69<br />

Summary <strong>of</strong> Rate Analysis<br />

Item<br />

No.<br />

Descriptions<br />

Unit Rate<br />

b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 65686.00<br />

c<br />

Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour ).<br />

metre 62558.00<br />

(v) Beyond 30m upto 40 m<br />

a<br />

Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 118903.00<br />

b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 149818.00<br />

c<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour).<br />

metre 142684.00<br />

C S<strong>of</strong>t rock (11m dia well )<br />

(i) Depth <strong>of</strong> s<strong>of</strong>t rock strata upto 3m metre 30822.00<br />

D Hard rock (11m dia well )<br />

(i) Depth <strong>of</strong> hard rock upto 3 m<br />

Sinking <strong>of</strong> 12 m external diameter well ( other than pneumatic method <strong>of</strong> sinking<br />

metre 39130.00<br />

12.18<br />

) through all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as<br />

shown against each case, complete as per drawing <strong>and</strong> technical<br />

specifications. Depth <strong>of</strong> sinking is reckoned from bed level.<br />

A S<strong>and</strong>y soil<br />

(i) I) Depth below bed level upto 3.0 M metre 25691.00<br />

(ii) Beyond 3m upto 10m depth metre 28812.00<br />

(iii) Beyond 10m upto 20m<br />

a<br />

Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 38052.00<br />

(iv) Beyond 20m upto 30 m<br />

a<br />

Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />

sinking <strong>for</strong> the previous meter<br />

metre 71377.00<br />

b<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour .<br />

metre 85652.00<br />

(v) Beyond 30m upto 40 m<br />

a<br />

Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 169580.00<br />

b<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />

<strong>and</strong> Labour etc.<br />

metre 203496.00<br />

B Clayey soil (12 m dia. Well )<br />

(i) Depth below bed level upto 3.0 M metre 28179.00<br />

(ii) Beyond 3m upto 10m depth metre 49666.00<br />

(iii) Beyond 10 m upto 20 m<br />

a<br />

Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 65595.00<br />

b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 68875.00<br />

(iv) Beyond 20m upto 30 m<br />

a<br />

Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />

sinking <strong>for</strong> the previous meter<br />

metre 123040.00<br />

b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 161490.00<br />

c<br />

Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour ).<br />

metre 153800.00