67<br />
Summary <strong>of</strong> Rate Analysis<br />
Item<br />
No.<br />
Descriptions<br />
Unit Rate<br />
(iv) Beyond 20m upto 30 m<br />
a<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter<br />
metre 24284.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering on the cost, if required metre 31873.00<br />
c<br />
Add 25% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour ).<br />
metre 30355.00<br />
(v) Beyond 30m upto 40 m<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 57694.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 72695.00<br />
c<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour).<br />
metre 69233.00<br />
C S<strong>of</strong>t rock ( 9m dia well )<br />
(i) Depth upto 3m metre 13591.00<br />
D Hard rock ( 9m dia well )<br />
(i) Depth <strong>of</strong> hard rock strata upto 3 m<br />
Sinking <strong>of</strong> 10 m external diameter well ( other than pneumatic method <strong>of</strong> sinking<br />
metre 14889.00<br />
12.16<br />
) through all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as<br />
shown against each case, complete as per drawing <strong>and</strong> technical<br />
specifications. Depth <strong>of</strong> sinking is reckoned from bed level.<br />
A S<strong>and</strong>y soil<br />
(i) Depth below bed level upto 3.0 M metre 5396.00<br />
(ii) Beyond 3m upto 10m depth metre 6327.00<br />
(iii) Beyond 10m upto 20m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 8357.00<br />
(iv) Beyond 20m upto 30 m<br />
a<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter<br />
metre 15674.00<br />
b<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour .<br />
metre 18809.00<br />
(v) Beyond 30m upto 40 m<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 37239.00<br />
b<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />
<strong>and</strong> Labour etc.<br />
metre 44687.00<br />
B Clayey soil (10m dia. Well )<br />
(i) Depth below bed level upto 3.0 M metre 6884.00<br />
(ii) Beyond 3m upto 10m depth metre 9760.00<br />
(iii) Beyond 10 m upto 20 m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 12890.00<br />
b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 13534.00