24.04.2013 Views

Re-engineering and Function testing

Re-engineering and Function testing

Re-engineering and Function testing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

01.03.2012<br />

<strong>Re</strong>-<strong>engineering</strong> <strong>and</strong><br />

function <strong>testing</strong> at<br />

H<strong>and</strong>tmann Zittau<br />

H<strong>and</strong>tmann Zittau


Generell Information<br />

With the Second-h<strong>and</strong> Machine Centre in<br />

Zittau, H<strong>and</strong>tmann offers its international<br />

customers the approved H<strong>and</strong>tmann quality<br />

in the business with used-machines –<br />

by means of re-<strong>engineering</strong> <strong>and</strong><br />

function <strong>testing</strong><br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

H<strong>and</strong>tmann Maschinenvertrieb GmbH & Co.KG<br />

Niederlassung Zittau<br />

Dittelsdorfer Str. 7<br />

D-02763 Zittau<br />

Tel.:+49-3583/79790-0<br />

www.h<strong>and</strong>tmann.de/zittau<br />

2


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

What is reconditioned?<br />

100% of vacuum pumps are new<br />

100% replacement of all gear bearings <strong>and</strong> seals<br />

100% inspection of proportional valves;<br />

replaced if faulty<br />

100% replacement of meat pump <strong>and</strong> side plate<br />

60 - 70% of pipes are replaced<br />

100% of machine feet (plastic parts) are replaced<br />

100% replacement of proportional valve cables <strong>and</strong> machine<br />

supply cable<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

3


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

What is reconditioned?<br />

100% recondition of hopper swivelling mechanism<br />

100% replacement of torsion springs on the swivel housing<br />

100% replacement of bearings <strong>and</strong> toothed belt on the<br />

linking drive<br />

General rust-free etching, s<strong>and</strong>blasting <strong>and</strong> re-galvanizing of:<br />

gear cover plate <strong>and</strong> oil tank cover as well as supporting steel<br />

components on VF 50/100<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

4


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

What is reconditioned?<br />

S<strong>and</strong>blasting <strong>and</strong> painting of steel baseplate <strong>and</strong> portal<br />

components (VF 80/200/300)<br />

100% of electric motors are electrically checked <strong>and</strong> fitted with<br />

new bearings<br />

100% of control systems are checked;<br />

replaced if faulty<br />

100% of housing <strong>and</strong> hopper are shot-blasted<br />

100% of linking gear box is completely reconditioned<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

5


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

New<br />

machine foot<br />

Rust-free etched <strong>and</strong> galvanized<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

S<strong>and</strong>blasted<br />

<strong>and</strong> painted<br />

Steam cleaned<br />

(oil tank)<br />

6


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Oil pump<br />

checked<br />

Oil cooler<br />

- Cleaned<br />

- Checked<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Motor:<br />

- Electrically checked<br />

- New bearings<br />

- Housing de-rusted + painted<br />

New oil filter<br />

7


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

- De-rusted<br />

- Shot-blasted<br />

8


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Gear:<br />

- Cleaned<br />

- Inspected<br />

- New bearing<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

All bearings in<br />

the gear column<br />

are replaced<br />

Gear cover<br />

- S<strong>and</strong>blasted<br />

- Galvanized<br />

9


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Portal:<br />

- De-rusted<br />

- Steel parts painted<br />

- Stainless steal parts<br />

shot-blasted<br />

New seal<br />

Universal drive:<br />

Inspected <strong>and</strong> cleaned<br />

or replaced<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Rotational-speed sensor:<br />

- Cleaned<br />

- New seal<br />

10


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Edges reground<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

New meat pump<br />

11


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Cleaned<br />

Cylinder:<br />

- Inspected<br />

- Cleaned<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Swivel housing<br />

- Cleaned<br />

- Shot-blasted<br />

New side plate<br />

12


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

a<br />

All pipes new<br />

or de-rusted <strong>and</strong> galvanized<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

New hose<br />

Vacuum pump new<br />

13


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Proportional valves<br />

new or inspected<br />

Oil motor:<br />

- Checked for leaks<br />

- Cleaned<br />

Linking drive bearing<br />

- <strong>Re</strong>conditioned (new toothed belt)<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Supports:<br />

- Shot-blasted<br />

- New dry bushings<br />

- New disc springs<br />

14


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Electrically checked<br />

(30-50% of cables<br />

are replaced on<br />

every filler)<br />

Stainless steal air shaft<br />

15


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

- Control checked;<br />

replaced if faulty<br />

- New switches<br />

- New hour counter<br />

16


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

Hopper column :<br />

- <strong>Re</strong>conditioned<br />

(new springs)<br />

Swivel housing :<br />

- Cleaned<br />

- Shot-blasted<br />

if stainless steal<br />

Chain + sprockets :<br />

- Cleaned<br />

- Inspected<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

17


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

New cover<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Bracket:<br />

- Shot-blasted<br />

Ventilator checked<br />

18


H<strong>and</strong>tmann Zittau – <strong>Re</strong>-<strong>engineering</strong><br />

Assembly of a VF 200<br />

The service<br />

<strong>Re</strong>-engineered<br />

H<strong>and</strong>tmann inspected<br />

H<strong>and</strong>tmann quality seal<br />

H<strong>and</strong>tmann spare parts<br />

Factory warranty<br />

Worldwide service via H<strong>and</strong>tmann sales<br />

<strong>and</strong> service partners<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

19


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

What is tested?<br />

100% perform full H<strong>and</strong>tmann service<br />

100% check of vacuum system;<br />

repaired if necessary<br />

100% function test of controls;<br />

replaced if faulty<br />

100% function test of servo-drives,<br />

replaced if faulty<br />

100% check of side-plate;<br />

replaced if cracked or high wear<br />

01.03.2012 H<strong>and</strong>tmann Zittau 20


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

What is tested?<br />

100% check of meat pump;<br />

replaced if high wear<br />

100% check of machine safeties<br />

100% of linking gear box is completely reconditioned<br />

Quality check of Vacuum Filler with Q-Check<br />

01.03.2012 H<strong>and</strong>tmann Zittau 21


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Perform a full<br />

H<strong>and</strong>tmann Service<br />

23


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Check of side-plate;<br />

<strong>Re</strong>placed if cracked or<br />

high wear<br />

24


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Check of meat pump;<br />

<strong>Re</strong>placed if high wear<br />

25


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

Rotor within tolerance<br />

<strong>Re</strong>main in machine<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

Rotor outside tolerance<br />

<strong>Re</strong>placed by a new one<br />

26


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

100% re-<strong>engineering</strong> of<br />

linking gearbox 34-5<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

27


H<strong>and</strong>tmann Zittau – <strong>Function</strong> <strong>testing</strong><br />

<strong>Function</strong> <strong>testing</strong> VF 608<br />

Final inspection of<br />

machines with<br />

H<strong>and</strong>tmann Q-Check,<br />

like new machines<br />

01.03.2012 H<strong>and</strong>tmann Zittau<br />

28


01.03.2012<br />

Thank you for your attention<br />

H<strong>and</strong>tmann Zittau

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!