APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Preamble:<br />
Chapter – 16<br />
REPAIR AND REHABILITATION<br />
1 Removal <strong>of</strong> cement concrete wearing coat <strong>and</strong> asphaltic wearing coat has been proposed with<br />
pneumatic breakers.<br />
2 The rate <strong>for</strong> external prestressing has been analysed <strong>for</strong> three different spans <strong>of</strong> 25, 50 <strong>and</strong> 100 m.<br />
3 Sealing <strong>of</strong> cracks has been proposed with cement grout, cement mortar (1:1) grout <strong>and</strong> epoxy grout<br />
by injecting with grout pump through nipples.<br />
4 Bonding <strong>of</strong> new concrete with old concrete is proposed with epoxy resin.<br />
5 The repair <strong>and</strong> replacement <strong>of</strong> following structures has been included -<br />
a) Bridge Bearings<br />
b) Expansion Joints<br />
c) Concrete Railing<br />
d) Mild Steel Railing<br />
e) Crash Barrier<br />
87