Annexure – C - Gujarat Pollution Control Board
Annexure – C - Gujarat Pollution Control Board
Annexure – C - Gujarat Pollution Control Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
7 Environmental baseline monitoring has<br />
not been carried out satisfactorily<br />
8 Please justify only 3 air quality<br />
monitoring station in 100 km stretch of<br />
highways<br />
9 Air quality and noise quality are<br />
already in poor conditions. At time of<br />
construction quality would be worsen.<br />
What special care would be taken to<br />
preserve / improve air and noise quality<br />
during construction?<br />
Environmental baseline monitoring is<br />
carried out satisfactorily by the expert.<br />
The traffic characteristics are more or less<br />
homogenous throughout the entire stretch-<br />
three locations were chosen to represent<br />
the potential worst scenarios as well as<br />
well as normal scenarios, more or less<br />
equidistant from each other- two are busy<br />
junctions, and third is a comparatively less<br />
polluted area<br />
All vehicles for air quality delivering<br />
materials to the site shall be covered to<br />
avoid spillage of materials. Every<br />
precaution to reduce the level of dust<br />
emission for the hot mix plant up to the<br />
satisfaction. All existing highways and<br />
roads works shall be kept clean and clear<br />
of all dust/mud. If required the Engineer,<br />
the road surfaces shall be hosed or<br />
watered using necessary equipment.<br />
Plants, machinery and equipment shall be<br />
so handled (including dismantling) so as<br />
to minimize generation dust. The hot <strong>–</strong><br />
mix plant be sited at least 500 m from the<br />
nearest habitation, shall be fitted with dust<br />
extraction units in order. The discharge<br />
standards promulgated under the<br />
Environment Protection Act, 1986 shall<br />
be strictly adhered to.<br />
The for noise quality plants and<br />
equipment used in construction (including<br />
the aggregate crushing plant) shall strictly<br />
conform to the GOI noise standards.<br />
Maintenance of vehicles shall be regular<br />
and proper. In construction sites within<br />
150 m of the nearest habitation and 500 m<br />
of protected and reserved forests. Workers