Gujarat State Road Development Corporation Ltd. Improvement and Widening of Bagodara-Wataman-Tarapur-Vasad road [ State Highway – 8 ] The earlier presentation on the proposed improvement and strengthening of Bagodara- Wataman-Tarapur-Vasad road of state highway-8.included salient features like proposed Right of Way, Construction aspects, Existing land user pattern, need of the project, environmental aspects related to water and land etc. It was also informed by the project proponent that the proposed widening shall entail additional land acquisition. After detailed deliberations by the experts, additional Terms of Reference were prescribed 1. Detailed study flora & fauna of the study area and impact analysis due to proposed project 2. Detailed study on hydrology, drainage pattern of the study area and impact analysis due to proposed project and mitigation measures. 3. Land acquisition details and change in land use pattern due to proposed project especially with respect to agricultural land as well as likely impact. 4. Impact on water bodies surrounding the project site i.e. in study area due to proposed project.. 5. Top soil management plan for the proposed project. 6. Detailed Environmental Management Plan of the stone crushing plants, hot mix plants, Ready Mix Concrete plants that may come up temporarily for this projects. 7. Detailed Safety provisions proposed during the construction of the project.. 8. Bar chart of the project specifying time period. 9. Details on the consumption of water during construction and operation, source of water supply and permissions from the concerned authority in the case of ground water extraction. 10. Clearance from the Forest department for the existing tree cutting and details of compensatory plantation plan.
11. Detailed Environment Management Plan along with all proposed mitigation measures for both construction phase and operation phase. 12. Base line status of Ambient air quality and modeling indicating the likely impact on ambient air quality due to proposed activities in operation phase. 13. Detailed green-belt development plan. 14. Highway design drawing with cross section showing road thickness, super elevation, road slope to drain water etc To Sarpanch Galiyana Gram Panchayat, Tal. Tarapur, Dist. Anand No. PIU/Camp/2008 Project Implementation Unit C/o National Highway Sub Division R&B D Compound, Anand Dt: 7-10-2008 Sub : Problems due to Six laning of Bagodara -Wataman - Tarapur - Vasad Road S H-8. Ref : Your letter dated 3-10-2008. You have represented regarding flood due to Sabarmati river near your village in last three years and water logging due to roads, the necessary action will be taken after verifying the possibilities of providing
- Page 1 and 2: Annexure - C Reponses to the issues
- Page 3: * D[P S[PV[DP 5ZLB GM 5+ TFo*q!_q_(
- Page 17 and 18: V[G[1FZ v ;L 5IF"JZ6 lD+4 VDNFJFNGM
- Page 19 and 20: !_ K DFUL"I Z:TM 5]6" SZJF DF8[ S[8
- Page 21 and 22: 5|lT4 ;Z5\RzL U,LIF6F U|FD 5\RFIT4
- Page 23 and 24: 5|lT4 ;Z5\RzL 5R[UFD U|FD 5\RFIT4 D
- Page 25 and 26: 5|lT4 ;Z5\RzL 8M, U|FD 5\RFIT4 D]P8
- Page 27 and 28: Annexure C Representation of affect
- Page 29 and 30: Project Implementation Unit GSRDC,
- Page 31: 10 What is expected completion time
- Page 35 and 36: To Sarpanch Pachegam Gram Panchayat
- Page 37 and 38: To Sarpanch Toll Gram Panchayat, To
- Page 39: To M/s. K.M. Parikh Bharat Petroleu
<strong>Gujarat</strong> State Road Development Corporation Ltd. Improvement and<br />
Widening of Bagodara-Wataman-Tarapur-Vasad road [ State Highway <strong>–</strong> 8 ]<br />
The earlier presentation on the proposed improvement and strengthening of Bagodara-<br />
Wataman-Tarapur-Vasad road of state highway-8.included salient features like proposed<br />
Right of Way, Construction aspects, Existing land user pattern, need of the project,<br />
environmental aspects related to water and land etc. It was also informed by the project<br />
proponent that the proposed widening shall entail additional land acquisition. After detailed<br />
deliberations by the experts, additional Terms of Reference were prescribed<br />
1. Detailed study flora & fauna of the study area and impact analysis due to proposed<br />
project<br />
2. Detailed study on hydrology, drainage pattern of the study area and impact analysis<br />
due to proposed project and mitigation measures.<br />
3. Land acquisition details and change in land use pattern due to proposed project<br />
especially with respect to agricultural land as well as likely impact.<br />
4. Impact on water bodies surrounding the project site i.e. in study area due to proposed<br />
project..<br />
5. Top soil management plan for the proposed project.<br />
6. Detailed Environmental Management Plan of the stone crushing plants, hot mix<br />
plants, Ready Mix Concrete plants that may come up temporarily for this projects.<br />
7. Detailed Safety provisions proposed during the construction of the project..<br />
8. Bar chart of the project specifying time period.<br />
9. Details on the consumption of water during construction and operation, source of<br />
water supply and permissions from the concerned authority in the case of ground<br />
water extraction.<br />
10. Clearance from the Forest department for the existing tree cutting and details of<br />
compensatory plantation plan.