Summary <strong>of</strong> Rate Analysis<br />
Item<br />
No.<br />
Descriptions<br />
Unit Rate<br />
a<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 41275.00<br />
b Add 5% <strong>of</strong> cost <strong>for</strong> dewatering, if required metre 52006.00<br />
c<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour).<br />
49529.00<br />
C S<strong>of</strong>t rock ( 7m dia well )<br />
(i) Depth <strong>of</strong> s<strong>of</strong>t rock strata upto 3m metre 10012.00<br />
D Hard rock ( 7m dia well )<br />
(i) Depth upto 3 m<br />
Sinking <strong>of</strong> 8 m external diameter well ( other than pneumatic method <strong>of</strong> sinking )<br />
metre 12733.00<br />
12.14<br />
through all types <strong>of</strong> strata namely s<strong>and</strong>y soil, clayey soil <strong>and</strong> rock as shown<br />
against each case, complete as per drawing <strong>and</strong> technical specifications.<br />
Depth <strong>of</strong> sinking is reckoned from bed level.<br />
A S<strong>and</strong>y soil<br />
(i) Depth below bed level upto 3.0 M metre 4429.00<br />
(ii) Beyond 3m upto 10m depth metre 5465.00<br />
(iii) Beyond 10m upto 20m<br />
a<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
<strong>for</strong> the previous meter<br />
metre 7217.00<br />
(iv)<br />
a<br />
b<br />
Beyond 20m upto 30 m<br />
Add 7.5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong><br />
sinking <strong>for</strong> the previous meter metre 13538.00<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement<br />
<strong>and</strong> Labour . metre 16246.00<br />
(v) Beyond 30m upto 40 m<br />
Add 10% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
a<br />
<strong>for</strong> the previous meter<br />
Add 20% <strong>of</strong> cost <strong>for</strong> Kentledge including supports, loading arrangement,<br />
b<br />
<strong>and</strong> Labour etc.<br />
B Clayey soil ( 8m dia. Well )<br />
65<br />
metre 4759.00<br />
metre 5711.00<br />
(i) Depth upto 3.0 M metre 5954.00<br />
(ii) Beyond 3m upto 10m depth metre 9100.00<br />
(iii) Beyond 10 m upto 20 m<br />
Add 5% <strong>for</strong> every additional meter depth <strong>of</strong> sinking over the rate <strong>of</strong> sinking<br />
a <strong>for</strong> the previous meter metre 12019.00<br />
b Add <strong>for</strong> dewatering @ 5% <strong>of</strong> cost, if required. metre 12620.00