Summary <strong>of</strong> Rate Analysis<br />
Item<br />
No.<br />
Descriptions<br />
Unit Rate<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 65686.00<br />
c<br />
Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour ).<br />
metre 62558.00<br />
(v) Beyond 30m upto 40 m<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 118903.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 149818.00<br />
c<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour).<br />
metre 142684.00<br />
C S<strong>of</strong>t rock (11m dia well )<br />
(i) Depth <strong>of</strong> s<strong>of</strong>t rock strata upto 3m metre 30822.00<br />
D Hard rock (11m dia well )<br />
(i) Depth <strong>of</strong> hard rock upto 3 m<br />
Sinking <strong>of</strong> 12 m external diameter well ( other than pneumatic method <strong>of</strong> sinking<br />
metre 39130.00<br />
12.18<br />
) through all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as<br />
shown against each case, complete as per drawing <strong>and</strong> technical<br />
specifications. Depth <strong>of</strong> sinking is reckoned from bed level.<br />
A S<strong>and</strong>y soil<br />
(i) I) Depth below bed level upto 3.0 M metre 25691.00<br />
(ii) Beyond 3m upto 10m depth metre 28812.00<br />
(iii) Beyond 10m upto 20m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 38052.00<br />
(iv) Beyond 20m upto 30 m<br />
a<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter<br />
metre 71377.00<br />
b<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour .<br />
metre 85652.00<br />
(v) Beyond 30m upto 40 m<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 169580.00<br />
b<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />
<strong>and</strong> Labour etc.<br />
metre 203496.00<br />
B Clayey soil (12 m dia. Well )<br />
(i) Depth below bed level upto 3.0 M metre 28179.00<br />
(ii) Beyond 3m upto 10m depth metre 49666.00<br />
(iii) Beyond 10 m upto 20 m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 65595.00<br />
b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 68875.00<br />
(iv) Beyond 20m upto 30 m<br />
a<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter<br />
metre 123040.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 161490.00<br />
c<br />
Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour ).<br />
metre 153800.00