Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Date : 23/01/2009<br />
To,<br />
The Respectable Collector,<br />
Sub : Regarding <strong>Pollution</strong><br />
Our village named Bhayala, which is far around 1 to 2 kilometers from the project (1)<br />
M/s Zen Oncology (2) M/s Unimark Remedies Ltd. They have analyzed some samples,<br />
which is totally wrong against the pollution control measures prescribed for air, water.<br />
We would like to further state that due to these ongoing projects of the said company, we<br />
are facing lot of bad effects for air / water.<br />
Therefore this is our request from the entire Bhayala and surrounding areas that your<br />
attention is very much needed to make necessary action for both the projects for which<br />
we shall feel highly oblige.<br />
Hasmukh D. Parmar
Answer: Hasmukh D. Parmar<br />
It has been mentioned in our report that to control the pollution necessary scrubber is<br />
installed and in the future also the same procedure will be maintained, if necessary.
Date : 23/01/2009<br />
To,,<br />
The Respectable Collector Saheb,<br />
Ahmedabad.<br />
We would like to inform you that the company M/s Unimark Remedies Ltd., located at<br />
Kerala. In that the biggest question is the pollution, which discharges dangerous gas and<br />
it is harmful for human being. While discharging water from the company, it is dangerous<br />
for the crop as well as health.<br />
Some samples are taken from the submitted reports and made analysis by Independent<br />
Agency. The company has taken a necessary step for recycling the generator water using<br />
(Utility and during process) Zero Discharge concepts.<br />
Sarpanch Shree<br />
Chapaben Devabhai Pagi
Answer : Sarpanch Shree Chapaben Devabhai Pagi<br />
It has been mentioned in our report that to control the pollution necessary scrubber is<br />
installed and in the future also the same procedure will be maintained, if necessary.
To,<br />
Dist. Collector,<br />
Ahmedabad.<br />
C. K. Parmar<br />
Member<br />
Pharmacetical Advisory Forum<br />
Government of India<br />
Mini. of Chemicals & Fertilizers<br />
Dept. of Chemicals & Petrochemicals<br />
New Delhi<br />
Sub.: MoEF notification no. S.O. 1533 dated 14.09.2006 about public hearing.<br />
Respected Sir,<br />
As per above subject M/s Zen oncology Pvt. Ltd. & M/s. Unimark Remedies Pvt. Ltd.<br />
Submitted E. I. A.(Environment Impact Assessment) through Govt. approved consultant,<br />
but there is not mention or copy of certificate of examine by any department of govt. and<br />
also not attached reference of other environment agencies. We submitting here for<br />
peoples benefit that about this E. I. A. govt. take action only after some active agencies’<br />
neutral report.<br />
People complain that they asked information for environment from related department<br />
but till today they doesn’t get it due to that people can not study about information. So I<br />
request you to postpone the date of public hearing.<br />
Thanks,<br />
Yours truly,<br />
Sd. /+++++<br />
C. K. Parmar
Ans.:<br />
All reports submitted by our company through notified consultant and all information<br />
mentioned as per forest ministry guide line. So there is no question about postpone of<br />
public hearing.
Date : 23/01/2008<br />
Becharbhai Patel<br />
Naranpura<br />
Ahmedabad<br />
To: The <strong>Gujarat</strong> Polution <strong>Control</strong> <strong>Board</strong><br />
Navrangpura<br />
Ahmedabad<br />
OBJECTION APPLICATION<br />
In regards with proposed M/S Zen Oncology Pvt Ltd, we have objection because the<br />
Present Unit is spreading more <strong>Pollution</strong>, and if the same is expanded than it will not be<br />
possible to say the ratio of <strong>Pollution</strong>. Hence you are requested not to give OK for the<br />
same.<br />
Sd/xxxx<br />
Becharbahi Patel
Answer: Becharbahi Patel<br />
As per specifications of submitted EIA report company will provide necessary<br />
equipments to prevent pollution hence no question comes to reach at higher pollution.
To<br />
The Chairman,<br />
District Environmental Public-Hearing Committee,<br />
Ahmedabad District.<br />
Harisinh Jagmalbhai Gohil,<br />
At. Kochariya,<br />
Taluka, Bavla.<br />
Dist>Ahmedabad.<br />
Date:23/01/02009<br />
Sub: Representation in public Hearing of Unimark Remedies: Ltd. Being held on<br />
23/01/2009.<br />
Dear Sir,<br />
I wish you well,<br />
1. People of this company are very much disturbed because of the Air-<strong>Pollution</strong>. During<br />
daytime also the bad smell of gas is felt which i9s released by the company. The data<br />
shown in the report as in approved proportion is wrong.<br />
2. During night this company releases very intense bad smelling poisonous gas. This gas<br />
creates very adverse effects. It should be studied first.<br />
3. For noise pollution, the standard for day and night are proper but according to the study<br />
in summary page No.7, it is shown 51.7 to 60.9 decimal during the day time and 38.8 to<br />
57.7 decimal during night time. Why the noise of the company is lesser during night?.<br />
4. This company is a pollution producing company. How many closer notices are given<br />
by G.P.C.B. and according to which Acts? Please inform this.<br />
5. This Company has received three various notices regarding pollution on 26 th June-2006<br />
by <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>. And many other such closer notices have been<br />
received regarding pollution matter to this company. Then how this present company’s<br />
pollution is stopped and how an environmental consent can be given to such polluted<br />
Company?<br />
Thanking you,<br />
Yours faithfully,<br />
Harisinh J Gohil.<br />
C.C To<br />
Member Secretary and Regional Officer,<br />
<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Gandhinagar.
Answer : Harisinh Jagmalbhai Gohil,<br />
1. The company has made all the instruments for pollution <strong>Control</strong>. And they are<br />
running successfully.<br />
2. Our company is ever active. Moreover created gas during process is being<br />
scrubbed. We a have attached scrubber-hood for the transit of the raw materials.<br />
And we have studied this.<br />
3. During the night time additional noise level like transportation , loading,<br />
unloading were not carried out , So cumulative noise level were observed less<br />
then day time.<br />
4. A detail of this has been enclosed in the appendix.<br />
5. A detail of this has been enclosed in the appendix.
To,<br />
The Chairman<br />
District Environmental Public Hearing Committee<br />
Ahmedabd District<br />
The President of a Village Panchayat<br />
Jaydeepsingh Motibhai Sagar<br />
Village : Kalyangadh,<br />
Town: Bavla<br />
District: Ahmedabad<br />
23 rd January 2009<br />
Subject: Representation in public hearing of Unimark Remedies Ltd. Being held on 23.01.2009.<br />
Sir,<br />
I wish you well.<br />
(1) This company stores collected solid waster material outside of the factory by making shade,<br />
whose is this site? And why it is at outside of the factory?<br />
(2) In its old plant, the company has developed Green Belt in the area of 20,000 square meter.<br />
But in fact this is not true. We also demand to get this place be visited by the committee.<br />
(3) Is this company doing green belt in the area of 20000 Square Meter in its new plant? Will it<br />
do? How may trees it will grow? Of which types of tress it will grow? Will these trees be<br />
capable of controlling the pollution by this company? Or the company will grow fast growing<br />
trees?<br />
(4) What planning has been done for the use of fly ass occurring from the company? Has an<br />
agreement been done with any bricks making company?<br />
(5) As shown in E.I.A. summary on page no.3, habitations of wild animals are not there at the<br />
distance of 10 kilometers from the indicated project place, which is wrong because behind the<br />
area of the company the groups of Nil cows are habitated. And therefore it is necessary to<br />
clarify this which is mentioned in the study.<br />
(6) According to the belief of the people, in the ancient time Bhim killed the Devil called Jaimala<br />
and years old temple of Bhim also is existed at present in the Kochariya village. Will such<br />
historical place be destroyed or will it be damaged? It is also not proper that such places are<br />
also not mentioned.<br />
(7) What employment is given in an old project? How many people you will employ in the new<br />
project? How may local and affected people will be given employment?<br />
(8) How many works you will do of local development? Of which kind? How much fund will be<br />
provided? One committee should be made in which there should be a representative and also<br />
representative of Gram Panchayat as well as of the affected People.<br />
Thanking you,<br />
Yours faithfully,<br />
Jaydeepsinh Motibhai Sagar<br />
Copy to : Member secretary and Regional officer<br />
<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>,<br />
Gandhinagar
Answer: The President of a Village Panchayat<br />
Jaydeepsingh Motibhai Sagar<br />
1. This company has kept collected sold waste in Hazardous storage area.<br />
2. The details of the Green belt developed by the company is mentioned in the report.<br />
3. The company will develop green belt which is mentioned in the report and it will proceed<br />
accordingly.<br />
4. Fly ass, produced by the company will be used within company itself. We have made an<br />
agreement with bricks making company.<br />
5. Nil Cows – According to the advise of Mahendrabhai<br />
6. We do not know about this.<br />
7. The details of the employment of the old project is included in the report and the opportunities<br />
of employment in the new project also is mentioned in the report. (IN the old project about<br />
600 and in the new project about 300)<br />
8. Out company believe in accepting social responsibility. Upto now we have fulfilled many<br />
responsibilities which are mentioned in the report. And the future also we will fulfill our<br />
responsibility.
To,<br />
The Officer,<br />
<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>,<br />
Navrang Pura, Ahmmedabad.<br />
From: Trivedi Anil Kumar Babubhai Vanechar<br />
24, Klin Tenament,<br />
Nr, Bhavna Tenament,<br />
Vasna, Ahmedabad.<br />
Dt. 23.01.2009<br />
Sub: Public hearing for environmental related issues of proposed expansion of M/s. Zen<br />
Oncology Pvt. Ltd. On 23.01.09 at Bavla<br />
Dear Sir,<br />
I am Anil B. Trivedi is giving information evidence to you about M/ Unimark Remedies<br />
Ltd and M/s Zen Oncology P. Ltd. May engage in manufacturing of anti cancer drugs.<br />
1. Which type of technology and steps will be taken by the company for Safety<br />
Health and Environmental Protection? And which type of standards follow in<br />
UK, US, Europ and Japan for such protection.<br />
2. With rererence to the news published in daily news paper “ DIVYA<br />
BHASKER “ dated 21.01.07 on page No. 13 that Dr. Vouter frans man –<br />
jurmany explained that exposure of ante cancer drug may cause premature<br />
delivery and weight loss of child.<br />
3. Which steps will be taken by the company in proposed project/ unit for<br />
workmen and surrounding population?<br />
The company should give information about which steps will be taken for<br />
prevention of emission of dust of anti cencer drug due to dusting of powder<br />
may possible in such project?<br />
4. Is there given any information to surrounding villagers who are staying within<br />
ten km. by M/s. Unimark Remedies Ltd and Zen Oncology for the<br />
manufacturing of anti censer drug at propose project.<br />
Yours truly,<br />
Sd/ ++++++++<br />
A. B. Trivedi
Ans.;<br />
1. The information wants by you about UK, US, Europe and Japan etc<br />
country which safety related information we doesn’t have it.<br />
2. The safety measures are already mentioned in our E.I. A. report.<br />
3. We follow safety measures which are given by our safety experts and<br />
we often given training to employees who are engaged in chemical<br />
handling for use of personal protective equipment.<br />
4. All necessary information submitted in our E. I. A. report.
To<br />
The Regional Officer<br />
<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>,<br />
Navrang pura Ahmedabad.<br />
Anilkumar R Trivedi Canechar,<br />
24, Kulim Tenament,<br />
Nr. Bhavna Tenament, Vsana,<br />
Ahmedabad-380007.<br />
Tel:079-26600153<br />
Date:23/01/2009<br />
Sub: Public hearing on dtd. 23.01.09 of M/s UNIMARK REMEDIES LIMITED at<br />
Bavla, Ahmedabad.<br />
Dear sir,<br />
I am Anil Trivedi here by informed and given avidence .<br />
With reference to the page no. 1-4 of draft report of M/s UNIMARK REMEDIES<br />
LIMITED is indicated that “ there is no surface water body within 10 Km radious from<br />
industry” . In this regards my request that that is not correct and insuficient information<br />
given to the govt. for leading midsguid to fulfill their buisness purpose and made crime .<br />
There is ntiantialy suspected the information of villgelack and checkdam.<br />
It is true that this area is cover under area of bavla FATEH WADI Canal system. As per<br />
Drawing no. 32 dtd . 29.06.2000 of NARMADA WATER RESOURCE & SUPPLY<br />
DEPARTMENT 26 villages are covered within 10 Km distance form village KERALA.<br />
M/s UNIMARK REMEDIES LIMITED it self proposed in this area which is under<br />
Bhaila dam, Hirashar lack and bhimnath water “CANCH MENT”.<br />
This is for your records and reject the draft EIA report of M/s UNIMARK REMEDIES<br />
LIMITED, which is prepared by San Enviro Tech. Pvt. Ltd. – Paldi , Ahmedabad and<br />
public hearing.<br />
You are kindly requested that take reassessment of draft report and then conduct further<br />
public hearing will get justic by affected villagers.<br />
Yours truly,<br />
Anil B. Trivedi.
Answer : 8/UAnil B. Trivedi<br />
1. Information given in our EIA report is correct of M/s UNIMARK REMEDIES<br />
LIMITED<br />
2. This area is water logging area and there is no any permanent water bodies, in this<br />
study area only seasonal temporary ponds were found and it is always dry after<br />
month of December so we have not consider as regular water reservoir.
To,<br />
The Respected Collector,<br />
Ahmedabad<br />
Agnihotri Dineshkumar O<br />
“Santoshi Nivas” Gopalnagar<br />
Amraiwadi<br />
Ahmedabad – 380 025<br />
23 rd January, 2009<br />
Subject: Regarding commentaries in public hearing of declaration no. 5.0. 1533, dated<br />
14.09.2006 of Environment and Forest Ministry, New Delhi.<br />
Respected Sir,<br />
We, applicant of <strong>Gujarat</strong>, stay in Ahmedabad at Santoshi Nivas” Gopalnagar, Amraiwadi,<br />
Ahmedabad -26 and of Indian citizen. According to Indian constitution article – 19 (1)(k) we<br />
have a right of Freedom of Speech and expression. Moreover, according to Indian constitution<br />
Article 51 (k), part 4 (k), every Indian citizen is imposed of fundamental duty of maintaining<br />
environment. For the above mentioned subject we request you to extend the date of public<br />
hearing taking the following reasons into consideration.<br />
Regarding the declaration No. 5.0 1533, dated 14.09.2006 of Environment and Forest Ministry,<br />
New Delhi, M/s. Zen Oncology Private Limited and M/s. Unimark Remedies Ltd at Kerala,<br />
Town: Bavla, Dist. Ahmedabad gave an advertisement in <strong>Gujarat</strong> Samachar dated 16.01.2009 for<br />
the bulk-drugs production. Afterwards, on 20.12.2009, to get an information of the both the units,<br />
we applied to the Public Information Officer of the Collectorate office under information right<br />
act-2005. We attach herewith the enclosure.<br />
We have not received the reply of our RTI application of dated 20.12.2008 and so we can not<br />
present our ideas in the public hearing of these companies and therefore we request you to extend<br />
the date of this public hearing by favouring us.<br />
Thanking you,<br />
Yours faithfully,<br />
(Agnihotri Dineshkumar O)<br />
Encl: Our T.T.I. Application of dated 20.12.2008 (Xerox copy)<br />
1
Sir,<br />
We request you to inform you that on dated 11.12.2008, by public notice, shri Sanjv Tyagi, State<br />
Secretary, <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, <strong>Gujarat</strong> State, Gandhinagar, in connection with the<br />
declaration no. 5.0. 1533, dated 14.09.2006 of Environment and Forest Ministry, New delhi of the<br />
Government of India, the company has declared (1) M/s. Zen Oncology Private Limited, and (2)<br />
M/s. Unimark Remedies Ltd. Situated in Plot No. 337,338,269,294,296, 297 and 300 at Village<br />
Kerala, Town: Bavla, District Ahmedabad, for the production of bulk drugs for the project<br />
category “A” for the new plant by the Indian Government at C.G.O. Complex, Lodhi Road, New<br />
Delhi-110003 and declared as <strong>Control</strong> Authority to cover the present environment and forest<br />
ministry in category “A”.<br />
Above declaration has been found and read on page No.2 of the daily the <strong>Gujarat</strong> Samachar,<br />
Ahmedabad of <strong>Gujarat</strong> State b y us.<br />
Regarding the above mentioned declaration, public hearing has been held on 23.01.2009 to get<br />
public opinion at District Collectorate in Ahmedabad. So in connection with all above matters,<br />
we request you to provide the information and answers of the question which are mentioned as<br />
below:<br />
Under information right Act, 2005, as we have to represent the comments, remarks and objections<br />
in writing before dated 23.01.2009 against the above company for the all above matters. Please<br />
provide this information as soon as possible:<br />
(1) Inform us in details, the names, addresses, Residential and office telephone numbers,<br />
Mobile numbers, email address, fax no. etc. of Managing Directors and Directors of<br />
the above companies.<br />
(2) How many kinds of trees are there at present in the plot of the above mentioned<br />
company and of how much of age? Inform the number of trees.<br />
(3) How many trees have cut off legally or illegally, from the present plot in last years?<br />
Please provide us the copies of permission given in this regard. And have<br />
applications or complaints been done by persons or institutions regarding cutting off<br />
the trees legally? What procedure has been done against the company by the<br />
responsible authority? Which procedure? When? By whom? You are to give in<br />
details all the information regarding all the applications, complaints, permission letter<br />
for cutting the trees and its disposal.<br />
(4) If any application is done by the company for cutting the trees in the compound or<br />
plot in about units and if government has given permission for that we want to know<br />
under which rules and conditions, the permission has been given? And who has<br />
accepted the responsibility to maintain the conditions and rules? And on what base?<br />
Give information in details of all above matters.<br />
(5) Is the construction of the factory, done in the plot of the above company, legal or<br />
illegal? Any if it is legal, on what base, proofs and certificates and approval of<br />
construction has been given? Provide us in details the copies of proofs. And if the<br />
construction is illegal, how these factories, at present are active? According to which<br />
rules, regulations, conditions and certificates are these factories active? And are these<br />
conditions and rules to be followed or not? If yes, provide information. If the<br />
answer is no, then give the reasons for that.<br />
1
(6) Which kinds of productions have been done by the both above companies at present?<br />
From whom? Which kinds of the processes are being done? And due to these<br />
processes, what kinds of pollutions have been created regarding noise, gas and health<br />
in the atmosphere? And upto today, how many persons and institutions have<br />
complained and done applications? And of which kinds? Give in details, classified<br />
all the information regarding all above matters. Regarding these complaints which<br />
kinds of action have been taken? Give the full details.<br />
(7) Is there any possibility of the pollution regarding noise, gas, air and health by giving<br />
permission to above both the companies for the new project of bulk drugs production<br />
for project category “A” and of which kinds? What kinds of strict steps will be<br />
taken? Give in detail the classified information.<br />
(8) By whose responsibility and guidance, the planting of the trees will be done against<br />
the damage to be done to the environment by the above units? In which plots? In<br />
how much time? Give the details.<br />
(9) Give the copy of audit report of environmental matters of the above company from<br />
April 2008 upto today according to the rules by G.P.C.B. represented by the<br />
Company.<br />
(10) Give the maps with survey number of the land of the above mentioned plot numbers.<br />
(11) How many trees will be cut off to make this unit? Give details.<br />
(12) Give the application copy and copies of its report of the account (description) of<br />
E.I.A (Environment Inspect assessment) of this unit.<br />
(13) If any review of the thin layers investigation (mar and chemical) of the lands of the<br />
surrounding villages and of all the plots mentioned for the above company, has been<br />
done, give the copies of the report.<br />
(14) Has any plan or map has been made for the disposal of industrial waste and water<br />
waste occurred during the production process in the above company? Give the<br />
information with proofs.<br />
(15) How much cubic water will be necessitated for the production process in above<br />
company? Scarcity of how much cubic water will be created in the surrounding areas<br />
due to draining of water? Give information (with proofs) if any arrangement or the<br />
reports of survey have been prepared for dealing with scarcity.<br />
(16) By whose permission, by whom and from which place, can be gained the samples<br />
given for investigations of water waste released from these units at present? Give in<br />
detail the classified information.<br />
We want to get all above-mentioned information according to the Information Right Act. We<br />
request you to provide information as soon as possible in public interest.<br />
Thanking you,<br />
Ahmedabad<br />
20.12.2008<br />
2
Answer : Mr. Agnihotry Dinesh Kumar<br />
1. It is not relevant with pollution.<br />
2. Total area of green belt is 20,000 sq. meter and we have planted native pieces<br />
having average height 3 meter to 10 meter.<br />
3. We have not cut off any trees because of no expansion carried out in last year.<br />
4. Not applicable.<br />
5. Not related to environmental problem.<br />
6. All the details covered in our EIA report. Please see the web site of GPCB<br />
7. All the details covered in our EIA report. Please see the web site of GPCB<br />
8. Language is not clear<br />
9. We have submitted to GPCB and we are not suppose the audit report to you.<br />
10. The information is included in our EIA report.<br />
11. Not a single tree cut.<br />
12. For that you may visit to web site of GPCB .<br />
13. Point is not clear<br />
14. Our unit is Zero Discharge unit.<br />
15. The details are included in EIA report.<br />
16. Point is Not clear.
To<br />
The Collector,<br />
Ahmedabad Dist.<br />
Anilkumar R Trivedi Canechar,<br />
24, Kulim Tenament,<br />
Nr. Bhavna Tenament, Vsana,<br />
Ahmedabad-380007.<br />
Tel:079-26600153<br />
Date:23/01/2009<br />
Matter: Giving presentation proofs regarding the matter of Public- Hearing.<br />
Dated: 23/01/2009, Bavla, Ahmedabad of Environment subject of M/s.<br />
Unimark Remedies Ltd.,<br />
Respected Sir,<br />
I, Anilkumar B Trivedi, is givingt you my presentation proof to you.<br />
The draft of M/S. Unimark Remedies Ltd., has been presented by E.I.A. Report San<br />
Envirotech Pvt. Ltd., Paldi, Ahmedabad. In which company mentions that the project of<br />
extension in plot No.337,338,269,299,294,296,297,300 is to be implemented.<br />
Through you give the information of the points mentioned as under:<br />
(1) Give the details of any legal procedure done according to Environment<br />
Protection Act-1986 and Water (Prevention and <strong>Control</strong> of <strong>Pollution</strong>) Act.1974<br />
and Air (prevention and control of pollution) Act-1981 on M/s. Unimark<br />
Remedies Ltd., during the time of last ten Years by <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong><br />
<strong>Board</strong>. For example permission given to Start Production under which conditions<br />
and the procedure done to stop production, notice show-cause Notice.<br />
(2) How much construction area of the present production Unit will be and according<br />
to Factory Act, how many and of which kind of trees will be planted and will be<br />
maintained in the Factory plot for the permanent greenery and maintenance of<br />
Environment. Give the complete details<br />
(3) Habitants of the Bhayala village have presented that M/s/. Unimark Remedies<br />
Ltd., Factory has made a small pond to keep polluted water. Polluted water is<br />
being kept in this pond. After the first-second of the rain, the water of this pond is<br />
released by opening the valve of this pond and this water comes into the Bhayla<br />
dam and pollutes the water of the dam keeping this matter in view, inform<br />
alternate steps which are taken by factory.<br />
(4) According to the REIA Report (Page No.3,37), Figure:3.2 (Wind rose diagram)<br />
when the direction of Air is South-West, West-South, West-East, West-North,<br />
North-North-West, this polluted air of the factory affects the health of the<br />
habitants of the Bhayala village. In this matter inform us necessary steps taken by<br />
factory.<br />
1
(5) In the coming productions of the company, Medicine against cancer is going to be<br />
produced I bulk. In big proportion the manpower is to be used. So inform in<br />
detail regarding the Employee’s health protection and the protection of the<br />
Environment as well.<br />
Yours faithfully,<br />
Anilkumar B. Trivedi Vanechar.<br />
2
Answer : Anilkumar R Trivedi Canechar,<br />
1. The details of the legal procedure is included in the report.<br />
2. The area constructed activities are not related with environment as per as green<br />
belt area is consulted. W have planted native (Local) pieces as per the advice of<br />
<strong>Gujarat</strong> Agriculture University. Total green belt area is 20,000 Sq. Meter.<br />
3. We are having Zero discharge company within our company so there is no<br />
question of releasing polluted water.<br />
4. Area distance of Bhayla Village is from our factory is 206 Km. and there is no<br />
health or environment related problem because maximum ground level<br />
concentration of toxic gas is predicted 1 Km. from the factory site and<br />
concentration of toxic gas is 0.368 μg/M 3 which is very negligible.<br />
5. We are followed the instruction and guideline given by our Environment , Health<br />
and Safety (EHS) expert and adhered EHS management system. And also from<br />
time to the employees are given training for using the instruments of protection.<br />
They are also given training while using Chemical.
To<br />
The Collector,<br />
Ahmedabad Dist.<br />
Anilkumar R Trivedi Canechar,<br />
24, Kulim Tenament,<br />
Nr. Bhavna Tenament, Vsana,<br />
Ahmedabad-380007.<br />
Tel:079-26600153<br />
Date:23/01/2009<br />
Matter: Giving presentation proofs regarding the matter of Public- Hearing.<br />
Dated: 23/01/2009, Bavla, Ahmedabad of Environment subject of M/s.<br />
Unimark Remedies Ltd.,<br />
Respected Sir,<br />
I, Anilkumar B Trivedi, is givingt you my presentation proof to you.<br />
The draft of M/S. Unimark Remedies Ltd., has been presented by E.I.A. Report San<br />
Envirotech Pvt. Ltd., Paldi, Ahmedabad. In which company mentions that the project of<br />
extension in plot No.337,338,269,299,294,296,297,300 is to be implemented.<br />
Through you give the information of the points mentioned as under:<br />
(1) Give the details of any legal procedure done according to Environment<br />
Protection Act-1986 and Water (Prevention and <strong>Control</strong> of <strong>Pollution</strong>) Act.1974<br />
and Air (prevention and control of pollution) Act-1981 on M/s. Unimark<br />
Remedies Ltd., during the time of last ten Years by <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong><br />
<strong>Board</strong>. For example permission given to Start Production under which conditions<br />
and the procedure done to stop production, notice show-cause Notice.<br />
(2) How much construction area of the present production Unit will be and according<br />
to Factory Act, how many and of which kind of trees will be planted and will be<br />
maintained in the Factory plot for the permanent greenery and maintenance of<br />
Environment. Give the complete details<br />
(3) Habitants of the Bhayala village have presented that M/s/. Unimark Remedies<br />
Ltd., Factory has made a small pond to keep polluted water. Polluted water is<br />
being kept in this pond. After the first-second of the rain, the water of this pond is<br />
released by opening the valve of this pond and this water comes into the Bhayla<br />
dam and pollutes the water of the dam keeping this matter in view, inform<br />
alternate steps which are taken by factory.<br />
(4) According to the REIA Report (Page No.3,37), Figure:3.2 (Wind rose diagram)<br />
when the direction of Air is South-West, West-South, West-East, West-North,<br />
North-North-West, this polluted air of the factory affects the health of the<br />
habitants of the Bhayala village. In this matter inform us necessary steps taken by<br />
factory.<br />
1
(5) In the coming productions of the company, Medicine against cancer is going to be<br />
produced I bulk. In big proportion the manpower is to be used. So inform in<br />
detail regarding the Employee’s health protection and the protection of the<br />
Environment as well.<br />
Yours faithfully,<br />
Anilkumar B. Trivedi Vanechar.<br />
2
Answer : Anilkumar R Trivedi Canechar,<br />
1. The details of the legal procedure is included in the report.<br />
2. The area constructed activities are not related with environment as per as green<br />
belt area is consulted. W have planted native (Local) pieces as per the advice of<br />
<strong>Gujarat</strong> Agriculture University. Total green belt area is 20,000 Sq. Meter.<br />
3. We are having Zero discharge company within our company so there is no<br />
question of releasing polluted water.<br />
4. Area distance of Bhayla Village is from our factory is 206 Km. and there is no<br />
health or environment related problem because maximum ground level<br />
concentration of toxic gas is predicted 1 Km. from the factory site and<br />
concentration of toxic gas is 0.368 μg/M 3 which is very negligible.<br />
5. We are followed the instruction and guideline given by our Environment , Health<br />
and Safety (EHS) expert and adhered EHS management system. And also from<br />
time to the employees are given training for using the instruments of protection.<br />
They are also given training while using Chemical.
To.<br />
The Chairman,<br />
Dist. Environmental Public Hearing Committee,<br />
Dist.Ahmedabad.<br />
The President of a village Panchayat,<br />
Hasmukhbhai Dhoribhai Parmar,<br />
Deputy President of Village President,<br />
Narendrasinh Ranchhodbhai Rathod,<br />
Village: Bhayala, Tal: Bavla.<br />
Dist. Ahmedabad.<br />
Date: 23/01/2009<br />
Sub: Representation in public Hearing of Unimark Remedies Ltd., being held on<br />
23/01/2009<br />
Sir,<br />
I wish you well.<br />
(1) This company mentions in its E.I.A. report that in the studied area of 10 Kilo<br />
meter there is no surface water. But in our this area there are check-dams and<br />
ponds. There is cannel also. Such serious mistake in the report is not mistake. But<br />
it is an effort to hide the information knowingly. Therefore we demand to cancel<br />
the E.I.A. Report and wish to held public- Hearing again.<br />
(2) The company is going to do the construction in the area where there are ways of<br />
the disposal of the rainy water. If company will construct and will prevent ‘water<br />
by building walls, our villager will be drowned. Surrounding water will disturb<br />
the life of the people and the plague will be spread over. The company has not<br />
mentioned what arrangement it has done regarding this matter. We strictly<br />
demand to change the site for new extension of company.<br />
(3) Company releases its dirty water into the Dam/Cannel from which Farmers uses<br />
water for agriculture. This dirty water pollutes dam/Cannel.<br />
(4) It is a serious matter that this company releases dirty water by gutter/ small<br />
cannels in open and outward area of the company. We have paid attention to the<br />
administration regarding this matter and G.P.C.B. have issued notices also. So<br />
how can such polluted company be given permission?<br />
(5) This company make ponds in its plant and accumulates dirty water and make the<br />
place dirty. Due to this the water underneath also is polluted and every year the<br />
company releases the p0olluted water with the rainy water; which is not proper<br />
and we demand strictly that be stopped soon.<br />
1
(6) The company is going to use 859 Kil0-litres of water every day, which is<br />
mentioned on Page N0.E-9 of summary. It is too much. If the water of such big<br />
proportion is going to be sucked by its bore-well, there will be an adverse effect to<br />
the water underneath. Questions like decrease of underneath water and decrease<br />
of the quality of water will arise. There is not alternate except bore-well. If the<br />
company let the polluted water go underneath by reverse bore-well, it is very<br />
difficult to examine that matter and it is expensive also. What is the assurance of<br />
this matter?<br />
(7) This company is going to use the water and out of this water there will be<br />
produced 554 Kilo-liter dirty water and after treatment this dirty water will be<br />
used in washing machinery and again this dirty water will be more dirty and<br />
everyday dirty water will be increased. How much capacity company has to<br />
storage such too much dirty water? Where will company dispose storage of dailypolluted<br />
water? What method of examining this matter?<br />
(8) Where you will discharge the underneath water? How will do this? How much<br />
fund will you use? Have you will do bore-well, ponds, check dam, well etc.?<br />
Thanking you,<br />
Yours faithfully,<br />
(Hasmukhbhai D. Parmar).<br />
C.c. To<br />
Member Secretary and Regional Officer,<br />
<strong>Gujarat</strong> pollution <strong>Control</strong> <strong>Board</strong>, Gandhinagar.<br />
2
Answer: The President of a village Panchayat, -<br />
Hasmukhbhai Dhoribhai Parmar,<br />
1. This area is water logging area and there is no any permanent water bodies, in<br />
this study area only seasonal temporary ponds were found and it is always dry<br />
after month of December so we have not consider as regular water reservoir.<br />
2. The site belongs to the company where it is going to do the construction,<br />
which is not off water<br />
3. Our company is of zero discharge company, we do not release water into<br />
gutter or rivulet.<br />
4. We do not release any type of water into gutter or rivulet<br />
5. Company does not accumulate dirty water in its plant. We use the water after<br />
giving treatment<br />
6. We have water harvesting system in the company. The roof top water is<br />
diverted in the harvesting system hence there is no possibility of<br />
contamination. This will increase under earth water level and improve under<br />
earth water quality. The details of water treatment facilities like full fledge<br />
effluent treatment plant, 7 stage multiple effective evaporator, RO plants,<br />
recycle and reuse of treated water. All the details are given in our EIA report.<br />
7. Our company will do the treatment of dirty water and after passing the dirty<br />
water into reverse osmosis plant, we will use it again. This recycling is<br />
constant so there is no question of accumulating water.<br />
8. To recharge the underneath water we will deposit the fund according to the<br />
necessity required.
From:<br />
Rakesh kumar Kishorebhai Suthar<br />
46, Ganesh Society<br />
Near Mohannagar<br />
Naroda, Ahmedabad – 382 330<br />
To,<br />
The District Collector<br />
O/o. the District Collector<br />
Ahmedabad.<br />
Dear Sir,<br />
Sub: Objection application<br />
Ref: RTI Ref. No. 152 dated 20.12.08, GPCB, Gandhinagar<br />
Ministry of Environment and Forest, Govt. of India, New Delhi, Notification No.<br />
SO 1533 dated 14.09.2006 – Zen Oncology Pvt. Ltd and Unimark Remedies Ltd<br />
I, the undersigned Rakesh Kumar Kishorebhai Suthat, would like to state that in<br />
connection with the public hearing, we are objecting against the above said company<br />
namely Zen Oncology Pvt. Ltd and Unimark Remedies Ltd as under:<br />
In connection with the public hearing advertisement given by the company in the news<br />
paper, we have approached the <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong> for getting information<br />
about the proposed project report under Right to Information act. But I regret to inform<br />
you that I have not received the sufficient information from the GPCB officials.<br />
Therefore, request you to provide the necessary information in this regard.<br />
I therefore request you to provide necessary information about the above said company to<br />
the public regarding environmental problems due to pollution so that the peoples can<br />
understand about the environmental situations. I would like to further inform you that<br />
without knowledge of chemicals, how the peoples can raise the problems. Therefore,<br />
kindly adjourn the public hearing.<br />
Thanking you,<br />
Yours faithfully,<br />
Rakesh kumar Kishorebhai Suthar
Answer : Rakesh kumar Kishorebhai Suthar<br />
We have provided all the necessary informative reports to all surrounding villages and<br />
informed about the same as per the standards prescribed by the Government.<br />
We have included the details regarding the proposed products and required raw materials<br />
in the EIA reports for general public.
From:<br />
Dinesh Chauhan<br />
All India Youth Federation<br />
Ahmedabad District Council<br />
41-Shanti Nivas Bldg,<br />
Nr. Vijay Mill, Naroda Road<br />
Ahmedabad – 25<br />
To:<br />
The Member Secretary<br />
<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong><br />
Gandhinagar<br />
Dear Sir,<br />
Sub: Information – Public Hearing<br />
Ref: Unimark Remedies Ltd<br />
Zen Oncology Pvt. Ltd , plot no. 337, 338,269,299,295, 296, 297, 300<br />
<strong>Gujarat</strong> State Road & Development Nigam Limited – Bagodara – Valabhipura,<br />
Bhavngar, Sarkhej – Vataman – Bhavnagar<br />
Please note that we are actively working with All India Youth Federation in Ahmedabad.<br />
With reference to the above subject, we would like to request to note our objection<br />
application regarding public hearing dated 23.01.2009.<br />
We would like to further inform you that if we will not get any information about the<br />
environmental impact due to the proposed projects of the above said company, on what<br />
basis we can raise an objection. We therefore request you to provide the EIA report and<br />
Audit Report (last five years) in <strong>Gujarat</strong>i version at our above mentioned address, so that<br />
we can give necessary suggestions and take objections.<br />
We request you to do the needful in the above matter.<br />
Thanking you,<br />
Dinesh Chauhan<br />
C.C. To: The Secretary<br />
Ministry of Environment and Forest<br />
CGO Complex, New Delhi<br />
The District Collector, Ahmedabad
From:<br />
Dinesh Chauhan<br />
All India Youth Federation<br />
Ahmedabad District Council<br />
41-Shanti Nivas Bldg,<br />
Nr. Vijay Mill, Naroda Road<br />
Ahmedabad – 25<br />
Date: 23.01.2009<br />
To:<br />
The District Collector<br />
O/o. the District Collector<br />
Ahmedabad<br />
Dear Sir,<br />
Sub: Objection application for Public Hearing<br />
Ref: Notification No. SO 1533 dated 14.09.2006 of Ministry of Environment and<br />
Forest, New Delhi, Government of India.- Unimark Remedies Ltd and Zen<br />
Oncology Pvt. Ltd , Village: Kerala, Tal: Bavla, Dist. Ahmedabad<br />
Please note that we are actively working with All India Youth Federation in Ahmedabad<br />
for resolving the environmental problem.<br />
With reference to the above mentioned subject, we hereby object to the proposed project<br />
to put in category “A”.<br />
As you may be aware that almost all the major chemical industries are permitted by<br />
Government in <strong>Gujarat</strong> State of India. Due to the chemical process, most of the problems<br />
are arrived in air and water. The crisis of trees can also resulted in uncertain rain every<br />
year and increasing more pollution of air and water in <strong>Gujarat</strong> State Hence, people of<br />
Guajrat, suffered from polluted air, Asthma, Kidney related disease.<br />
We have requested GPCB on dated 5.1.2009 for providing possible environmental impact<br />
and human disease before public hearing of proposed project of the above company.<br />
However, till date GPCB officials has not provided the information. Also no steps are<br />
taken by the GPCB for plantation.<br />
Considering all the above points in mind and also giving permission for chemical<br />
industries, we will oppose with a help of public for the same.<br />
Hope to get a favourable action.<br />
Dinesh Chauhan
Answer : All India Youth Federation<br />
We are not responsible for that.
From:<br />
Premsingh B. Rathod<br />
Municipal Corporator smt. Jankidevi Chauhan<br />
Vishnu ni Chali<br />
Bapunagar, Ahmedabad<br />
Date: 23.01.2009<br />
To,<br />
The Collector,<br />
Dist. Ahmedabad<br />
Ahmedbaad<br />
Dear Sir,<br />
Sub: Notification No. SO 15033 dated 14.09.06 of Ministry of Environment and<br />
Forest, New Delhi<br />
Ref: Application dated 05.01.2009, Shri Sanjiv Tyagi, Member Secretary, GPCB.<br />
Paryavaran Bhavan, Sector 10, Gandhinagar – 382010<br />
With reference to the above mentioned subject and public hearing dated 23.01.2009<br />
would like to raise my objection and suggestion for the same.<br />
1. We would like to have clarification regarding the advertisement given by Member<br />
Secretary, GPCB for the public hearing in <strong>Gujarat</strong> Samachar dated 11.12.2008 for<br />
M/s. Unimark Remedies Limited and Zen Oncology Pvt. Ltd separately. But the<br />
both company have mentioned the plot no. 337, 338, 269, 299, 294, 296, 297 and<br />
300, Village Kerala, Dist. Ahmedabad. Is the company have taken permission for<br />
individual construction as the address given in the advertisement are same for<br />
both company.<br />
2. As per point no. 1, if the company is having same plot, then the construction will<br />
be the same for the both the unit or not?<br />
3. As per the point no. 1, on which plot, the company is going to make a<br />
construction.<br />
4. As per our knowledge, the company M/s. Unimark Remedies Ltd is in operation<br />
since long. If the company is also would like to make an expansion in the same<br />
plot, on what basis the company has obtained the permission? From whom?<br />
1
5. There is no explanation given for the construction / manufacturing activities of<br />
M/s. Zen Onocology Pvt. Ltd, if they want to make a construction in the same<br />
plot.<br />
6. Please provide all the documents pertaining to construction activities of Zen<br />
Oncology Pvt. Ltd.<br />
7. If both the company is ready to make a manufacturing activities in the same plot,<br />
in future, how we can come to know that by whose mistake the incidents is taken<br />
place?<br />
Thanking you,<br />
Yours faithfully,<br />
Premsingh Rathod<br />
2
ANS: Premsingh B. Rathod<br />
Municipal Corporator smt. Jankidevi Chauhan<br />
1. M/s. Unimark Remedies Ltd is a working unit. We would like to start the<br />
operations activities of M/s.Zen Oncology Pvt. Ltd in the same premises. The plot<br />
no. of the same is mentioned in our report.<br />
2. This question is not related to pollution. So it is not necessary to give any answer.<br />
Point No. 3,4,5,6,7 are not related to pollution.
20 th January, 2009<br />
To,<br />
Mahesh Pandya<br />
CENTRE FOR SOCIAL JUSTICE – JANVIKAS<br />
Ahmedabad<br />
Dear Sir,<br />
Sub: Environmental Public Hearing of Unimark remedies Ltd. at Bavla,<br />
Ahmedabad on 23/01/2009<br />
Ref: Your letter PM/MP/188/2009, dated 9 th January, 2009.<br />
We are in receipt of a copy of your letter addressed to Shri Sanjiv Tyagi, Member<br />
Secretary, <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Gandhinagar. We have studied the points<br />
contained in this letter and would like to send our reply/ clarifications as under.<br />
1. Whether company has Environment clearance for its existing unit? If yes, Give<br />
copy of clearance and compliance report thereof. When latest compliance report<br />
according to the Environmental clearance submitted to MoEF as well as GPCB?<br />
Please give date of submission. Is it uploaded on your official website?<br />
Yes, Unit has obtained Environmental Clearance.<br />
2. Whether company has valid consolidated consent and Authorization of GPCB<br />
under various acts for its existing unit? Please give copy of it and copy of<br />
compliance report of consent and Authorization. What is date of validation of<br />
CCA?<br />
Yes, company has valid Consent and Authorization of GPCB under various<br />
acts for its existing unit. Copy of CC & A and its compliance are enclosed for<br />
your reference as Annexure -A.<br />
3. Please give copy of GPCB visit report and air/water/solid waste sample analysis<br />
report for existing unit in last two years.<br />
Enclosed as Annexure-B.<br />
4. Please give copy of MoEF regional office visit report in last two years, if any.<br />
Not available because MoEF regional officer were not visited our plant.<br />
5. Whether company had been issued show cause notice/ closure order/notice under<br />
water act 1974 or Air act 1981 or Environment protection act 1986 since starting
of existing unit? If yes give copy of it. Also what remedies had been taken for<br />
restarting operation?<br />
6. Whether unit has submitted Environmental Audit reports regularly to GPCB for<br />
existing plant? What were suggestions of Auditor in last two years report?<br />
Yes, unit has submitted Environmental Audit reports regularly to GPCB for<br />
existing plant. Points of suggestions are enclosed as Annexure-C.<br />
7. Whether GPCB has issued NOC for proposed expansion of project?<br />
Not applied for NOC. We have applied very soon for consent to<br />
establishment<br />
8. When will be the phases implemented as expansion and omission?<br />
9. Please justify coal as fuel for captive power plant in the wake of climate change<br />
and global warming<br />
Considering the non availability of Natural gas in this region and feasibility<br />
of project, we have select lignite/coal as fuel for our CPP.<br />
10. Is there any agreement between unimark and brick manufacturer to utilize fly ash?<br />
11. How much water from rain water harvesting system is expected to collect in one<br />
season? Do you have water harvesting plan? Our suggestion is do not harvest rain<br />
water in your campus. Please carry out this plan to nearby villages. Reason is if<br />
you are harvesting rain water in your campus, than toxic waste might be<br />
percolated to the soil.<br />
12. What is source of water for existing and proposed plant?<br />
Source of water is groundwater for existing and proposed plant. The area of<br />
unit is not falls under the dark Zone hence necessary permission for<br />
extraction of ground water is not required.<br />
13. Water balance diagram for both existing and proposed plants are not properly<br />
balanced. So report is inadequate. It is a serious lacuna in EIA.
14. What is final discharge point of treated effluent?<br />
15. What would be odor control measures after expansion?<br />
The unit has also installed fumes hood to suck fugitive’s emissions during<br />
charging of Raw materials/Centrifuge/Packing of products and same will be<br />
scrubbed by suitable scrubbing systems.<br />
16. Why baseline monitoring was carried out before finalization of terms and<br />
reference for the project?<br />
To saving the time for obtaining permission of EC, we have started our<br />
baseline study at planning stage i.e. with application of TORs.<br />
17. Please give name of CPCB authorized recycler/trader to whom waste oil and other<br />
solid hazardous waste is given for existing unit<br />
Bombay barrel supply Co, Unity Petroleum Co. is register recycler with<br />
CPCB and we are selling our used lubricating oil.<br />
18. How many skilled and unskilled people from surrounding are will get<br />
employment in proposed expansion project?<br />
The total manpower for the plant operations is around 600 hundred and<br />
after expansion 300 men force will be added.<br />
skilled and unskilled workers will get employment in proposed expansion<br />
project. Most of will be from local surrounding area.<br />
We hope the details/clarifications given by us will help you assess our proposal and EIA<br />
report in proper perspective.<br />
Regards<br />
For, Unimark remedies Ltd.<br />
Managing Director
January 23, 2009<br />
To,<br />
Chairman / Member Secretary<br />
Environmental Public Hearing Committee,<br />
Ahmedabad<br />
Sub: Environmental Public Hearing of M/s Unimark Remedies<br />
Limited.<br />
Respected sir,<br />
We are in receipt of above cited letter addressed to your office and<br />
have noted the content mentioned therein.<br />
With regard to above, we hereby clarify for questions raised by Mr.<br />
Manish rana, Editor of Paryavaran Mitra <strong>Gujarat</strong> concerning to our new<br />
project at village Kerala as under:<br />
With regard to above, we hereby clarify for questions raised by you.<br />
1. What will be steps to be taken to protect environment by<br />
deputing environment expert?<br />
This company will appoint environmental expert for the<br />
prevention of pollution and it will be installed ETP, RO and multi<br />
effect evaporation plant for prevention of pollution.<br />
2. What will be steps taken by unit to take care of social<br />
responsibility?<br />
We regularly provide voluntary donations to social, religious<br />
activities. We understand the concept of social responsibility /<br />
security.<br />
3. We suggest that this unit will give the priority to local<br />
employment.<br />
Company will give the first priority for employment to local<br />
people from the surrounding area.
4. We suggest earmarking necessary budgets for protection<br />
and prevention of the environment.<br />
This company will do all the efforts for the prevention of<br />
environmental pollution and will provide budget of Rs. 1.5 crore.<br />
5. We suggest that this unit will provide a best example for<br />
prevention of pollution.<br />
Company will obey all the rules of GPCB and CPCB and becoming<br />
a good example for others<br />
6. We recommended to provide reasonable budge for the<br />
development of nearby area as well as to give help to<br />
school, widows and poor people.<br />
Project proponent of the company will help to the people of the<br />
surrounding by providing budget for school, widows and poor<br />
people.<br />
Thanking you,<br />
For M/s Unimark Remedies Limited<br />
Authorized Signatory
January 23, 2009<br />
To,<br />
Pravinbhai Sheth<br />
A-8, Kalandi Apartment,<br />
Chikuwadi, Ankleshwar-393001<br />
<strong>Gujarat</strong>.<br />
Sub:-Environment public hearing of proposed project of<br />
Unimark Remedies Limited .on 23-01-2009 at Bavla, Dist:-<br />
Ahmedabad.<br />
Respected Sir,<br />
We are in receipt of a copy of your letter addressed to Member<br />
Secretary, <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Gandhinagar. We have<br />
studied the points contained in this letter and would like to send our<br />
reply/ clarifications as under.<br />
Views, Comments& Suggestions<br />
Sr.<br />
No.<br />
Findings Measures<br />
1 AS REGARDS RAW MATERIALS USAGE,PLEASE FURNISH<br />
a Facility available for major solvent YES<br />
fire extinguishing.<br />
b Do you have your own in house YES<br />
fire foam tender?<br />
c What will be inventory of foam? 300 - 400 Ltr.<br />
d What reserve stock of water will<br />
be kept for fire fighting & storage<br />
capacity?<br />
e Where is risk analysis of<br />
carcinogenic, hazardous chemicals<br />
& explosive chemicals, if any what<br />
will be mitigation measures to<br />
handle these to safeguard<br />
employees from health hazards.<br />
f What fire fighting facility available<br />
for mutual aid in study area?<br />
Water reservoir for fire water<br />
is 600 KL<br />
Company has prepared ON<br />
SITE EMERGENCY PLAN and<br />
mitigation action of potential<br />
emergencies available at site.<br />
Mutual aid carried out with<br />
neighboring industries.
g What type of fire alarm system<br />
with details of 'sensors' installed?<br />
h How you will neutralize static<br />
charge before unloading solvents<br />
tankers at the entry point? What<br />
is solvent tanker unloading<br />
procedure?<br />
i Is there any carcinogenic<br />
chemical? How do you safeguard<br />
your employees from health<br />
hazards?<br />
2 How many polluting industries are<br />
already there in study area?<br />
3 You propose to use "Coal" as fuels<br />
for boiler, how do you ensure on<br />
to control 'CO' <strong>Pollution</strong> as<br />
present-data is 0.44 mg. / m3<br />
4 What is noise monitoring data at<br />
Environment sensitive places?<br />
5 Map on page 123 is misguiding,<br />
project site is shown in gulf of<br />
cam bay, and corrective action is<br />
needed.<br />
6 Please furnish membership letters<br />
with validity period of the<br />
organizations, where organic<br />
residues shall be sent for<br />
incineration. Any dioxan or furan<br />
likely to get emitted in vent<br />
Company has provided<br />
emergency siren.<br />
Yes, Checklist available<br />
including earthning continuity.<br />
1. Company has provided<br />
dedicated safety cup boards to<br />
all dept. for put in Personal<br />
Protective equipments (PPEs),<br />
While handling of hazardous<br />
chemicals concerned dept. in<br />
charge ensured the safe use of<br />
PPEs. Periodically medical<br />
2. Hazardous chemical<br />
handling activities are followed<br />
in close condition.<br />
3. Periodical medical check up<br />
followed once in every six<br />
month.<br />
Majority engineering and rice<br />
mills are available within 5- 10<br />
Km range.<br />
We ensure to provide sufficient<br />
Oxygen/Air for complete<br />
combustion of fuel.<br />
Noise monitoring carried out<br />
regularly and found within<br />
limit. Same is included in our<br />
EIA report.<br />
It was the conversion mistake<br />
of computer software and<br />
assures to correct it.<br />
Company has valid member<br />
ship of BEIL, GAPIL letter is<br />
enclosed herewith. Dioxin or<br />
furan will not emitted from<br />
stack/vent.
during incineration?<br />
7 Solvents will be used in no. of<br />
processes, What will be %<br />
evaporation loss & how you will<br />
reduce if further?<br />
8 Where is decontamination<br />
procedure for discarded barrels<br />
before reuse / sell?<br />
9 As regards green belt<br />
environment<br />
a What types of tress will be<br />
planted?<br />
Very negligible, chilled<br />
condenser provided at vent to<br />
control the losses.<br />
Yes<br />
Azadirachta India,<br />
Kena,Termininaliac catappa,<br />
Moringa oleiaera, Casuarina<br />
equisepofolia,Nerium indicum,<br />
Thevatia peruviana,<br />
Neriumspecaies etc.<br />
b How many trees will be planted? 2105<br />
c What will be APTR of trees? Don’t know meaning of PTRA<br />
d To protect environment from There will no vaporization of<br />
Bromin & Chlorine vapour Bromine & Chlorine.<br />
pollution. What special trees will<br />
be planted? What will be height of<br />
the trees?<br />
e What will be fresh water 48 cu.m/day present, 130<br />
consumption?<br />
proposed.<br />
10 As regards waste minimization<br />
concept.<br />
a Which bye products you will We are recovering mainly<br />
recover & reuse? What will be solvents and quantities will be<br />
monthly quantity?<br />
depending<br />
solvent.<br />
on the use of<br />
b Where is rain water harvesting Yes, we have facilities for<br />
schematic diagram? How much rainwater harvesting. Average<br />
rain water will he harvested? How quantity of water recharge per<br />
much fresh water consumption season will be around 15968<br />
will be reduced? on yearly basis. m 3 .<br />
11 As regards occupational health &
safety.<br />
a What is last three years safety<br />
health & environment track record<br />
of "Unimark" for all locations?<br />
b For either location during periodic<br />
health check-up any serious case<br />
of infections, disease or<br />
carcinogenic disorder was<br />
reported? If so what are details &<br />
what health care facilities offered<br />
to such employees.<br />
12 How many ammonia torches will<br />
be kept as reserved stock?<br />
13 What Chemicals / Vapors will lead<br />
to Chemical Poisoning & what<br />
antidotes will be kept in ready<br />
stock.<br />
14 What is decontamination<br />
procedure before charging any<br />
new batch?<br />
15 How do you ensure that in<br />
summer, hot water will not flow<br />
through pipeline connected to eye<br />
wash fountain?<br />
16 Is there any exothermic<br />
reactions? If so, what safety<br />
measures will be adopted?<br />
17 In order to justify project<br />
sustainability, what will be pay<br />
back period of Rs. 36 Crores<br />
project cost?<br />
SUGGESTIONS<br />
18 As regards green belt, please<br />
monitor periodically CO2 & O2<br />
level for ascertaining green belt<br />
effectiveness.<br />
One fatal accident report<br />
during the last three years.<br />
No<br />
Two Ammonia torch available<br />
& 10 gas cylinder (50Kg.) of<br />
Ammonia stored at site<br />
Major hazardous chemicals<br />
which will be used for the<br />
process and its antidotes are<br />
available at site.<br />
It is necessary for API<br />
manufacturing process which<br />
depends on the reagent used<br />
for the process.<br />
In summer safety shower lines<br />
are flushes regularly i.e.<br />
frequency of line flushing is<br />
three times and for laboratory<br />
dedicated eye wash unit<br />
provided.<br />
Yes, Reactor cooling, chilling<br />
facility is provided.<br />
Not related with Environment<br />
related activities.<br />
Good suggestion and we will<br />
evaluate and consider.
19 Before constructing building<br />
blocks requiring air conditioning /<br />
refrigeration, please ensure to<br />
calculate proper R value & U<br />
factor for slab, roof, side walls,<br />
glasses to achieve maximum<br />
power saving.<br />
20 Please encourage timber free<br />
construction wherever possible &<br />
use eco-friendly construction<br />
material.<br />
21 In order to encourage energy<br />
conservation drive, please use<br />
solar system (street lights, garden<br />
lantern, heater, pumping water to<br />
overhead tank etc.) Also use CFL<br />
lamps (with due care to handle<br />
discarded lamps to avoid mercury<br />
pollution).<br />
22 Restrict use of CFC & alternates<br />
should be encouraged to avoid<br />
Global Warming & to honour<br />
national drive campaign. Other<br />
green house gases emission<br />
should be kept at minimum<br />
possible level.<br />
23 It would have been appreciated if<br />
baseline studies would have been<br />
incorporated for whole year all<br />
seasons (except monsoon) data<br />
to understand predicated pollution<br />
load in a better way which would<br />
rather help for an effective EMP to<br />
overcome negative adverse<br />
impacts.<br />
24 Please budget some amount<br />
towards donation to uplift society<br />
weaker class persons like needy,<br />
widows, handicapped, blind,<br />
orphans, senior citizen likewise.<br />
25 Please avail of carbon credit by<br />
adopting cleaner / Green<br />
Our project team will take care<br />
for the same.<br />
Valid suggestion and do best<br />
for it.<br />
Valid suggestion and do best<br />
for it.<br />
Valid suggestion and do best<br />
for it.<br />
It is Rapid EIA study and one<br />
season monitoring suggested<br />
by MoEF.<br />
Company has considered<br />
corporate responsible care.<br />
Point noted, we will take<br />
benefit.
Technology.<br />
I hope the detailed clarification given by us will help you to assess our<br />
proposal and EIA report in proper perspective.<br />
Thanks & Regards<br />
For, Unimark Remedies Limited,<br />
Authorized Signatory
Baayalaa gaàma pMcaayat hsamauKBaa[ DI.prmaar<br />
rIpaoT-naI AMdr savao- krolaa jo namaunaa laIQaola Co jo svatM~ AojnsaIAo laIQaola Co Anao<br />
AonaalaIsaIsa krola Co. baIju jNaavavaanauM ko Aa pàojokTnaI AMdr jo p`duYaIt paNaI<br />
naIkLvaanauM Co tonao saMpUNa- pNao rIsaayakla krvaanaa CIAo.³yauTIlaITI Anao pàosaosa naI AMdr´<br />
zero Dischage concept.<br />
PàduYaNanaa inayaM~Na maaTo jrurI sk`bar lagaavaola Co Anao ivastrNa pCI pNa jruiryaat<br />
p`maaNao sk`bar lagaavavaamaaM AavaSao.AovauM Amaara rIpaoT-maaM dSaa-vaola Co.
PàitEaIÊ<br />
klaokTr saahobaÊ<br />
ivaYaya:p`duYaNa baabat<br />
AmaarI nama` ivanaMtI Co Amaara gaama BaayalaaqaI bao qaI ~Na iklaaomaITr dur ³1´<br />
mao.Jona AaonkaolaaoŸ ³2´ mao.yaunaImaak- romaoDIJ pàojokT banao Co.tao toAao naa savao- krola<br />
namaunaa baIlakula KaoTa Co. jovaa ko hvaamaanaÊ paNaInao lagata jo AaMkDa toAaoAo dSaa-vyaa<br />
Co to KaoTa Co Anao Aa caalau pàojokT qaI jo Amaara gaamanaI Aajubaaju hvaamaana Anao<br />
paNaI maaM Kubaj Kraba Asar qa[ Co.tao Aap saahoba nao AmaarI Baayalaa gaama tqaa<br />
Aajubaajunaa gaamanaa laaokaonaI nama` ivanaMtI Co.Aa baMnnao pàojokT Amaara ivastarmaaM Kuba<br />
naukSaana kta- Co. tao GaTtuM krvaa ivanaMtI.<br />
hsamauKBaa[ QaaorIBaa[ prmaar<br />
Baayalaa
PàitEaI<br />
klaokTr saahoba<br />
Amadavaad.<br />
Aap saahobanao jNaavavaanauM ko koraLa jo yaunaImaak- karKanauM AavaolauM Co tonaao Kasa pÈna<br />
p`duYNa naao Co.jo gaosa Kuba j Kraba Aavao Co jo jnatanaI ihtnao naukSaana krnaar Co<br />
toma j paNaI naa inakala kro Co tomaaMqaI KotInaa pak nao naukSaana qa[ Sako Co tomaj<br />
Aaraogya AMgao naukSaana qa[ Sako Co.]praokt baabat QyaanamaaM la[ AagaL kaya-vaahI<br />
krvaa ivanaMtI.<br />
caMpabaona dovaaBaa[<br />
sarpMca<br />
ZoZaL gaàma pMcaayat
jvaaba : sarpMca caMpabaona dovaaBaa[<br />
rIpaoT-naI AMdr savao- krolaa jo namaunaa laIQaola Co jo svatM~ AojnsaIAo laIQaola Co Anao<br />
AonaalaIsaIsa krola Co. baIju jNaavavaanauM ko Aa pàojokTnaI AMdr jo p`duYaIt paNaI<br />
naIkLvaanauM Co tonao saMpUNa- pNao rIsaayakla krvaanaa CIAo.³yauTIlaITI Anao pàosaosa naI AMdr´<br />
zero Dischage concept.<br />
PàduYaNanaa inayaM~Na maaTo jrurI sk`bar lagaavaola Co Anao ivastrNa pCI pNa jruiryaat<br />
p`maaNao sk`bar lagaavavaamaaM AavaSao.AovauM Amaara rIpaoT-maaM dSaa-vaola Co.
PàitEaI<br />
maa. Ÿllaa klaokTrEaI<br />
Amadavaad.<br />
ivaYaya : Baart sarkarnaa pyaa-varNa Anao vana maM~alayanaa jahornaamaaM k`maaMk<br />
Aosa.Aao.1533 ta.14.09.2006 naI laaok saunaavaNaI baabato.<br />
mao.saahobaEaI<br />
saivanaya jNaavavaanauM ko ]praok
jvaaba : saI.ko.prmaar<br />
Aa kMpnaI wara jo kMa[ rIpaoT- rju krvaamaaM Aavaola Co Ao sarkar wara naaoTIfa[D<br />
knsalaTnT wara j banaavaola Co Anao jo kaM[ maaihtI faorosT maInaIsT/Iga gaa[D laa[na<br />
p`maaNao jrurI Co.to Amaara irpaoT-maaM dSaa-vaola Co. toqaI laaok saunaavaNaInaaM tarIK AagaL<br />
laMbaavavaanaao pÈna j naqaI.
p`itEaIÊ<br />
gaujrat paolyauSana baaoD-Ê<br />
navarMgapura Amadavaad.<br />
vaaMQaa ArŸ<br />
baocarBaa[ pTolaÊ<br />
naarNapuraÊ<br />
Amadavaad.<br />
ta.23.01.09<br />
saivanaya saaqao jNaavavaanauM ko Jaona AaonkaolaaoŸ p``a[vaoT laImaIToD nauM ivastrNa krvaa<br />
baabat saamao Amaao Aa ArŸ krI saKt vaaMQaao naaoMQaavaIAo CIAo.karNa ko sadrhu<br />
ivastrNamaaM p`duYaNa nao lagatI baabat samaayaolaI Co.halamaaM jo kMpnaI caalaI rhI Co to<br />
Kuba j p`duYaNa folaavao Co Anao jao ivastrNa krvaa dovaamaaM Aavao tao p`duYaNa<br />
prakaYzaAo phaoMcao joqaI Aapnao nama` Arj Co ko sadrhu kMpnaI nao ivastrNa maaTo<br />
prvaanagaI AapvaamaaM na Aavao.<br />
AaBaar EaIÊ<br />
baocarBaa[ pTola
jvaaba : baocarBaa[ pTola<br />
kMpnaIAo rjuAat kyaa- p`maaNao ³[.Aa[.Ao p`maaNao´p`duYaNa inayaM~Nanaa saaQanaao<br />
lagaavavaanauM jNaavaola Co joqaI p`duYaNa prakaYzaAo phaocavaanaoa pÈna j ]pisqat qatao<br />
naqaI.
pìtEaI<br />
ijllaa pyaa-varNaIya laaok saunaavaNaI saimait<br />
Amadavaad ijllaa.<br />
hrIisaMh jagamaala gaoaihla<br />
kaocarIyaa ta:baavaLa<br />
ij.Amadavaad<br />
ta:23.01.08<br />
ivaYaya:yauinamaak- romaoDIHa ila.naI ta:23.01.09 naa raoj yaaojanaar laaok saunaavaNaI maaM<br />
rjUAat.<br />
EaImaana<br />
kUSaL hSaao.<br />
³1´Aa kMpnaInaa hvaa p`dUYaNaqaI laaokao GaNaaM proSaana Co.idvasa drimayaana pNa kMpnaI wara<br />
CUTta[ gaosanaI vaasa AnauBavaaya Co.irpaoT-maaM maanya maa~a p`maaNao j DoTa batavavaamaaM<br />
Aavyaa Co.to KaoTa Co.<br />
³2´rai~ drimayaana tIva` gaMQa maartao JorI gaosa Aa kMpnaI wara CaoDvaamaaM Aavao Co.jo<br />
gaosanaI bahu ivaprIt Asarao qaaya Co.tonaao pholaa AByaasa qavaao jao[Ao.<br />
³3´Avaaj p`dUYaNa maaTo rai~ Anao idvasanaa QaaorNaao barabar Co.prMtu AByaasa qayaao Co tomaa<br />
[samarI poj naMbar [ 7 idvasa drimayaana 51.7 qaI 60.9 DosaIbala Anao rai~ drimayaana<br />
38.8 qaI 57.7 DosaIbala batavaola Co.rai~ drimayaana kMpnaInaao Avaaj AaoCao qavaanauM<br />
karNa SauMÆ<br />
³4´Aa kMpnaI p`dUYaNa krtI kMpnaI Co tonao Ÿ.pI.saI.baI Ao kyaaM kyaaM AokT maujba<br />
klaaoJr naaoTIsaao Aapola CoÆ to jNaavavaa ivanaMtIÆ<br />
³5´Aa kMpnaInao p`dUYaNa baabato gaujrat p`dUYaNa inayaM~Na baaoD- ta.26 jUna 2006 naa raoj<br />
~Na Alaga Alaga klaaoJr naaoiTsaao maLola Co Anao ta.6.09.05naa raoj pNa klaaoJr<br />
naaoiTsa p`dUYaNa baabato AavaI GaNaI klaaoJr naaoiTsaao Aa kMpnaInao maLola Co.tao hyaat<br />
kMpnaInauM p`dUYaNa raokaya Anao AavaI p`dUYaNa kMpnaI nao k[ pyaa-varNaIya saMmait AapI<br />
SakayaÆ<br />
AaBaar sah<br />
Aapnaao<br />
hirisaMh jo.gaaoihla<br />
nakla rvaanaa:saBya saicavaEaI Anao pàdoSaIk AiQakarIEaI gaujrat p`dUYaNa inayaM~Na baaoD-<br />
gaaMQaInagar
jvaaba : hirisaMh jo.gaaoihla<br />
1.kMpnaIAo p`dUYaNa inayaM~Na maaTonaa baQaaj saaQanaao lagaavaola Co.Anao safLtapUva-k caalaI<br />
rhyaa Co.<br />
2.AmaarI kMpnaI satt pìk`yaavaaLI Co.td\]praMt pìk`yaa drimayaana ]d\Bavata vaayauAao<br />
sk`ba krvaamaaM Aavao Co kacaamaalanaI horfor (Chavgig) maaTo sk`bar huD lagaavaola Co.jonaao<br />
Amao AByaasa krola Co.<br />
3.rai~ drimayaana vaQaara naao GaaoMGaaT T/anspaoToSana ,maalanaI horaforI jovau kama krvaamaaM<br />
Aavatu na haovaaqaI saroraSa AvaajnauM p`maaNa idvasa krtaM AaoCu maalauMma pDola Co.<br />
4.AanaI ivagat piriSaYT maaM jaoDola Co.
pìtEaI<br />
AQyaxa<br />
ijllaa pyaa-varNaIya laaok saunaavaNaI saimait<br />
Amadavaad ijllaa.<br />
sarpMcaEaIÊ<br />
jgadIpisaMh maaotIBaa saagarÊ<br />
mau:klyaaNagaZÊta:baavaLaÊ<br />
ij.Amadavaad.<br />
ta:23.1.2009<br />
ivaYaya: yauinamaak- romaIDIJ ila.naI ta23.01.09 naa raoj yaaojanaar laaok saunaavaNaImaaM<br />
rjUAat.<br />
EaImaana<br />
kUSaL hSaao.<br />
1.Aa kMpnaI Gana kcaranao Aokzao krI fokTrInaI baharnaI jgyaaAo SaoD banaavaI Aokzao<br />
krvaanaI Co to jgyaa kaonaI CoÆAnao baharnaI jgyaaAo komaÆ<br />
2.kMpnaIAo jUnaa PlaanTmaaM 20000 caaorsa maITr ivastarmaaM gaÌna baolT ivaksaavyaao CoÆ tovauM<br />
kho Co jo hikktmaaM qayaola naqaI.to pNa kimaTI wara sqaL maulaakat krvaamaaM Aavao tovaI<br />
AmaarI tIva` maaMgaNaI Co.<br />
3.navaa PlaanTmaaM baIja 20000 caaorsa maITr ivastarmaaM Aa kMpnaI gaÌna baolT krvaanaI CoÆ<br />
SauM to krSaoÆ koTlaa JaD vaavaSaoÆkyaaM p`kar naa JaD vaavaSaoÆ to JaDao Aa kMpnaI wara<br />
inakLta p`dUYaNanao kMnT/aola krvaanaI xamatavaaLa hSaoÆ ko pCI jldI ]gaI jaya tovaa JaD<br />
vaavaSaoÆ<br />
4.Aa kMpnaImaaMqaI flaaya AoSa naIkLSao tonaa ]pyaaoga maaTo SauM Aayaaojna krvaamaaM Aavaola<br />
CoƳkao[ [MTao banaavatI kMpnaI pasao AogaÌmaonT krola Co ko komaÆ´<br />
5.[.Aa[.Ao samarI poj naMbar 3 maaM batavaola Co ko saUicat krola pàojokTnaa sqaLoqaI 10<br />
iklaaomaITrnaa ivastar sauQaImaaM jMgalaI pàNaIAaonaa inavaasa Aavata naqaI to KaoTuM CoÆ koma<br />
ko kMpnaI paCL j Anao ivastarmaaM naIla gaayanaa TaoLa Anao JUMDao inavaasa kro Co maaTo<br />
AByaasamaaM KaoTao ]llaoK krvaamaaM Aavyaao Co tonaI spYTta krvaamaaM AavaoÆ<br />
6.Aa ivastarmaaM Aok laaok vaa[ka p`maaNao BaImao j[malaa d
jvaaba : jgadIpisaMh maaotIBaa saagar<br />
1.Aa kMpnaIAo Gana kcarao jo Aokzao krola krola Co tonao Hazardose Storage Area maaM<br />
raKola Co.<br />
2. Aa kMpnaIAo Gana kcarao jo Aokzao krola krola Co tonao Hazardose Storage Area maaM<br />
raKola Co.<br />
3.kMpnaIAo jo gaÌna baolT ivaksaavaola Co tonaI ivagat rIpaoT-maaM Aapola Co.<br />
4.kMpnaIAo rIpaoT-maaM jNaavaola p`maaNao jo kaM[ gaÌna baolT ivaksaavavaanaao Co to p`maaNao<br />
kaya-vaahI krSao.<br />
5.kMpnaImaaMqaI inakLtI falya AoSanaao ]pyaaoga kMpnaInaI AMdr j krvaanaI Co.AmaaoAo<br />
kao[ [Mtao banaavatI kMpnaI saaqao AogaÌmaonT krola Co.<br />
6.sTDI AorIyaanaI Aasapasa kayamaI QaaorNao naIla gaaya jovaa pàNaIAaonaao vasavaaT jaovaa<br />
maLola naqaI.<br />
7.AmaarI jaNamaaM Aa vaat naqaI<br />
8.jUnaa pàojokTnaI raojgaarInaI ivagat irpaoT-maaM saamaola Co Anao navaa pàojokTmaaM jo kaM[<br />
raojgaarInaI tkao ]BaI qavaanaI Co to pNa irpaoT-maaM dSaa-vaola Co.³junaamaaM 600 Anao navaamaaM<br />
AaSaro 300´<br />
9.AmaarI kMpnaI saamaaijk jvaabadarI svaIkarvaamaaM maanao Co.A%yaar sauQaI Amao GaNaI<br />
jvaabadarI inaBaavaI Co to irpaoT-maaM dSaa-vaola Co Anao BaivaYyamaaM pNa AmaarI jvaabadarI<br />
inaBaavaISauM.
pìtEaIÊ<br />
klaokTrEaIÊ<br />
Amadavaad ijllaaÊ<br />
AnaIlakumaar baI.i~vaodIÊ<br />
vanaocarÊ<br />
24ÊkUlaIna TonaamaonTÊ<br />
Baavanaa TonaamaonT naI baajUmaaMÊ<br />
vaasaNaaÊAmadavaad.380007<br />
Faona:079 26600153<br />
tarIK:23.01.09<br />
baabat:mao.yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunaavaNaI<br />
ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />
maananaIya EaIÊ<br />
huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />
mao.yaunaImaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao.rIpaoT- saana AonavaayaraoTok<br />
pà.ila.palaDIÊAmadavaad wara rjU qayaao Co tomaaM kMpnaI jNaavao Co ko PlaaoT naMbar<br />
:337Ê338Ê269Ê294Ê296Ê299Ê297Ê300 maaM ivastrNanaI yaaojnaa AmalamaaM laavanaar Co.<br />
AapEaI naaM maaQyama qaI naIcao jNaavaola mau_aAao maaTo naI maaihtI AapSaao….<br />
1.gaujrat p`dUYaNa inayaM~Na baaoD- wara Collaa dsa vaYa- naaM samayagaaLa maaM mao.yaunaImaak-<br />
romaoDIJ laImaIToD ]pr AonvaayarmaonT pàoToxana AokT 1986 tomaj vaaoTr ³pÌvaonSana AonD<br />
kMTa/ola Aaof paolyauSana´AokT:1974 tqaa Aor³ p`IvaonSana AonD kMTa/ola Aaof paolyauSana´<br />
AokT:1981 AnaUsaar kao[ kayadoSarnaI kaya-vaahI qa[ haoya tao tonaI ivagatao<br />
jNaavaSaao.da.t.naaoiTsa À SaaokaoJ naaoiTsa À]%padna baMQa raKvaa maaTonaI kaya-vaahI tqaa<br />
k[ Satao- nao AaQaIna ]%padna Saru krvaanaI prvaanagaI AapI haoya.<br />
2.halanauM ]%padna AokmanauM baaQakama xao~fL koTlaUM rhoSao Anao fokT/I AokT maUjba<br />
baaMQakama naaM xao~fL naaM koTlaa Tka ivastarmaaM kayamaI laIlaao~I pyaa-varNa naI jaLvaNaI<br />
maaTo fokT/I naaM PlaaoTmaaM koTlaa Anao kovaa p`karnaaM GaTadar vaRxaao nauM vaavaotr Anao jaLvaNaI<br />
naI ivagatao AapSaao.<br />
3.Baayalaa gaama naaM vaasaIAao naI rjUAat Co ko mao.yaunaImaak- romaIDIJ laImaIToD fokT/ImaaM<br />
p`dUYaIt paNaI BarI raKvaa maaTo naanaUM tLava banaavaola Co jomaa fokT/I wara p`dUYaIt paNaI<br />
BarI raKolauM haoya Co.caaomaasaa naI ?tumaaM pholaa baIja varsaad baad caalaU varsaadmaaM fokT/I<br />
wara p`dUYaIt paNaInaaM tLava naao vaalva KaolaI naaKvaaqaI to paNaI Baayalaa baMQamaaM Aavao<br />
Co.Anao baMQa nauM paNaI p`dUYaIt kro Co.tao Aa baabat nao Qyaana maaM laota fokT/I wara<br />
vaOklpIk pgalaa jNaavaSaao.<br />
4.REIA rIpaoT-naa panaa naMbar 3 –37 ifgar 3.2 ³Wind rose diagram´p`maaNao hvaa naI<br />
idSaa d.5 Ê5.d Ê5 Ê5 Ê5 Ê]p Ê].].p haoya Co %yaaro ÊfokT/InaI p`dUYaIt hvaa Baayalaa<br />
vaasaIAaonaa svaasqya nao Asar kro Co.tao Aa baabato fokT/I wara jrurI pgalaa jNaavaSaao.<br />
5.fokT/Inaa AagaamaI ]%padnaaomaaM konsar vaIraoQaI dvaaAaonauM ]%padna maaoTa payao qanaar<br />
Co.jomaaM Kasaa maaoTa p`maaNa maaM maanavaEama qanaar Co taoAa drok kma-caarIAaonaa svaasqya<br />
naI saurxaa tqaa pyaa-varNa naI saurxaa baabato ivastRt maaM jNaavaSaao.<br />
Aapnaao ivaEvaasau Ê
jvaaba : AnaIlakumaar baI.i~vaodI.<br />
1.kayadosarnaI kaya-vaahInaI ivagatao rIpaoT-maaM saamaola Co.<br />
2.saurxaa AMgaonaI ivagatao [.Aa[.Ao irpaoT- saamaola Co.<br />
3.AmaarI kMpnaI naI AMdr JIrao DIscaaj- kMpnaI Co joqaI p`dUYaIt paNaI CaoDvaanaao pÈna<br />
]pisqat qatao naqaI.<br />
4.tmaama ivagatao Amaara [.Aa[.Ao irpaoT-maaM saamaola krola Co.<br />
5.Amao raKola saurxaanaa tj&Ao saUcavaola saurxaanaa ]payaaonauM caust pNao palana krvaamaaM<br />
Aavao Co tqaa kma-caarIAao nao saUrxaanaa saaQanaao vaaprvaa ivaSao T/oinaMga Avaar navaar<br />
AapvaamaaM Aavao Co.jo rsaayaNa vaaprtI vaKto krvaa naa ]pyaaoga ivaSao talaIma AapvaamaaM<br />
Aavao Co.
pìtEaIÊ<br />
mau#ya AiQakarIEaIÊ<br />
pàdoiSak kcaorIÊ<br />
Ÿ.pI.saI.baI.<br />
gaujrat inayaM~Na baaoD-<br />
navarMgapuraÊAmadavaad.<br />
AnaIlakumaar baI.i~vaodIÊ<br />
vanaocarÊ<br />
24ÊkUlaIna TonaamaonTÊ<br />
Baavanaa TonaamaonT naI baajUmaaMÊ<br />
vaasaNaaÊAmadavaad.380007<br />
Faona:079 26600153<br />
tarIK:23.01.09<br />
baabat: mao. yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunavaNaI<br />
ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />
maananaIya EaIÊ<br />
huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />
mMao. yauinamaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao rIpaoT- saana<br />
AonavaayaraoTok pà.ila.palaDIÊAmadavaad wara rjU qayaao Co.tonaa panaa naM.1–4 ]pr<br />
dSaa-vaola Co ko “there is no surface water body within 10 km.radius from industry.”Aa<br />
baabato AapEaI nao maarI rjUAat Co ko Aa hkIkt KaoTI Co Anao sarkrI maaQyamanao<br />
ApUrta Anao ]pjavaI kaZolaa pUravaa rjU krI gaor maagao- daorI paotanaaM vaoparI svaaqa-nao pUraM<br />
krvaanauM gaUnaahIt kaya- krola Co.gaama tLavaao ivaSaonaI maaihtI [rada pUrva-k Cupavaola Co.<br />
hkIktAo Co ko baavaLa ivastar ftohvaaDI konaala saIsTma AMtga-t Aavatao KotI<br />
ivastar Co.gaujrat sarkar naaM nama-da vaaoTr rIsaaosa- Anao vaaoTr saPlaaya DIpaT-maonT naaM<br />
D/ao[Mga naMbar: 32 ta:29.06.2000 AnaUsaar koralaagaama qaI 10ikmaI.i~jyaa vatU-L AavarI<br />
laota ivastarmaaM 26 gaama Aavaola Co Anao tonaI saIcaa[ tomaj gaama ]pyaaogamaaM AavataM<br />
tLava Anao Doma naI ivagat Aa saaqao jaoDola ivagatmaaM dSaa-vaola Co.<br />
mao. yauinamaak- romaoDIJ laImaIToD paoto Baayalaa gaama naaM Baayalaa Doma tqaa kaocarIyaa<br />
gaamanaaM hIrasar tLava tomaj BaImakuMD DomanaaM vaaoTr kocamaonT ivastarmaaM Aavaola Co.<br />
]praokt hkIktnao rokaoD- ]pr laoSaao Anao mao. yauinamaak- romaoDIJ laImaIToD naao<br />
T/fT [.Aa[.Ao rIpaoT- saana AonavaayaraoTok pà.ila.palaDI Amadavaad wara rjU qayaao<br />
Co.tonao naamaMjUr krI forvaIcaarNaa Anao saUQaara maaTo pCI maaoklaSaao.pyaa-varNa baabat naI<br />
Aa laaok saUnavaNaI rd krSaao.<br />
AapEaInao maarI nama` ivanaMtI Co ko mao. yauinamaak- romaoDIJ laImaIToD naao Ta/fT [.Aa[.Ao<br />
rIpaoT- maaM jrurI saUQaarao qayaa baad puna:maUlyaaMkna kyaa- pCI navaosar qaI pyaa-varNa baabatnaI<br />
laaok saUnavaNaI yaaojnaamaaM Aavao tao Asarga`st gaa`majnaaonao nyaaya maLSao.<br />
Apnaao ivaEvaasau.<br />
AnaIlakumaar baI.i~vaodI<br />
vanaocar
jvaaba : AnaIlakumaar baI.i~vaodI<br />
1. yauinamaak- romaoDIJ laImaIToD naaM D/afT EIA rIpaoT-maaM jo maaihtI AapvaamaaM Aavao Co to<br />
sacaaoT maaihtI Co.<br />
2.Aa ivastarmaaM kayamaI QaaorNao paNaInauM tLava banaola rhota naqaI.Aa sTDI ivastarmaaM<br />
saIJna drimayaana paNaI jaovaa maLola htu prMtu iDsaombar maihnaa pCI Aa ivastar saamaanya<br />
rIto saUkao rho Co.joqaI Amaaonao kayamaI QaaorNao paNaInaa sTaoroj trIko laIQaola naqaI.
pìtEaIÊ<br />
klaokTrEaIÊ<br />
Amadavaad ijllaaÊ<br />
Aignahao~I idnaoSakumaar AaoÊ<br />
“saMtaoYaI inavaasa”gaaopalanagarÊ<br />
Amara[vaaDI<br />
Amadavaad.380026<br />
ta:23.01.2009<br />
ivaYaya: pyaa-varNa Anao vana maM~alaya navaI idllaInaa jahornaamaaM k`maaMk Aosa.Aao.1533<br />
ta:14.9.2006 Anvayao laaok saunaavaNaI maaM iTka iTPPaNaI baabato.<br />
Mmao.saahobaÊ<br />
Amaao Arjdar gaujrat naa Amadavaad Sahor maaM “saMtaoYaI inavaasa” gaaopalanagar<br />
Amara[vaaDI Amadavaad 26 Kato rhIAo CIAo Anao BaartIya naagairk CIAo.Baartnaa<br />
baMQaarNa AaTI-kla 19 ³1´³k´ maujba vaaNaI Anao AiBavyaikt naa mauLBaUt AiQakar<br />
QaravaIAo CIAo.Aa ]praMt Baartnaa baMQaarNa Baaga 4 k naa AaTI_kla 51 k³ca´maujba<br />
pyaa-varNa jaLvavaanaI mauLBaUt frj pNa drok BaartIya naagarIk ]pr Baartnaa baMQaarNa maaM<br />
laadolaI Co.maaTo ]praokt ivaYaya baabato jNaavaola karNaao nao QyaanamaaM la[ Aa laaok<br />
saunaavaNaI naI tarIK laMbaavavaa yaaogya krvaa AmaarI AapEaI nao Arj Co.<br />
Payaa-varNa Anao vana maM~alaya navaI idllaI naa jahornaamaa k`maaMk Aosa.Aao 1533<br />
ta.14.09.2006 Anvayao mao.Jona AaonkaolaaojI p`yavaoT laImaIToD Anao mao.yaunaImaak-<br />
romaoDIJ laImaIToD gaama koralaa ta:baavaLa ij.Amadavaad Wara balk D/gsa ]%padna maaTo jo<br />
jahorat dOinak “gaujrat samaacaar”ta.16.01.2009maaM jahor krvaa maaM AavaI htI.Ao<br />
pCI Amao ta.2012.2008 naa raoj klaokTr kcaorI naa jahornaamaaM AiQakarEaInao maaihtI<br />
AiQakar AiQainayama 2005 AMtga-t Aa baMnao AqaI saMbaMQaIt maaihtI maoLvavaa maaTo ArjI<br />
krola Co. jonauM baIDaNa Aa ArjI saaqao krIAo CIAo.<br />
AmaarI ta:20.12.2008naI Aar.TI.Aa[ ArjInauM jvaaba Aajraoj sauQaI Amanao<br />
maLola na haovaaqaI Amao Aa kMpnaIAao naI laaok saunaavaNaImaaM paotanaa ivacaar rju krI<br />
Sakta na haoyaI AapEaI nao AmaarI Arj Co ko Aa laaok saunaavaNaI naI tarIK laMbaavavaa<br />
maaTo yaaogya krvaa kRpa krSaaojI.<br />
AaBaar<br />
AapnaaoivaEvasanaIya<br />
idnaoSakumaar Aao.Aignahao~I<br />
baIDaNa:ta.20.12.2008 naI AmaarI Aar.TI.Aa[ naI ArjI naI Joraoxa
Aignahao~I baIDaNa<br />
mahaSayaEaI<br />
namaskar<br />
ivanaMtI sah jNaavavaanauM ko ta.11.12.2009 naa raoj paolyauSana kMT/aola baaoD- gaujrat<br />
rajya gaaMQaInagar naa rajya saicavaEaI saMjIva %yaagaI wara jahor saUcanaa wara Baart sarkar<br />
pyaa-varNa Anao vana maM~alaya navaI idllaI naa jahor naamaa k`maaMk Aosa.Aao.1533<br />
ta.14.09.2006 Anvayao gaama:koralaa , ta:baavLa ij.Amadavaad maukamao Aavaola PlaaoT naM<br />
337Ê338Ê269Ê299Ê294Ê296Ê297 Anao 300 naMbar naaM PlaaoTmaaM 1.mao.Jona AaonkaolaaojI<br />
pà/ila.Anao 2.yaunaImaak- romaoDIJ laImaIToD wara balk D/gsa naa ]%padna maaTo navaa PlaanT<br />
maaTonaI piryaaojnaa koTogarI “Ao”maaTo kMpnaIAo Baart sarkar wara saI.jI.Aao kaomplaoxa<br />
laaoQaI raoD navaI idllaI.110003 Kato kaya-rt pyaa-varNa Anao van maM~alaya nao koTogarI<br />
“Ao”maaM AavarI laovaa maaTo inayaM~Na AaoqaaorITI trIko jahor krola Co.<br />
]praokt jahornaamauM Amaaonao gaujrat rajya naaM Amadavaad SahornaaM jahor AKbaar<br />
“gaujrat samaacaar”maaM panaa naM.2 ]pr vaaMcavaa maLola Co.<br />
]praokt jahornaamaanaI baabatmaaM ijllaa klaokTrEaI Amadavaad ta.23.10.2009 naa<br />
raoj laaok AiBapàya maoLvavaanaI laaok saunaavaNaI raKvaamaaM Aavaola Co.joqaI ]praokt tmaama<br />
baabatao Ao ]praokt kMpnaI naI ivaruQQamaaM Amao ta.23.01.2009naaM pholaaM laoiKt maaM<br />
TIka iTPpNaI vaaMQaaAao rju krvaanaaM ko maaoklavaanaaM hao[ maaihtI AiQakar AiQainayama<br />
2005naI jaogavaa[ Aao hozL ]praokt kMpnaIAaonao lagatI naIcao jNaavyaa maujba pÈnaavalaI<br />
naaM jvaabaao saaqaonaI maaihtI %varIt ta%kailak QaaorNao Amaaonao maaoklaI Aapvaa ivanaMtI Co.<br />
1.]praokt kMpnaIAaonaaM maonaojIMga DayarokTrÊDayarokTr naa naama sarnaamaaM maaobaa[la Aa^ifsa<br />
rhozaNanaaM Toilafaona naMbarao tomaj [ maola AoD/osa foksanaMbar vagaoro ivastRt maaihtI AapSaao.<br />
2.]praokt baMnao kMpnaI Aaonaa PlaaoTmaaM kyaa kyaa p`karnaaM koTlaI ]marnaaM koTlaa vaRxaao<br />
hala maaM hyaat CoÆ tonaI saM#yaa jNaavaSaao.<br />
3.paClaa vaYaao- maaM kayadosar ko gaorkayadosar rIto sadr PlaaoTaonaI jmaInaao maaMqaI koTlaa<br />
vaRxaaonauM Codna krvaamaaM Aavaola CoÆto baabato AapvaamaaM Aavaola prvaanagaInaI naklaao tomaj<br />
gaorkayadosar vaRxa Codna baabato k[ k[ vyaikt ko saMsqaaAao Ao firyaadao ko ArjI Aao<br />
krola CoÆ to jvaabadar sa
6.]praokt baMnao kMpnaIAaomaaM halamaaM kyaarqaI kyaa p`karnaaM ]%padnaao krvaamaMa AavaI<br />
r)aa CoÆ tomaj kyaa kyaa p`karnaI pìk`yaa Aao krvaamaaM Aavao CoÆtomaj pìk`yaaAaoqaI<br />
vaatavarNa maaM QvanaI vaayau Anao Aaraogyanao lagata kyaa kyaa p`dUYaNaao ]Baa qayaolaa CoÆtomaj<br />
Aaj idna sauQaImaaM to p`dUYaNa baabato kyaa kyaa p`karnaI k[ k[ frIyaad , ArjIAao,<br />
k[k[ vyaikt , saMsqaaAaoAo krola CoÆto tmaama baabatao nao lagatI vagaI-kRt ivastRt maaihtI<br />
AapSaao.tomaj to firyaadao baabat maaM kyaa kyaa p`kar naao Sau inakala krvaamaaM Aavaola<br />
CoÆtonaI ivagatao AapSaao.<br />
7.]praokt baMnnao kMpnaIAaonao pàojokT koTogarI “A”maaTo balk D/gsanaa ]%padnanaa navaa<br />
pàojokT maaTo jo prvaanaI AapvaamaaM Aavanaar Co tonaaqaI kyaa kyaa p`karnaa QvanaI vaayau<br />
hvaa Anao Aaraogya lagataM p`dUYaNaao ]Baa qavaanaI saMBaavanaa CoÆ tomaj to baabato tkodarInaa<br />
Sau pgalaaM laovaaSaoÆ to AMgao ivastRt maaihtI AapSaao.<br />
8.]praokt Aokmaao qaI pyaa-varNanao qanaar naukSaananaI saamao vaRxaaonau kyaa kyaa PlaaoTmaaM<br />
kaonaI jvaabadarI Anao rahbaarI maaM koTlaa samayamaaM krvaamaaM AavaSao tonaI maaihtI<br />
AapSaao.<br />
9.jI.PaI.saI.baI.wara inayama Anausaar ]praokt kMpnaInaa Aoip`la 2005 qaI Aaj idna<br />
sauQaImaaM rju krvaamaaM Aavaola p`dUYaNa baabatnaao AaoDIT rIpaoT- naI nakla AapSaao.<br />
10.]praokt jNaavaola PlaaoT naMbarao ]prnaI jmaInaaonaa nakSaaAao savao- naMbar saaqao<br />
AapSaao.<br />
11.Aa Aokma banaavavaa maaTo kula koTlaa vaRxaaonauM Codna krvaamaaM AavaSao tonaI ivagat<br />
AapSaao.<br />
12.Aa Aokma AMgaonaa [.Aa[.Ao.naa Ahovaala mausa_anaI p`t Anao tonaa rIpaoT-naI<br />
nakla AapSaao.<br />
13.]praokt kMpnaI maaTo dSaa-vaola tmaama PlaaoT Anao tonaI Aaju baajumaaM Aavaola gaamanaI<br />
jmaInaao CarI prIxaNa krvaamaa Aavaola haoyatao tonaa irpaoT-naI naklaao AapSaao.<br />
14.]praokt kMpnaImaaM ]%pa_na pìk`yaa drimayaana ]Bau qanaar [nDsT/Iyala vaosT Anao vaaoTr<br />
vaosTnaa inakala maaTo kao[ Plaana ko nakSaao banaavavaamaaM Aavaola haoya tao to AMgaonaa pUravaa<br />
saaqao naI maaihtI AapSaao.<br />
15.]praokt kMpnaImaaM krvaamaaM Aavanaar ]%pa_na pìk`yaa maaTo koTlaa kyaUsaok paNaI<br />
AavaSyakta ]BaI qaSaoÆ tomaj to paNaInaa KocaaNanao karNao Aajubaaju maaM koTlaa kyaUsaok<br />
paNaInaI Asar qaSaoÆ tomaj to ACtnaa inakala maaTo kao[ vyavasqaa ko savao-naao irpaoT- tOyaar<br />
krvaamaaM Aavaola haoyata maaihtI AapSaao.pUravaa saaqao.<br />
16.hala Aa AokmaaoqaI CaoDvaamaaM Aavata vaaoTr vaosTnaa saomplaao pirxaNa Aqao- kaonaI<br />
prvaanaagaIqaI , kaonaa wara k[ jgyaa ]prqaI maoLvaI SakaSao to AMgaonaI ivagatvaar maaihtI<br />
AapSaao.<br />
]praokt tmaama maaihtI Amaao jo AaSayaqaI maaihtI AiQakar AiQainayama baMnaavavaamaaM<br />
Aavaola Co to AaSaya qaI j maoLvavaa maaMgaIAo CIAo.joqaI t%kaL maaihtI Aapvaa<br />
jahorihtmaaM ivanaMtI Co.<br />
AaBaar<br />
Aignahao~I idnaoSakumaar<br />
Amadavaad<br />
ta.20.12.08
jvaaba : Aignahao~I idnaoSakumaar<br />
1.jo paolyauSananao lagatao pÈna naqaI.<br />
2.TaoTla gaÌna baolT AorIyaa 20000 maI 2 Anao Amao laaokaoAo laaokla vaRxaao vaavaolaa Co jonaI<br />
]Mcaa[ AaSaro 3 maITrqaI 10 maITr Co.<br />
3.Amao kao[pNa vaRxaao kapola naqaI karNa ko Collaa vaYa-maaM ivastRtIkrNa krola naqaI<br />
4.laagau pDtuM naqaI<br />
5.jo paolyauSananao lagatao pÈna naqaI.<br />
6.tmaama jrurI ivagatao Amaara [.Aa[.Ao.irpaoT-maaM dSaa-vaola Co.jo tmao<br />
jI.pI.saI.baI.vaobasaa[T ]pr jao[ Sakao Cao.<br />
7.tmaama jrurI ivagatao Amaara [.Aa[.Ao.irpaoT-maaM dSaa-vaola Co.jo tmao<br />
jI.pI.saI.baI.vaobasaa[T ]pr jao[ Sakao Cao.<br />
8.BaaYaa barabar naqaI.<br />
9.Amaao Ao jI.pI.saI.baI.maaM jmaaM kravaola Co.AaoDIT rIpaoT- Aapvaao maagata naqaI.<br />
10.maaihtI Amaara [.Aa[.Ao.rIpaoT-maaM saamaola krola Co.<br />
11.AokpNa vaRxa Codna krola naqaI<br />
12.Aa ivagat maaTo Aap jI.pI.saI.baI.vaobasaa[T naao ]pyaaoga krI Sakao Co.<br />
13.ivagat samajatI naqaI.<br />
14.Amaaru yauinaT iJrao iDscaaj- kMpnaI Co.<br />
15. maaihtI Amaara [.Aa[.Ao.rIpaoT-maaM saamaola krola Co.<br />
16.ivagat samajatI naqaI.
pìtEaIÊ<br />
klaokTrEaIÊ<br />
Amadavaad ijllaaÊ<br />
AnaIlakumaar baI.i~vaodIÊ<br />
vanaocarÊ<br />
24ÊkUlaIna TonaamaonTÊ<br />
Baavanaa TonaamaonT naI baajUmaaMÊ<br />
vaasaNaaÊAmadavaad.380007<br />
Faona:079 26600153<br />
tarIK:23.01.09<br />
baabat:mao.yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunaavaNaI<br />
ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />
maananaIya EaIÊ<br />
huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />
mao.yaunaImaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao.rIpaoT- saana AonavaayaraoTok<br />
pà.ila.palaDIÊAmadavaad wara rjU qayaao Co tomaaM kMpnaI jNaavao Co ko PlaaoT naMbar<br />
:337Ê338Ê269Ê294Ê296Ê299Ê297Ê300 maaM ivastrNanaI yaaojnaa AmalamaaM laavanaar Co.<br />
AapEaI naaM maaQyama qaI naIcao jNaavaola mau_aAao maaTo naI maaihtI AapSaao….<br />
1.gaujrat p`dUYaNa inayaM~Na baaoD- wara Collaa dsa vaYa- naaM samayagaaLa maaM mao.yaunaImaak-<br />
romaoDIJ laImaIToD ]pr AonvaayarmaonT pàoToxana AokT 1986 tomaj vaaoTr ³pÌvaonSana AonD<br />
kMTa/ola Aaof paolyauSana´AokT:1974 tqaa Aor³ p`IvaonSana AonD kMTa/ola Aaof paolyauSana´<br />
AokT:1981 AnaUsaar kao[ kayadoSarnaI kaya-vaahI qa[ haoya tao tonaI ivagatao<br />
jNaavaSaao.da.t.naaoiTsa À SaaokaoJ naaoiTsa À]%padna baMQa raKvaa maaTonaI kaya-vaahI tqaa<br />
k[ Satao- nao AaQaIna ]%padna Saru krvaanaI prvaanagaI AapI haoya.<br />
2.halanauM ]%padna AokmanauM baaQakama xao~fL koTlaUM rhoSao Anao fokT/I AokT maUjba<br />
baaMQakama naaM xao~fL naaM koTlaa Tka ivastarmaaM kayamaI laIlaao~I pyaa-varNa naI jaLvaNaI<br />
maaTo fokT/I naaM PlaaoTmaaM koTlaa Anao kovaa p`karnaaM GaTadar vaRxaao nauM vaavaotr Anao jaLvaNaI<br />
naI ivagatao AapSaao.<br />
3.Baayalaa gaama naaM vaasaIAao naI rjUAat Co ko mao.yaunaImaak- romaIDIJ laImaIToD fokT/ImaaM<br />
p`dUYaIt paNaI BarI raKvaa maaTo naanaUM tLava banaavaola Co jomaa fokT/I wara p`dUYaIt paNaI<br />
BarI raKolauM haoya Co.caaomaasaa naI ?tumaaM pholaa baIja varsaad baad caalaU varsaadmaaM fokT/I<br />
wara p`dUYaIt paNaInaaM tLava naao vaalva KaolaI naaKvaaqaI to paNaI Baayalaa baMQamaaM Aavao<br />
Co.Anao baMQa nauM paNaI p`dUYaIt kro Co.tao Aa baabat nao Qyaana maaM laota fokT/I wara<br />
vaOklpIk pgalaa jNaavaSaao.<br />
4.REIA rIpaoT-naa panaa naMbar 3 –37 ifgar 3.2 ³Wind rose diagram´p`maaNao hvaa naI<br />
idSaa d.5 Ê5.d Ê5 Ê5 Ê5 Ê]p Ê].].p haoya Co %yaaro ÊfokT/InaI p`dUYaIt hvaa Baayalaa<br />
vaasaIAaonaa svaasqya nao Asar kro Co.tao Aa baabato fokT/I wara jrurI pgalaa jNaavaSaao.<br />
5.fokT/Inaa AagaamaI ]%padnaaomaaM konsar vaIraoQaI dvaaAaonauM ]%padna maaoTa payao qanaar<br />
Co.jomaaM Kasaa maaoTa p`maaNa maaM maanavaEama qanaar Co taoAa drok kma-caarIAaonaa svaasqya<br />
naI saurxaa tqaa pyaa-varNa naI saurxaa baabato ivastRt maaM jNaavaSaao.<br />
Aapnaao ivaEvaasau Ê
jvaaba : AnaIlakumaar baI.i~vaodI.<br />
1.kayadosarnaI kaya-vaahInaI ivagatao rIpaoT-maaM saamaola Co.<br />
2.saurxaa AMgaonaI ivagatao [.Aa[.Ao irpaoT- saamaola Co.<br />
3.AmaarI kMpnaI naI AMdr JIrao DIscaaj- kMpnaI Co joqaI p`dUYaIt paNaI CaoDvaanaao pÈna<br />
]pisqat qatao naqaI.<br />
4.tmaama ivagatao Amaara [.Aa[.Ao irpaoT-maaM saamaola krola Co.<br />
5.Amao raKola saurxaanaa tj&Ao saUcavaola saurxaanaa ]payaaonauM caust pNao palana krvaamaaM<br />
Aavao Co tqaa kma-caarIAao nao saUrxaanaa saaQanaao vaaprvaa ivaSao T/oinaMga Avaar navaar<br />
AapvaamaaM Aavao Co.jo rsaayaNa vaaprtI vaKto krvaa naa ]pyaaoga ivaSao talaIma AapvaamaaM<br />
Aavao Co.
pìtEaIÊ<br />
klaokTrEaIÊ<br />
Amadavaad ijllaaÊ<br />
AnaIlakumaar baI.i~vaodIÊ<br />
vanaocarÊ<br />
24ÊkUlaIna TonaamaonTÊ<br />
Baavanaa TonaamaonT naI baajUmaaMÊ<br />
vaasaNaaÊAmadavaad.380007<br />
Faona:079 26600153<br />
tarIK:23.01.09<br />
baabat:mao.yauinamaak- romaoDIJ laImaIToD naI pyaa-varNa baabat naI laaok saunaavaNaI<br />
ta:23.01.09 baavaLaÊAmadavaad Kato rjUAat pUravaa Aapvaa baabato.<br />
maananaIya EaIÊ<br />
huM AnaIlakumaar baI.i~vaodI AapnaI samaxa maarI rjUAat pUravaa AapI r)aao CuM.<br />
mao.yaunaImaak- romaoDIJ laImaIToD naao T/afT [.Aa[.Ao.rIpaoT- saana AonavaayaraoTok<br />
pà.ila.palaDIÊAmadavaad wara rjU qayaao Co tomaaM kMpnaI jNaavao Co ko PlaaoT naMbar<br />
:337Ê338Ê269Ê294Ê296Ê299Ê297Ê300 maaM ivastrNanaI yaaojnaa AmalamaaM laavanaar Co.<br />
AapEaI naaM maaQyama qaI naIcao jNaavaola mau_aAao maaTo naI maaihtI AapSaao….<br />
1.gaujrat p`dUYaNa inayaM~Na baaoD- wara Collaa dsa vaYa- naaM samayagaaLa maaM mao.yaunaImaak-<br />
romaoDIJ laImaIToD ]pr AonvaayarmaonT pàoToxana AokT 1986 tomaj vaaoTr ³pÌvaonSana AonD<br />
kMTa/ola Aaof paolyauSana´AokT:1974 tqaa Aor³ p`IvaonSana AonD kMTa/ola Aaof paolyauSana´<br />
AokT:1981 AnaUsaar kao[ kayadoSarnaI kaya-vaahI qa[ haoya tao tonaI ivagatao<br />
jNaavaSaao.da.t.naaoiTsa À SaaokaoJ naaoiTsa À]%padna baMQa raKvaa maaTonaI kaya-vaahI tqaa<br />
k[ Satao- nao AaQaIna ]%padna Saru krvaanaI prvaanagaI AapI haoya.<br />
2.halanauM ]%padna AokmanauM baaQakama xao~fL koTlaUM rhoSao Anao fokT/I AokT maUjba<br />
baaMQakama naaM xao~fL naaM koTlaa Tka ivastarmaaM kayamaI laIlaao~I pyaa-varNa naI jaLvaNaI<br />
maaTo fokT/I naaM PlaaoTmaaM koTlaa Anao kovaa p`karnaaM GaTadar vaRxaao nauM vaavaotr Anao jaLvaNaI<br />
naI ivagatao AapSaao.<br />
3.Baayalaa gaama naaM vaasaIAao naI rjUAat Co ko mao.yaunaImaak- romaIDIJ laImaIToD fokT/ImaaM<br />
p`dUYaIt paNaI BarI raKvaa maaTo naanaUM tLava banaavaola Co jomaa fokT/I wara p`dUYaIt paNaI<br />
BarI raKolauM haoya Co.caaomaasaa naI ?tumaaM pholaa baIja varsaad baad caalaU varsaadmaaM fokT/I<br />
wara p`dUYaIt paNaInaaM tLava naao vaalva KaolaI naaKvaaqaI to paNaI Baayalaa baMQamaaM Aavao<br />
Co.Anao baMQa nauM paNaI p`dUYaIt kro Co.tao Aa baabat nao Qyaana maaM laota fokT/I wara<br />
vaOklpIk pgalaa jNaavaSaao.<br />
4.REIA rIpaoT-naa panaa naMbar 3 –37 ifgar 3.2 ³Wind rose diagram´p`maaNao hvaa naI<br />
idSaa d.5 Ê5.d Ê5 Ê5 Ê5 Ê]p Ê].].p haoya Co %yaaro ÊfokT/InaI p`dUYaIt hvaa Baayalaa<br />
vaasaIAaonaa svaasqya nao Asar kro Co.tao Aa baabato fokT/I wara jrurI pgalaa jNaavaSaao.<br />
5.fokT/Inaa AagaamaI ]%padnaaomaaM konsar vaIraoQaI dvaaAaonauM ]%padna maaoTa payao qanaar<br />
Co.jomaaM Kasaa maaoTa p`maaNa maaM maanavaEama qanaar Co taoAa drok kma-caarIAaonaa svaasqya<br />
naI saurxaa tqaa pyaa-varNa naI saurxaa baabato ivastRt maaM jNaavaSaao.<br />
Aapnaao ivaEvaasau Ê
jvaaba : AnaIlakumaar baI.i~vaodI.<br />
1.kayadosarnaI kaya-vaahInaI ivagatao rIpaoT-maaM saamaola Co.<br />
2.saurxaa AMgaonaI ivagatao [.Aa[.Ao irpaoT- saamaola Co.<br />
3.AmaarI kMpnaI naI AMdr JIrao DIscaaj- kMpnaI Co joqaI p`dUYaIt paNaI CaoDvaanaao pÈna<br />
]pisqat qatao naqaI.<br />
4.tmaama ivagatao Amaara [.Aa[.Ao irpaoT-maaM saamaola krola Co.<br />
5.Amao raKola saurxaanaa tj&Ao saUcavaola saurxaanaa ]payaaonauM caust pNao palana krvaamaaM<br />
Aavao Co tqaa kma-caarIAao nao saUrxaanaa saaQanaao vaaprvaa ivaSao T/oinaMga Avaar navaar<br />
AapvaamaaM Aavao Co.jo rsaayaNa vaaprtI vaKto krvaa naa ]pyaaoga ivaSao talaIma AapvaamaaM<br />
Aavao Co.
p/it ,<br />
A)yx[aI,<br />
ijLla pya$vr8Iy lok Ýsunav8I simit,<br />
Amdavad @Lla.<br />
srp&c [aI<br />
hsmù -a; 0orI-a; prmar<br />
5e. s&rp&c[aI<br />
nreN²is&h r82o6-a; ra5o6<br />
gamÝ -ayla taÝbavla<br />
@ ÝAmdavad<br />
Taa.ÊË jaNyuAarI ,ÊÈÈÑ.<br />
ivqy ŠÝ yuinmak$ remI6a;z il.nI ta. ÊËÝÉÝÊÈÈÑ na roj yojnar sunav8I babte rjuAat.<br />
[aIman,<br />
kU=X h=o.<br />
•É– Aa k&pnI tena ;.Aa;.Ae irpo4$ma& j8ave 2e ke ,A_yasna ÉÈ iklomI4rna ivStarma&<br />
srfes vo4r n9I. pr&tu, Amara Aa ivStarma& cek6emo Ane tXavo 2e. vXI ,kenal p8<br />
2e.irpo4$ AavI g&-Ir -Ul te -Ul n9I. pr&tu , ja8I jo;ne maihtI 2upavvano Aek p/yas<br />
2e. Ae4le tmarI ma&g8I 2e ke,;.Aa;.Ae irpo4$ rd krI frI v`t lok Ý sunav8I yojvama&<br />
Aave.<br />
•Ê– Jya& k&pnI ba&0kam krvanI 2e. te ivStar9I Amara vrsadI pa8Ina inkalna rSta 2e. jo<br />
k&pnI Tya& ba&0kam Ane idval9I te roka8 kr=e to Amara gamo 6Ubma& j=e.pa8I 3erava9I<br />
jn @vn iv`ra=e mhamarI fa4I nIkX=e. je9I k&pnI te babte ko; Aayojn krel 2e ke<br />
kem teno wkel n9I? k&pnIna nva ivStar8 ma4enI sa;4 bdlvanI AmarI tIv/ ma&g8I<br />
2e.<br />
•Ë– je 6emÝkenalnu& pa8I `e6Uto `etI ma& vapre 2e te 6emÝkenalma& k&pnI potanu& g&dupa8I 2o6e 2e.<br />
te 6emÝkenalne p/dUiqt kre 2e.
•Ì– Aa k&pnI bharna -age g4rÝnaXa va4e p/dUiqt pa8I `uLla ma& 2o6e 2e te g&-Ir babt 2e.<br />
jena9I t&{anu& te babte Ame )yan dorel 2e. Ane @.pI.sI.bIAe noi4so p8 Aapel 2e.to<br />
AavI p/dUiqt k&pnIne k; rIte prmI=n AapI =kay?<br />
•Í– Aa k&pnI potana Pla4ma& tXavo jevI jGya bnavI g&du pa8I s&g/h kre 2e jena9I -Ug$-<br />
jX p8 p/dUiqt 9ay Ane dr vqeR vrsadna pa8I sa9e te p/dUiqt pa8Ine 2o6I p8 de 2e je<br />
yoGy n9I te takIde b&0 9vu& jo;Ae tevI AmarI 5os ma&g8I 2e.<br />
•Î– k&pnI dEink ÐÍÑ iklolI4r p/it idvs pa8I pavrnI 2e je smrIna pej n&br ;ÝÑ pr<br />
btavel 2e. je v0are g8ay.Aa4la mo4a p/ma8ma& -Ug-$ jXne potana borvel ²ara<br />
`e&cvana 2e. to -Ug-$jXne kevI ivprIt Asr 9=e. -Ug-$jX 34I jva Ane pa8InI<br />
gu8v]aa p8 34I jvI jeva& p/[no w-a 9=e. borvel isvay bIja ivkLp n9I.k&pnI irvs$<br />
borvel ²ara p/dUiqt pa8I -Ug-$ma& wtare to te babt tpasvI 38I mu+kel 2e Ane `ca$X<br />
2e. to te babtnI `a{aI =u&?<br />
•Ï– Aa k&pnI je dEink pa8I vaprvanI 2e tema& ÍÍÌ iklolI4r g&du pa8I nIkX=e jene 4I4meN4<br />
AapI m=InrI 0ovama& wpyog kr=e frI g&du pa8I wmero 9=e. Aa4la b0a g&da pa8Ine<br />
S4orej krva ma4e k&pnI pase ke4lI kepesI4I 2e? S4orej 9yel dEink p/dUiqt pa8I ke4lu& Kya&<br />
mokl=e ? te tpasva ma4enI p)0it =o& 2e?<br />
•Ð– -ug-R jX rIcajR krvanI vat krI 2e te Kya& kr=o?, k; rIte kr=o>, tema& ke4lu& f&D<br />
vapr=o? borvel ,tXav, cekDem, kUvo vgere k; rIte kr=o?<br />
Aa-ar sh<br />
Apno,<br />
•hsmù prmar–<br />
nkl rvana Š s_y sicv [aI Ane p/adei=k Ai0karI [aI gujrat p/dUq8 iny&{a8 boDR, ga&0Ingr
jvaaba : hsamauKBaa[ prmaar<br />
1.Aa saUkao p`doSa haovaaqaI AhIMyaa kao[ kayamaI tLavaao haota naqaI Aa p`doSamaaM ?tuAaonao<br />
AaiQana hMgaamaI tLava jaovaa maLo Co.iDsaombar maihnaa pCI to saUka haoya Co.toTlaaM maaTo<br />
Amaao Aonao inayamaIt paNaI saMgaàhk trIko gaNata naqaI.<br />
2.Aa ivastar jyaaM baaMQakama krvaamaaM Aavyau Co jo paNaInaa BaraNa vaaLao ivastar naqaI.<br />
3.AmaarI kMpnaI iJrao iDscaaj- kMpnaI Co Amao gaTr ko baIjo kyaaMya paNaI CaoDta naqaI.<br />
4. Amao gaTr ko baIjo kyaaMya paNaI CaoDta naqaI.<br />
5.Amao AmaarI kMpnaImaaM gaMda paNaInaao saMga`h krta naqaI.Amao SauiQQakrNanaI pìk`yaa kyaa-<br />
pCI frI paNaI vaaprIAo CIAo.<br />
6.AmaaoAo vaaoTr harvaosTIMga ³paNaI ircaaj-´banaavaola Co.CtaonaaM varsaadI paNaI nao yaaogya<br />
irto vaaoTrharvaosTIMga saIsTmamaaM vaaLola Co.joqaI krInao paNaInauM p`dUYaIt qavaanauM Sakya<br />
naqaI.AanaaqaI jmaInanaa paNaI nauM p`maaNa Anao gauNava
PàitEaI‚<br />
Ÿllaa klaokTrEaI ³Amadavaad´<br />
Ÿllaa klaokTrEaInaI kcaorI‚<br />
Amadavaad.<br />
rakoSakuamaar ikSaaorBaa[ sauqaar<br />
46‚ gaNaoSa saaosaayaTI‚<br />
maaohnanagar naI baajumaaM‚<br />
Amadavaad 382330<br />
ivaYaya : vaaMQaa ArŸ<br />
saMdBa-: 1.RTI rof naM.152 ta.20.12.08 Ÿ.pI.saI.baI.baaoD- gaaMQaInagar AMgao<br />
2.Baart sarkar naa pyaa-varNa Anao vana maM~alaya navaI idllaInaa jahornaamaaM k`maaMk<br />
Aosa.Aao.1533 ta.14.09.2006naa Anvayao mao.Jona AaonkaolaaoŸ pà.laI.Anao mao.yaunaImaak-<br />
romaoDIJ ila.gaama koralaa ta:baavaLa Ÿ:Amadavaad AMgao<br />
EaImaana<br />
jya Baart saaqao jNaavavaanauM ko Amaao ]praokt saMdBa-maaM jNaavaola kMpnaInaa<br />
laaok AiBapàya baabato Amaao rakoSakumaar ikSaaorBaa[ sauqaar Aok jagaRt p~kar trIko AapnaI<br />
samaxa ]praokt kMpnaInaI ivaruQQamaaM vaaMQaaM ArŸ rju krIAo CIAo.<br />
1.]praokt kMpnaIAao Wara jo laaok AiBapàya maoLvavaa jahorat krI laaok saunaavaNaI raKola Co<br />
to baabato Amaao ]BaI qanaar pyaa-varNa samasyaaAaoqaI AjaNa haovaaqaI AmaaoAo ga[<br />
ta.20.12.08 naa raoj gaujrat rajya paolyau.kMT/aola baaoD- gaaMQaInagar maaM maaihtI AiQakar<br />
2005 hozL maaihtI maoLvavaa ArŸ krola jonaa jvaaba maaM aolyau.baaoD- wara saMpUNa-maaihtI<br />
AapvaamaaM Aavaola naqaI Anao BaivaYyamaaM qanaar pyaa-varNa samasyaaAaoqaI vaakof krola naqaI.joqaI<br />
Aa AMgao Amaaonao saMpUNa- vaakof krvaamaaM Aavao.<br />
2.jahor jnatanaa laaBaaqao- ]praokt kMpnaIAao AMgao saMpUNa- maaihtI jahor krvaamaaM Aavao jao<br />
]praokt kMpnaIAao AMgaonaI maaihtI jahor krvaamaaM nahI Aavao tao Amadavaad Ÿllaa komaIkla<br />
³rasaayaiNak pìk`yaa´laa[naqaI AjaNa naagairkao kyaa AaQaaro ivaraoQa krI Sako.AaqaI nama`<br />
Arj Co ko ]praokt saunaavaNaInaI tarIK laMbaavavaa Anao jahor jnatanao pyaa-varNa naI<br />
samasyaaAaoqaI vaakof krvaa AmaarI jahor iht maaTo ivanaMtI Co.<br />
AaBaar sah<br />
Aapnaao ivaEvaasau<br />
rakoSakumaar ikSaaorBaa[ sauqaar
jvaaba : rakoSakumaar ikSaaorBaa[ sauqaar<br />
1. ]praokt laaok saunaavaNaI vaKto sarkarEaI Ao jNaavaola jrurI Asarga`st<br />
ivastarao naao rIpaoT- Aapola Co Anao jaNa krvaamaaM Aavaola Co<br />
2. jahor jnatanaI jaNakarI maaTo jo p`aoDkTnauM ]%padna krvaanauM Co Anao rsaayaNaao<br />
vaaprvaamaaM Aavanaar Co jonauM laIsT rIpaoT-maaM dSaa-vaola Co.
P`aitEaI<br />
Ÿllaa klaokTrEaI ³Amadavaad´<br />
Ÿllaa klaokTrEaInaI kcaorI‚<br />
Amadavaad.<br />
AiKla BaartIya navajvaana saBaa<br />
ivaYaya : laaok saunaavaNaI AMgao vaaMQaa ArŸ<br />
saMdBa-: Baart sarkar naaM pyaa-varNa Anao vana maM~alaya navaI idllaI naaM jahornaamaa<br />
k`maaMk Aosa.Aao.1533 ta.14.09.2006 Anvayao ³1´ maosasa- Jona<br />
AaonkaolaaoŸ p`a.ila. ³2´ mao.yauinamaak- romaoDIJ ila.gaama– koralaa ta–baavaLa<br />
Ÿ–Amadavaad<br />
mahaodyaEaI‚ namaskar<br />
AaqaI Amaao idnaoSakumaar Aosa.caaOhaNa kond/Iya saMgazna Aaola [nDIyaa yauqa foDroSana<br />
Amadavaad ŸllaaM naaM Aga`NaI Anao jagaRt naagairk trIko frj bajavaIAo CIAo Anao<br />
pyaa-varNa naI samasyaa naaM inakala maaTo p`ya%naSaIla CIAo.<br />
]praok
vaQaumaaM laIlaavaRxaaonauM vaavaotr krvaa kao[ pgalaaM sarkarEaI ko paolyauSana kMT/aola baaoD_ Wara<br />
laovaayaola naqaI.pyaa-varNa samasyaanaaM inakala maaTo AavaSyakta AnausaarnaaM vaRxaao pNa ]Baa<br />
krvaamaaM Aavaola naqaI.<br />
]praok
P`aitEaI‚<br />
rajya saicavaEaI‚<br />
gaujrat paolyauSana kMT/aola baaoD-³gaujrat rajya´‚<br />
gaaMQaInagar.<br />
ivaYaya: laaok saunaavaNaI maaTo naamanaI naaoMQaNaI krI maaihtI Aapvaa AMgao<br />
saMdBa-: ³1´mao.yaunaImaak- romaoDIJ p`a.ila.<br />
³2´mao.Jona AaonkaolaaoŸ<br />
sqaL: PlaaoT naM.337‚338‚269‚299‚294‚296‚297 Anao 300 gaama koralaa ta<br />
baavaLa<br />
Ÿ Amadavaad<br />
³3´ maosasa- gaujrat rajya maaga- ivakasa inagama ilamaIToD.<br />
bagaaodra vallaBaIpur Baavanagar<br />
sarKoj vaTamaNa Baavanagar<br />
mahaSayaEaI‚ namaskar<br />
ivanaMtI sah jNaavavaanauM ko Amaao ]praok
jvaaba : idnaoSa caaOhaNa<br />
1.jonaa maaTo Amao jvaabadar naqaI.
PàitEaI‚<br />
maa.EaI.klaokTr saahoba‚<br />
Amadavaad Ÿllaao‚<br />
Amadavaad.<br />
PàomasaIMga baI.razaoD<br />
myau.kao.EaImatI janakI dovaI caaOhana<br />
ivaYNau naI caalaI.baapunagar<br />
Amadavaad.<br />
ivaYaya: pyaa-varNa Aovama vana maM~alaya navaI idllaI.naI jahor saucanaa k`maaMk<br />
Aosa.Aao.1533 ta.14.09.2006 baabato.<br />
ArŸ: ta.5.01.2009 naa raoj pìt‚ EaImaana saMŸva %yaagaI‚ saBya sacaIva‚Ÿ.pI.saI.baI. pyaavarNa<br />
Bavana‚saokTr 10Ao gaaMQaInagar‚382010.<br />
mMao.saahoba‚<br />
]praokt ivaYaya Anao ArŸ baabato ta.23.01.09 Aaj raoj jahor saunaavaNaI maaM huM<br />
paoto rubaru naIcao jNaavaola maud\aAao qakI TIka TIPPaNaI ko vaaMQaaAao rju krI rhola CuM.<br />
³1´ “gaujrat samaacaar”maaM maa.EaI saMŸva %yaagaI saBya sacaIva maarft ta.11.12.2008 naa<br />
raoj naa AapvaamaaM Aavaola jahor saunaavaNaI naI jahoratmaaM mao.yaunaImaak- romaoDIJ Anao mao.Jona<br />
AaonkaolaaoŸ maaM baMnao Alaga Alaga jahorat maaM pNa baMnao kMpnaI Aao naa Plaao<br />
naM.337‚338‚269‚299‚296‚297 Anao 300 gaama koralaa‚talaukao baavaLa‚ Ÿllaao Amadavaad.Aa<br />
baMnao kMpnaIAao Ao SauM Alaga Alaga baaMQakama naI prmaISana laIQaola Co ko koma.karNa ko baMnao<br />
jahoratao maaM baMnao naa PlaaoT Aok sarKa Co.<br />
³2´ ]praokt jNaavaola kaolama ³1´ maaM Amao jNaavaola Co ko baMnao kMpnaIAaonaa PlaaoT Aok<br />
sarKa haoya tao Aa baMnao kMpnaI Aao naaM baaMQakama SauM Aok sarKa Aqavaa tao juda juda Co.Ao<br />
vaat naI kao[ spYTta krvaamaaM Aavaola naqaI karNa.<br />
³3´ ]praokt jNaavaola ³1´naI jahorat baabato jNaavavaanauM ko Aa jahorat maaM jNaavaola PlaaoT<br />
naM.pr kyaaM kyaaM k[ kMpnaIAaonauM baaMQakama krvaamaaM AavaSao.<br />
³4´AmaarI jat sqaL tpasa krta Amanao jaNavaa maLola ko mao.yaunaImaak- romaoDIJ ilamaIToD<br />
Aokj kMpnaI pholaaqaI kaya-rt Co jao mao.yaunaImaak- romaoDIJ laI.kMpnaI paotanaao ]%padna<br />
vahIvaT Aaj PlaaoTaomaaM vaQaarvaa maaMgatI haoya tao Aa baabato qanaar vaQaaranaaM baaMQakama naI<br />
prvaanagaI kyaaMqaI Anao kyaa puravaa naa AaQaaro maooLvaola Co.<br />
³5´jao yaunaImaak- romaoDIJ laI ]praokt jNaavaola PlaaoTao maaM paotanaa yauinaTmaaM vaQaaranaao ]%padna<br />
krta haoya tao mao.Jona AaonkaolaaoŸ pà.laI. kyaa PlaaoTaomaaM‚ kyaa AaQaar puravaa Aao Anao<br />
baaMQakama naI prvaanagaI maaM paotanau ]%padna krSao Ao baabat naao kao[ KulaaSaao krvaamaaM<br />
Aavaola naqaI.<br />
³6´jao Jona AaonkaolaaoŸ pà.laI naa baaMQakama nao maMjurI maLola haoya tao Aa baabatnaa tmaama<br />
puravaa jahor krvaa.
³7´kdaca baMnao kMpnaIAao ]praokt dSaa-vaola PlaaoT naMbarao maaM ]%padana krtI haoya tao BaivaYya<br />
kao[pNa Aksmaat k[ rIto nakI krI SakaSao ko k[ kMpnaI naa Baulanaa karNao Aksmaat<br />
qayaola Co.<br />
Amadavaad<br />
ta.23.01.09<br />
AaBaar sahIt<br />
Aaptao Bava dIya<br />
PàomasaIMga baI.razaoD
jvaaba : PàomasaIMga baI.razaoD<br />
1.mao.yaunaImaak- romaIDIJ A~o kaya-rt yaunaIT Co.jonauM Anao Jona AokaonlaaoŸ p`a.laI naa<br />
naamao Saru krvaa maagaIAo CIAo.jo Aok j ip`maa[saIsamaaM krvaa maaMgaIAo CIAo. Jonaa<br />
PlaaoT naMbar Amaara rIpaoT-maaM jNaavaola Co.<br />
2.Aa p`Ena p`duYaNanao lagatao naa haovaaqaI tonaao jvaaba Aapvaao jrurI naqaI<br />
3.Aa p`Ena p`duYaNa nao lagatao naqaI<br />
4.Aa p`Ena p`duYaNa nao lagatao naqaI<br />
5.6.7 Aa p`Ena p`duYaNa nao lagata Co nahI.
EaI<br />
mahoSa pMDyaa<br />
saamaaŸk Anao jnaklyaaNa kond/<br />
Amadavaad.<br />
PàitEaI<br />
ivaYaya: yauinamaak- romaIiDJ ila.baavaLa Amadavaad AMgao saunaavaNaI ta: 23.01.2009<br />
rof: Aapnaao p~ PM/MP/188/2009 Date:09.10.2009<br />
Aapnaa p~ maomba.saokòTrI EaI saMŸva %yaagaI Ÿ.pI.saI.baI.naa p~ baabato AmaaoAo<br />
Aapnaa p~ naI ivagatao QyaanamaaM raKI naIcao maujba Kulaasaa krIAo CIAo.<br />
1.halanaa kaya-rt kMpnaI naa yauinaT pasao pyaa-varNa iklayarMnsa Co ko nahIÆ jao na haoya tao<br />
tonaI nakla AapSaao.A~o tonauM koTlau palana qaaya Co jo MOEF & GPCB maaM Aapola CoÆ<br />
Aa AMgao naI jmaa kravyaanaI tarIK AapSaao.jo Aapnaa AaoifsaIyala vaobasaa[T ApDoT<br />
krola CoÆ<br />
jvaaba: ha ,kMpnaI Ao pyaa-varNa iklayarMsa maoLvaola Co<br />
2.halanaa kaya-rt yauinaT pasao jI.pI.saI.baI.maaM ivaivaQa rogyaulaoSana maujba maanya kaomana<br />
knsaaolaIDoToD knsaonT CoÆ tonaI nakla Anao palana kyaa-naI ivagatao AapSaao. CCA kyaaM<br />
sauQaI maanya Co tonaI tarIK AapSaao.<br />
jvaaba:ha ,kMpnaI pasao maanya knsaonT Co Anao jI.pI.saI.baI.naa rogyaulaoSana p`maaNao<br />
halamaaM kaya-rt yauinaT Co. CCA naI nakla Anao palana kyaa-naI ivagatao piriYaYz 1 maaM<br />
dSaa-vaola Co.<br />
3.Collaa 2 vaYa- drimayaana laIQaolaa hvaa paNaI jII.pI.saI.baI.wara Anao Gana kcaranaaM<br />
saoomplaao Anao tonaaM TosTIMga naa rIpaoT- piriYaYz baI.maaM saamaola krola Co.<br />
jvaaba : A~o piriYaYz baI maaM saamaola krola Co.<br />
4. MOEF naaM pàdoiSak Aaoifsayala maulaakat Collaa bao vaYa- maaM qa[ haoya tao tonaI ivagatao.<br />
jvaaba : laagau pDtu naqaI karNako MOEF naaM pàdoSaIk AaoifsarnaI Collaa bao vaYa- drimayaana<br />
maulaakat qayaola naqaI.<br />
5.A~onaaM kaya-rt yauinaTnao vaaoTr AokT 1974 ,Aor AokT 1981 anao AorvaayaraomaonT<br />
pàoTokSana AokT 1986 naI AMdr SaaokaoJ naaoTIsa ,klaaoJr AapvaamaaM Aavaolaa Co.tonaI<br />
ivagatao AapSaao.Anao laIQaolaa pgalaanaI ivagatao AapSaao.
6.halamaaM kaya-rt kMpnaI Ao pyaa-varNa AaoiDT jI.pI.saI.baI.maaM jmaaM kravaola CoÆCollaa<br />
bao vaYa-naaM rIpaoT-maaM jNaavaola saUcanaaonaI ivagatao AapSaao.<br />
jvaaba : ha ,kMpnaI wara pyaa-varNa AaoiDT rIpaoT-sa inayaimat jI.pI.saI.baI.maaM jmaaM<br />
kravavaamaaM Aavao Co.maLolaa saUcanaao piriYaYz saI maaM saamaola Co.<br />
7.saMBaivat ivastRitkrNa maaTo jI.pI.saI.baI.wara kMpnaI Aona Aao saI AapvaamaaM<br />
Aavaola CoÆ<br />
jvaaba: Aona.Aao.saI maaTo naI ArjI Aapola naqaI.AmaaoAo Aona.Aao.saI.maaTo ArjI<br />
krola Co.<br />
8.saMBaivat ivastRitkrNa kMpnaI kyaaro pUNa- krSaoÆ<br />
9.koPTIla paavar PlaanT maaTo kaolasaao vaaprvaamaaM Aavanaar Co.joqaI badlaata pyaa-varNa<br />
glaaobala vaaomaI-Mga baabato SauM krSaaoÆ<br />
jvaaba:Aa ivastaarmaaM naocarla gaosa naao purvazao ]plbaQa na haovaaqaI Anao AamaaoAo<br />
ilagnaa[T , kaolasaao koPTIva pavar PlaanT naaM [MqaNa trIko Amaara ifjIbaIlaITI Ahovaala<br />
maaM laIQaola Co.<br />
10.SauM kMpnaI wara [Taonaa Ba{avaaLa jaoDo raK maaTo kao[ krarao krolaa Co ko komaÆ<br />
11.vaaoTr havao-sTIMga wara saIJna maaM koTlau paNaI havao-sT krI SakaSaoÆSauM tmaarI pasao vaaoTr<br />
havao-sTIMga Plaana CoÆ AmaarI saUcanaa Co kokMpnaI kompsamaaM Aok~ krola paNaI nauM havao-sT<br />
krvau naih.jao Aavaa Plaana najIknaaM gaamaaomaaM krvaa jao[Ao.karNako tmaarI kMpnaI maaM<br />
Aavaola havao-sTIMga vaaoTr p`dUYaIt paNaI jmaInamaaM ]tarI Sako<br />
12.halamaaM kaya-rt Anao saMBaivat PlaanT maaTo paNaInaao s~aot SauM CoÆ<br />
jvaaba:halanaa PlaanT maaTo paNaInaao mau#ya s~aot jmaIna nauM paNaI Co Aa ivastar “Dak-<br />
Jaona”maaM Aavatu na haovaaqaI jmaIna naa vaaoTr AoksT/kosana maaTo naI prvaanagaInaI jrur<br />
rhotI naqaI.<br />
13.halamaaM kaya-rt yauinaT Amao saMBaivat PlaanT maaTonaaM vaaoTr baolaonsa caaT- barabar<br />
baolaonsa qayaola naqaI.joqaI rIpaoT- yaaogya naqaI jo [.Aa[.Ao rIpaoT-maaM KamaI rhola Co.<br />
14.fa[nala Aa]T laoT iDscaaJ- pao[nT SauM CoÆ<br />
15.saMBaivat ivastRitkrNa pCI hvaanaI gaMQa maaTo SauM krvaa maagaao CaoÆ<br />
jvaaba: kMpnaI Ao huD Anao sk`bar naI vyavasqaa krola Co jo maTorIyala caajI-Mga vaKto<br />
saonT/If\yauj pokIMga drimayaana ]d\Bavata gaosa naI sk`barmaaM sk`ba krvaamaaM AavaSao.
16.Saa maaTo pàojokT Saru krta pholaa k[ baoJ laa[na ko sTaD- Anao rofrnsa laIQaolaa CoÆ<br />
jvaaba : pyaa-varNa iklaIyarnsa naI maMjUrI maaTo naa samayanaao bacaava krvaa maaTo baoJ laa[na<br />
PlaanaIMganaa samayao da.t.TORs naI ArjI saaqao<br />
17.halanaa kaya-rt PlaanT wara AapvaamaaM Aavata nakamaaM Aao[la Anao jaoKmaI Gana<br />
kcaranaao inakala maaTo saI.pI.saI.baI.maanya kyaa rIsaayaklar – vaocaaNa krvaamaaM Aavoa Co<br />
to jNaavaSaaoÆ<br />
jvaaba: baaombao baorla saPlaaya kMpnaI , yauinaTI poT/aolaIyama kMpnaI , saI.pI.saI.baI.wara<br />
maanya krvaamaaM Aavaola Co. Amao vaprayaolaa Aao[la nauM vaocaana krIAo CIAo.<br />
18.saMBaivat pàojokT maaM AasapasanaaM ivastar maaTo raojgaarInaI koTlaI tkao ]BaI qaSaoÆ<br />
jvaaba: hala naaM kaya-rt PlaanTmaa 600 kamadaraonao raojgaarI AapvaamaaM Aavao Co.Anao<br />
navaa PlaanTnaa ivastRitkrNa pCI 300 kamadaraonao raojgaarI maLSao.<br />
Amaaonao AaSaa Co ko AmaaoAo jNaavaola hkIkt Anao samajNa Amaara Ahovaala Anao<br />
[.Aa[.Ao rIpaoT- AMgaonaI yaaogya samajNa maaTo madd rup banaSao.<br />
AaBaar sah<br />
yauinamaak- romaoDIJ laImaIToD<br />
maonaojIMga DayarkoTr
Ankleshwar : B-24, MANGAL MURTI SOCIETY, DIVA ROAD, ANKLESHWAR<br />
k/ma&k Š PM/PH/0904<br />
p/it,<br />
A)yx[aI/ sicv[aI/p/adei=k Ai0karI [aI,<br />
pyaRvr8Iy loksunam8I kimi4,<br />
gujrat p/duq8 iny&{a8 boDR,<br />
Amdavad<br />
Date : 21/01/2009<br />
ivqy Š MS. UNIMARK REMEDIES, LTD. nI pyaRvr8Iy loksunav8Ima& sUcno imnIS4^sma&<br />
leva babt.<br />
Aadr8Iy [aI,<br />
MS.UNIMARK REMEDIES, LTD. nI pyaRvr8Iy loksunav8I nI tarI` ŠÊËÝÈÉÝÊÈÈÑ<br />
na roj yojanar hova9I nIce mujbna sUcno imin4^sma& leva ivn&tI.<br />
•É– Aa k&pnI pyaRvr8ne sb0I =u& pgla& le=e t9a pyaRvr8ne tj}a nI inm8U&k krnar 2e ke nhI?<br />
•Ê– p/ojeK4 p/op/onN4 Aa ivStarna ivkasnI sama@k jvabdarI sm@ =u& pgla& lenar 2e?<br />
•Ë– Aa k&pnI S9aink berojgarone rojgarI Aapva phelu )yan Aape.<br />
•Ì– Aa k&pnI p/dUq8na mu¥e AgmcetI da`vI na9va tmam p/karnI koi==o krI pyaRvr8ne bcavva<br />
yoGy p/ojeK4 faXve te j£rI 2e.<br />
•Í– Aa k&pnI µara Aek wTtm wdahr8 pu£ paDI @.pI.sI.bI. t9a pI.sI.bI. na kaydane Anusre 2e.<br />
•Î– Aa k&pnI na p/ojeK4 p/op/onN4 µara Aaju& baju&na ivStarna na ivkas ma4e yoGy bje4 faXvI skUlo,<br />
iv0vaAo t9a grIbI rè a nIce @vta lokonu& @vn0or8 w&cu lavva mdd kre.<br />
A&te Aa p/ojeK4 taluka, @Llana t9a gujrat Ane smg/ de=na ivkasma& sh-agI bnnar<br />
hova9I Aa p/ojeK4ne Amo AavkarIAe 2IAe.<br />
Aa-ar sh<br />
Aapno iv¿vasu&<br />
mnIq ra8a<br />
•t&{aI–<br />
pyaRvr8 m&{aI
jvab : Ankleshwar : B-24, MANGAL MURTI SOCIETY, DIVA ROAD, ANKLESHWAR<br />
Aa A&genI yoGy ivgt gujrat p/duq8 iny&{a8 boDR ma& jma krel 2e.
janyauAarI 23.2009<br />
pìt ,<br />
EaI pìvaNaBaa[ Saoz<br />
Ao.8 , kalaIndI AopaT-maonT<br />
caIkuvaaDI ,AMklaoEvar.393001<br />
gaujrat.<br />
ivaYaya: mao.yauinamaak- romaIDIJ laImaIToD baavaLa , ij.Amadavaad naaM ivastRitkrNa maaTonaI<br />
pyaa-varNa laaok saunaavaNaI ta.23.01.2009 baabat.<br />
maananaIya saahoba<br />
,<br />
Aapnao saBya saicavaEaI saMjIva %yaagaI jI.pI.saI.baI.gaaMQaInagar nao maaoklavaamaaM Aavaola<br />
p~ saMdBao- AmaaoAo Aapnaa p~naI ivagato AByaasa krI nao Aa baabato naIcao p`maaNao<br />
Amaarao jvaaba samajNa AapvaamaaM Aavao Co.<br />
TIPpNaI Anao salaah saUcana<br />
k`ma TIPpNaI ]payaao<br />
1 mau#ya maTorIyala baabato maaihtI AapSaao<br />
A maojr saaolvanT Aaga maaTo AignaSaamak ha<br />
vyavasqaa Co<br />
ba Sau tmaarI pasao faoma TonDr Co ha<br />
k Faomanaao sTaok koTlaao raKSaao 300 qaI 400 laITr<br />
D fayar fayaTIMga maaTo fayar vaaoTrnaao sTaorj 600 iklaao laITr<br />
xamata koTlaI Co<br />
[ jaoKmaI rsaayaNaao, karsaInaaojna, Anao<br />
AoksaPlaaoJIva rsaayaNaaonaa rIsk AosaosmaonT<br />
kyaaM CoÆjao haoya tao kma-caarInaa saurxaa<br />
maaTo naa maITIgaoSana ]paya Sau CoÆ<br />
F SauM sTDI ivastarmaaM maIcyaula AoD krvaamaaM<br />
Aavaola Co Æ<br />
jI Sau Fayar Aolaarama saIsTmanaI saaqao saonsar<br />
raKolaa CoÆ<br />
Aoca SaaolvanT Tonkrnao KalaI krta pholaa kovaI<br />
rIto sqaIt ivaVut nao mau#ya drvaaja pasaoo<br />
Aqa- krvaamaaM AavaSaoÆ<br />
Aa[ Sau %yaaM kao[ kasaI-naaojna rsaayaNa naao<br />
vapraSa CoÆ tmaara kma-caarIAaonao<br />
Aaraogyanaa jaoKmaaoqaI kovaI rIto saurxaIt<br />
raKSaaoÆ<br />
kMpnaIAo Aaona saa[T [marjnsaI Plaana<br />
banaavaola Co Anao saMBaivat [marjnsaI<br />
maaTo maITIgaoSana AokSana banaavaola Co.jo<br />
kMpnaI maaM maLI rhoSao.<br />
PaDaoSaI kMpnaIAao saaqao maIcyaula AoD krola<br />
Co<br />
kMpnaIAo [marjnsaI SaayarnanaI vyavasqaa<br />
krI Co<br />
ha ,jonaa maaTo AqaI-Mga kTInyauTI saaqao<br />
caoklaIsT naIBaavavaamaaM Aavao Co<br />
kMpnaI Ao sva saurxaanaa saaQanaao raKvaa<br />
maaTo Kasa p`karnaa saurxaa kbaaTao drok<br />
Katamaa raKolaa Co , jyaaro jyaaro<br />
jaoKmaI rsaayaNaaonaa vapraSa samayao jo to<br />
Katanaa AiQakarI wara svasaurxaanaa<br />
saaQanaaonaa vapraSa AMgao Ka~I krvaamaaM<br />
Aavao Co.Anao inayamaIt dak
2. sTDI ivastarmaaM koTlaI p`dUYaNa folaavatI<br />
kMpnaI Aao AavaolaI CoÆ<br />
,<br />
3. tmao jNaavyaa maujba baao[lar maaTo kaolasaao<br />
vaaprnaar Cao kaba-na maaonaaok\saa[D naa<br />
p`dUYaNanaaM kMT/aola maaTo kovaI rIto Ka~I<br />
krSaao Æ jo vat-maana maaihtI maujba 0.44<br />
maI.gaa`maÀmaI 3 Co<br />
4. Payaa-varNanao Asarga`t ivastaraomaaM<br />
Avaajnau p`maaNa Sau Co Æ<br />
, 5. nakSaanaa poj naM 123 PaòajokT saa[T<br />
cambay naa AkatmaaM batavao Co.jo gaor<br />
maagao- daoro Co Anao sauQaara maaTo pgalaa jrurI<br />
Co.<br />
6. kMpnaIe laIQaola AaorgaonaIk rosaIDIyau naa<br />
[nsaInaoroSana maaTo Aaoqaoara[j maombarSaIp<br />
koTlaa samaya sauQaI naI Co Æ tonaI ivagat<br />
AapSaao.<br />
7 saoalvanT koTlaa p,karnaI p`kÌyaamaaM vapraya<br />
CoÆ to hvaamaa koTlaa Tka baaYpIBavana<br />
qaaya CoÆ tmao BavaIYyamaMa kovaI rIto eaCU<br />
krSaoaÆ<br />
8 frI ]pyaaogamaaM laovaataM baorla nao saaf<br />
krvaanaI pQQatI/vyavasqaa raKola Co.<br />
Aasapaasa naa 5 qaI 10 iklaaomaITr<br />
ivastarmaaM maoaTaBaagao AonjInyarIMga Anao<br />
ra[samaIlaao AavaolaI Co.<br />
Amao purtao A^aksaIjna À Aor [QaNanaa<br />
saMpUNa- saLgaavavaa vyavasqaa krvaamaaM<br />
AavaSao.<br />
Avaajnau p`maaNa inayamaIt rIto maapvaamaaM<br />
Aavao Co jo mayaa-dIt maalauma pDola Co.jo<br />
Amaara [.Aa[.Ao irpaoT-maaM saamaola<br />
Co.<br />
jo kaomaPyauTrnaa saaofT`vaornaI KamaIAaonaa<br />
laIQao qayaola Co jo sauQaarvaa naI Ka~I<br />
AapIAo CIAo.<br />
kMpnaI pasao Aaoqaaora[j BEIL,GAPIL<br />
maombarSaIp Co jonaa p~ao saamaola krola<br />
Co.sTok ÀvaonT vaaTo DayaaokJIna Aqavaa<br />
fyaurana jovaa gaosa CaoDvaamaaM Aavanaar<br />
naqaI.<br />
Kubaj nagaNya, baaYpIBavana AaoCuM qaaya<br />
maaTo zMDa knDonsanaI vyavasqaa krola Co.<br />
9 gaÌna baolT pyaa^varNanao lagata.<br />
e kyaa p`karnaa vaRxaaonauM vaavaotr krSaao? eJaDIrIsTa [nDIyaa, konaa,<br />
TrmaInaInaalaIAa, kTapa, earIngaa<br />
ealaIAara, kjurInaa, [kaosaopaolaIyaa,<br />
naorIyama [nDIkma, qaovaaTIyaa, poruvaIyaanaa,<br />
naoruyamaeSaIyasa vagaor o<br />
baI koTlaa vaRxaaonauM vaavaotr krSaao? 2105<br />
saI APTR vaRxaaonauM SauM Co? APTR vaRxaaonaao Aqa^ jaNata naqaI.<br />
DI baàomaIna Anao klaaorIna vaopr p`duYaNanao<br />
ATkavavaa/pyaa^varNanao bacaavavaa kyaa<br />
p`karnaa Kasa vaRxaao vaavaSaao? vaRxaaonaI<br />
}Mcaa[ koTlaI rhoSao ?<br />
ha.<br />
baàomaIna Anao klaaorInanauM baaYpIBavana<br />
qavaanauM naqaI.
[ tajuM paNaI koTlauM vapraSao? halamaaM 48 kyaubaIklaITr/dIvasa saMBavaIt<br />
130<br />
10 kcarao eaCao krvaa maaTonaa ]payaao /<br />
11<br />
vaIcaarao.<br />
e kyaa p`karnaI AaDpodaSaao paCIlaovaamaaM<br />
baI<br />
tomaj vaaprvaamaaM Aavao Co? tonaao maasaIk<br />
jqqaao<br />
varsaadI paNaInaa jLsaMcayanaI ruproKa kyaaM<br />
Co? koTlauM varsaadI paNaI jLsaMcaya qaSao?<br />
taja paNaInaao vapraSa koTlaao GaTSao<br />
vaaiYa^k?<br />
AaokyaupoSanala holqa Anao saofTI baabato<br />
Ao Collaa ~Na vaYa-naao holqa &pyaa-varNa naao<br />
rokaoD- Sau Co?<br />
baI Aaraogya tpasa drimayaana kao[ gaMBaIr koSa<br />
naaoMQaayaola Co? jovaako [MfokSana konsar<br />
kark caamaDI lagata raogaao?jao ha tao SauM<br />
Aa AMgao yaaogya maaga-dSa-na Aapola Co?<br />
12 Aomaaoinayaa Taoca- naao sTaoksa raKola Co<br />
Anao koTlaao Aomaaoinayaa sTaok raKnaar Co<br />
13 rRsaayaNa pao[JnaIMga kro tovaa rsaayaNa<br />
/gaosanaI saMBaavanaa Co?kyaa pìtkarkao naao<br />
sTaok raKvaamaaM AavaSao<br />
14 navaI baoca Saru krta pholaa saaf krvaanaI<br />
pQQait SauM Co?<br />
15. ]naaLa drimayaana kovaI rIto Ka~I krSaao<br />
?ko garma paNaI naao flaao AaMK saaf<br />
krvaanaa fuvaara vaaTo na qaaya jonaI saaqao<br />
pa[p laa[na jaoDayaola Co<br />
16 %yaaM kaM[ AokJaoqamaI-k pìk`yaa Co?jao haoya<br />
tao kyaa p`karnaaM saurxaa naa pgalaa laIQaola<br />
Co?<br />
17 Aa paòjokTnaI fIJIbaIlaITIAo jomaaM 36<br />
kraoD ruipyaa Kca- qanaar Co tonaao pobaok<br />
samaya SauM Co?<br />
Amaao mau#ya
saUcanaao<br />
18 gaÌna baolT saMdBao- kaba-na Dayaoksaa[D Anao<br />
AaoksaIjna nauM p`maaNa gaÌna baolTnaI<br />
Asarkarkta inayamaIt Aok krvaI<br />
19 makananaa naaoMQakama pholaa jrurI<br />
erkMDISanaIMga‚ rofrIjroSananaI vyavasqaa<br />
tomaj slaoba‚ AgaaSaI‚ baajunaI idvaala‚ kaca<br />
ivagaoronaI ivagatao jo vaQaumaaM vaQau pavar<br />
bacat krI Sako.<br />
20 laakDanaa vapraSa vagarnauM baaMQakama Anao<br />
payaa^varNanao AnaukuL baaMQakama krvaa maaTo<br />
vyavasqaa krvaa.<br />
21 ivajLInaa bacat maaTo jrurI saaolar saIsTma<br />
gaaozvavaa, sT/IT laa[T, gaaD^na laa[T, hITr<br />
Anao PaaNaInaI vyavasqaa tomaj CFL naa<br />
laomp (markyaurI naa ]DI gayaola balba dUr<br />
krvaa)<br />
22 CFC naao KUbaj eaCao ]pyaaoga Anao<br />
baIja p`karnaI vyavasqaa jo ‘glaaobala<br />
vaaoima^Mga saamaonaa doSanaa AiBayaanamaaM madd<br />
qaaya. Tomaj baIja gaÌnaha]sa gaosanauM<br />
vaatavarNa maaM BaoLvavaanauM ekdma eaCuM<br />
krvau.<br />
23 Payaa^varNanaI samatulaa jaLvavaa maaTo AaKa<br />
varsanaao (caaomaasaa isavaayanaao) AByaasa<br />
krInao p`duYaNanaao saarI rIto inakala qa[<br />
Sako. jo vyavasqaIt EMP jo p`duYaNaqaI qatI<br />
Kraba Asarao dUr krSao.<br />
24 samaajnaa ]