Item No. 8.35 8.36 8.38 8.40 8.43 8.44 A B C Descriptions Summary of Rate Analysis Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973) Traffic Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per BS 873) Rumble Strips (Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.) High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast pole lighting with 30 m high hot dip galvanised mast designed to withstand forces exerted with wind speeds of 180 km per hour with 3 seconds gust, as per IS:875 (Part 3) - 1978, fitted with a base flange, door at the base of mast with heavy duty internal lock, lantern carriage, suitable winching arrangement for safe working load of 750 kg and high powered electrically driven power tools for raising and lowering of lantern carriage, flexible 8 core electric cable, lightening conductor, earthing terminal, and fixing 2 nos aviation obstruction lights on top of the mast, all complete as per approved design and drawings This is a specialised work and is generally done by firms who specialise in such jobs. The detailed designs and estimates are submitted by the firms alongwith their tender for checks by the Department. The cost of this work is required to be worked out based on approved design, drawings and estimate of the lowest tender. A separate contract for this work is concluded as the contractors for road and bridge works generally don Portable Barricade in Construction Zone (Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 ) Permanent Type Barricade in Construction Zone With Steel Components (Construction of a permanent type barricade made of steel components, 1.5 m high from road level, fitted with 3 horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical support, painted with yellow and white strips, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 ) With Wooden Components (Construction of a permanent type barricade made of wooden components, 1.5 m high from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical post, painted with yellow and white striups, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 ) With Bricks (Construction of a permanent type barricade made with brick work in mud mortar, 1.5 m high, 4 m long, 600 mm thick, plastered with cement mortar 1:6, painted with yellow and white strips) 47 Unit Rate each 535.00 each 1212.00 sqm each 2518.00 each 4050.00 each 2481.00 each 9792.00
Item No. 8.45 8.46 Descriptions Summary of Rate Analysis Drum Delineator in Construction Zone (Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001) Flagman (Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag 600 x 600 mm securely fastened to a staff 1 m in length for guiding the traffic) 48 Unit Rate each 248.00 each 249.00
- Page 1 and 2: PUBLIC WORKS DEPARTMENT ARUNACHAL P
- Page 3 and 4: INDEX Lead Chart for carriage of ma
- Page 5 and 6: CARRIAGE OF MATERIALS BY MECHANICAL
- Page 7 and 8: CARRIAGE OF MATERIALS BY MECHANICAL
- Page 9 and 10: 6 (A) Usage Rates of Plant and Mach
- Page 11 and 12: 8 (B) Labour Sl. No. Description of
- Page 13 and 14: 10 Sl. No. Description Unit Rate M-
- Page 15 and 16: M-162 Seeds kg 250 M-163 Selected e
- Page 17 and 18: A. Roads Works Basic Notes for Prep
- Page 19 and 20: 8. Labour 8.1 The avarage market ra
- Page 21 and 22: Preamble: CHAPTER - 1 CARRIAGE OF M
- Page 23 and 24: Preamble: Chapter - 2 SITE CLEARANC
- Page 25 and 26: Summary of Rate Analysis Item No. D
- Page 27 and 28: Preamble: Chapter - 3 EARTHWORK, ER
- Page 29 and 30: Summary of Rate Analysis Item No. D
- Page 31 and 32: Item No. 3.26 3.27 3.28 3.29 3.30 3
- Page 33 and 34: Preamble: Chapter - 4 SUB-BASES, BA
- Page 35 and 36: 32 Summary of Rate Analysis Item No
- Page 37 and 38: Preamble: 34 Chapter - 5 BASES AND
- Page 39 and 40: 36 Summary of Rate Analysis Item No
- Page 41 and 42: Item No. 5.19 5.20 5.21 5.22 (i) (i
- Page 43 and 44: Item No. 6.1 6.2 6.3 6.4 Descriptio
- Page 45 and 46: 16 The rate analysis for traffic im
- Page 47 and 48: Item No. 8.9 8.10 8.11 8.12 8.13 8.
- Page 49: Item No. 8.24 8.25 8.27 8.28 8.29 B
- Page 53 and 54: Item No. 9.1 9.2 9.3 Descriptions C
- Page 55 and 56: Item No. 10.1 10.2 10.3 10.4 10.5 D
- Page 57 and 58: Item No. 10.21 Descriptions Summary
- Page 59 and 60: Item No. 11.1 11.2 Descriptions CHA
- Page 61 and 62: Preamble: Chapter - 12 FOUNDATION 1
- Page 63 and 64: Item No. Descriptions CHAPTER-12 FO
- Page 65 and 66: 62 Summary of Rate Analysis Item No
- Page 67 and 68: 64 Summary of Rate Analysis Item No
- Page 69 and 70: 66 Summary of Rate Analysis Item No
- Page 71 and 72: 68 Summary of Rate Analysis Item No
- Page 73 and 74: 70 Summary of Rate Analysis Item No
- Page 75 and 76: 72 Summary of Rate Analysis Item No
- Page 77 and 78: Item No. Descriptions CHAPTER-13 SU
- Page 79 and 80: Item No. 13.9 13.10 13.11 13.12 13.
- Page 81 and 82: Item No. Descriptions CHAPTER-14 SU
- Page 83 and 84: 80 Summary of Rate Analysis Item No
- Page 85 and 86: Item No. 14.11 14.15 14.16 Descript
- Page 87 and 88: Preamble: Chapter - 15 PROTECTION W
- Page 89 and 90: Item No. 15.13 Descriptions Summary
- Page 91 and 92: Item No. 16.1 16.2 16.3 16.4 16.5 1
Item<br />
No.<br />
8.45<br />
8.46<br />
Descriptions<br />
Summary <strong>of</strong> Rate Analysis<br />
Drum Delineator in Construction Zone (Provision <strong>of</strong> metal drum/empty bitumen<br />
drum delineator, 300 mm in diameter, 800 mm high, filled with earth <strong>for</strong> stability,<br />
painted in circumferential strips <strong>of</strong> alternate black <strong>and</strong> white 100 mm wide fitted with<br />
reflectors 3 Nos <strong>of</strong> 7.5 cm dia, all as per IRC:SP:55-2001)<br />
Flagman (Positioning <strong>of</strong> a smart flagman with a yellow vest <strong>and</strong> a yellow cap <strong>and</strong> a<br />
red flag 600 x 600 mm securely fastened to a staff 1 m in length <strong>for</strong> guiding the<br />
traffic)<br />
48<br />
Unit Rate<br />
each 248.00<br />
each 249.00