25.04.2013 Views

Thermo Ramsey - Hoferick Engineering GmbH

Thermo Ramsey - Hoferick Engineering GmbH

Thermo Ramsey - Hoferick Engineering GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2<br />

Installation<br />

2.1 Safety Precautions<br />

This chapter describes the Integrator installation procedure, hardware<br />

configuration, and initial programming. Initial programming is a machine<br />

directed procedure prompting the operator to enter required conveyor and belt<br />

scale parameters. After all parameters have been entered, the Integrator<br />

performs an unassisted zero and span calibration.<br />

CAUTION<br />

DO NOT INSTALL, OPERATE, OR PERFORM ANY<br />

MAINTENANCE PROCEDURES UNTIL YOU HAVE READ THE<br />

SAFETY PRECAUTIONS THAT FOLLOW.<br />

CAUTION<br />

DO NOT CONNECT POWER TO THE ELECTRONICS OR TURN<br />

ON THE UNIT UNTIL YOU HAVE READ AND UNDERSTOOD<br />

THIS ENTIRE MANUAL. THE PRECAUTIONS AND<br />

PROCEDURES PRESENTED IN THIS MANUAL MUST BE<br />

FOLLOWED CAREFULLY IN ORDER TO PREVENT<br />

EQUIPMENT DAMAGE AND PROTECT THE OPERATOR.<br />

WARNING<br />

THE INTEGRATOR DOOR SHOULD ALWAYS REMAIN<br />

CLOSED DURING OPERATION, AND ONLY OPENED FOR<br />

MAINTENANCE PROCEDURES. BE SURE TO CLOSE THE<br />

COVER BEFORE RESUMING OPERATION.<br />

<strong>Thermo</strong> Fisher Scientific Operation<br />

REC 4175 Rev B<br />

2-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!