Other Delays:<br />

a. Utilities<br />

i. Suitable utilities to the buildings POCo (i.e. water, electric, sewer, etc.) ECM<br />

planned to connect to these functional utilities POC's, 12-05-08.<br />

ii. HC Ramp Relocation/RemovaL.<br />

iii. Owner & Developer modifications.<br />

B, Skyalk Facilty - Tenant Improvements lTs),<br />

. TI Ground Level Entry, M. Johnson brought Ground Floor ADA floor plans to the<br />

meeting and display boards with proposed interior finishes. A copy of P&D's comment<br />

letter addressing Ground Level Entry recommended revisions was distrbuted to the<br />

Committee. Comments included:<br />

Item Sheet Detail No. Ex"lanatJon<br />

1 A-3 Figure 404.2.3.1, (b) 01 the A 12 inch clearance is required on the push side of the door<br />

1998ANSIA117.1 serving the women's retrom, as preented it appears it may not<br />

comolv.<br />

2 CVR and A.2 Code analysis and Exitin9 Per Table 1003.2.2.2 Foyer area 11 shall have an ocpant load<br />

analysis detennined by using the floor area in square feet per occupant at 5<br />

net for a stndinn s"ace. Revise the ocnant load.<br />

3 A-3 Secion 1003.2.2.5 Posl an occupant load sion In Fover area 11.<br />

4 A.3 1 A 1 hour ocupancy separaüon is proposed and shown or a Fire<br />

Barrer per section 706. Per section 1002 Ihis is a Horizontal<br />

Ext(s) Opening shall comply with Table 714.2 which will afect<br />

door and frme type 3, also review of the shell building pians<br />

existino door #023.<br />

5 General Duels and Transfer Please review secion 715 for the reuirements of Ducts and<br />

comment Oneninos Transfer Ooeninns and comnlv.<br />

6 General Interior elevations Provide inlerior elevations for Foyer area 11 that show the ceilng<br />

comment height in confonnance with section 1003.2.4 and typical interior<br />

finishes in accrdance with chaoter 8.<br />

Mechanical Plan Review<br />

1 - i M-l and M.2 I General comment i Fire/smoke damner are renuired at the rated seoarations.<br />

. Project Budget. The committee discussed the need for GCSD to disclose its<br />

construction budget. R. Majenty instructed C. Daines to add this item to the list of project<br />

deliverables.<br />

. <strong>Construction</strong> Work-5ite Liabilties. The committee reviewed the problem of visitors<br />

entering the <strong>Skywalk</strong> construction site without wearing hard hats. A solution was<br />

discussed that would include a waiver of liabilty on the <strong>Skywalk</strong> entry ticket.<br />

".;"<br />

'~ ,<br />

H'IlOJECT IMPROVEMENts; FOLLOWUP:'f.:'.¡¡Jl';:;i~~i'<br />

FoJlowUo: Issue: Acton Item:<br />

GCSD Faux Rock Panels Cordinate constctn of faux ro reprentatie panels.<br />

C. Daines Hualapai Fire Marshal Meet wit Fire Marshal to disss conditonal approal of fire delivery sytem.<br />

Fire Marshal's offce to isue a letter specing condttnal approal of the fire<br />

delivery sysm, wit the explici undersnding that a remmendaton for the<br />

Isuanc of a Cartcate of Occpancy wlt be witheld until as-buiIts are<br />

drawn and forwarded to Fire Marshal's offæ for revIew, a site Inspeon wltl<br />

be conducted and a punchllst genera outIning modifcations to the fire<br />

delivery system. and all punehiist itms to be complete to Fire Marshal's<br />

satisfactn.<br />

GCSD, ECM, C. Datnes Gant Charts RevIse Gantt chart for Tis bas on conditonal approval of fire delivery<br />

sYSm.<br />

GCRCISNW, GCSD Liabilit Fonn examIne use of waiver of Habitit included In the Skyalk entr tickt as a<br />

means of addresJnq constrcton zone hard hat Isue.<br />

GCSD Skywlk. Project Budget GCSD to ~ent constrct cosls for (al Phase 1- Glass Bndge<br />

Constrelon. GCSD to d~oos conston budget for (b) Phas II. Base<br />

Shelt oonslrcton, and (el Phase II - Tenant Improvements for Main Flor<br />

and Ground Floor ADA ac.<br />

5<br />

GCSD010436<br />

.