5. PROJECT IMPROVEMENTS<br />

Skyalk Faclltv - Base Shell, Executive <strong>Construction</strong> Mgt summarized activities associated<br />

with the construction of the <strong>Skywalk</strong>'s exterior Base Shell through 2/09/09. The following<br />

schedule of Shell-only items pending completion includes (completed schedules not listed):<br />

Schedule DescriptIon of Work endlna Comn/etan % Complete<br />

2000 S~e Constrction Civil concrete (AOA site walks onlv to tie into existino Sidewalk 18.58%<br />

5000 Metls Revised soiral interior stair/soiral stair infill 35.00%<br />

Cable railnos 35.00%<br />

Cable railino added railno for NE balconv 10 rooftoo al siair 34.90%<br />

Cable railino Dinino Room ro 35.00%<br />

7000 Thermal/Molslure Insulation (walls and roan 65.74%<br />

Protecton Rofino and decks (finish) 37.96%<br />

8000 Doors & Windows Storefront 94.87%<br />

9000 Finishes Secndary framino (sleel studs1 98.00%<br />

Paint - Exerior 65.30%<br />

14000 Elevator Elevator 83.00%<br />

15000 MechanIcal Fire protecton 59.43%<br />

HVAC shell rna TI 89.75%<br />

16000 Eleeb1cal Buildina shell~ivewire (no TI, no site work) 94.95%<br />

. Exterior Stone. The external insulation finish system (EIFS) and stack stone are 100%<br />

complete; however, the application of exterior faux stone was discussed per the revised<br />

architectural rendition of the <strong>Skywalk</strong> by Dozal Illustrations. It was recommended to<br />

GCSD during the meeting that several representative panels of faux stone be<br />

constructed, transported to GCW and allowed to weather over time so that GCW<br />

management may examine which manufactured panel best suits the exterior of the<br />

<strong>Skywalk</strong>.<br />

. Weather Delays. The totai working days lost to date amount to 38. Delays include (a)<br />

temperature at 35 degrees or below, (b) rain and/or materials wet, (c) fallng snow and/or<br />

standing snow, and (d) wind (excessive for specialized construction).<br />

B. Skyalk Facilitv - Tenant Improvements (Tis),<br />

. TI Ground Level Entry, M. Johnson brought Ground Floor ADA floor plans to the<br />

meeting and display boards with proposed interior finishes. A copy of P&D's comment<br />

letter addressing Ground Level Entry recommended revisions was distributed to the<br />

Committee. Comments included:<br />

Item Sheet Detail No. Ex lanatlon<br />

1 A-3 Figure 404.2.3.1, (b) of tte A 12 Inch clearance is required on the push side of tte door<br />

1998ANSIA11.1 serving the women's restroom, as presented it appears it may not<br />

comalv.<br />

2 CVR and A-2 Code analysis and Exiling Per Table 1003.2.2.2 Foyer area 11 shall have an ocupant load<br />

analysis determined by using tte floor area in square feet per occupanl at 5<br />

nel for a standinn snace. Revise tte ocuoant load.<br />

3 A-3 Seion 1003.2.2.5 Past an ocoant load sinn in Fover area 11.<br />

4 A-3 1 A 1 hour ocupancy separation is propoed and shawn or a Fire<br />

Barrer per secon 706. Per secon 1002 ttis Is a Horizontal<br />

Exit(s) Opening shall comply with Table 714.2 which will afect<br />

door and frme type 3, aiso review of tte shell building plans<br />

exlstina door #023.<br />

5 General Duct and Transfer Please review secion 715 for tte requirements of Ducts and<br />

comment Ooeninos Transfer Ooenlnos and coalv.<br />

6 General Interior elevations Provide interior elevations for Foyer area 11 that show the ceilng<br />

comment height In conforance witt secon 1003.2.4 and typical interior<br />

finishes in accrdance with chamer 8.<br />

Mechanical Plan Review<br />

1 I M-t and M-2 i General comment I Firelsmoke damaer are reouire at tte rated seaarations.<br />

4<br />

GCSD010444<br />

"