Preamble: Chapter – 9 PIPE CULVERTS 1 Pipe culverts of sizes 1000 mm and 1200 mm dia in single row and double row which are generally used on roads, have been included. Providing and laying of pipe has been included in the rate analysis. Items of auxiliary works such as excavation, bedding, backfilling, concrete and masonry shall be analysed, as provided under the respective sections and paid for separately. 2 Analysis has been given separately for NP2 pipes for ease of adoption. 3 Cost of any river training and protection work like stone pitching, apron, curtain wall etc. may be analysed under the respective item included in Chapter 16. 4 The joining of pipes is proposed by collar joints. 5 Chain & pulley for lifting the pipes is considered part of overheads. 49 6 The thickness of first class bedding has been taken as 150 mm. The height of bedding has been taken as 1/10th of overall height of pipe in the analysis. This may be modified as per thickness indicated in the approved drawing.
Item No. 9.1 9.2 9.3 Descriptions CHAPTER-9 PIPE CULVERTS Summary of Rate Analysis PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Laying Reinforced Cement Concrete Pipe NP2/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP2/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 50 Unit Rate cum 3023.00 A 1000 mm dia metre 1082.00 B 1200 mm dia Laying Reinforced Cement Concrete Pipe NP 2 /prestrssed concrete pipe on first class bedding in double row . (Laying Reinforced cement concrete pipe NP2 /prestrssed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) metre 1458.00 A 1000 mm dia metre 2279.00 B 1200 mm dia metre 3040.00
- Page 1 and 2: PUBLIC WORKS DEPARTMENT ARUNACHAL P
- Page 3 and 4: INDEX Lead Chart for carriage of ma
- Page 5 and 6: CARRIAGE OF MATERIALS BY MECHANICAL
- Page 7 and 8: CARRIAGE OF MATERIALS BY MECHANICAL
- Page 9 and 10: 6 (A) Usage Rates of Plant and Mach
- Page 11 and 12: 8 (B) Labour Sl. No. Description of
- Page 13 and 14: 10 Sl. No. Description Unit Rate M-
- Page 15 and 16: M-162 Seeds kg 250 M-163 Selected e
- Page 17 and 18: A. Roads Works Basic Notes for Prep
- Page 19 and 20: 8. Labour 8.1 The avarage market ra
- Page 21 and 22: Preamble: CHAPTER - 1 CARRIAGE OF M
- Page 23 and 24: Preamble: Chapter - 2 SITE CLEARANC
- Page 25 and 26: Summary of Rate Analysis Item No. D
- Page 27 and 28: Preamble: Chapter - 3 EARTHWORK, ER
- Page 29 and 30: Summary of Rate Analysis Item No. D
- Page 31 and 32: Item No. 3.26 3.27 3.28 3.29 3.30 3
- Page 33 and 34: Preamble: Chapter - 4 SUB-BASES, BA
- Page 35 and 36: 32 Summary of Rate Analysis Item No
- Page 37 and 38: Preamble: 34 Chapter - 5 BASES AND
- Page 39 and 40: 36 Summary of Rate Analysis Item No
- Page 41 and 42: Item No. 5.19 5.20 5.21 5.22 (i) (i
- Page 43 and 44: Item No. 6.1 6.2 6.3 6.4 Descriptio
- Page 45 and 46: 16 The rate analysis for traffic im
- Page 47 and 48: Item No. 8.9 8.10 8.11 8.12 8.13 8.
- Page 49 and 50: Item No. 8.24 8.25 8.27 8.28 8.29 B
- Page 51: Item No. 8.45 8.46 Descriptions Sum
- Page 55 and 56: Item No. 10.1 10.2 10.3 10.4 10.5 D
- Page 57 and 58: Item No. 10.21 Descriptions Summary
- Page 59 and 60: Item No. 11.1 11.2 Descriptions CHA
- Page 61 and 62: Preamble: Chapter - 12 FOUNDATION 1
- Page 63 and 64: Item No. Descriptions CHAPTER-12 FO
- Page 65 and 66: 62 Summary of Rate Analysis Item No
- Page 67 and 68: 64 Summary of Rate Analysis Item No
- Page 69 and 70: 66 Summary of Rate Analysis Item No
- Page 71 and 72: 68 Summary of Rate Analysis Item No
- Page 73 and 74: 70 Summary of Rate Analysis Item No
- Page 75 and 76: 72 Summary of Rate Analysis Item No
- Page 77 and 78: Item No. Descriptions CHAPTER-13 SU
- Page 79 and 80: Item No. 13.9 13.10 13.11 13.12 13.
- Page 81 and 82: Item No. Descriptions CHAPTER-14 SU
- Page 83 and 84: 80 Summary of Rate Analysis Item No
- Page 85 and 86: Item No. 14.11 14.15 14.16 Descript
- Page 87 and 88: Preamble: Chapter - 15 PROTECTION W
- Page 89 and 90: Item No. 15.13 Descriptions Summary
- Page 91 and 92: Item No. 16.1 16.2 16.3 16.4 16.5 1
Item<br />
No.<br />
9.1<br />
9.2<br />
9.3<br />
Descriptions<br />
CHAPTER-9<br />
PIPE CULVERTS<br />
Summary <strong>of</strong> Rate Analysis<br />
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone<br />
aggregate 40 mm nominal size mechanically mixed, placed in foundation <strong>and</strong><br />
compacted by vibration including curing <strong>for</strong> 14 days.)<br />
Laying Rein<strong>for</strong>ced Cement Concrete Pipe NP2/prestrssed concrete pipe on<br />
first class bedding in single row . (Laying Rein<strong>for</strong>ced cement concrete pipe<br />
NP2/prestrssed concrete pipe <strong>for</strong> culverts on first class bedding <strong>of</strong> granular<br />
material in single row including fixing collar with cement mortar 1:2 but<br />
excluding excavation, protection works, backfilling, concrete <strong>and</strong> masonry<br />
works in head walls <strong>and</strong> parapets . )<br />
50<br />
Unit Rate<br />
cum 3023.00<br />
A 1000 mm dia metre 1082.00<br />
B 1200 mm dia<br />
Laying Rein<strong>for</strong>ced Cement Concrete Pipe NP 2 /prestrssed concrete pipe on<br />
first class bedding in double row . (Laying Rein<strong>for</strong>ced cement concrete pipe<br />
NP2 /prestrssed concrete pipe <strong>for</strong> culverts on first class bedding <strong>of</strong> granular<br />
material in double row including fixing collar with cement mortar 1:2 but<br />
excluding excavation, protection works, backfilling, concrete <strong>and</strong> masonry<br />
works in head walls <strong>and</strong> parapets . )<br />
metre 1458.00<br />
A 1000 mm dia metre 2279.00<br />
B 1200 mm dia metre 3040.00