APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Item<br />
No.<br />
3.35 (i)<br />
B<br />
3.35 (ii)<br />
A<br />
3.35 (ii)<br />
B<br />
Descriptions<br />
Summary <strong>of</strong> Rate Analysis<br />
Deduct <strong>for</strong> quantum <strong>of</strong> earthwork <strong>of</strong> all types disposal directly by throwing into the<br />
valley without involving any lead <strong>and</strong> lift (Ordinary <strong>and</strong> Hard Soil/Hard Shale, Soil<br />
containing shingle or small size boulders.<br />
Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in<br />
Ordinary Rock using Manual Means including loading in a truck <strong>and</strong> carrying <strong>of</strong><br />
excavated material to embankment site with a lift upto 1.5 m <strong>and</strong> lead upto 20 m as<br />
per Clause 1603.2.)<br />
Deduct <strong>for</strong> quantum <strong>of</strong> earthwork <strong>of</strong> all types disposal directly by throwing into the<br />
valley without involving any lead <strong>and</strong> lift. (Ordinary <strong>and</strong> Hard Rock)<br />
29<br />
Unit Rate<br />
cum 24.00<br />
cum 141.00<br />
cum 39.00