VariTop winders. Afterwards, the slit rolls<br />

are transported to an automatic weighing<br />

device and labeling unit and finally to the<br />

Twister 2 Line roll wrapping system. The<br />

finished wrapped rolls are then sent with<br />

the help of chain conveyors over a connecting<br />

bridge from the PM building into<br />

the finished goods warehouse.<br />

As part of the Process Line Package,<br />

LEIPA received a production line, that not<br />

only included the complete automation<br />

solution and the machine clothing but<br />

Fig. 7: Reel section with Janus MK 2<br />

and Sirius wind-up system.<br />

Fig. 8: VariTop winder.<br />

Fig. 9: Roll wrapping station Twister 2 Line.<br />

<strong>19</strong>/05<br />

also had these components optimally<br />

matched to the paper machine in preliminary<br />

trials. For a trouble-free startup<br />

curve, forming fabrics, press sleeves,<br />

press felts and dryer fabrics from <strong>Voith</strong><br />

Fabrics were used as initial machine<br />

clothing.<br />

The extensive <strong>Voith</strong> Automation solution<br />

includes the process, quality control and<br />

information system and extends from the<br />

preparation of the raw material to the finished<br />

end product. The web browser<br />

makes all current and historical machine,<br />

process and quality data mill-wide available<br />

in the information system. This facilitates<br />

easy access to data for the planning<br />

of optimization work and for trouble-shooting.<br />

The automation system was<br />

subjected to extensive functional tests in<br />

„Factory Acceptance Tests“ at <strong>Voith</strong> so<br />

9<br />

that a tested and pre-optimized system<br />

could be successfully installed.<br />

Ahead of time<br />

Project handling with the Process Line<br />

Package, proven technology based on<br />

the One Platform Concept as well as a<br />

successful system partnership have<br />

proven very successful at LEIPA. Since<br />

production commenced as early as four<br />

weeks ahead of the agreed date, the further<br />

optimization phase also went off<br />

very successfully.<br />

The intermediate trial 1 was brought forward<br />

by 7 weeks and intermediate trial 2<br />

even by 6.5 months: on October 13 the<br />

two trials were successfully completed<br />

together.