VariTop winders. Afterwards, the slit rolls<br />
are transported to an automatic weighing<br />
device and labeling unit and finally to the<br />
Twister 2 Line roll wrapping system. The<br />
finished wrapped rolls are then sent with<br />
the help of chain conveyors over a connecting<br />
bridge from the PM building into<br />
the finished goods warehouse.<br />
As part of the Process Line Package,<br />
LEIPA received a production line, that not<br />
only included the complete automation<br />
solution and the machine clothing but<br />
Fig. 7: Reel section with Janus MK 2<br />
and Sirius wind-up system.<br />
Fig. 8: VariTop winder.<br />
Fig. 9: Roll wrapping station Twister 2 Line.<br />
<strong>19</strong>/05<br />
also had these components optimally<br />
matched to the paper machine in preliminary<br />
trials. For a trouble-free startup<br />
curve, forming fabrics, press sleeves,<br />
press felts and dryer fabrics from <strong>Voith</strong><br />
Fabrics were used as initial machine<br />
clothing.<br />
The extensive <strong>Voith</strong> Automation solution<br />
includes the process, quality control and<br />
information system and extends from the<br />
preparation of the raw material to the finished<br />
end product. The web browser<br />
makes all current and historical machine,<br />
process and quality data mill-wide available<br />
in the information system. This facilitates<br />
easy access to data for the planning<br />
of optimization work and for trouble-shooting.<br />
The automation system was<br />
subjected to extensive functional tests in<br />
„Factory Acceptance Tests“ at <strong>Voith</strong> so<br />
9<br />
that a tested and pre-optimized system<br />
could be successfully installed.<br />
Ahead of time<br />
Project handling with the Process Line<br />
Package, proven technology based on<br />
the One Platform Concept as well as a<br />
successful system partnership have<br />
proven very successful at LEIPA. Since<br />
production commenced as early as four<br />
weeks ahead of the agreed date, the further<br />
optimization phase also went off<br />
very successfully.<br />
The intermediate trial 1 was brought forward<br />
by 7 weeks and intermediate trial 2<br />
even by 6.5 months: on October 13 the<br />
two trials were successfully completed<br />
together.