Beyond Beyond Beyond Bey- Sl. Capa- Unit 5 Km 10 Km 20 Km ond No. Material city of 1 Km 2 Km 3 Km 4 Km 5 Km upto upto upto 30 Km (Net) Rate 10 Km 20 Km 30 Km addl. addl. addl. addl. per Km per Km per Km per Km Cost per trip 244.57 281.34 317.52 352.46 386.28 31.05 26.13 22.38 22.38 1. Sand, Lime, Shingle, 3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4 Aggreagte, Surkhi, Earth, Moorum, Excavated Kerb stone rock and Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64 Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04 2. Timber, Bamboo and Ballie 4 Cu.m. 61.14 70.34 79.38 88.12 96.57 7.76 6.53 5.6 5.6 Add CPOH @ 10% 6.11 7.03 7.94 8.81 9.66 0.78 0.65 0.56 0.56 Total 67.25 77.37 87.32 96.93 106.23 8.54 7.18 6.16 6.16 3. Cement, Steel, Angle and Tee Channel 7 Ton 34.94 40.19 45.36 50.35 55.18 4.44 3.73 3.2 3.2 Add CPOH @ 10% 3.49 4.02 4.54 5.04 5.52 0.44 0.37 0.32 0.32 Total 38.43 44.21 49.9 55.39 60.7 4.88 4.10 3.52 3.52 4. Bricks 1500 1000 163.05 187.56 211.68 234.97 257.52 20.7 17.42 14.92 14.92 Add CPOH @ 10% 16.31 18.76 21.17 23.5 25.75 2.07 1.74 1.49 1.49 Total 179.36 206.32 232.85 258.47 283.27 22.77 19.16 16.41 16.41 5. Tar, Bitumen and Firewood 5 Ton 48.91 56.27 63.5 70.49 77.26 6.21 5.23 4.48 4.48 Add CPOH @ 10% 4.89 5.63 6.35 7.05 7.73 0.62 0.52 0.45 0.45 Total 53.8 61.9 69.85 77.54 84.99 6.83 5.75 4.93 4.93 6. Stone for masonary & soling 3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4 Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64 Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04 7. SW Pipe 3 CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT (INCLUDING LOADING, UNLOADING AND STACKING) a) 100 mm dia. 480 100 m 50.95 58.61 66.15 73.43 80.48 6.47 5.44 4.66 4.66 Add CPOH @ 10% 5.10 5.86 6.62 7.34 8.05 0.65 0.54 0.47 0.47 Total 56.05 64.47 72.77 80.77 88.53 7.12 5.98 5.13 5.13 b) 150 mm dia. 240 100 m 101.9 117.23 132.3 146.86 160.95 12.94 10.89 9.33 9.33 Add CPOH @ 10% 10.19 11.72 13.23 14.69 16.1 1.29 1.09 0.93 0.93 Total 112.09 128.95 145.53 161.55 177.05 14.23 11.98 10.26 10.26
CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT (INCLUDING LOADING, UNLOADING AND STACKING) Beyond Beyond Beyond Bey- Sl. Capa- Unit 5 Km 10 Km 20 Km ond No. Material city of 1 Km 2 Km 3 Km 4 Km 5 Km upto upto upto 30 Km (Net) Rate 10 Km 20 Km 30 Km addl. addl. addl. addl. per Km per Km per Km per Km Cost per trip 244.57 281.34 317.52 352.46 386.28 31.05 26.13 22.38 22.38 c) 200 mm dia. 135 100 m 181.16 208.4 235.2 261.08 286.13 23 19.36 16.58 16.58 Add CPOH @ 10% 18.12 20.84 23.52 26.11 28.61 2.3 1.94 1.66 1.66 Total 199.28 229.24 258.72 287.19 314.74 25.3 21.3 18.24 18.24 d) 230 mm dia. 105 100 m 232.92 267.94 302.40 335.68 367.89 29.57 24.89 21.32 21.32 Add CPOH @ 10% 23.29 26.79 30.24 33.57 36.79 2.96 2.49 2.13 2.13 Total 256.21 294.73 332.64 369.25 404.68 32.53 27.38 23.45 23.45 e) 250 mm dia. 84 100 m 291.15 334.93 378 419.6 459.86 36.96 31.11 26.65 26.65 Add CPOH @ 10% 29.12 33.49 37.8 41.96 45.99 3.7 3.11 2.67 2.67 Total 320.27 368.42 415.8 461.56 505.85 40.66 34.22 29.32 29.32 f) 300 mm dia. 66 100 m 370.56 426.27 481.09 534.03 585.27 47.04 39.59 33.91 33.91 Add CPOH @ 10% 37.06 42.63 48.11 53.40 58.53 4.7 3.96 3.39 3.39 Total 407.62 468.9 529.2 587.43 643.8 51.74 43.55 37.30 37.3 g) 350 mm dia. 48 100 m 509.52 586.13 661.5 734.29 804.75 64.68 54.44 46.63 46.63 Add CPOH @ 10% 50.95 58.61 66.15 73.43 80.48 6.47 5.44 4.66 4.66 Total 560.47 644.74 727.65 807.72 885.23 71.15 59.88 51.29 51.29 h) 400 mm dia. 33 100 m 741.12 852.55 962.18 1068.06 1170.55 94.08 79.18 67.83 67.83 Add CPOH @ 10% 74.11 85.26 96.22 106.81 117.06 9.41 7.92 6.78 6.78 Total 815.23 937.81 1058.4 1174.87 1287.61 103.49 87.10 74.61 74.61 i) 450 mm dia. 27 100 m 905.81 1042.00 1176 1305.41 1430.67 114.99 96.78 82.9 82.9 Add CPOH @ 10% 90.58 104.2 117.6 130.54 143.07 11.5 9.68 8.29 8.29 Total 996.39 1146.2 1293.60 1435.95 1573.74 126.49 106.46 91.19 91.19 j) 500 mm dia. 24 100 m 1019.04 1172.25 1323.00 1468.58 1609.5 129.36 108.88 93.26 93.26 Add CPOH @ 10% 101.9 117.23 132.3 146.86 160.95 12.94 10.89 9.33 9.33 Total 1120.94 1289.48 1455.30 1615.44 1770.45 142.3 119.77 102.59 102.59 k) 600 mm dia. 18 100 m 1358.72 1563.00 1764.00 1958.11 2146 172.48 145.17 124.35 124.35 Add CPOH @ 10% 135.87 156.3 176.4 195.81 214.6 17.25 14.52 12.44 12.44 Total 1494.59 1719.30 1940.40 2153.92 2360.6 189.73 159.69 136.79 136.79 8. RC Pipes, AC Pipes, Hume, Steel and CI Pipe 4 a) 100 mm dia. 292.80 100 m 83.53 96.09 108.44 120.38 131.93 10.6 8.92 7.64 7.64 Add CPOH @ 10% 8.35 9.61 10.84 12.04 13.19 1.06 0.89 0.76 0.76 Total 91.88 105.7 119.28 132.42 145.12 11.66 9.81 8.4 8.4 b) 125 mm dia. 219.60 100 m 111.37 128.11 144.59 160.5 175.9 14.14 11.90 10.19 10.19 Add CPOH @ 10% 11.14 12.81 14.46 16.05 17.59 1.41 1.19 1.02 1.02 Total 122.51 140.92 159.05 176.55 193.49 15.55 13.09 11.21 11.21
- Page 1 and 2: PUBLIC WORKS DEPARTMENT ARUNACHAL P
- Page 3 and 4: INDEX Lead Chart for carriage of ma
- Page 5: CARRIAGE OF MATERIALS BY MECHANICAL
- Page 9 and 10: 6 (A) Usage Rates of Plant and Mach
- Page 11 and 12: 8 (B) Labour Sl. No. Description of
- Page 13 and 14: 10 Sl. No. Description Unit Rate M-
- Page 15 and 16: M-162 Seeds kg 250 M-163 Selected e
- Page 17 and 18: A. Roads Works Basic Notes for Prep
- Page 19 and 20: 8. Labour 8.1 The avarage market ra
- Page 21 and 22: Preamble: CHAPTER - 1 CARRIAGE OF M
- Page 23 and 24: Preamble: Chapter - 2 SITE CLEARANC
- Page 25 and 26: Summary of Rate Analysis Item No. D
- Page 27 and 28: Preamble: Chapter - 3 EARTHWORK, ER
- Page 29 and 30: Summary of Rate Analysis Item No. D
- Page 31 and 32: Item No. 3.26 3.27 3.28 3.29 3.30 3
- Page 33 and 34: Preamble: Chapter - 4 SUB-BASES, BA
- Page 35 and 36: 32 Summary of Rate Analysis Item No
- Page 37 and 38: Preamble: 34 Chapter - 5 BASES AND
- Page 39 and 40: 36 Summary of Rate Analysis Item No
- Page 41 and 42: Item No. 5.19 5.20 5.21 5.22 (i) (i
- Page 43 and 44: Item No. 6.1 6.2 6.3 6.4 Descriptio
- Page 45 and 46: 16 The rate analysis for traffic im
- Page 47 and 48: Item No. 8.9 8.10 8.11 8.12 8.13 8.
- Page 49 and 50: Item No. 8.24 8.25 8.27 8.28 8.29 B
- Page 51 and 52: Item No. 8.45 8.46 Descriptions Sum
- Page 53 and 54: Item No. 9.1 9.2 9.3 Descriptions C
- Page 55 and 56: Item No. 10.1 10.2 10.3 10.4 10.5 D
Beyond Beyond Beyond Bey-<br />
Sl. Capa- Unit 5 Km 10 Km 20 Km ond<br />
No. Material city <strong>of</strong> 1 Km 2 Km 3 Km 4 Km 5 Km upto upto upto 30 Km<br />
(Net) Rate 10 Km 20 Km 30 Km addl.<br />
addl. addl. addl. per Km<br />
per Km per Km per Km<br />
Cost per trip 244.57 281.34 317.52 352.46 386.28 31.05 26.13 22.38 22.38<br />
1. S<strong>and</strong>, Lime, Shingle, 3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4<br />
Aggreagte, Surkhi,<br />
Earth, Moorum,<br />
Excavated<br />
Kerb stone<br />
rock <strong>and</strong><br />
Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64<br />
Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04<br />
2. Timber, Bamboo <strong>and</strong><br />
Ballie<br />
4 Cu.m. 61.14 70.34 79.38 88.12 96.57 7.76 6.53 5.6 5.6<br />
Add CPOH @ 10% 6.11 7.03 7.94 8.81 9.66 0.78 0.65 0.56 0.56<br />
Total 67.25 77.37 87.32 96.93 106.23 8.54 7.18 6.16 6.16<br />
3. Cement, Steel, Angle<br />
<strong>and</strong> Tee Channel<br />
7 Ton 34.94 40.19 45.36 50.35 55.18 4.44 3.73 3.2 3.2<br />
Add CPOH @ 10% 3.49 4.02 4.54 5.04 5.52 0.44 0.37 0.32 0.32<br />
Total 38.43 44.21 49.9 55.39 60.7 4.88 4.10 3.52 3.52<br />
4. Bricks 1500 1000 163.05 187.56 211.68 234.97 257.52 20.7 17.42 14.92 14.92<br />
Add CPOH @ 10% 16.31 18.76 21.17 23.5 25.75 2.07 1.74 1.49 1.49<br />
Total 179.36 206.32 232.85 258.47 283.27 22.77 19.16 16.41 16.41<br />
5. Tar, Bitumen <strong>and</strong><br />
Firewood<br />
5 Ton 48.91 56.27 63.5 70.49 77.26 6.21 5.23 4.48 4.48<br />
Add CPOH @ 10% 4.89 5.63 6.35 7.05 7.73 0.62 0.52 0.45 0.45<br />
Total 53.8 61.9 69.85 77.54 84.99 6.83 5.75 4.93 4.93<br />
6. Stone <strong>for</strong> masonary &<br />
soling<br />
3.50 Cu.m. 69.88 80.38 90.72 100.7 110.37 8.87 7.47 6.4 6.4<br />
Add CPOH @ 10% 6.99 8.04 9.07 10.07 11.04 0.89 0.75 0.64 0.64<br />
Total 76.87 88.42 99.79 110.77 121.41 9.76 8.22 7.04 7.04<br />
7. SW Pipe<br />
3<br />
CARRIAGE OF MATERIALS BY MECHANICAL TRANSPORT<br />
(INCLUDING LOADING, UNLOADING AND STACKING)<br />
a) 100 mm dia. 480 100 m 50.95 58.61 66.15 73.43 80.48 6.47 5.44 4.66 4.66<br />
Add CPOH @ 10% 5.10 5.86 6.62 7.34 8.05 0.65 0.54 0.47 0.47<br />
Total 56.05 64.47 72.77 80.77 88.53 7.12 5.98 5.13 5.13<br />
b) 150 mm dia. 240 100 m 101.9 117.23 132.3 146.86 160.95 12.94 10.89 9.33 9.33<br />
Add CPOH @ 10% 10.19 11.72 13.23 14.69 16.1 1.29 1.09 0.93 0.93<br />