33<br />

Summary <strong>of</strong> Rate Analysis<br />

Item<br />

No.<br />

Descriptions<br />

Wet Mix Macadam (Providing, laying, spreading <strong>and</strong> compacting graded stone<br />

aggregate to wet mix macadam specification including premixing the Material with<br />

Unit Rate<br />

4.12 water at OMC in mechanical mix plant carriage <strong>of</strong> mixed Material by tipper to site,<br />

laying in uni<strong>for</strong>m layers with paver in sub- base / base course on well prepared<br />

surface <strong>and</strong> compacting with vibratory roller to achieve the desired density.)<br />

Construction <strong>of</strong> Median <strong>and</strong> Isl<strong>and</strong> with Soil Taken from <strong>Road</strong>way Cutting<br />

cum 1086.00<br />

4.13<br />

(Construction <strong>of</strong> Median <strong>and</strong> Isl<strong>and</strong> above road level with approved material<br />

deposited at site from roadway cutting <strong>and</strong> excavation <strong>for</strong> drain <strong>and</strong> foundation <strong>of</strong><br />

other structures, spread, graded <strong>and</strong> compacted as per clause 407)<br />

Construction <strong>of</strong> Median <strong>and</strong> Isl<strong>and</strong> with Soil Taken from Borrow Areas<br />

cum 163.00<br />

4.14 (Construction <strong>of</strong> median <strong>and</strong> Isl<strong>and</strong> above road level with approved material<br />

brought from borrow pits, spread, sloped <strong>and</strong> compacted as per clause 407)<br />

cum 390.00<br />

4.15 Construction <strong>of</strong> Shoulders (A. Earthen Shoulders)<br />

Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on<br />

4.17<br />

a prepared surface by hauling vehicles, spreading <strong>and</strong> mixing with a motor grader,<br />

watering <strong>and</strong> compacting with a vibratory roller to clause 410 to <strong>for</strong>m a layer <strong>of</strong> subbase/Base)<br />

A By Mix in Place Method<br />

(i) For 53 mm maximum size cum 1877.00<br />

(ii) For 45 mm maximum size cum 2254.00<br />

B By Mixing Plant :<br />

(i) For 53 mm maximum size cum 1992.00<br />

(ii) For 45 mm maximum size<br />

Preparation <strong>of</strong> sub grade (Preparation <strong>of</strong> sub grade by excavating earth to an<br />

cum 1484.00<br />

4.18 (A) average depth <strong>of</strong> 22.50 cm, dressing to camber <strong>and</strong> consolidating with road roller,<br />

making good the undulations etc. <strong>and</strong> disposal <strong>of</strong> surplus earth, lead upto 50 m.)<br />

Consolidation <strong>of</strong> sub-grade with road roller <strong>of</strong> 8 to 12 tonne capacity including making<br />

sqm 28.00<br />

4.18 (B) good the undulations etc. with earth or quarry spoils etc. <strong>and</strong> rerolling the sub grade. sqm 2.90