Annual Report 2008 in PDF - GKN
Annual Report 2008 in PDF - GKN
Annual Report 2008 in PDF - GKN
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
In January 2009 <strong>GKN</strong> completed the acquisition of the Airbus<br />
w<strong>in</strong>g component and sub-assembly facility at Filton, a<br />
manufactur<strong>in</strong>g and assembly specialist for w<strong>in</strong>g components<br />
such as lead<strong>in</strong>g and trail<strong>in</strong>g edges, ribs and pylons. <strong>GKN</strong> also<br />
secured life of programme contracts with Airbus across its<br />
complete product range and an order to design and produce<br />
large-scale composite structures for the w<strong>in</strong>g of the new A350<br />
XWB aircraft.<br />
<strong>GKN</strong> delivers the fi rst state of the art Future Lynx airframe<br />
Work<strong>in</strong>g <strong>in</strong> partnership with AgustaWestland, <strong>GKN</strong> implemented an effective design-to-cost<br />
methodology to create a highly effective and efficient operational airframe for Future Lynx<br />
helicopters, the first of which was delivered dur<strong>in</strong>g the year.<br />
<strong>GKN</strong> achieved the challeng<strong>in</strong>g technological goals<br />
for the airframe by adopt<strong>in</strong>g <strong>in</strong>novative techniques<br />
across the manufactur<strong>in</strong>g process. Extensive use<br />
was made of monolithic mach<strong>in</strong>ed components,<br />
replac<strong>in</strong>g a traditional fabricated detail structure,<br />
to realise an 80% reduction <strong>in</strong> parts count when<br />
compared with the exist<strong>in</strong>g Super Lynx airframe.<br />
Three-dimensional design modell<strong>in</strong>g ensured highly<br />
accurate part-to-part assembly, and state of the art<br />
assembly tool<strong>in</strong>g, which rotates through 360<br />
degrees and has vertical movement for ease of<br />
access, greatly enhanced the speed and efficiency of<br />
the assembly process.<br />
<strong>GKN</strong> is responsible for supply<strong>in</strong>g complete, assembled<br />
airframes for Future Lynx helicopters for the British Army<br />
and Royal Navy. Assembly of the airframe takes place at<br />
<strong>GKN</strong>’s Yeovil facility which, for the last seven years, has<br />
supplied all Lynx airframes, <strong>in</strong>clud<strong>in</strong>g those for a number<br />
of successful export programmes.<br />
Bus<strong>in</strong>ess Review<br />
Automotive<br />
Powder Metallurgy<br />
OffHighway<br />
Aerospace<br />
www.gkn.com 33<br />
Sales*<br />
22%<br />
of total Group sales<br />
£1,002m<br />
(2007 – £820m)<br />
Trad<strong>in</strong>g Profi t*<br />
48%<br />
of total Group<br />
trad<strong>in</strong>g profi t<br />
£105m<br />
(2007 – £83m)<br />
* on a management basis