Item Descriptions No. C RCC Grade M 30 Using Concrete Mixer Case I 79 Summary of Rate Analysis Unit Rate (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m cum 6074.00 (q) Height 5m to 10m cum 6327.00 (r) Height above 10m cum 6581.00 (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m cum 6327.00 (q) Height 5m to 10m cum 6581.00 (r) Height above 10m cum 6834.00 Case II Using Batching Plant, Transit Mixer and Concrete Pump. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m cum 5984.00 (q) Height 5m to 10m cum 6233.00 (r) Height above 10m cum 6482.00 (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m cum 6233.00 (q) Height 5m to 10m cum 6482.00 (r) Height above 10m cum 6732.00 D RCC/PSC Grade M35 Case 1 Using concrete mixer. (i) For solid slab super-structure, 18-28% of (a+b+c) (p) Height upto 5m cum 6117.00 (q) Height 5m to 10m cum 6376.00 (r) Height above 10m cum 6635.00 (ii) For T-beam & slab, 23-33% of (a+b+c) (p) Height upto 5m cum 6376.00 (q) Height 5m to 10m cum 6635.00 (r) Height above 10m cum 6894.00 (iii) For box girder and balanced cantilever, 38-58% of cost of concrete. (p) Height upto 5m cum 7154.00 (q) Height 5m to 10m cum 7672.00 (r) Height above 10m cum 8190.00 Case II Using Batching Plant, Transit Mixer and Concrete Pump (i) For solid slab super-structure, 18-28% of (a+b+c) (p) Height upto 5m cum 6025.00 (q) Height 5m to 10m cum 6280.00 (r) Height above 10m cum 6536.00 (ii) For T-beam & slab, 23-33% of (a+b+c) (p) Height upto 5m cum 6280.00 (q) Height 5m to 10m cum 6536.00 (r) Height above 10m cum 6791.00
80 Summary of Rate Analysis Item No. Descriptions Unit Rate (iii) For box girder and balanced cantilever, 38-58% of cost of concrete. (p) Height upto 5m cum 7046.00 (q) Height 5m to 10m cum 7557.00 (r) Height above 10m cum 8068.00 E PSC Grade M-40 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m cum 6440.00 (q) Height 5m to 10m cum 6709.00 (r) Height above 10m cum 6977.00 (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m cum 6709.00 (q) Height 5m to 10m cum 6977.00 (r) Height above 10m cum 7245.00 Case II Using Batching Plant, Transit Mixer and Concrete Pump (i) For solid slab super-structure, 18-28% of (a+b+c) (p) Height upto 5m cum 6223.00 (q) Height 5m to 10m cum 6487.00 (r) Height above 10m cum 6751.00 (ii) For T-beam & slab, 23-33% of (a+b+c) (p) Height upto 5m cum 6487.00 (q) Height 5m to 10m cum 6751.00 (r) Height above 10m cum 7014.00 (iii) For box girder and balanced cantilever, 38-58% of cost of concrete. (p) Height upto 5m cum 7278.00 (q) Height 5m to 10m cum 7805.00 (r) Height above 10m cum 8333.00 F PSC Grade M-45 (i) For solid slab/voided slab super-structure, 16-26% of cost of concrete (a+b+c) (p) Height upto 5m cum 6450.00 (q) Height 5m to 10m cum 6728.00 (r) Height above 10m cum 7006.00 (ii) For I-beam & slab including launching of precast girders by launching truss upto 40 m span, 21-31% of cost of concrete. (p) Height upto 5m cum 6728.00 (q) Height 5m to 10m cum 7006.00 (r) Height above 10m cum 7284.00 (iii) For cast-in-situ box girder, segmental construction and balanced cantilever, 36-56% of cost of concrete. (p) Height upto 5m cum 7562.00 (q) Height 5m to 10m cum 8118.00 (r) Height above 10m cum 8674.00
- Page 31 and 32: Item No. 3.26 3.27 3.28 3.29 3.30 3
- Page 33 and 34: Preamble: Chapter - 4 SUB-BASES, BA
- Page 35 and 36: 32 Summary of Rate Analysis Item No
- Page 37 and 38: Preamble: 34 Chapter - 5 BASES AND
- Page 39 and 40: 36 Summary of Rate Analysis Item No
- Page 41 and 42: Item No. 5.19 5.20 5.21 5.22 (i) (i
- Page 43 and 44: Item No. 6.1 6.2 6.3 6.4 Descriptio
- Page 45 and 46: 16 The rate analysis for traffic im
- Page 47 and 48: Item No. 8.9 8.10 8.11 8.12 8.13 8.
- Page 49 and 50: Item No. 8.24 8.25 8.27 8.28 8.29 B
- Page 51 and 52: Item No. 8.45 8.46 Descriptions Sum
- Page 53 and 54: Item No. 9.1 9.2 9.3 Descriptions C
- Page 55 and 56: Item No. 10.1 10.2 10.3 10.4 10.5 D
- Page 57 and 58: Item No. 10.21 Descriptions Summary
- Page 59 and 60: Item No. 11.1 11.2 Descriptions CHA
- Page 61 and 62: Preamble: Chapter - 12 FOUNDATION 1
- Page 63 and 64: Item No. Descriptions CHAPTER-12 FO
- Page 65 and 66: 62 Summary of Rate Analysis Item No
- Page 67 and 68: 64 Summary of Rate Analysis Item No
- Page 69 and 70: 66 Summary of Rate Analysis Item No
- Page 71 and 72: 68 Summary of Rate Analysis Item No
- Page 73 and 74: 70 Summary of Rate Analysis Item No
- Page 75 and 76: 72 Summary of Rate Analysis Item No
- Page 77 and 78: Item No. Descriptions CHAPTER-13 SU
- Page 79 and 80: Item No. 13.9 13.10 13.11 13.12 13.
- Page 81: Item No. Descriptions CHAPTER-14 SU
- Page 85 and 86: Item No. 14.11 14.15 14.16 Descript
- Page 87 and 88: Preamble: Chapter - 15 PROTECTION W
- Page 89 and 90: Item No. 15.13 Descriptions Summary
- Page 91 and 92: Item No. 16.1 16.2 16.3 16.4 16.5 1
80<br />
Summary <strong>of</strong> Rate Analysis<br />
Item<br />
No.<br />
Descriptions<br />
Unit Rate<br />
(iii) For box girder <strong>and</strong> balanced cantilever, 38-58% <strong>of</strong> cost <strong>of</strong> concrete.<br />
(p) Height upto 5m cum 7046.00<br />
(q) Height 5m to 10m cum 7557.00<br />
(r) Height above 10m cum 8068.00<br />
E PSC Grade M-40<br />
Case<br />
1<br />
Using concrete mixer.<br />
(i) For solid slab super-structure, 20-30% <strong>of</strong> (a+b+c)<br />
(p) Height upto 5m cum 6440.00<br />
(q) Height 5m to 10m cum 6709.00<br />
(r) Height above 10m cum 6977.00<br />
(ii) For T-beam & slab, 25-35% <strong>of</strong> (a+b+c)<br />
(p) Height upto 5m cum 6709.00<br />
(q) Height 5m to 10m cum 6977.00<br />
(r) Height above 10m cum 7245.00<br />
Case<br />
II<br />
Using Batching Plant, Transit Mixer <strong>and</strong> Concrete Pump<br />
(i) For solid slab super-structure, 18-28% <strong>of</strong> (a+b+c)<br />
(p) Height upto 5m cum 6223.00<br />
(q) Height 5m to 10m cum 6487.00<br />
(r) Height above 10m cum 6751.00<br />
(ii) For T-beam & slab, 23-33% <strong>of</strong> (a+b+c)<br />
(p) Height upto 5m cum 6487.00<br />
(q) Height 5m to 10m cum 6751.00<br />
(r) Height above 10m cum 7014.00<br />
(iii) For box girder <strong>and</strong> balanced cantilever, 38-58% <strong>of</strong> cost <strong>of</strong> concrete.<br />
(p) Height upto 5m cum 7278.00<br />
(q) Height 5m to 10m cum 7805.00<br />
(r) Height above 10m cum 8333.00<br />
F PSC Grade M-45<br />
(i)<br />
For solid slab/voided slab super-structure, 16-26% <strong>of</strong> cost <strong>of</strong> concrete<br />
(a+b+c)<br />
(p) Height upto 5m cum 6450.00<br />
(q) Height 5m to 10m cum 6728.00<br />
(r) Height above 10m cum 7006.00<br />
(ii)<br />
For I-beam & slab including launching <strong>of</strong> precast girders by launching truss<br />
upto 40 m span, 21-31% <strong>of</strong> cost <strong>of</strong> concrete.<br />
(p) Height upto 5m cum 6728.00<br />
(q) Height 5m to 10m cum 7006.00<br />
(r) Height above 10m cum 7284.00<br />
(iii)<br />
For cast-in-situ box girder, segmental construction <strong>and</strong> balanced cantilever,<br />
36-56% <strong>of</strong> cost <strong>of</strong> concrete.<br />
(p) Height upto 5m cum 7562.00<br />
(q) Height 5m to 10m cum 8118.00<br />
(r) Height above 10m cum 8674.00