70<br />
Summary <strong>of</strong> Rate Analysis<br />
Item<br />
No.<br />
Descriptions<br />
Unit Rate<br />
(v) Beyond 30m upto 40 m<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 292324.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 368329.00<br />
c<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour).<br />
metre 350789.00<br />
C S<strong>of</strong>t rock (12m dia well )<br />
(i) Depth <strong>of</strong> s<strong>of</strong>t rock strata upto 3m metre 71713.00<br />
D Hard rock (12m dia well )<br />
(i) Depth <strong>of</strong> hard rock strata upto 3 m<br />
Sinking <strong>of</strong> Twin D Type well ( other than pneumatic method <strong>of</strong> sinking ) through<br />
metre 90227.00<br />
12.19<br />
all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as shown against<br />
each case, complete as per drawing <strong>and</strong> technical specifications. Depth <strong>of</strong><br />
sinking is reckoned from bed level.<br />
A S<strong>and</strong>y soil<br />
(i) Depth from bed level upto 3.0 M metre 5819.00<br />
(ii) Beyond 3m upto 10m depth metre 6274.00<br />
(iii) Beyond 10m upto 20m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 8284.00<br />
(iv) Beyond 20m upto 30 m<br />
a<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter<br />
metre 15538.00<br />
b<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour .<br />
metre 18646.00<br />
(v) Beyond 30m upto 40 m<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 36917.00<br />
b<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />
<strong>and</strong> Labour etc.<br />
metre 44301.00<br />
B Clayey soil (Twin D Type Well )<br />
(i) Depth below bed level upto 3.0 M metre 6826.00<br />
(ii) Beyond 3m upto 10m depth metre 10846.00<br />
(iii) Beyond 10 m upto 20 m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 14324.00<br />
b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 15040.00<br />
(iv) Beyond 20m upto 30 m<br />
a<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter<br />
metre 26866.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 35262.00<br />
c<br />
Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour ).<br />
metre 33583.00