20.04.2013 Views

app 5 - EUROCONTROL

app 5 - EUROCONTROL

app 5 - EUROCONTROL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Updated on 13/12/12 RAD<br />

Valid from 07/02/13 APPENDIX 5 - Airport connectivity Page 39 of 40<br />

RADAN LW:<br />

SID/STAR shall be followed completely, leaving or joining at an intermediate point is not permitted<br />

AD Departures/Arrivals DCT = 0nms<br />

Connecting points additional to the published SID/STARs for LWOH<br />

Departures<br />

LWOH GOSTI/MAVAR<br />

Arrivals<br />

LWOH DOBAR/MAVAR<br />

RADAN LY:<br />

The use of SID/STAR is mandatory where published<br />

SID/STAR shall be followed completely, leaving or joining at an intermediate point is not permitted<br />

DCT for LYBE/BT/KV/NI/PG/TV/VR DCT = 0nms<br />

For AD's LYBE/BT/KV/NI/PG/TV/VR<br />

- The last RP of the SID shall be filed as the first RP of the route<br />

- The first RP of the STAR shall be filed as the last RP of the route<br />

AD Departures/Arrivals DCT = 50nms<br />

Connecting points for DEP/ARR. to airfields:<br />

LYBE: OBR (only available for LYBE local traffic)<br />

RADAN LZ:<br />

AD Departures/Arrivals DCT = 30nms<br />

LZIB/PP Departures/Arrivals DCT = 0nms<br />

Departures/Arrivals LZIB shall file via one of the following SID/STAR transition points:<br />

SID - BERVA/NIT/NUBRA/TABIN/TOVKA/VAMOG.<br />

STAR - ABLOM/BERVA/KUNET/NIT/TABIN/XOMBA.<br />

Departures/Arrivals LZPP shall file via one of the following SID/STAR transition points:<br />

SID - BERVA/NIT/OKR.<br />

STAR - BERVA/JAN/NIT<br />

- 39 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!