Beyond Beyond Beyond Bey- Sl. Capa- Unit 5 Km 10 Km 20 Km ond No. Material city of 1 Km 2 Km 3 Km 4 Km 5 Km upto upto upto 30 Km (Net) Rate 10 Km 20 Km 30 Km addl. addl. addl. addl. per Km per Km per Km per Km Cost per trip 244.57 281.34 317.52 352.46 386.28 31.05 26.13 22.38 22.38 1. Sand, Lime, Shingle, 3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4 Aggreagte, Surkhi, Earth, Moorum, Excavated Kerb stone rock and Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64 Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04 2. Timber, Bamboo and Ballie 4 Cu.m. 61.14 70.34 79.38 88.12 96.57 7.76 6.53 5.6 5.6 Add CPOH @ 10% 6.11 7.03 7.94 8.81 9.66 0.78 0.65 0.56 0.56 Total 67.25 77.37 87.32 96.93 106.23 8.54 7.18 6.16 6.16 3. Cement, Steel, Angle and Tee Channel 7 Ton 34.94 40.19 45.36 50.35 55.18 4.44 3.73 3.2 3.2 Add CPOH @ 10% 3.49 4.02 4.54 5.04 5.52 0.44 0.37 0.32 0.32 Total 38.43 44.21 49.9 55.39 60.7 4.88 4.10 3.52 3.52 4. Bricks 1500 1000 163.05 187.56 211.68 234.97 257.52 20.7 17.42 14.92 14.92 Add CPOH @ 10% 16.31 18.76 21.17 23.5 25.75 2.07 1.74 1.49 1.49 Total 179.36 206.32 232.85 258.47 283.27 22.77 19.16 16.41 16.41 5. Tar, Bitumen and Firewood 5 Ton 48.91 56.27 63.5 70.49 77.26 6.21 5.23 4.48 4.48 Add CPOH @ 10% 4.89 5.63 6.35 7.05 7.73 0.62 0.52 0.45 0.45 Total 53.8 61.9 69.85 77.54 84.99 6.83 5.75 4.93 4.93 6. Stone for masonary & soling 3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4 Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64 Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04 7. SW Pipe 3 CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT (INCLUDING LOADING, UNLOADING AND STACKING) a) 100 mm dia. 480 100 m 50.95 58.61 66.15 73.43 80.48 6.47 5.44 4.66 4.66 Add CPOH @ 10% 5.10 5.86 6.62 7.34 8.05 0.65 0.54 0.47 0.47 Total 56.05 64.47 72.77 80.77 88.53 7.12 5.98 5.13 5.13 b) 150 mm dia. 240 100 m 101.9 117.23 132.3 146.86 160.95 12.94 10.89 9.33 9.33 Add CPOH @ 10% 10.19 11.72 13.23 14.69 16.1 1.29 1.09 0.93 0.93 Total 112.09 128.95 145.53 161.55 177.05 14.23 11.98 10.26 10.26

CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT (INCLUDING LOADING, UNLOADING AND STACKING) Beyond Beyond Beyond Bey- Sl. Capa- Unit 5 Km 10 Km 20 Km ond No. Material city of 1 Km 2 Km 3 Km 4 Km 5 Km upto upto upto 30 Km (Net) Rate 10 Km 20 Km 30 Km addl. addl. addl. addl. per Km per Km per Km per Km Cost per trip 244.57 281.34 317.52 352.46 386.28 31.05 26.13 22.38 22.38 c) 200 mm dia. 135 100 m 181.16 208.4 235.2 261.08 286.13 23 19.36 16.58 16.58 Add CPOH @ 10% 18.12 20.84 23.52 26.11 28.61 2.3 1.94 1.66 1.66 Total 199.28 229.24 258.72 287.19 314.74 25.3 21.3 18.24 18.24 d) 230 mm dia. 105 100 m 232.92 267.94 302.40 335.68 367.89 29.57 24.89 21.32 21.32 Add CPOH @ 10% 23.29 26.79 30.24 33.57 36.79 2.96 2.49 2.13 2.13 Total 256.21 294.73 332.64 369.25 404.68 32.53 27.38 23.45 23.45 e) 250 mm dia. 84 100 m 291.15 334.93 378 419.6 459.86 36.96 31.11 26.65 26.65 Add CPOH @ 10% 29.12 33.49 37.8 41.96 45.99 3.7 3.11 2.67 2.67 Total 320.27 368.42 415.8 461.56 505.85 40.66 34.22 29.32 29.32 f) 300 mm dia. 66 100 m 370.56 426.27 481.09 534.03 585.27 47.04 39.59 33.91 33.91 Add CPOH @ 10% 37.06 42.63 48.11 53.40 58.53 4.7 3.96 3.39 3.39 Total 407.62 468.9 529.2 587.43 643.8 51.74 43.55 37.30 37.3 g) 350 mm dia. 48 100 m 509.52 586.13 661.5 734.29 804.75 64.68 54.44 46.63 46.63 Add CPOH @ 10% 50.95 58.61 66.15 73.43 80.48 6.47 5.44 4.66 4.66 Total 560.47 644.74 727.65 807.72 885.23 71.15 59.88 51.29 51.29 h) 400 mm dia. 33 100 m 741.12 852.55 962.18 1068.06 1170.55 94.08 79.18 67.83 67.83 Add CPOH @ 10% 74.11 85.26 96.22 106.81 117.06 9.41 7.92 6.78 6.78 Total 815.23 937.81 1058.4 1174.87 1287.61 103.49 87.10 74.61 74.61 i) 450 mm dia. 27 100 m 905.81 1042.00 1176 1305.41 1430.67 114.99 96.78 82.9 82.9 Add CPOH @ 10% 90.58 104.2 117.6 130.54 143.07 11.5 9.68 8.29 8.29 Total 996.39 1146.2 1293.60 1435.95 1573.74 126.49 106.46 91.19 91.19 j) 500 mm dia. 24 100 m 1019.04 1172.25 1323.00 1468.58 1609.5 129.36 108.88 93.26 93.26 Add CPOH @ 10% 101.9 117.23 132.3 146.86 160.95 12.94 10.89 9.33 9.33 Total 1120.94 1289.48 1455.30 1615.44 1770.45 142.3 119.77 102.59 102.59 k) 600 mm dia. 18 100 m 1358.72 1563.00 1764.00 1958.11 2146 172.48 145.17 124.35 124.35 Add CPOH @ 10% 135.87 156.3 176.4 195.81 214.6 17.25 14.52 12.44 12.44 Total 1494.59 1719.30 1940.40 2153.92 2360.6 189.73 159.69 136.79 136.79 8. RC Pipes, AC Pipes, Hume, Steel and CI Pipe 4 a) 100 mm dia. 292.80 100 m 83.53 96.09 108.44 120.38 131.93 10.6 8.92 7.64 7.64 Add CPOH @ 10% 8.35 9.61 10.84 12.04 13.19 1.06 0.89 0.76 0.76 Total 91.88 105.7 119.28 132.42 145.12 11.66 9.81 8.4 8.4 b) 125 mm dia. 219.60 100 m 111.37 128.11 144.59 160.5 175.9 14.14 11.90 10.19 10.19 Add CPOH @ 10% 11.14 12.81 14.46 16.05 17.59 1.41 1.19 1.02 1.02 Total 122.51 140.92 159.05 176.55 193.49 15.55 13.09 11.21 11.21

Beyond Beyond Beyond Bey-<br />

Sl. Capa- Unit 5 Km 10 Km 20 Km ond<br />

No. Material city <strong>of</strong> 1 Km 2 Km 3 Km 4 Km 5 Km upto upto upto 30 Km<br />

(Net) Rate 10 Km 20 Km 30 Km addl.<br />

addl. addl. addl. per Km<br />

per Km per Km per Km<br />

Cost per trip 244.57 281.34 317.52 352.46 386.28 31.05 26.13 22.38 22.38<br />

1. S<strong>and</strong>, Lime, Shingle, 3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4<br />

Aggreagte, Surkhi,<br />

Earth, Moorum,<br />

Excavated<br />

Kerb stone<br />

rock <strong>and</strong><br />

Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64<br />

Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04<br />

2. Timber, Bamboo <strong>and</strong><br />

Ballie<br />

4 Cu.m. 61.14 70.34 79.38 88.12 96.57 7.76 6.53 5.6 5.6<br />

Add CPOH @ 10% 6.11 7.03 7.94 8.81 9.66 0.78 0.65 0.56 0.56<br />

Total 67.25 77.37 87.32 96.93 106.23 8.54 7.18 6.16 6.16<br />

3. Cement, Steel, Angle<br />

<strong>and</strong> Tee Channel<br />

7 Ton 34.94 40.19 45.36 50.35 55.18 4.44 3.73 3.2 3.2<br />

Add CPOH @ 10% 3.49 4.02 4.54 5.04 5.52 0.44 0.37 0.32 0.32<br />

Total 38.43 44.21 49.9 55.39 60.7 4.88 4.10 3.52 3.52<br />

4. Bricks 1500 1000 163.05 187.56 211.68 234.97 257.52 20.7 17.42 14.92 14.92<br />

Add CPOH @ 10% 16.31 18.76 21.17 23.5 25.75 2.07 1.74 1.49 1.49<br />

Total 179.36 206.32 232.85 258.47 283.27 22.77 19.16 16.41 16.41<br />

5. Tar, Bitumen <strong>and</strong><br />

Firewood<br />

5 Ton 48.91 56.27 63.5 70.49 77.26 6.21 5.23 4.48 4.48<br />

Add CPOH @ 10% 4.89 5.63 6.35 7.05 7.73 0.62 0.52 0.45 0.45<br />

Total 53.8 61.9 69.85 77.54 84.99 6.83 5.75 4.93 4.93<br />

6. Stone <strong>for</strong> masonary &<br />

soling<br />

3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4<br />

Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64<br />

Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04<br />

7. SW Pipe<br />

3<br />

CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT<br />

(INCLUDING LOADING, UNLOADING AND STACKING)<br />

a) 100 mm dia. 480 100 m 50.95 58.61 66.15 73.43 80.48 6.47 5.44 4.66 4.66<br />

Add CPOH @ 10% 5.10 5.86 6.62 7.34 8.05 0.65 0.54 0.47 0.47<br />

Total 56.05 64.47 72.77 80.77 88.53 7.12 5.98 5.13 5.13<br />

b) 150 mm dia. 240 100 m 101.9 117.23 132.3 146.86 160.95 12.94 10.89 9.33 9.33<br />

Add CPOH @ 10% 10.19 11.72 13.23 14.69 16.1 1.29 1.09 0.93 0.93<br />

Total 112.09 128.95 145.53 161.55 177.05 14.23 11.98 10.26 10.26