Summary <strong>of</strong> Rate Analysis<br />

Item<br />

No.<br />

Descriptions<br />

Unit Rate<br />

G PSC Grade M-50<br />

(i)<br />

For cast-in-situ box girder, segmental construction <strong>and</strong> balanced cantilever,<br />

35-55% <strong>of</strong> cost <strong>of</strong> concrete<br />

(p) Height upto 5m cum 7782.00<br />

(q) Height 5m to 10m cum 8359.00<br />

(r) Height above 10m cum 8935.00<br />

H PSC Grade M- 55<br />

(i)<br />

For cast-in-situ box girder, segmental construction <strong>and</strong> balanced cantilever,<br />

35-55% <strong>of</strong> cost <strong>of</strong> concrete<br />

(p) Height upto 5m cum 8215.00<br />

(q) Height 5m to 10m cum 8824.00<br />

(r) Height above 10m cum 9432.15<br />

14.2<br />

a) Supplying, fitting <strong>and</strong> placing HYSD bar rein<strong>for</strong>cement in super-structure<br />

complete as per drawing <strong>and</strong> technical specifications<br />

High tensile steel wires/str<strong>and</strong>s including all accessories <strong>for</strong> stressing,<br />

tonne 48653.00<br />

14.3 stressing operations <strong>and</strong> grouting complete as per drawing <strong>and</strong> Technical<br />

Specifications<br />

Providing <strong>and</strong> laying Cement concrete wearing coat M-30 grade including<br />

tonne 95146.00<br />

14.4 rein<strong>for</strong>cement complete as per drawing <strong>and</strong> Technical Specifications cum 8656.00<br />

14.5<br />

14.6<br />

14.7<br />

Mastic Asphalt (Providing <strong>and</strong> laying 12 mm thick mastic asphalt wearing course<br />

on top <strong>of</strong> deck slab excluding prime coat with paving grade bitumen meeting the<br />

requirements given in table 500-29, prepared by using mastic cooker <strong>and</strong> laid to<br />

required level <strong>and</strong> slope after cleaning the surface, including providing antiskid<br />

surface with bitumen precoated fine grained hard stone chipping <strong>of</strong> 9.5 mm nominal<br />

size at the rate <strong>of</strong> 0.005cum per 10 sqm <strong>and</strong> at an approximate spacing <strong>of</strong> 10 cm<br />

center to center in both directions, pressed into surface when the temperature <strong>of</strong><br />

surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface,<br />

all complete as per clause 515.)<br />

Construction <strong>of</strong> precast RCC railing <strong>of</strong> M30 Grade, aggregate size not<br />

exceeding 12 mm, true to line <strong>and</strong> grade, tolurence <strong>of</strong> vertical RCC post not<br />

to exceed 1 in 500, centre to centre spacing between vertical post not to<br />

exceed 2000 mm, leaving adequate space between vertical post <strong>for</strong><br />

expansion, complete as per approved drawings <strong>and</strong> technical specifications.<br />

Construction <strong>of</strong> RCC railing <strong>of</strong> M30 Grade in-situ with 20 mm nominal size<br />

aggregate, true to line <strong>and</strong> grade, tolurence <strong>of</strong> vertical RCC post not to<br />

exceed 1 in 500, centre to centre spacing between vertical post not to exceed<br />

2000 mm, leaving adequate space between vertical post <strong>for</strong> expansion,<br />

complete as per approved drawings <strong>and</strong> technical specifications.<br />

81<br />

sqm 243.00<br />

metre 1389.00<br />

metre 1353.00<br />

14.8<br />

Providing, fitting <strong>and</strong> fixing mild steel railing complete as per drawing <strong>and</strong><br />

Technical Specification<br />

metre 2848.00<br />

14.9 Drainage Spouts complete as per drawing <strong>and</strong> Technical specification each 571.00<br />

14.10<br />

PCC M15 Grade leveling course below approach slab complete as per<br />

drawing <strong>and</strong> Technical specification<br />

cum 3757.00