app 5 - EUROCONTROL
app 5 - EUROCONTROL
app 5 - EUROCONTROL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Updated on 13/12/12 RAD<br />
Valid from 07/02/13 APPENDIX 5 - Airport connectivity Page 26 of 40<br />
RADAN EV<br />
The use of SID/STARs is mandatory where published<br />
SIDs/STARs shall be completely followed within EVRRFIR, leaving or joining at an intermediate point is not permitted<br />
AD Departures/Arrivals DCT = 0nms<br />
EVRA Departures/Arrivals DCT = 0nms (except local training flights with type of<br />
flight “X” or “M”)<br />
RADAN EY<br />
AD Departures/Arrivals DCT = 50nms<br />
RADAN GM<br />
AD Departures/Arrivals DCT = 50nms<br />
RADAN LA:<br />
For AD’s where SID/STARs are published:<br />
- the last RP of the SID shall be filed as the first RP of the route<br />
- the first RP of the STAR shall be filed as the last RP of the route<br />
AD Departures/Arrivals DCT = 50nms<br />
LATI Departures/Arrivals DCT = 0nms<br />
RADAN LB:<br />
For AD’s where SID/STARs are published:<br />
- the last RP of the SID shall be filed as the first RP of the route<br />
- the first RP of the STAR shall be filed as the last RP of the route<br />
AD Departures/Arrivals DCT = 50nms<br />
LBBG/GO/PD/SF/WN Departures/Arrivals DCT = 0nms<br />
Connecting points for ARR. to airfields:<br />
LBSF: NAPET<br />
LBGO: AMTOV/DELIN<br />
- 26 -