Annexure – C - Gujarat Pollution Control Board
Annexure – C - Gujarat Pollution Control Board
Annexure – C - Gujarat Pollution Control Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
11. Detailed Environment Management Plan along with all proposed mitigation measures<br />
for both construction phase and operation phase.<br />
12. Base line status of Ambient air quality and modeling indicating the likely impact on<br />
ambient air quality due to proposed activities in operation phase.<br />
13. Detailed green-belt development plan.<br />
14. Highway design drawing with cross section showing road thickness, super elevation,<br />
road slope to drain water etc<br />
To<br />
Sarpanch<br />
Galiyana Gram Panchayat,<br />
Tal. Tarapur,<br />
Dist. Anand<br />
No. PIU/Camp/2008<br />
Project Implementation Unit<br />
C/o National Highway Sub<br />
Division<br />
R&B D Compound, Anand<br />
Dt: 7-10-2008<br />
Sub : Problems due to Six laning of Bagodara -Wataman - Tarapur -<br />
Vasad Road S H-8.<br />
Ref : Your letter dated 3-10-2008.<br />
You have represented regarding flood due to Sabarmati river<br />
near your village in last three years and water logging due to roads, the<br />
necessary action will be taken after verifying the possibilities of providing