Item<br />
No.<br />
4.1<br />
A<br />
B<br />
4.2<br />
4.3<br />
4.4<br />
4.5<br />
Descriptions<br />
Summary <strong>of</strong> Rate Analysis<br />
CHAPTER-4<br />
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS<br />
Granular Sub-base with Close Graded Material (Table:- 400-1)<br />
Plant Mix Method (Construction <strong>of</strong> granular sub-base by providing close graded<br />
Material, mixing in a mechanical mix plant at OMC, carriage <strong>of</strong> mixed Material to<br />
work site, spreading in uni<strong>for</strong>m layers with motor grader on prepared surface <strong>and</strong><br />
compacting with vibratory power roller to achieve the desired density, complete as<br />
per clause 401 )<br />
31<br />
Unit Rate<br />
(i) <strong>for</strong> grading- I Material cum 983.00<br />
(ii) <strong>for</strong> grading- II Material cum 854.00<br />
(iii) <strong>for</strong> grading-III Material<br />
By Mix in Place Method (Construction <strong>of</strong> granular sub-base by providing close<br />
graded material, spreading in uni<strong>for</strong>m layers with motor grader on prepared<br />
surface, mixing by mix in place method with rotavator at OMC, <strong>and</strong> compacting with<br />
vibratory roller to achieve the desired density, complete as per clause 401)<br />
cum 839.00<br />
(i) <strong>for</strong> grading- I Material cum 864.00<br />
(ii) <strong>for</strong> grading- II Material cum 735.00<br />
(iii) <strong>for</strong> grading-III Material<br />
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction<br />
<strong>of</strong> granular sub-base by providing coarse graded material, spreading in uni<strong>for</strong>m<br />
layers with motor grader on prepared surface, mixing by mix in place method with<br />
rotavator at OMC, <strong>and</strong> compacting with vibratory roller to achieve the desired<br />
density, complete as per clause 401)<br />
cum 719.00<br />
(i) <strong>for</strong> grading- I Material cum 891.00<br />
(ii) <strong>for</strong> grading- II Material cum 799.00<br />
(iii) <strong>for</strong> grading-III Material<br />
Lime Stabilisation <strong>for</strong> Improving Subgrade (Laying <strong>and</strong> spreading available soil<br />
in the subgrade on a prepared surface, pulverising, mixing the spread soil in place<br />
with rotavator with 3 % slaked lime having minimum content <strong>of</strong> 70% <strong>of</strong> CaO, grading<br />
with motor grader <strong>and</strong> compacting with the road roller at OMC to the desired<br />
density to <strong>for</strong>m a layer <strong>of</strong> improved sub grade)<br />
cum 729.00<br />
A By Mechanical Means cum 724.00<br />
B By Manual Means<br />
Lime Treated Soil <strong>for</strong> Sub- Base (Providing, laying <strong>and</strong> spreading soil on a<br />
prepared sub grade, pulverising, mixing the spread soil in place with rotavator with<br />
cum 696.00<br />
3 % slaked lime with minimum content <strong>of</strong> 70% <strong>of</strong> CaO, grading with motor grader<br />
<strong>and</strong> compacting with the road roller at OMC to achieve at least 98%<strong>of</strong> the max dry<br />
density to <strong>for</strong>m a layer <strong>of</strong> sub base.)<br />
Cement Treated Soil Sub Base/ Base (Providing, laying <strong>and</strong> spreading soil on a<br />
prepared sub grade, pulverising, adding the designed quantity <strong>of</strong> cement to the<br />
cum 902.00<br />
spread soil, mixing in place with rotavator, grading with the motor grader <strong>and</strong><br />
compacting with the road roller at OMC to achieve the desired unconfined<br />
compressive strength <strong>and</strong> to <strong>for</strong>m a layer <strong>of</strong> sub-base/base.)<br />
cum 802.00