Item<br />

No.<br />

Descriptions<br />

CHAPTER-14<br />

SUPER-STRUCTURE<br />

Summary <strong>of</strong> Rate Analysis<br />

14.1<br />

Furnishing <strong>and</strong> Placing Rein<strong>for</strong>ced/Prestressed cement concrete in superstructure<br />

as per drawing <strong>and</strong> Technical Specification<br />

A RCC Grade M20<br />

Case I<br />

Using Concrete Mixer<br />

78<br />

Unit Rate<br />

(i) For solid slab super-structure, 20-30% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 5440.00<br />

(q) Height 5m to 10m cum 5667.00<br />

(r) Height above 10m cum 5894.00<br />

(ii) For T-beam & slab, 25-35% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 5667.00<br />

(q) Height 5m to 10m cum 5894.00<br />

(r) Height above 10m cum 6120.00<br />

Case<br />

II<br />

Using Batching Plant, Transit Mixer <strong>and</strong> Concrete Pump<br />

(i) For solid slab super-structure, 20-30% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 5354.00<br />

(q) Height 5m to 10m cum 5577.00<br />

(r) Height above 10m cum 5800.00<br />

(ii) For T-beam & slab, 25-35% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 5577.00<br />

(q) Height 5m to 10m cum 5800.00<br />

(r) Height above 10m cum 6023.00<br />

B RCC Grade M25<br />

Case I<br />

Using Concrete Mixer<br />

(i) For solid slab super-structure, 20-30% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 5993.00<br />

(q) Height 5m to 10m cum 6243.00<br />

(r) Height above 10m cum 6493.00<br />

(ii) For T-beam & slab, 25-35% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 6243.00<br />

(q) Height 5m to 10m cum 6493.00<br />

(r) Height above 10m cum 6742.00<br />

Case<br />

II<br />

Using Batching Plant, Transit Mixer <strong>and</strong> Concrete Pump<br />

(i) For solid slab super-structure, 20-30% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 5913.00<br />

(q) Height 5m to 10m cum 6160.00<br />

(r) Height above 10m cum 6406.00<br />

(ii) For T-beam & slab, 25-35% <strong>of</strong> (a+b+c)<br />

(p) Height upto 5m cum 6160.00<br />

(q) Height 5m to 10m cum 6406.00<br />

(r) Height above 10m cum 6653.00