11.04.2013 Views

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Preamble:<br />

39<br />

Chapter – 6<br />

CEMENT CONCRETE PAVEMENT<br />

1 High capacity batch mix plants <strong>of</strong> 75 cum/hour (effective output) has been considered in the rate<br />

analysis <strong>of</strong> cement concrete pavement works.<br />

2 While tippers have been provided <strong>for</strong> tranportation <strong>of</strong> dry lean cement concrete <strong>and</strong> rolled cement<br />

concrete, transit truck mixers have been considered <strong>for</strong> the cement concrete pavement.<br />

3 Super plasticizer admixture has been provided to improve workability with reduced water cement<br />

ratio.<br />

4 Cement 43 grade has been catered <strong>for</strong> the cement concrete pavement i.e., <strong>for</strong> pavement quality<br />

concrete to get higher strength. However, <strong>for</strong> dry lean concrete, cement <strong>of</strong> 33 grade may be<br />

preferred.<br />

5 While a slip <strong>for</strong>m paver has been catered <strong>for</strong> the top layer <strong>of</strong> concrete pavement, a mechanical<br />

paver has been provided <strong>for</strong> dry lead <strong>and</strong> roller cement concrete.<br />

6 Materials provided in the rate analysis are <strong>for</strong> estimating prupose. Exact quantity <strong>of</strong> materiasl be<br />

determined <strong>for</strong> the job mix <strong>for</strong>mula.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!