Item<br />

No.<br />

4.1<br />

A<br />

B<br />

4.2<br />

4.3<br />

4.4<br />

4.5<br />

Descriptions<br />

Summary <strong>of</strong> Rate Analysis<br />

CHAPTER-4<br />

SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS<br />

Granular Sub-base with Close Graded Material (Table:- 400-1)<br />

Plant Mix Method (Construction <strong>of</strong> granular sub-base by providing close graded<br />

Material, mixing in a mechanical mix plant at OMC, carriage <strong>of</strong> mixed Material to<br />

work site, spreading in uni<strong>for</strong>m layers with motor grader on prepared surface <strong>and</strong><br />

compacting with vibratory power roller to achieve the desired density, complete as<br />

per clause 401 )<br />

31<br />

Unit Rate<br />

(i) <strong>for</strong> grading- I Material cum 983.00<br />

(ii) <strong>for</strong> grading- II Material cum 854.00<br />

(iii) <strong>for</strong> grading-III Material<br />

By Mix in Place Method (Construction <strong>of</strong> granular sub-base by providing close<br />

graded material, spreading in uni<strong>for</strong>m layers with motor grader on prepared<br />

surface, mixing by mix in place method with rotavator at OMC, <strong>and</strong> compacting with<br />

vibratory roller to achieve the desired density, complete as per clause 401)<br />

cum 839.00<br />

(i) <strong>for</strong> grading- I Material cum 864.00<br />

(ii) <strong>for</strong> grading- II Material cum 735.00<br />

(iii) <strong>for</strong> grading-III Material<br />

Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction<br />

<strong>of</strong> granular sub-base by providing coarse graded material, spreading in uni<strong>for</strong>m<br />

layers with motor grader on prepared surface, mixing by mix in place method with<br />

rotavator at OMC, <strong>and</strong> compacting with vibratory roller to achieve the desired<br />

density, complete as per clause 401)<br />

cum 719.00<br />

(i) <strong>for</strong> grading- I Material cum 891.00<br />

(ii) <strong>for</strong> grading- II Material cum 799.00<br />

(iii) <strong>for</strong> grading-III Material<br />

Lime Stabilisation <strong>for</strong> Improving Subgrade (Laying <strong>and</strong> spreading available soil<br />

in the subgrade on a prepared surface, pulverising, mixing the spread soil in place<br />

with rotavator with 3 % slaked lime having minimum content <strong>of</strong> 70% <strong>of</strong> CaO, grading<br />

with motor grader <strong>and</strong> compacting with the road roller at OMC to the desired<br />

density to <strong>for</strong>m a layer <strong>of</strong> improved sub grade)<br />

cum 729.00<br />

A By Mechanical Means cum 724.00<br />

B By Manual Means<br />

Lime Treated Soil <strong>for</strong> Sub- Base (Providing, laying <strong>and</strong> spreading soil on a<br />

prepared sub grade, pulverising, mixing the spread soil in place with rotavator with<br />

cum 696.00<br />

3 % slaked lime with minimum content <strong>of</strong> 70% <strong>of</strong> CaO, grading with motor grader<br />

<strong>and</strong> compacting with the road roller at OMC to achieve at least 98%<strong>of</strong> the max dry<br />

density to <strong>for</strong>m a layer <strong>of</strong> sub base.)<br />

Cement Treated Soil Sub Base/ Base (Providing, laying <strong>and</strong> spreading soil on a<br />

prepared sub grade, pulverising, adding the designed quantity <strong>of</strong> cement to the<br />

cum 902.00<br />

spread soil, mixing in place with rotavator, grading with the motor grader <strong>and</strong><br />

compacting with the road roller at OMC to achieve the desired unconfined<br />

compressive strength <strong>and</strong> to <strong>for</strong>m a layer <strong>of</strong> sub-base/base.)<br />

cum 802.00