<strong>Gujarat</strong> State Road Development Corporation Ltd. Improvement and<br />

Widening of Bagodara-Wataman-Tarapur-Vasad road [ State Highway <strong>–</strong> 8 ]<br />

The earlier presentation on the proposed improvement and strengthening of Bagodara-<br />

Wataman-Tarapur-Vasad road of state highway-8.included salient features like proposed<br />

Right of Way, Construction aspects, Existing land user pattern, need of the project,<br />

environmental aspects related to water and land etc. It was also informed by the project<br />

proponent that the proposed widening shall entail additional land acquisition. After detailed<br />

deliberations by the experts, additional Terms of Reference were prescribed<br />

1. Detailed study flora & fauna of the study area and impact analysis due to proposed<br />

project<br />

2. Detailed study on hydrology, drainage pattern of the study area and impact analysis<br />

due to proposed project and mitigation measures.<br />

3. Land acquisition details and change in land use pattern due to proposed project<br />

especially with respect to agricultural land as well as likely impact.<br />

4. Impact on water bodies surrounding the project site i.e. in study area due to proposed<br />

project..<br />

5. Top soil management plan for the proposed project.<br />

6. Detailed Environmental Management Plan of the stone crushing plants, hot mix<br />

plants, Ready Mix Concrete plants that may come up temporarily for this projects.<br />

7. Detailed Safety provisions proposed during the construction of the project..<br />

8. Bar chart of the project specifying time period.<br />

9. Details on the consumption of water during construction and operation, source of<br />

water supply and permissions from the concerned authority in the case of ground<br />

water extraction.<br />

10. Clearance from the Forest department for the existing tree cutting and details of<br />

compensatory plantation plan.<br />

11. Detailed Environment Management Plan along with all proposed mitigation measures<br />

for both construction phase and operation phase.<br />

12. Base line status of Ambient air quality and modeling indicating the likely impact on<br />

ambient air quality due to proposed activities in operation phase.<br />

13. Detailed green-belt development plan.<br />

14. Highway design drawing with cross section showing road thickness, super elevation,<br />

road slope to drain water etc