11.04.2013 Views

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Item<br />

No.<br />

3.35 (i)<br />

B<br />

3.35 (ii)<br />

A<br />

3.35 (ii)<br />

B<br />

Descriptions<br />

Summary <strong>of</strong> Rate Analysis<br />

Deduct <strong>for</strong> quantum <strong>of</strong> earthwork <strong>of</strong> all types disposal directly by throwing into the<br />

valley without involving any lead <strong>and</strong> lift (Ordinary <strong>and</strong> Hard Soil/Hard Shale, Soil<br />

containing shingle or small size boulders.<br />

Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in<br />

Ordinary Rock using Manual Means including loading in a truck <strong>and</strong> carrying <strong>of</strong><br />

excavated material to embankment site with a lift upto 1.5 m <strong>and</strong> lead upto 20 m as<br />

per Clause 1603.2.)<br />

Deduct <strong>for</strong> quantum <strong>of</strong> earthwork <strong>of</strong> all types disposal directly by throwing into the<br />

valley without involving any lead <strong>and</strong> lift. (Ordinary <strong>and</strong> Hard Rock)<br />

29<br />

Unit Rate<br />

cum 24.00<br />

cum 141.00<br />

cum 39.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!