Summary <strong>of</strong> Rate Analysis<br />

Item<br />

No.<br />

Descriptions<br />

Unit Rate<br />

a<br />

Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 41275.00<br />

b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 52006.00<br />

c<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour).<br />

49529.00<br />

C S<strong>of</strong>t rock ( 7m dia well )<br />

(i) Depth <strong>of</strong> s<strong>of</strong>t rock strata upto 3m metre 10012.00<br />

D Hard rock ( 7m dia well )<br />

(i) Depth upto 3 m<br />

Sinking <strong>of</strong> 8 m external diameter well ( other than pneumatic method <strong>of</strong> sinking )<br />

metre 12733.00<br />

12.14<br />

through all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as shown<br />

against each case, complete as per drawing <strong>and</strong> technical specifications.<br />

Depth <strong>of</strong> sinking is reckoned from bed level.<br />

A S<strong>and</strong>y soil<br />

(i) Depth below bed level upto 3.0 M metre 4429.00<br />

(ii) Beyond 3m upto 10m depth metre 5465.00<br />

(iii) Beyond 10m upto 20m<br />

a<br />

Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

<strong>for</strong> the previous meter<br />

metre 7217.00<br />

(iv)<br />

a<br />

b<br />

Beyond 20m upto 30 m<br />

Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />

sinking <strong>for</strong> the previous meter metre 13538.00<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />

<strong>and</strong> Labour . metre 16246.00<br />

(v) Beyond 30m upto 40 m<br />

Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

a<br />

<strong>for</strong> the previous meter<br />

Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />

b<br />

<strong>and</strong> Labour etc.<br />

B Clayey soil ( 8m dia. Well )<br />

65<br />

metre 4759.00<br />

metre 5711.00<br />

(i) Depth upto 3.0 M metre 5954.00<br />

(ii) Beyond 3m upto 10m depth metre 9100.00<br />

(iii) Beyond 10 m upto 20 m<br />

Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />

a <strong>for</strong> the previous meter metre 12019.00<br />

b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 12620.00