25.04.2013 Views

Thermo Ramsey - Hoferick Engineering GmbH

Thermo Ramsey - Hoferick Engineering GmbH

Thermo Ramsey - Hoferick Engineering GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operation<br />

7. All additional field wiring operation at voltages less then 30 V must be<br />

located on the left bottom of the enclosure. Leave ample loose wiring<br />

(typically 8”) to facilitate removing the terminal connectors.<br />

8. Close the inside panel and tighten the screw to secure the cover.<br />

Figure 2-3: Field Mount Inside Front Panel<br />

2-6<br />

A90869<br />

2.4 Panel Mount Installation<br />

The panel mounted Integrator is suitable for mounting in a control panel. The<br />

control panel should not be exposed to excessive vibration, heat, or moisture.<br />

The front bezel, when properly seated, forms a dust seal.<br />

A two (2) inch clearance around the top and bottom of the Integrator is required<br />

for convection cooling. Additional clearances may be required if equipment<br />

mounted directly below generates excessive heat. Clearance in the back is<br />

necessary for wiring access and fuse replacement. Clearance on the side is<br />

necessary for inserting the chassis holding brackets from the back after insertion<br />

of the Integrator.<br />

2.4.1 Mounting<br />

Provide a cutout in the panel and insert the Integrator after removing the<br />

holding brackets. From the back, insert the holding brackets on both sides of the<br />

Integrator. Tighten the holding brackets to support the Integrator and form the<br />

dust seal.<br />

Operation <strong>Thermo</strong> Fisher Scientific<br />

REC 4175 Rev B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!