[ Aao hozL ]praokt kMpnaIAaonao lagatI naIcao jNaavyaa maujba pÈnaavalaI<br />

naaM jvaabaao saaqaonaI maaihtI %varIt ta%kailak QaaorNao Amaaonao maaoklaI Aapvaa ivanaMtI Co.<br />

1.]praokt kMpnaIAaonaaM maonaojIMga DayarokTrÊDayarokTr naa naama sarnaamaaM maaobaa[la Aa^ifsa<br />

rhozaNanaaM Toilafaona naMbarao tomaj [ maola AoD/osa foksanaMbar vagaoro ivastRt maaihtI AapSaao.<br />

2.]praokt baMnao kMpnaI Aaonaa PlaaoTmaaM kyaa kyaa p`karnaaM koTlaI ]marnaaM koTlaa vaRxaao<br />

hala maaM hyaat CoÆ tonaI saM#yaa jNaavaSaao.<br />

3.paClaa vaYaao- maaM kayadosar ko gaorkayadosar rIto sadr PlaaoTaonaI jmaInaao maaMqaI koTlaa<br />

vaRxaaonauM Codna krvaamaaM Aavaola CoÆto baabato AapvaamaaM Aavaola prvaanagaInaI naklaao tomaj<br />

gaorkayadosar vaRxa Codna baabato k[ k[ vyaikt ko saMsqaaAao Ao firyaadao ko ArjI Aao<br />

krola CoÆ to jvaabadar sa


6.]praokt baMnao kMpnaIAaomaaM halamaaM kyaarqaI kyaa p`karnaaM ]%padnaao krvaamaMa AavaI<br />

r)aa CoÆ tomaj kyaa kyaa p`karnaI pìk`yaa Aao krvaamaaM Aavao CoÆtomaj pìk`yaaAaoqaI<br />

vaatavarNa maaM QvanaI vaayau Anao Aaraogyanao lagata kyaa kyaa p`dUYaNaao ]Baa qayaolaa CoÆtomaj<br />

Aaj idna sauQaImaaM to p`dUYaNa baabato kyaa kyaa p`karnaI k[ k[ frIyaad , ArjIAao,<br />

k[k[ vyaikt , saMsqaaAaoAo krola CoÆto tmaama baabatao nao lagatI vagaI-kRt ivastRt maaihtI<br />

AapSaao.tomaj to firyaadao baabat maaM kyaa kyaa p`kar naao Sau inakala krvaamaaM Aavaola<br />

CoÆtonaI ivagatao AapSaao.<br />

7.]praokt baMnnao kMpnaIAaonao pàojokT koTogarI “A”maaTo balk D/gsanaa ]%padnanaa navaa<br />

pàojokT maaTo jo prvaanaI AapvaamaaM Aavanaar Co tonaaqaI kyaa kyaa p`karnaa QvanaI vaayau<br />

hvaa Anao Aaraogya lagataM p`dUYaNaao ]Baa qavaanaI saMBaavanaa CoÆ tomaj to baabato tkodarInaa<br />

Sau pgalaaM laovaaSaoÆ to AMgao ivastRt maaihtI AapSaao.<br />

8.]praokt Aokmaao qaI pyaa-varNanao qanaar naukSaananaI saamao vaRxaaonau kyaa kyaa PlaaoTmaaM<br />

kaonaI jvaabadarI Anao rahbaarI maaM koTlaa samayamaaM krvaamaaM AavaSao tonaI maaihtI<br />

AapSaao.<br />

9.jI.PaI.saI.baI.wara inayama Anausaar ]praokt kMpnaInaa Aoip`la 2005 qaI Aaj idna<br />

sauQaImaaM rju krvaamaaM Aavaola p`dUYaNa baabatnaao AaoDIT rIpaoT- naI nakla AapSaao.<br />

10.]praokt jNaavaola PlaaoT naMbarao ]prnaI jmaInaaonaa nakSaaAao savao- naMbar saaqao<br />

AapSaao.<br />

11.Aa Aokma banaavavaa maaTo kula koTlaa vaRxaaonauM Codna krvaamaaM AavaSao tonaI ivagat<br />

AapSaao.<br />

12.Aa Aokma AMgaonaa [.Aa[.Ao.naa Ahovaala mausa_anaI p`t Anao tonaa rIpaoT-naI<br />

nakla AapSaao.<br />

13.]praokt kMpnaI maaTo dSaa-vaola tmaama PlaaoT Anao tonaI Aaju baajumaaM Aavaola gaamanaI<br />

jmaInaao CarI prIxaNa krvaamaa Aavaola haoyatao tonaa irpaoT-naI naklaao AapSaao.<br />

14.]praokt kMpnaImaaM ]%pa_na pìk`yaa drimayaana ]Bau qanaar [nDsT/Iyala vaosT Anao vaaoTr<br />

vaosTnaa inakala maaTo kao[ Plaana ko nakSaao banaavavaamaaM Aavaola haoya tao to AMgaonaa pUravaa<br />

saaqao naI maaihtI AapSaao.<br />

15.]praokt kMpnaImaaM krvaamaaM Aavanaar ]%pa_na pìk`yaa maaTo koTlaa kyaUsaok paNaI<br />

AavaSyakta ]BaI qaSaoÆ tomaj to paNaInaa KocaaNanao karNao Aajubaaju maaM koTlaa kyaUsaok<br />

paNaInaI Asar qaSaoÆ tomaj to ACtnaa inakala maaTo kao[ vyavasqaa ko savao-naao irpaoT- tOyaar<br />

krvaamaaM Aavaola haoyata maaihtI AapSaao.pUravaa saaqao.<br />

16.hala Aa AokmaaoqaI CaoDvaamaaM Aavata vaaoTr vaosTnaa saomplaao pirxaNa Aqao- kaonaI<br />

prvaanaagaIqaI , kaonaa wara k[ jgyaa ]prqaI maoLvaI SakaSao to AMgaonaI ivagatvaar maaihtI<br />

AapSaao.<br />

]praokt tmaama maaihtI Amaao jo AaSayaqaI maaihtI AiQakar AiQainayama baMnaavavaamaaM<br />

Aavaola Co to AaSaya qaI j maoLvavaa maaMgaIAo CIAo.joqaI t%kaL maaihtI Aapvaa<br />

jahorihtmaaM ivanaMtI Co.<br />

AaBaar<br />

Aignahao~I idnaoSakumaar<br />

Amadavaad<br />

ta.20.12.08


jvaaba : Aignahao~I idnaoSakumaar<br />

1.jo paolyauSananao lagatao pÈna naqaI.<br />

2.TaoTla gaÌna baolT AorIyaa 20000 maI 2 Anao Amao laaokaoAo laaokla vaRxaao vaavaolaa Co jonaI<br />

]Mcaa[ AaSaro 3 maITrqaI 10 maITr Co.<br />

3.Amao kao[pNa vaRxaao kapola naqaI karNa ko Collaa vaYa-maaM ivastRtIkrNa krola naqaI<br />

4.laagau pDtuM naqaI<br />

5.jo paolyauSananao lagatao pÈna naqaI.<br />

6.tmaama jrurI ivagatao Amaara [.Aa[.Ao.irpaoT-maaM dSaa-vaola Co.jo tmao<br />

jI.pI.saI.baI.vaobasaa[T ]pr jao[ Sakao Cao.<br />

7.tmaama jrurI ivagatao Amaara [.Aa[.Ao.irpaoT-maaM dSaa-vaola Co.jo tmao<br />

jI.pI.saI.baI.vaobasaa[T ]pr jao[ Sakao Cao.<br />

8.BaaYaa barabar naqaI.<br />

9.Amaao Ao jI.pI.saI.baI.maaM jmaaM kravaola Co.AaoDIT rIpaoT- Aapvaao maagata naqaI.<br />

10.maaihtI Amaara [.Aa[.Ao.rIpaoT-maaM saamaola krola Co.<br />

11.AokpNa vaRxa Codna krola naqaI<br />

12.Aa ivagat maaTo Aap jI.pI.saI.baI.vaobasaa[T naao ]pyaaoga krI Sakao Co.<br />

13.ivagat samajatI naqaI.<br />

14.Amaaru yauinaT iJrao iDscaaj- kMpnaI Co.<br />

15. maaihtI Amaara [.Aa[.Ao.rIpaoT-maaM saamaola krola Co.<br />

16.ivagat samajatI naqaI.


pìtEaIÊ<br />

klaokTrEaIÊ<br />

Amadavaad ijllaaÊ<br />

AnaIlakumaar baI.i~vaodIÊ<br />

vanaocarÊ<br />

24ÊkUlaIna TonaamaonTÊ<br />

Baavanaa TonaamaonT naI baajUmaaMÊ<br />

vaasaNaaÊAmadavaad.380007<br />

Faona:079 26600153<br />

tarIK:23.01.09<br />

baabat:mao.yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunaavaNaI<br />

ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />

maananaIya EaIÊ<br />

huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />

mao.yaunaImaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao.rIpaoT- saana AonavaayaraoTok<br />

pà.ila.palaDIÊAmadavaad wara rjU qayaao Co tomaaM kMpnaI jNaavao Co ko PlaaoT naMbar<br />

:337Ê338Ê269Ê294Ê296Ê299Ê297Ê300 maaM ivastrNanaI yaaojnaa AmalamaaM laavanaar Co.<br />

AapEaI naaM maaQyama qaI naIcao jNaavaola mau_aAao maaTo naI maaihtI AapSaao….<br />

1.gaujrat p`dUYaNa inayaM~Na baaoD- wara Collaa dsa vaYa- naaM samayagaaLa maaM mao.yaunaImaak-<br />

romaoDIJ laImaIToD ]pr AonvaayarmaonT pàoToxana AokT 1986 tomaj vaaoTr ³pÌvaonSana AonD<br />

kMTa/ola Aaof paolyauSana´AokT:1974 tqaa Aor³ p`IvaonSana AonD kMTa/ola Aaof paolyauSana´<br />

AokT:1981 AnaUsaar kao[ kayadoSarnaI kaya-vaahI qa[ haoya tao tonaI ivagatao<br />

jNaavaSaao.da.t.naaoiTsa À SaaokaoJ naaoiTsa À]%padna baMQa raKvaa maaTonaI kaya-vaahI tqaa<br />

k[ Satao- nao AaQaIna ]%padna Saru krvaanaI prvaanagaI AapI haoya.<br />

2.halanauM ]%padna AokmanauM baaQakama xao~fL koTlaUM rhoSao Anao fokT/I AokT maUjba<br />

baaMQakama naaM xao~fL naaM koTlaa Tka ivastarmaaM kayamaI laIlaao~I pyaa-varNa naI jaLvaNaI<br />

maaTo fokT/I naaM PlaaoTmaaM koTlaa Anao kovaa p`karnaaM GaTadar vaRxaao nauM vaavaotr Anao jaLvaNaI<br />

naI ivagatao AapSaao.<br />

3.Baayalaa gaama naaM vaasaIAao naI rjUAat Co ko mao.yaunaImaak- romaIDIJ laImaIToD fokT/ImaaM<br />

p`dUYaIt paNaI BarI raKvaa maaTo naanaUM tLava banaavaola Co jomaa fokT/I wara p`dUYaIt paNaI<br />

BarI raKolauM haoya Co.caaomaasaa naI ?tumaaM pholaa baIja varsaad baad caalaU varsaadmaaM fokT/I<br />

wara p`dUYaIt paNaInaaM tLava naao vaalva KaolaI naaKvaaqaI to paNaI Baayalaa baMQamaaM Aavao<br />

Co.Anao baMQa nauM paNaI p`dUYaIt kro Co.tao Aa baabat nao Qyaana maaM laota fokT/I wara<br />

vaOklpIk pgalaa jNaavaSaao.<br />

4.REIA rIpaoT-naa panaa naMbar 3 –37 ifgar 3.2 ³Wind rose diagram´p`maaNao hvaa naI<br />

idSaa d.5 Ê5.d Ê5 Ê5 Ê5 Ê]p Ê].].p haoya Co %yaaro ÊfokT/InaI p`dUYaIt hvaa Baayalaa<br />

vaasaIAaonaa svaasqya nao Asar kro Co.tao Aa baabato fokT/I wara jrurI pgalaa jNaavaSaao.<br />

5.fokT/Inaa AagaamaI ]%padnaaomaaM konsar vaIraoQaI dvaaAaonauM ]%padna maaoTa payao qanaar<br />

Co.jomaaM Kasaa maaoTa p`maaNa maaM maanavaEama qanaar Co taoAa drok kma-caarIAaonaa svaasqya<br />

naI saurxaa tqaa pyaa-varNa naI saurxaa baabato ivastRt maaM jNaavaSaao.<br />

Aapnaao ivaEvaasau Ê


jvaaba : AnaIlakumaar baI.i~vaodI.<br />

1.kayadosarnaI kaya-vaahInaI ivagatao rIpaoT-maaM saamaola Co.<br />

2.saurxaa AMgaonaI ivagatao [.Aa[.Ao irpaoT- saamaola Co.<br />

3.AmaarI kMpnaI naI AMdr JIrao DIscaaj- kMpnaI Co joqaI p`dUYaIt paNaI CaoDvaanaao pÈna<br />

]pisqat qatao naqaI.<br />

4.tmaama ivagatao Amaara [.Aa[.Ao irpaoT-maaM saamaola krola Co.<br />

5.Amao raKola saurxaanaa tj&Ao saUcavaola saurxaanaa ]payaaonauM caust pNao palana krvaamaaM<br />

Aavao Co tqaa kma-caarIAao nao saUrxaanaa saaQanaao vaaprvaa ivaSao T/oinaMga Avaar navaar<br />

AapvaamaaM Aavao Co.jo rsaayaNa vaaprtI vaKto krvaa naa ]pyaaoga ivaSao talaIma AapvaamaaM<br />

Aavao Co.


pìtEaIÊ<br />

klaokTrEaIÊ<br />

Amadavaad ijllaaÊ<br />

AnaIlakumaar baI.i~vaodIÊ<br />

vanaocarÊ<br />

24ÊkUlaIna TonaamaonTÊ<br />

Baavanaa TonaamaonT naI baajUmaaMÊ<br />

vaasaNaaÊAmadavaad.380007<br />

Faona:079 26600153<br />

tarIK:23.01.09<br />

baabat:mao.yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunaavaNaI<br />

ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />

maananaIya EaIÊ<br />

huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />

mao.yaunaImaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao.rIpaoT- saana AonavaayaraoTok<br />

pà.ila.palaDIÊAmadavaad wara rjU qayaao Co tomaaM kMpnaI jNaavao Co ko PlaaoT naMbar<br />

:337Ê338Ê269Ê294Ê296Ê299Ê297Ê300 maaM ivastrNanaI yaaojnaa AmalamaaM laavanaar Co.<br />

AapEaI naaM maaQyama qaI naIcao jNaavaola mau_aAao maaTo naI maaihtI AapSaao….<br />

1.gaujrat p`dUYaNa inayaM~Na baaoD- wara Collaa dsa vaYa- naaM samayagaaLa maaM mao.yaunaImaak-<br />

romaoDIJ laImaIToD ]pr AonvaayarmaonT pàoToxana AokT 1986 tomaj vaaoTr ³pÌvaonSana AonD<br />

kMTa/ola Aaof paolyauSana´AokT:1974 tqaa Aor³ p`IvaonSana AonD kMTa/ola Aaof paolyauSana´<br />

AokT:1981 AnaUsaar kao[ kayadoSarnaI kaya-vaahI qa[ haoya tao tonaI ivagatao<br />

jNaavaSaao.da.t.naaoiTsa À SaaokaoJ naaoiTsa À]%padna baMQa raKvaa maaTonaI kaya-vaahI tqaa<br />

k[ Satao- nao AaQaIna ]%padna Saru krvaanaI prvaanagaI AapI haoya.<br />

2.halanauM ]%padna AokmanauM baaQakama xao~fL koTlaUM rhoSao Anao fokT/I AokT maUjba<br />

baaMQakama naaM xao~fL naaM koTlaa Tka ivastarmaaM kayamaI laIlaao~I pyaa-varNa naI jaLvaNaI<br />

maaTo fokT/I naaM PlaaoTmaaM koTlaa Anao kovaa p`karnaaM GaTadar vaRxaao nauM vaavaotr Anao jaLvaNaI<br />

naI ivagatao AapSaao.<br />

3.Baayalaa gaama naaM vaasaIAao naI rjUAat Co ko mao.yaunaImaak- romaIDIJ laImaIToD fokT/ImaaM<br />

p`dUYaIt paNaI BarI raKvaa maaTo naanaUM tLava banaavaola Co jomaa fokT/I wara p`dUYaIt paNaI<br />

BarI raKolauM haoya Co.caaomaasaa naI ?tumaaM pholaa baIja varsaad baad caalaU varsaadmaaM fokT/I<br />

wara p`dUYaIt paNaInaaM tLava naao vaalva KaolaI naaKvaaqaI to paNaI Baayalaa baMQamaaM Aavao<br />

Co.Anao baMQa nauM paNaI p`dUYaIt kro Co.tao Aa baabat nao Qyaana maaM laota fokT/I wara<br />

vaOklpIk pgalaa jNaavaSaao.<br />

4.REIA rIpaoT-naa panaa naMbar 3 –37 ifgar 3.2 ³Wind rose diagram´p`maaNao hvaa naI<br />

idSaa d.5 Ê5.d Ê5 Ê5 Ê5 Ê]p Ê].].p haoya Co %yaaro ÊfokT/InaI p`dUYaIt hvaa Baayalaa<br />

vaasaIAaonaa svaasqya nao Asar kro Co.tao Aa baabato fokT/I wara jrurI pgalaa jNaavaSaao.<br />

5.fokT/Inaa AagaamaI ]%padnaaomaaM konsar vaIraoQaI dvaaAaonauM ]%padna maaoTa payao qanaar<br />

Co.jomaaM Kasaa maaoTa p`maaNa maaM maanavaEama qanaar Co taoAa drok kma-caarIAaonaa svaasqya<br />

naI saurxaa tqaa pyaa-varNa naI saurxaa baabato ivastRt maaM jNaavaSaao.<br />

Aapnaao ivaEvaasau Ê


jvaaba : AnaIlakumaar baI.i~vaodI.<br />

1.kayadosarnaI kaya-vaahInaI ivagatao rIpaoT-maaM saamaola Co.<br />

2.saurxaa AMgaonaI ivagatao [.Aa[.Ao irpaoT- saamaola Co.<br />

3.AmaarI kMpnaI naI AMdr JIrao DIscaaj- kMpnaI Co joqaI p`dUYaIt paNaI CaoDvaanaao pÈna<br />

]pisqat qatao naqaI.<br />

4.tmaama ivagatao Amaara [.Aa[.Ao irpaoT-maaM saamaola krola Co.<br />

5.Amao raKola saurxaanaa tj&Ao saUcavaola saurxaanaa ]payaaonauM caust pNao palana krvaamaaM<br />

Aavao Co tqaa kma-caarIAao nao saUrxaanaa saaQanaao vaaprvaa ivaSao T/oinaMga Avaar navaar<br />

AapvaamaaM Aavao Co.jo rsaayaNa vaaprtI vaKto krvaa naa ]pyaaoga ivaSao talaIma AapvaamaaM<br />

Aavao Co.


p/it ,<br />

A)yx[aI,<br />

ijLla pya$vr8Iy lok Ýsunav8I simit,<br />

Amdavad @Lla.<br />

srp&c [aI<br />

hsmù -a; 0orI-a; prmar<br />

5e. s&rp&c[aI<br />

nreN²is&h r82o6-a; ra5o6<br />

gamÝ -ayla taÝbavla<br />

@ ÝAmdavad<br />

Taa.ÊË jaNyuAarI ,ÊÈÈÑ.<br />

ivqy ŠÝ yuinmak$ remI6a;z il.nI ta. ÊËÝÉÝÊÈÈÑ na roj yojnar sunav8I babte rjuAat.<br />

[aIman,<br />

kU=X h=o.<br />

•É– Aa k&pnI tena ;.Aa;.Ae irpo4$ma& j8ave 2e ke ,A_yasna ÉÈ iklomI4rna ivStarma&<br />

srfes vo4r n9I. pr&tu, Amara Aa ivStarma& cek6emo Ane tXavo 2e. vXI ,kenal p8<br />

2e.irpo4$ AavI g&-Ir -Ul te -Ul n9I. pr&tu , ja8I jo;ne maihtI 2upavvano Aek p/yas<br />

2e. Ae4le tmarI ma&g8I 2e ke,;.Aa;.Ae irpo4$ rd krI frI v`t lok Ý sunav8I yojvama&<br />

Aave.<br />

•Ê– Jya& k&pnI ba&0kam krvanI 2e. te ivStar9I Amara vrsadI pa8Ina inkalna rSta 2e. jo<br />

k&pnI Tya& ba&0kam Ane idval9I te roka8 kr=e to Amara gamo 6Ubma& j=e.pa8I 3erava9I<br />

jn @vn iv`ra=e mhamarI fa4I nIkX=e. je9I k&pnI te babte ko; Aayojn krel 2e ke<br />

kem teno wkel n9I? k&pnIna nva ivStar8 ma4enI sa;4 bdlvanI AmarI tIv/ ma&g8I<br />

2e.<br />

•Ë– je 6emÝkenalnu& pa8I `e6Uto `etI ma& vapre 2e te 6emÝkenalma& k&pnI potanu& g&dupa8I 2o6e 2e.<br />

te 6emÝkenalne p/dUiqt kre 2e.


•Ì– Aa k&pnI bharna -age g4rÝnaXa va4e p/dUiqt pa8I `uLla ma& 2o6e 2e te g&-Ir babt 2e.<br />

jena9I t&{anu& te babte Ame )yan dorel 2e. Ane @.pI.sI.bIAe noi4so p8 Aapel 2e.to<br />

AavI p/dUiqt k&pnIne k; rIte prmI=n AapI =kay?<br />

•Í– Aa k&pnI potana Pla4ma& tXavo jevI jGya bnavI g&du pa8I s&g/h kre 2e jena9I -Ug$-<br />

jX p8 p/dUiqt 9ay Ane dr vqeR vrsadna pa8I sa9e te p/dUiqt pa8Ine 2o6I p8 de 2e je<br />

yoGy n9I te takIde b&0 9vu& jo;Ae tevI AmarI 5os ma&g8I 2e.<br />

•Î– k&pnI dEink ÐÍÑ iklolI4r p/it idvs pa8I pavrnI 2e je smrIna pej n&br ;ÝÑ pr<br />

btavel 2e. je v0are g8ay.Aa4la mo4a p/ma8ma& -Ug-$ jXne potana borvel ²ara<br />

`e&cvana 2e. to -Ug-$jXne kevI ivprIt Asr 9=e. -Ug-$jX 34I jva Ane pa8InI<br />

gu8v]aa p8 34I jvI jeva& p/[no w-a 9=e. borvel isvay bIja ivkLp n9I.k&pnI irvs$<br />

borvel ²ara p/dUiqt pa8I -Ug-$ma& wtare to te babt tpasvI 38I mu+kel 2e Ane `ca$X<br />

2e. to te babtnI `a{aI =u&?<br />

•Ï– Aa k&pnI je dEink pa8I vaprvanI 2e tema& ÍÍÌ iklolI4r g&du pa8I nIkX=e jene 4I4meN4<br />

AapI m=InrI 0ovama& wpyog kr=e frI g&du pa8I wmero 9=e. Aa4la b0a g&da pa8Ine<br />

S4orej krva ma4e k&pnI pase ke4lI kepesI4I 2e? S4orej 9yel dEink p/dUiqt pa8I ke4lu& Kya&<br />

mokl=e ? te tpasva ma4enI p)0it =o& 2e?<br />

•Ð– -ug-R jX rIcajR krvanI vat krI 2e te Kya& kr=o?, k; rIte kr=o>, tema& ke4lu& f&D<br />

vapr=o? borvel ,tXav, cekDem, kUvo vgere k; rIte kr=o?<br />

Aa-ar sh<br />

Apno,<br />

•hsmù prmar–<br />

nkl rvana Š s_y sicv [aI Ane p/adei=k Ai0karI [aI gujrat p/dUq8 iny&{a8 boDR, ga&0Ingr


jvaaba : hsamauKBaa[ prmaar<br />

1.Aa saUkao p`doSa haovaaqaI AhIMyaa kao[ kayamaI tLavaao haota naqaI Aa p`doSamaaM ?tuAaonao<br />

AaiQana hMgaamaI tLava jaovaa maLo Co.iDsaombar maihnaa pCI to saUka haoya Co.toTlaaM maaTo<br />

Amaao Aonao inayamaIt paNaI saMgaàhk trIko gaNata naqaI.<br />

2.Aa ivastar jyaaM baaMQakama krvaamaaM Aavyau Co jo paNaInaa BaraNa vaaLao ivastar naqaI.<br />

3.AmaarI kMpnaI iJrao iDscaaj- kMpnaI Co Amao gaTr ko baIjo kyaaMya paNaI CaoDta naqaI.<br />

4. Amao gaTr ko baIjo kyaaMya paNaI CaoDta naqaI.<br />

5.Amao AmaarI kMpnaImaaM gaMda paNaInaao saMga`h krta naqaI.Amao SauiQQakrNanaI pìk`yaa kyaa-<br />

pCI frI paNaI vaaprIAo CIAo.<br />

6.AmaaoAo vaaoTr harvaosTIMga ³paNaI ircaaj-´banaavaola Co.CtaonaaM varsaadI paNaI nao yaaogya<br />

irto vaaoTrharvaosTIMga saIsTmamaaM vaaLola Co.joqaI krInao paNaInauM p`dUYaIt qavaanauM Sakya<br />

naqaI.AanaaqaI jmaInanaa paNaI nauM p`maaNa Anao gauNava


PàitEaI‚<br />

Ÿllaa klaokTrEaI ³Amadavaad´<br />

Ÿllaa klaokTrEaInaI kcaorI‚<br />

Amadavaad.<br />

rakoSakuamaar ikSaaorBaa[ sauqaar<br />

46‚ gaNaoSa saaosaayaTI‚<br />

maaohnanagar naI baajumaaM‚<br />

Amadavaad 382330<br />

ivaYaya : vaaMQaa ArŸ<br />

saMdBa-: 1.RTI rof naM.152 ta.20.12.08 Ÿ.pI.saI.baI.baaoD- gaaMQaInagar AMgao<br />

2.Baart sarkar naa pyaa-varNa Anao vana maM~alaya navaI idllaInaa jahornaamaaM k`maaMk<br />

Aosa.Aao.1533 ta.14.09.2006naa Anvayao mao.Jona AaonkaolaaoŸ pà.laI.Anao mao.yaunaImaak-<br />

romaoDIJ ila.gaama koralaa ta:baavaLa Ÿ:Amadavaad AMgao<br />

EaImaana<br />

jya Baart saaqao jNaavavaanauM ko Amaao ]praokt saMdBa-maaM jNaavaola kMpnaInaa<br />

laaok AiBapàya baabato Amaao rakoSakumaar ikSaaorBaa[ sauqaar Aok jagaRt p~kar trIko AapnaI<br />

samaxa ]praokt kMpnaInaI ivaruQQamaaM vaaMQaaM ArŸ rju krIAo CIAo.<br />

1.]praokt kMpnaIAao Wara jo laaok AiBapàya maoLvavaa jahorat krI laaok saunaavaNaI raKola Co<br />

to baabato Amaao ]BaI qanaar pyaa-varNa samasyaaAaoqaI AjaNa haovaaqaI AmaaoAo ga[<br />

ta.20.12.08 naa raoj gaujrat rajya paolyau.kMT/aola baaoD- gaaMQaInagar maaM maaihtI AiQakar<br />

2005 hozL maaihtI maoLvavaa ArŸ krola jonaa jvaaba maaM aolyau.baaoD- wara saMpUNa-maaihtI<br />

AapvaamaaM Aavaola naqaI Anao BaivaYyamaaM qanaar pyaa-varNa samasyaaAaoqaI vaakof krola naqaI.joqaI<br />

Aa AMgao Amaaonao saMpUNa- vaakof krvaamaaM Aavao.<br />

2.jahor jnatanaa laaBaaqao- ]praokt kMpnaIAao AMgao saMpUNa- maaihtI jahor krvaamaaM Aavao jao<br />

]praokt kMpnaIAao AMgaonaI maaihtI jahor krvaamaaM nahI Aavao tao Amadavaad Ÿllaa komaIkla<br />

³rasaayaiNak pìk`yaa´laa[naqaI AjaNa naagairkao kyaa AaQaaro ivaraoQa krI Sako.AaqaI nama`<br />

Arj Co ko ]praokt saunaavaNaInaI tarIK laMbaavavaa Anao jahor jnatanao pyaa-varNa naI<br />

samasyaaAaoqaI vaakof krvaa AmaarI jahor iht maaTo ivanaMtI Co.<br />

AaBaar sah<br />

Aapnaao ivaEvaasau<br />

rakoSakumaar ikSaaorBaa[ sauqaar


jvaaba : rakoSakumaar ikSaaorBaa[ sauqaar<br />

1. ]praokt laaok saunaavaNaI vaKto sarkarEaI Ao jNaavaola jrurI Asarga`st<br />

ivastarao naao rIpaoT- Aapola Co Anao jaNa krvaamaaM Aavaola Co<br />

2. jahor jnatanaI jaNakarI maaTo jo p`aoDkTnauM ]%padna krvaanauM Co Anao rsaayaNaao<br />

vaaprvaamaaM Aavanaar Co jonauM laIsT rIpaoT-maaM dSaa-vaola Co.


P`aitEaI<br />

Ÿllaa klaokTrEaI ³Amadavaad´<br />

Ÿllaa klaokTrEaInaI kcaorI‚<br />

Amadavaad.<br />

AiKla BaartIya navajvaana saBaa<br />

ivaYaya : laaok saunaavaNaI AMgao vaaMQaa ArŸ<br />

saMdBa-: Baart sarkar naaM pyaa-varNa Anao vana maM~alaya navaI idllaI naaM jahornaamaa<br />

k`maaMk Aosa.Aao.1533 ta.14.09.2006 Anvayao ³1´ maosasa- Jona<br />

AaonkaolaaoŸ p`a.ila. ³2´ mao.yauinamaak- romaoDIJ ila.gaama– koralaa ta–baavaLa<br />

Ÿ–Amadavaad<br />

mahaodyaEaI‚ namaskar<br />

AaqaI Amaao idnaoSakumaar Aosa.caaOhaNa kond/Iya saMgazna Aaola [nDIyaa yauqa foDroSana<br />

Amadavaad ŸllaaM naaM Aga`NaI Anao jagaRt naagairk trIko frj bajavaIAo CIAo Anao<br />

pyaa-varNa naI samasyaa naaM inakala maaTo p`ya%naSaIla CIAo.<br />

]praok


vaQaumaaM laIlaavaRxaaonauM vaavaotr krvaa kao[ pgalaaM sarkarEaI ko paolyauSana kMT/aola baaoD_ Wara<br />

laovaayaola naqaI.pyaa-varNa samasyaanaaM inakala maaTo AavaSyakta AnausaarnaaM vaRxaao pNa ]Baa<br />

krvaamaaM Aavaola naqaI.<br />

]praok


P`aitEaI‚<br />

rajya saicavaEaI‚<br />

gaujrat paolyauSana kMT/aola baaoD-³gaujrat rajya´‚<br />

gaaMQaInagar.<br />

ivaYaya: laaok saunaavaNaI maaTo naamanaI naaoMQaNaI krI maaihtI Aapvaa AMgao<br />

saMdBa-: ³1´mao.yaunaImaak- romaoDIJ p`a.ila.<br />

³2´mao.Jona AaonkaolaaoŸ<br />

sqaL: PlaaoT naM.337‚338‚269‚299‚294‚296‚297 Anao 300 gaama koralaa ta<br />

baavaLa<br />

Ÿ Amadavaad<br />

³3´ maosasa- gaujrat rajya maaga- ivakasa inagama ilamaIToD.<br />

bagaaodra vallaBaIpur Baavanagar<br />

sarKoj vaTamaNa Baavanagar<br />

mahaSayaEaI‚ namaskar<br />

ivanaMtI sah jNaavavaanauM ko Amaao ]praok


jvaaba : idnaoSa caaOhaNa<br />

1.jonaa maaTo Amao jvaabadar naqaI.


PàitEaI‚<br />

maa.EaI.klaokTr saahoba‚<br />

Amadavaad Ÿllaao‚<br />

Amadavaad.<br />

PàomasaIMga baI.razaoD<br />

myau.kao.EaImatI janakI dovaI caaOhana<br />

ivaYNau naI caalaI.baapunagar<br />

Amadavaad.<br />

ivaYaya: pyaa-varNa Aovama vana maM~alaya navaI idllaI.naI jahor saucanaa k`maaMk<br />

Aosa.Aao.1533 ta.14.09.2006 baabato.<br />

ArŸ: ta.5.01.2009 naa raoj pìt‚ EaImaana saMŸva %yaagaI‚ saBya sacaIva‚Ÿ.pI.saI.baI. pyaavarNa<br />

Bavana‚saokTr 10Ao gaaMQaInagar‚382010.<br />

mMao.saahoba‚<br />

]praokt ivaYaya Anao ArŸ baabato ta.23.01.09 Aaj raoj jahor saunaavaNaI maaM huM<br />

paoto rubaru naIcao jNaavaola maud\aAao qakI TIka TIPPaNaI ko vaaMQaaAao rju krI rhola CuM.<br />

³1´ “gaujrat samaacaar”maaM maa.EaI saMŸva %yaagaI saBya sacaIva maarft ta.11.12.2008 naa<br />

raoj naa AapvaamaaM Aavaola jahor saunaavaNaI naI jahoratmaaM mao.yaunaImaak- romaoDIJ Anao mao.Jona<br />

AaonkaolaaoŸ maaM baMnao Alaga Alaga jahorat maaM pNa baMnao kMpnaI Aao naa Plaao<br />

naM.337‚338‚269‚299‚296‚297 Anao 300 gaama koralaa‚talaukao baavaLa‚ Ÿllaao Amadavaad.Aa<br />

baMnao kMpnaIAao Ao SauM Alaga Alaga baaMQakama naI prmaISana laIQaola Co ko koma.karNa ko baMnao<br />

jahoratao maaM baMnao naa PlaaoT Aok sarKa Co.<br />

³2´ ]praokt jNaavaola kaolama ³1´ maaM Amao jNaavaola Co ko baMnao kMpnaIAaonaa PlaaoT Aok<br />

sarKa haoya tao Aa baMnao kMpnaI Aao naaM baaMQakama SauM Aok sarKa Aqavaa tao juda juda Co.Ao<br />

vaat naI kao[ spYTta krvaamaaM Aavaola naqaI karNa.<br />

³3´ ]praokt jNaavaola ³1´naI jahorat baabato jNaavavaanauM ko Aa jahorat maaM jNaavaola PlaaoT<br />

naM.pr kyaaM kyaaM k[ kMpnaIAaonauM baaMQakama krvaamaaM AavaSao.<br />

³4´AmaarI jat sqaL tpasa krta Amanao jaNavaa maLola ko mao.yaunaImaak- romaoDIJ ilamaIToD<br />

Aokj kMpnaI pholaaqaI kaya-rt Co jao mao.yaunaImaak- romaoDIJ laI.kMpnaI paotanaao ]%padna<br />

vahIvaT Aaj PlaaoTaomaaM vaQaarvaa maaMgatI haoya tao Aa baabato qanaar vaQaaranaaM baaMQakama naI<br />

prvaanagaI kyaaMqaI Anao kyaa puravaa naa AaQaaro maooLvaola Co.<br />

³5´jao yaunaImaak- romaoDIJ laI ]praokt jNaavaola PlaaoTao maaM paotanaa yauinaTmaaM vaQaaranaao ]%padna<br />

krta haoya tao mao.Jona AaonkaolaaoŸ pà.laI. kyaa PlaaoTaomaaM‚ kyaa AaQaar puravaa Aao Anao<br />

baaMQakama naI prvaanagaI maaM paotanau ]%padna krSao Ao baabat naao kao[ KulaaSaao krvaamaaM<br />

Aavaola naqaI.<br />

³6´jao Jona AaonkaolaaoŸ pà.laI naa baaMQakama nao maMjurI maLola haoya tao Aa baabatnaa tmaama<br />

puravaa jahor krvaa.


³7´kdaca baMnao kMpnaIAao ]praokt dSaa-vaola PlaaoT naMbarao maaM ]%padana krtI haoya tao BaivaYya<br />

kao[pNa Aksmaat k[ rIto nakI krI SakaSao ko k[ kMpnaI naa Baulanaa karNao Aksmaat<br />

qayaola Co.<br />

Amadavaad<br />

ta.23.01.09<br />

AaBaar sahIt<br />

Aaptao Bava dIya<br />

PàomasaIMga baI.razaoD


jvaaba : PàomasaIMga baI.razaoD<br />

1.mao.yaunaImaak- romaIDIJ A~o kaya-rt yaunaIT Co.jonauM Anao Jona AokaonlaaoŸ p`a.laI naa<br />

naamao Saru krvaa maagaIAo CIAo.jo Aok j ip`maa[saIsamaaM krvaa maaMgaIAo CIAo. Jonaa<br />

PlaaoT naMbar Amaara rIpaoT-maaM jNaavaola Co.<br />

2.Aa p`Ena p`duYaNanao lagatao naa haovaaqaI tonaao jvaaba Aapvaao jrurI naqaI<br />

3.Aa p`Ena p`duYaNa nao lagatao naqaI<br />

4.Aa p`Ena p`duYaNa nao lagatao naqaI<br />

5.6.7 Aa p`Ena p`duYaNa nao lagata Co nahI.


EaI<br />

mahoSa pMDyaa<br />

saamaaŸk Anao jnaklyaaNa kond/<br />

Amadavaad.<br />

PàitEaI<br />

ivaYaya: yauinamaak- romaIiDJ ila.baavaLa Amadavaad AMgao saunaavaNaI ta: 23.01.2009<br />

rof: Aapnaao p~ PM/MP/188/2009 Date:09.10.2009<br />

Aapnaa p~ maomba.saokòTrI EaI saMŸva %yaagaI Ÿ.pI.saI.baI.naa p~ baabato AmaaoAo<br />

Aapnaa p~ naI ivagatao QyaanamaaM raKI naIcao maujba Kulaasaa krIAo CIAo.<br />

1.halanaa kaya-rt kMpnaI naa yauinaT pasao pyaa-varNa iklayarMnsa Co ko nahIÆ jao na haoya tao<br />

tonaI nakla AapSaao.A~o tonauM koTlau palana qaaya Co jo MOEF & GPCB maaM Aapola CoÆ<br />

Aa AMgao naI jmaa kravyaanaI tarIK AapSaao.jo Aapnaa AaoifsaIyala vaobasaa[T ApDoT<br />

krola CoÆ<br />

jvaaba: ha ,kMpnaI Ao pyaa-varNa iklayarMsa maoLvaola Co<br />

2.halanaa kaya-rt yauinaT pasao jI.pI.saI.baI.maaM ivaivaQa rogyaulaoSana maujba maanya kaomana<br />

knsaaolaIDoToD knsaonT CoÆ tonaI nakla Anao palana kyaa-naI ivagatao AapSaao. CCA kyaaM<br />

sauQaI maanya Co tonaI tarIK AapSaao.<br />

jvaaba:ha ,kMpnaI pasao maanya knsaonT Co Anao jI.pI.saI.baI.naa rogyaulaoSana p`maaNao<br />

halamaaM kaya-rt yauinaT Co. CCA naI nakla Anao palana kyaa-naI ivagatao piriYaYz 1 maaM<br />

dSaa-vaola Co.<br />

3.Collaa 2 vaYa- drimayaana laIQaolaa hvaa paNaI jII.pI.saI.baI.wara Anao Gana kcaranaaM<br />

saoomplaao Anao tonaaM TosTIMga naa rIpaoT- piriYaYz baI.maaM saamaola krola Co.<br />

jvaaba : A~o piriYaYz baI maaM saamaola krola Co.<br />

4. MOEF naaM pàdoiSak Aaoifsayala maulaakat Collaa bao vaYa- maaM qa[ haoya tao tonaI ivagatao.<br />

jvaaba : laagau pDtu naqaI karNako MOEF naaM pàdoSaIk AaoifsarnaI Collaa bao vaYa- drimayaana<br />

maulaakat qayaola naqaI.<br />

5.A~onaaM kaya-rt yauinaTnao vaaoTr AokT 1974 ,Aor AokT 1981 anao AorvaayaraomaonT<br />

pàoTokSana AokT 1986 naI AMdr SaaokaoJ naaoTIsa ,klaaoJr AapvaamaaM Aavaolaa Co.tonaI<br />

ivagatao AapSaao.Anao laIQaolaa pgalaanaI ivagatao AapSaao.


6.halamaaM kaya-rt kMpnaI Ao pyaa-varNa AaoiDT jI.pI.saI.baI.maaM jmaaM kravaola CoÆCollaa<br />

bao vaYa-naaM rIpaoT-maaM jNaavaola saUcanaaonaI ivagatao AapSaao.<br />

jvaaba : ha ,kMpnaI wara pyaa-varNa AaoiDT rIpaoT-sa inayaimat jI.pI.saI.baI.maaM jmaaM<br />

kravavaamaaM Aavao Co.maLolaa saUcanaao piriYaYz saI maaM saamaola Co.<br />

7.saMBaivat ivastRitkrNa maaTo jI.pI.saI.baI.wara kMpnaI Aona Aao saI AapvaamaaM<br />

Aavaola CoÆ<br />

jvaaba: Aona.Aao.saI maaTo naI ArjI Aapola naqaI.AmaaoAo Aona.Aao.saI.maaTo ArjI<br />

krola Co.<br />

8.saMBaivat ivastRitkrNa kMpnaI kyaaro pUNa- krSaoÆ<br />

9.koPTIla paavar PlaanT maaTo kaolasaao vaaprvaamaaM Aavanaar Co.joqaI badlaata pyaa-varNa<br />

glaaobala vaaomaI-Mga baabato SauM krSaaoÆ<br />

jvaaba:Aa ivastaarmaaM naocarla gaosa naao purvazao ]plbaQa na haovaaqaI Anao AamaaoAo<br />

ilagnaa[T , kaolasaao koPTIva pavar PlaanT naaM [MqaNa trIko Amaara ifjIbaIlaITI Ahovaala<br />

maaM laIQaola Co.<br />

10.SauM kMpnaI wara [Taonaa Ba{avaaLa jaoDo raK maaTo kao[ krarao krolaa Co ko komaÆ<br />

11.vaaoTr havao-sTIMga wara saIJna maaM koTlau paNaI havao-sT krI SakaSaoÆSauM tmaarI pasao vaaoTr<br />

havao-sTIMga Plaana CoÆ AmaarI saUcanaa Co kokMpnaI kompsamaaM Aok~ krola paNaI nauM havao-sT<br />

krvau naih.jao Aavaa Plaana najIknaaM gaamaaomaaM krvaa jao[Ao.karNako tmaarI kMpnaI maaM<br />

Aavaola havao-sTIMga vaaoTr p`dUYaIt paNaI jmaInamaaM ]tarI Sako<br />

12.halamaaM kaya-rt Anao saMBaivat PlaanT maaTo paNaInaao s~aot SauM CoÆ<br />

jvaaba:halanaa PlaanT maaTo paNaInaao mau#ya s~aot jmaIna nauM paNaI Co Aa ivastar “Dak-<br />

Jaona”maaM Aavatu na haovaaqaI jmaIna naa vaaoTr AoksT/kosana maaTo naI prvaanagaInaI jrur<br />

rhotI naqaI.<br />

13.halamaaM kaya-rt yauinaT Amao saMBaivat PlaanT maaTonaaM vaaoTr baolaonsa caaT- barabar<br />

baolaonsa qayaola naqaI.joqaI rIpaoT- yaaogya naqaI jo [.Aa[.Ao rIpaoT-maaM KamaI rhola Co.<br />

14.fa[nala Aa]T laoT iDscaaJ- pao[nT SauM CoÆ<br />

15.saMBaivat ivastRitkrNa pCI hvaanaI gaMQa maaTo SauM krvaa maagaao CaoÆ<br />

jvaaba: kMpnaI Ao huD Anao sk`bar naI vyavasqaa krola Co jo maTorIyala caajI-Mga vaKto<br />

saonT/If\yauj pokIMga drimayaana ]d\Bavata gaosa naI sk`barmaaM sk`ba krvaamaaM AavaSao.


16.Saa maaTo pàojokT Saru krta pholaa k[ baoJ laa[na ko sTaD- Anao rofrnsa laIQaolaa CoÆ<br />

jvaaba : pyaa-varNa iklaIyarnsa naI maMjUrI maaTo naa samayanaao bacaava krvaa maaTo baoJ laa[na<br />

PlaanaIMganaa samayao da.t.TORs naI ArjI saaqao<br />

17.halanaa kaya-rt PlaanT wara AapvaamaaM Aavata nakamaaM Aao[la Anao jaoKmaI Gana<br />

kcaranaao inakala maaTo saI.pI.saI.baI.maanya kyaa rIsaayaklar – vaocaaNa krvaamaaM Aavoa Co<br />

to jNaavaSaaoÆ<br />

jvaaba: baaombao baorla saPlaaya kMpnaI , yauinaTI poT/aolaIyama kMpnaI , saI.pI.saI.baI.wara<br />

maanya krvaamaaM Aavaola Co. Amao vaprayaolaa Aao[la nauM vaocaana krIAo CIAo.<br />

18.saMBaivat pàojokT maaM AasapasanaaM ivastar maaTo raojgaarInaI koTlaI tkao ]BaI qaSaoÆ<br />

jvaaba: hala naaM kaya-rt PlaanTmaa 600 kamadaraonao raojgaarI AapvaamaaM Aavao Co.Anao<br />

navaa PlaanTnaa ivastRitkrNa pCI 300 kamadaraonao raojgaarI maLSao.<br />

Amaaonao AaSaa Co ko AmaaoAo jNaavaola hkIkt Anao samajNa Amaara Ahovaala Anao<br />

[.Aa[.Ao rIpaoT- AMgaonaI yaaogya samajNa maaTo madd rup banaSao.<br />

AaBaar sah<br />

yauinamaak- romaoDIJ laImaIToD<br />

maonaojIMga DayarkoTr


Ankleshwar : B-24, MANGAL MURTI SOCIETY, DIVA ROAD, ANKLESHWAR<br />

k/ma&k Š PM/PH/0904<br />

p/it,<br />

A)yx[aI/ sicv[aI/p/adei=k Ai0karI [aI,<br />

pyaRvr8Iy loksunam8I kimi4,<br />

gujrat p/duq8 iny&{a8 boDR,<br />

Amdavad<br />

Date : 21/01/2009<br />

ivqy Š MS. UNIMARK REMEDIES, LTD. nI pyaRvr8Iy loksunav8Ima& sUcno imnIS4^sma&<br />

leva babt.<br />

Aadr8Iy [aI,<br />

MS.UNIMARK REMEDIES, LTD. nI pyaRvr8Iy loksunav8I nI tarI` ŠÊËÝÈÉÝÊÈÈÑ<br />

na roj yojanar hova9I nIce mujbna sUcno imin4^sma& leva ivn&tI.<br />

•É– Aa k&pnI pyaRvr8ne sb0I =u& pgla& le=e t9a pyaRvr8ne tj}a nI inm8U&k krnar 2e ke nhI?<br />

•Ê– p/ojeK4 p/op/onN4 Aa ivStarna ivkasnI sama@k jvabdarI sm@ =u& pgla& lenar 2e?<br />

•Ë– Aa k&pnI S9aink berojgarone rojgarI Aapva phelu )yan Aape.<br />

•Ì– Aa k&pnI p/dUq8na mu¥e AgmcetI da`vI na9va tmam p/karnI koi==o krI pyaRvr8ne bcavva<br />

yoGy p/ojeK4 faXve te j£rI 2e.<br />

•Í– Aa k&pnI µara Aek wTtm wdahr8 pu£ paDI @.pI.sI.bI. t9a pI.sI.bI. na kaydane Anusre 2e.<br />

•Î– Aa k&pnI na p/ojeK4 p/op/onN4 µara Aaju& baju&na ivStarna na ivkas ma4e yoGy bje4 faXvI skUlo,<br />

iv0vaAo t9a grIbI rè a nIce @vta lokonu& @vn0or8 w&cu lavva mdd kre.<br />

A&te Aa p/ojeK4 taluka, @Llana t9a gujrat Ane smg/ de=na ivkasma& sh-agI bnnar<br />

hova9I Aa p/ojeK4ne Amo AavkarIAe 2IAe.<br />

Aa-ar sh<br />

Aapno iv¿vasu&<br />

mnIq ra8a<br />

•t&{aI–<br />

pyaRvr8 m&{aI


jvab : Ankleshwar : B-24, MANGAL MURTI SOCIETY, DIVA ROAD, ANKLESHWAR<br />

Aa A&genI yoGy ivgt gujrat p/duq8 iny&{a8 boDR ma& jma krel 2e.


janyauAarI 23.2009<br />

pìt ,<br />

EaI pìvaNaBaa[ Saoz<br />

Ao.8 , kalaIndI AopaT-maonT<br />

caIkuvaaDI ,AMklaoEvar.393001<br />

gaujrat.<br />

ivaYaya: mao.yauinamaak- romaIDIJ laImaIToD baavaLa , ij.Amadavaad naaM ivastRitkrNa maaTonaI<br />

pyaa-varNa laaok saunaavaNaI ta.23.01.2009 baabat.<br />

maananaIya saahoba<br />

,<br />

Aapnao saBya saicavaEaI saMjIva %yaagaI jI.pI.saI.baI.gaaMQaInagar nao maaoklavaamaaM Aavaola<br />

p~ saMdBao- AmaaoAo Aapnaa p~naI ivagato AByaasa krI nao Aa baabato naIcao p`maaNao<br />

Amaarao jvaaba samajNa AapvaamaaM Aavao Co.<br />

TIPpNaI Anao salaah saUcana<br />

k`ma TIPpNaI ]payaao<br />

1 mau#ya maTorIyala baabato maaihtI AapSaao<br />

A maojr saaolvanT Aaga maaTo AignaSaamak ha<br />

vyavasqaa Co<br />

ba Sau tmaarI pasao faoma TonDr Co ha<br />

k Faomanaao sTaok koTlaao raKSaao 300 qaI 400 laITr<br />

D fayar fayaTIMga maaTo fayar vaaoTrnaao sTaorj 600 iklaao laITr<br />

xamata koTlaI Co<br />

[ jaoKmaI rsaayaNaao, karsaInaaojna, Anao<br />

AoksaPlaaoJIva rsaayaNaaonaa rIsk AosaosmaonT<br />

kyaaM CoÆjao haoya tao kma-caarInaa saurxaa<br />

maaTo naa maITIgaoSana ]paya Sau CoÆ<br />

F SauM sTDI ivastarmaaM maIcyaula AoD krvaamaaM<br />

Aavaola Co Æ<br />

jI Sau Fayar Aolaarama saIsTmanaI saaqao saonsar<br />

raKolaa CoÆ<br />

Aoca SaaolvanT Tonkrnao KalaI krta pholaa kovaI<br />

rIto sqaIt ivaVut nao mau#ya drvaaja pasaoo<br />

Aqa- krvaamaaM AavaSaoÆ<br />

Aa[ Sau %yaaM kao[ kasaI-naaojna rsaayaNa naao<br />

vapraSa CoÆ tmaara kma-caarIAaonao<br />

Aaraogyanaa jaoKmaaoqaI kovaI rIto saurxaIt<br />

raKSaaoÆ<br />

kMpnaIAo Aaona saa[T [marjnsaI Plaana<br />

banaavaola Co Anao saMBaivat [marjnsaI<br />

maaTo maITIgaoSana AokSana banaavaola Co.jo<br />

kMpnaI maaM maLI rhoSao.<br />

PaDaoSaI kMpnaIAao saaqao maIcyaula AoD krola<br />

Co<br />

kMpnaIAo [marjnsaI SaayarnanaI vyavasqaa<br />

krI Co<br />

ha ,jonaa maaTo AqaI-Mga kTInyauTI saaqao<br />

caoklaIsT naIBaavavaamaaM Aavao Co<br />

kMpnaI Ao sva saurxaanaa saaQanaao raKvaa<br />

maaTo Kasa p`karnaa saurxaa kbaaTao drok<br />

Katamaa raKolaa Co , jyaaro jyaaro<br />

jaoKmaI rsaayaNaaonaa vapraSa samayao jo to<br />

Katanaa AiQakarI wara svasaurxaanaa<br />

saaQanaaonaa vapraSa AMgao Ka~I krvaamaaM<br />

Aavao Co.Anao inayamaIt dak


2. sTDI ivastarmaaM koTlaI p`dUYaNa folaavatI<br />

kMpnaI Aao AavaolaI CoÆ<br />

,<br />

3. tmao jNaavyaa maujba baao[lar maaTo kaolasaao<br />

vaaprnaar Cao kaba-na maaonaaok\saa[D naa<br />

p`dUYaNanaaM kMT/aola maaTo kovaI rIto Ka~I<br />

krSaao Æ jo vat-maana maaihtI maujba 0.44<br />

maI.gaa`maÀmaI 3 Co<br />

4. Payaa-varNanao Asarga`t ivastaraomaaM<br />

Avaajnau p`maaNa Sau Co Æ<br />

, 5. nakSaanaa poj naM 123 PaòajokT saa[T<br />

cambay naa AkatmaaM batavao Co.jo gaor<br />

maagao- daoro Co Anao sauQaara maaTo pgalaa jrurI<br />

Co.<br />

6. kMpnaIe laIQaola AaorgaonaIk rosaIDIyau naa<br />

[nsaInaoroSana maaTo Aaoqaoara[j maombarSaIp<br />

koTlaa samaya sauQaI naI Co Æ tonaI ivagat<br />

AapSaao.<br />

7 saoalvanT koTlaa p,karnaI p`kÌyaamaaM vapraya<br />

CoÆ to hvaamaa koTlaa Tka baaYpIBavana<br />

qaaya CoÆ tmao BavaIYyamaMa kovaI rIto eaCU<br />

krSaoaÆ<br />

8 frI ]pyaaogamaaM laovaataM baorla nao saaf<br />

krvaanaI pQQatI/vyavasqaa raKola Co.<br />

Aasapaasa naa 5 qaI 10 iklaaomaITr<br />

ivastarmaaM maoaTaBaagao AonjInyarIMga Anao<br />

ra[samaIlaao AavaolaI Co.<br />

Amao purtao A^aksaIjna À Aor [QaNanaa<br />

saMpUNa- saLgaavavaa vyavasqaa krvaamaaM<br />

AavaSao.<br />

Avaajnau p`maaNa inayamaIt rIto maapvaamaaM<br />

Aavao Co jo mayaa-dIt maalauma pDola Co.jo<br />

Amaara [.Aa[.Ao irpaoT-maaM saamaola<br />

Co.<br />

jo kaomaPyauTrnaa saaofT`vaornaI KamaIAaonaa<br />

laIQao qayaola Co jo sauQaarvaa naI Ka~I<br />

AapIAo CIAo.<br />

kMpnaI pasao Aaoqaaora[j BEIL,GAPIL<br />

maombarSaIp Co jonaa p~ao saamaola krola<br />

Co.sTok ÀvaonT vaaTo DayaaokJIna Aqavaa<br />

fyaurana jovaa gaosa CaoDvaamaaM Aavanaar<br />

naqaI.<br />

Kubaj nagaNya, baaYpIBavana AaoCuM qaaya<br />

maaTo zMDa knDonsanaI vyavasqaa krola Co.<br />

9 gaÌna baolT pyaa^varNanao lagata.<br />

e kyaa p`karnaa vaRxaaonauM vaavaotr krSaao? eJaDIrIsTa [nDIyaa, konaa,<br />

TrmaInaInaalaIAa, kTapa, earIngaa<br />

ealaIAara, kjurInaa, [kaosaopaolaIyaa,<br />

naorIyama [nDIkma, qaovaaTIyaa, poruvaIyaanaa,<br />

naoruyamaeSaIyasa vagaor o<br />

baI koTlaa vaRxaaonauM vaavaotr krSaao? 2105<br />

saI APTR vaRxaaonauM SauM Co? APTR vaRxaaonaao Aqa^ jaNata naqaI.<br />

DI baàomaIna Anao klaaorIna vaopr p`duYaNanao<br />

ATkavavaa/pyaa^varNanao bacaavavaa kyaa<br />

p`karnaa Kasa vaRxaao vaavaSaao? vaRxaaonaI<br />

}Mcaa[ koTlaI rhoSao ?<br />

ha.<br />

baàomaIna Anao klaaorInanauM baaYpIBavana<br />

qavaanauM naqaI.


[ tajuM paNaI koTlauM vapraSao? halamaaM 48 kyaubaIklaITr/dIvasa saMBavaIt<br />

130<br />

10 kcarao eaCao krvaa maaTonaa ]payaao /<br />

11<br />

vaIcaarao.<br />

e kyaa p`karnaI AaDpodaSaao paCIlaovaamaaM<br />

baI<br />

tomaj vaaprvaamaaM Aavao Co? tonaao maasaIk<br />

jqqaao<br />

varsaadI paNaInaa jLsaMcayanaI ruproKa kyaaM<br />

Co? koTlauM varsaadI paNaI jLsaMcaya qaSao?<br />

taja paNaInaao vapraSa koTlaao GaTSao<br />

vaaiYa^k?<br />

AaokyaupoSanala holqa Anao saofTI baabato<br />

Ao Collaa ~Na vaYa-naao holqa &pyaa-varNa naao<br />

rokaoD- Sau Co?<br />

baI Aaraogya tpasa drimayaana kao[ gaMBaIr koSa<br />

naaoMQaayaola Co? jovaako [MfokSana konsar<br />

kark caamaDI lagata raogaao?jao ha tao SauM<br />

Aa AMgao yaaogya maaga-dSa-na Aapola Co?<br />

12 Aomaaoinayaa Taoca- naao sTaoksa raKola Co<br />

Anao koTlaao Aomaaoinayaa sTaok raKnaar Co<br />

13 rRsaayaNa pao[JnaIMga kro tovaa rsaayaNa<br />

/gaosanaI saMBaavanaa Co?kyaa pìtkarkao naao<br />

sTaok raKvaamaaM AavaSao<br />

14 navaI baoca Saru krta pholaa saaf krvaanaI<br />

pQQait SauM Co?<br />

15. ]naaLa drimayaana kovaI rIto Ka~I krSaao<br />

?ko garma paNaI naao flaao AaMK saaf<br />

krvaanaa fuvaara vaaTo na qaaya jonaI saaqao<br />

pa[p laa[na jaoDayaola Co<br />

16 %yaaM kaM[ AokJaoqamaI-k pìk`yaa Co?jao haoya<br />

tao kyaa p`karnaaM saurxaa naa pgalaa laIQaola<br />

Co?<br />

17 Aa paòjokTnaI fIJIbaIlaITIAo jomaaM 36<br />

kraoD ruipyaa Kca- qanaar Co tonaao pobaok<br />

samaya SauM Co?<br />

Amaao mau#ya


saUcanaao<br />

18 gaÌna baolT saMdBao- kaba-na Dayaoksaa[D Anao<br />

AaoksaIjna nauM p`maaNa gaÌna baolTnaI<br />

Asarkarkta inayamaIt Aok krvaI<br />

19 makananaa naaoMQakama pholaa jrurI<br />

erkMDISanaIMga‚ rofrIjroSananaI vyavasqaa<br />

tomaj slaoba‚ AgaaSaI‚ baajunaI idvaala‚ kaca<br />

ivagaoronaI ivagatao jo vaQaumaaM vaQau pavar<br />

bacat krI Sako.<br />

20 laakDanaa vapraSa vagarnauM baaMQakama Anao<br />

payaa^varNanao AnaukuL baaMQakama krvaa maaTo<br />

vyavasqaa krvaa.<br />

21 ivajLInaa bacat maaTo jrurI saaolar saIsTma<br />

gaaozvavaa, sT/IT laa[T, gaaD^na laa[T, hITr<br />

Anao PaaNaInaI vyavasqaa tomaj CFL naa<br />

laomp (markyaurI naa ]DI gayaola balba dUr<br />

krvaa)<br />

22 CFC naao KUbaj eaCao ]pyaaoga Anao<br />

baIja p`karnaI vyavasqaa jo ‘glaaobala<br />

vaaoima^Mga saamaonaa doSanaa AiBayaanamaaM madd<br />

qaaya. Tomaj baIja gaÌnaha]sa gaosanauM<br />

vaatavarNa maaM BaoLvavaanauM ekdma eaCuM<br />

krvau.<br />

23 Payaa^varNanaI samatulaa jaLvavaa maaTo AaKa<br />

varsanaao (caaomaasaa isavaayanaao) AByaasa<br />

krInao p`duYaNanaao saarI rIto inakala qa[<br />

Sako. jo vyavasqaIt EMP jo p`duYaNaqaI qatI<br />

Kraba Asarao dUr krSao.<br />

24 samaajnaa ]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!