<strong>National</strong> <strong>Park</strong> <strong>Service</strong> FY 2013 Budget Justifications<br />

<strong>National</strong> <strong>Park</strong> <strong>Service</strong><br />

PROJECT DATA SHEET<br />

Project Identification<br />

Project Title: Replace the Old Faithful Warming Hut<br />

RecFee-25<br />

Total Project Score/Ranking: 408<br />

Programmed Funding FY: 2013<br />

Funding Source: Recreation Fee <strong>Park</strong> Revenue<br />

Project No: PMIS-175751A Unit/Facility Name: Yellowstone <strong>National</strong> <strong>Park</strong><br />

Region: Intermountain Congressional District: WYAL State: WY<br />

Project Justification<br />

DOI Asset Code Real Property Unique<br />

Identifier<br />

35290800 101945 70 0<br />

Project Description:<br />

API FCI-Before FCI-<br />

Projected<br />

The Old Faithful area is the major destination of winter visitors. However, winter services and facilities<br />

are very limited by comparison to those available during the main season. A warming hut provides<br />

essential shelter and basic amenities such as heated space, seats, and tables for winter visitors who<br />

must cope with subzero temperatures and heavy snowfall. For several decades, a structure that<br />

formerly functioned as a theater in the Old Faithful Visitor Center complex has been adaptively<br />

converted into a warming hut during the winter season. However, this structure was demolished along<br />

with the rest of the outdated facilities in the Old Faithful Visitor Center complex to make way for a new<br />

Visitor Education Center which opened to the public in 2010. Three temporary yurts and a restroom<br />

facility were constructed to bridge the time between the demolition and the replacement construction.<br />

Simultaneously, planning is underway that will inform management decisions as to the location and<br />

type of facility that will permanently serve as a winter warming hut, and key activities associated with<br />

this planning will be funded.<br />

Project Need/Benefit:<br />

Warming huts provide shelter and a place for day use winter visitors to each lunch at key locations in<br />

Yellowstone <strong>National</strong> <strong>Park</strong> during the winter season (mid-December to mid-March). These warming<br />

huts are critical to the safe and satisfactory experience of winter visitors, especially those traveling via<br />

snowmobile, as they provide a place in which to warm up from the subzero temperatures that are<br />

common during winter. Many also provide basic snacks and warm beverages.. The warming hut in the<br />

Old Faithful area is the single most heavily used facility because Old Faithful Geyser is the major<br />

destination of winter visitors. The only other facilities open at Old Faithful during the winter season are<br />

the Snow Lodge, <strong>Service</strong> Station, and visitor center. None of these facilities is designed to<br />

accommodate the number of day use visitors needing shelter. A temporary structure was previously<br />

constructed until a permanent structure could be designed and constructed. This funding will also<br />

support planning activities related to the Old Faithful Comprehensive Plan. These plans form the basis<br />

for decisions on the location and type of facility that will become the permanent warming hut for winter<br />

visitors to Old Faithful.<br />

Ranking Categories: Identify the percent of the project that is in the following categories of<br />

need.<br />

0 % Critical Health or Safety Deferred Maintenance 0 % Energy Policy, High Performance Sustain Bldg CI<br />

0 % Critical Health or Safety Capital Improvement 0 % Critical <strong>Mission</strong> Deferred Maintenance<br />

0 % Critical Resource Protection Deferred Maintenance 75 % Other Deferred Maintenance<br />

0 % Critical Resource Protection Capital Improvement 0 % Code Compliance Capital Improvement<br />

25 % Other Capital Improvement