28.04.2013 Views

Read Skywalk Construction Meeting Minutes, March 4, 2009 (PDF)

Read Skywalk Construction Meeting Minutes, March 4, 2009 (PDF)

Read Skywalk Construction Meeting Minutes, March 4, 2009 (PDF)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

. .<br />

.<br />

.<br />

Amphitheater, Identification of facilty that will provide enclosed space for Nalive<br />

dancers and performers, to keep warm in colder temperatures.<br />

. Retail Cluster. Future development to potentially be expanded to adapt to descending<br />

terrin, achieving a multi-storied building without exceeding height standards.<br />

. EP North Rim Outlook Trail. Development of a trail to the northwest of the <strong>Skywalk</strong> to<br />

maximize outlook vistas availabie to the public.<br />

. Special Events Plaza. Identification of open-spaced plaza south of <strong>Skywalk</strong>.<br />

. Site Remediation, Consideration of strategies aimed at remediating severely impacted<br />

site between the Amphitheater and the <strong>Skywalk</strong> facilty. Landscape architecture may<br />

apply elevation lift, rock work, and indigenous vegetation.<br />

. Cul-de-sac, Establishment of 50' radius, compliant with residential zoning standards.<br />

Supports fire suppression activities and special event staging.<br />

~<br />

. Parking. Parking alternative utilizing descending terrain near nort rim, without creating<br />

cross-circulation points of confict for pedestrians and vehicles. Alternatives to be<br />

considered.<br />

.:OE$IGNDEV,OPMENr:. FOllOW uP,i,.;',i¡t:''l~,.¡~~¡;;.~"""tT<br />

FollowUD: Issue: Actonltm:<br />

R. Mal.ntv. C, Daines Tribal Elders. Input Obtain input frm Hualapai Tribal Elders regarding the EP Sit Plan.<br />

WAIJEL C. Daln.s ParkIng Alternaties Develop altrnatie parkng strteies for EP that prerve Nort Rim vita.<br />

WAIJEL, C, Daines EP Master Plan Schedule Revise Gantt Chart projectng completion of EP Master Plan pro.<br />

C, Daines Stimulus Funding Exmine Stimulus funding that may support constrcton cots of EP Master<br />

Plan.<br />

ß, Utilty Development.<br />

.:. Power.<br />

. Cummins Assessment of Propane Generators. A letter from Rocky Mountain<br />

Cummins Power Generation Division was reviewed by the committee. Cummins had<br />

Inspected the propane gensets and made recommendations to GCRC on 2/4/09<br />

regarding the need for a major overhaul of both units. The cost of a new diesel generator<br />

(300KVA sized engine) is approximately $61,000. The cost to overhaul each propane<br />

generator is $50,000. The committee agreed that a new purchase would be more<br />

prudent than attempting to refurbish 15-year old gensets, and that the trade-in value of<br />

the generators should be explored.<br />

. Permanent Utilty Yard Location, Weller Architects and JEL & Associates reviewed the<br />

design development of a utility yard and recommended placing two diesel engine<br />

generators southwest of the <strong>Skywalk</strong> building approximately 1,000 feet near the area of<br />

the proposed sewage treatment plant This would locate generators away from the<br />

<strong>Skywalk</strong> building and public gathering areas. This would also require larger conductors<br />

between the generator and the buildings. The conductors would be installed in<br />

underground conduits, however, in the future when grid power is extended to the site, the<br />

connection point would be in the area of the generators with no disruption of <strong>Skywalk</strong> or<br />

plaza area activities. Diesel fuel tanks would be located near the engine generators, an<br />

addiUonal reason to keep them remote from the <strong>Skywalk</strong> area and public gathering areas.<br />

The use of sound attenuation enclosures was discussed to minimize noise impact<br />

throughout EP site. Effective fuel containment systems wil be incorporated in AlE<br />

designs to provide protection against fuel spilage at site.<br />

. Considerations of Short-term Utilty Yard Location, During the 1-14-09 <strong>Skywalk</strong><br />

meeting, an alternative for short-term power was discussed. A diesel generator might be<br />

rented that could hook directly to the <strong>Skywalk</strong> building so that the elevator, fire alarm, and<br />

MEP could be tested as soon as possible, until such time that gensets and fuel tanks are<br />

configured within the utility yard near the Advantex site. This alternative is functional but<br />

is not eco-sensitive given the possibilty of a fuel spil in close proximity to the Grand<br />

Canyon rim (in this case within 30'), impacts to the north rim ledge to support the<br />

configuration of gensets and fuel tanks, noise impact to existing operations, and visibilty<br />

of the utility yard from the <strong>Skywalk</strong> building. It is recommended that the permanent<br />

solution be implemented as soon as possible involving the location of the utilty yard<br />

2<br />

GCSD010442