Streamed for high performance:<br />

<strong>TURBINE</strong> <strong>CONDENSERS</strong><br />

<strong>Balcke</strong>-<strong>Dürr</strong> turbine condensers are rated among the most<br />

efficient in the world. Decades of experience in the construction<br />

of condensers, during which the products have been constantly<br />

optimized in close cooperation with power plant operators, also<br />

stand for a high degree of operating reliability and top class<br />

workmanship.<br />

<strong>Balcke</strong>-<strong>Dürr</strong> has a wide range of water-cooled surface condensers<br />

which cover virtually all ser vice conditions in power plants,<br />

irrespective of the type of turbine.<br />

We supply high performance condensers characterized by a tube<br />

bundle design (TEPEE) optimized in respect of pressure drop to<br />

generate electricity with maximum efficiency and to enhance the<br />

output of existing power plants.<br />

For use in combined cycle power plants, we provide innovative<br />

deaerating condensers as a space-saving product solution which<br />

combines the functionality of feed-water deaerators and turbine<br />

condensers in one single component.<br />

We make a valuable contribution to environmental protection<br />

and conservation of resources with a product line developed to<br />

generate energy regeneratively: geothermal condensers.<br />

Deaerating condenser in 785 MW Castellon CCPP, Spain<br />

PROFILE<br />

3D model of a<br />

high performance condenser<br />

■ Competence in engineering and fabrication of condensers for<br />

more than 100 years<br />

■ Equipping of power plants with capacities from approximately<br />

100 to 1,400 MWel and more<br />

■ Cooling surfaces up to 45,000 m 2<br />

per condenser shell<br />

■ Output raised in existing power plants through modular<br />

condenser change-out<br />

■ Optimizing the “Cold End” (condenser, cooling tower and<br />

cooling water circuit)<br />

■ Configuration concepts for turbines with vertical and horizontal<br />

exhaust steam flow<br />

■ Special constructions such as deaerating and geo thermal<br />

condensers<br />

■ Patented tube bundle with performance-optimized design<br />

(TEPEE)<br />

■ Patented tube configuration for maximum wet steam erosion<br />

resistance


TECHNOLOGY<br />

Our turbine condensers are equipped with TEPEE tube bundles.<br />

Depending on the tube material, this highly effective design is up<br />

to 20 % more efficient than the HEI Standard and offers significant<br />

benefits:<br />

■ Increase in power plant output as lower condenser pressures<br />

can be achieved.<br />

■ Savings in respect of capital expenditure costs as smaller<br />

cooling surfaces can be installed.<br />

Cross sections through TEPEE tube bundle<br />

The shape of the tube bundle reminiscent of an American Indian<br />

tent (“Tepee”) is the result of numerous experimental and numerical<br />

studies. It generates an ideal steam flow with minimal pressure<br />

drop, high condensation rate and effective deaeration.<br />

In-house programs which are backed up by results measured<br />

in practice are used to construct condensers with an optimal<br />

thermohydraulic design. The application of the very latest 3D CAD<br />

software ensures faultless engineering.<br />

Section 1 Section 2 Section 3 Section 4<br />

Our manufacturing facilities use proven QA programs with virtually<br />

fully automated production processes to ensure long-term troublefree<br />

condenser operation.<br />

BALCKE-DÜRR AMERICAS<br />

A DIVISION OF SPX COOLING TECHNOLOGIES, INC.<br />

7401 W 129 STREET<br />

OVERLAND PARK, KANSAS 66213<br />

UNITED STATES<br />

913 664 7428<br />

bdinfousa@spx.com<br />

balcke-duerr.com<br />

Water<br />

inlet<br />

Static pressure<br />

relative [Pa]<br />

Steam inlet<br />

CFD analysis of steam flow into a TEPEE tube bundle<br />

400.0<br />

300.0<br />

200.0<br />

100.0<br />

000.0<br />

-100.0<br />

-200.0<br />

-300.0<br />

-400.0<br />

-500.0<br />

-600.0<br />

-700.0<br />

-800.0<br />

-900.0<br />

-1000.0<br />

S1 S2 S3 S4<br />

Water<br />

outlet<br />

In the interest of technological progress,<br />

all products are subject to design and/or<br />

material change without notice.<br />

©2009 SPX Cooling Technologies, Inc.<br />

Printed in USA | brochure_na_49<br />

Welding of tube-to-tube sheet joints<br />

Comprehensive competence for jobsite erection, commissioning<br />

and acceptance testing round off our full-service spectrum.<br />

APPLICATION<br />

3x720 MW Majuba 4-6 coal-fired PP, South Africa:<br />

The dual-pressure condensers in operation since 1999 are among<br />

the largest in the world and equipped with 22m long titanium<br />

tubes.<br />

Insertion of titanium tubes at Nigel Works (SA)<br />

2 x 1,350 MW Gundremmingen B+C NPP, Germany:<br />

Output increased by 2x13 MW through modular conden ser bundle<br />

change-out (2003).<br />

Transport of tube bundle modules inside turbine house