. .:.<br />

.<br />

.<br />

ITiTelecommunicatlons.<br />

. The short-term solution for IT/telecom capacity at EP involves establishing microwave<br />

connectivity at GCW and mounting a microwave dish on the <strong>Skywalk</strong> Roof Deck. Two<br />

proposals are being considered by GCRC's Board of Directors for microwave services.<br />

.:. Other<br />

. Utilty Corridor. Master planning wil include the development of a 30' utilty corridor<br />

within the EP Master Plan to support <strong>Skywalk</strong> functions. Conduit wil be buried for future<br />

hard-line power and fiber optic extensions to the building<br />

;~ ~EVELOPMENT~ fOLLOWUP~~1.'\ô.~~P~,i .,<br />

Fo/lowUD: Issue: Acton Item:<br />

C. Daines Propane Generators Contact Cummins to asses trde In value of propane gensts.<br />

WAiJEL EP Utiit Yard Examine how descendIng terrin may effctely be used to hide the gensets<br />

and minimize the impact to the bus stging are, a prominent pubnc gatherng<br />

are.<br />

WAiJEL C. Daines Power Olsbuton Follow up wi UnlSourc regarding sttus of cot feasibilit analysis.<br />

C. Daines Hualapai Tribal Utiit Copy docment prepare by the Hualapai Planning and Ecnomic<br />

Auto'rlt Develooment Departent and forward to D. Watchman for review of reoort<br />

WAiJEL, C, Daines Hualapai Fire Marshal Dis fire pump house wit diesl power engine, and aHematie us of<br />

elecc coered ennine to be Instlled on the Ground Flr.<br />

GCRCISNW Telecom Proposals Board review of propols frm Frontier Communications and HualapaI<br />

5. PROJECT IMPROVEMENTS<br />

Towers for telecom svstem Insllatin,<br />

A, Skyalk Faclltv - Base ShelL. Executive <strong>Construction</strong> Mgt summarized activities associated<br />

with the construction of the <strong>Skywalk</strong>'s exterior Base Sheil through 1-31-09. The following<br />

schedule summarizes Shell-only items pending completion. Completed schedules are not listed;<br />

and, RFI changes (existing and future), Owner/Developer Changes (if any), are NOT represented<br />

within the schedule below:<br />

Schedule DescrlDtfon of Work DendiiiCorietion % Como/ete<br />

2000 SlIe Constrction Civil concrete (ADA site walks onlv to tie into existino Sidewaik) 18.58%<br />

5000 Metal. Revised spiral interior stair/spiral stair lnfill 35.00%<br />

Cabie railinos 35.00%<br />

Cabie raiinq added railinq for NE balconv to roftonat stair 34.90%<br />

Cable rallnq Dinino Room roof 35.00%<br />

7000 ThennaUMolsture Insulation (walls and roo 65.74%<br />

Protecton Roofino and decks (fnish) 37.96%<br />

8000 Doors & WIndows Storefront 94.87%<br />

9000 Finishes SecondarY framlno (sleel studs) 98.0%<br />

Paint - Exerior 65.30%<br />

14000 EJevator Elevalor 83.00%<br />

1500 Mechanical Fire proection 59.43%<br />

HVAC shell (no Til 89.75%<br />

16000 Electcal Buildinq shell-Iivewlre (no TI, no site work 94.95%<br />

. Exterior Stone, The extemal insulation finish system (EIFS) and stack stone are 99%<br />

complete (HC Ramp in the way); however, the application of exterior faux stone was<br />

discussed per the revised architectural rendition of the <strong>Skywalk</strong> by Dozal Ilustrations. It<br />

was recommended to GCSD during the meeting that several representative panels of<br />

faux stone be constructed, transported to GCW and ailowed to weather over time so that<br />

GCW management may examine which manufactured panel best suits the exterior of the<br />

<strong>Skywalk</strong>.<br />

. Weather Delays. The total working days lost to date amount to 38. Delays include (a)<br />

temperature at 35 degrees or below, (b) rain and/or materials wet, (c) fallng snow and/or<br />

standing snow, and (d) wind (excessive for specialized construction).<br />

4<br />