11.04.2013 Views

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

67<br />

Summary <strong>of</strong> Rate Analysis<br />

Item<br />

No.<br />

Descriptions<br />

Unit Rate<br />

(iv) Beyond 20m upto 30 m<br />

a<br />

Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />

sinking <strong>for</strong> the previous meter<br />

metre 24284.00<br />

b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 31873.00<br />

c<br />

Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour ).<br />

metre 30355.00<br />

(v) Beyond 30m upto 40 m<br />

a<br />

Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 57694.00<br />

b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 72695.00<br />

c<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour).<br />

metre 69233.00<br />

C S<strong>of</strong>t rock ( 9m dia well )<br />

(i) Depth upto 3m metre 13591.00<br />

D Hard rock ( 9m dia well )<br />

(i) Depth <strong>of</strong> hard rock strata upto 3 m<br />

Sinking <strong>of</strong> 10 m external diameter well ( other than pneumatic method <strong>of</strong> sinking<br />

metre 14889.00<br />

12.16<br />

) through all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as<br />

shown against each case, complete as per drawing <strong>and</strong> technical<br />

specifications. Depth <strong>of</strong> sinking is reckoned from bed level.<br />

A S<strong>and</strong>y soil<br />

(i) Depth below bed level upto 3.0 M metre 5396.00<br />

(ii) Beyond 3m upto 10m depth metre 6327.00<br />

(iii) Beyond 10m upto 20m<br />

a<br />

Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 8357.00<br />

(iv) Beyond 20m upto 30 m<br />

a<br />

Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />

sinking <strong>for</strong> the previous meter<br />

metre 15674.00<br />

b<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour .<br />

metre 18809.00<br />

(v) Beyond 30m upto 40 m<br />

a<br />

Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 37239.00<br />

b<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />

<strong>and</strong> Labour etc.<br />

metre 44687.00<br />

B Clayey soil (10m dia. Well )<br />

(i) Depth below bed level upto 3.0 M metre 6884.00<br />

(ii) Beyond 3m upto 10m depth metre 9760.00<br />

(iii) Beyond 10 m upto 20 m<br />

a<br />

Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 12890.00<br />

b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 13534.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!