Item<br />
No.<br />
2.10<br />
2.11<br />
2.12<br />
2.13<br />
2.14<br />
Descriptions<br />
Summary <strong>of</strong> Rate Analysis<br />
Unit Rate<br />
A<br />
Dismantling Kilometre Stone (Dismantling <strong>of</strong> kilometre stone including cutting <strong>of</strong><br />
earth, foundation <strong>and</strong> disposal <strong>of</strong> dismantled material with all lifts <strong>and</strong> lead upto<br />
1000 m <strong>and</strong> back filling <strong>of</strong> pit.)<br />
5th KM stone each 177.00<br />
B Ordinary KM Stone each 107.00<br />
C Hectometre Stone<br />
Dismantling <strong>of</strong> Fencing (Dismantling <strong>of</strong> barbed wire fencing/ wire mesh fencing<br />
including posts, foundation concrete, back filling <strong>of</strong> pit by manual means including<br />
each 21.00<br />
disposal <strong>of</strong> dismantled material with all lifts <strong>and</strong> up to a lead <strong>of</strong> 1000 metres,<br />
stacking serviceable material <strong>and</strong> unserviceable material separately. )<br />
metre 21.00<br />
Dismantling <strong>of</strong> CI Water Pipe Line (Dismantling <strong>of</strong> CI water pipe line 600 mm dia<br />
including disposal with all lifts <strong>and</strong> lead upto 1000 metres <strong>and</strong> stacking <strong>of</strong><br />
serviceable material <strong>and</strong> unserviceable material separately under supervision <strong>of</strong><br />
concerned department)<br />
Removal <strong>of</strong> Cement Concrete Pipe <strong>of</strong> Sewer Gutter (Removal <strong>of</strong> cement<br />
concrete pipe <strong>of</strong> sewer gutter 1500 mm dia under the supervision <strong>of</strong> concerned<br />
department including disposal with all lifts <strong>and</strong> up to a lead <strong>of</strong> 1000 metres <strong>and</strong><br />
stacking <strong>of</strong> serviceable <strong>and</strong> unserviceable material separately but excluding earth<br />
excavation <strong>and</strong> dismantling <strong>of</strong> masonry works.)<br />
Removal <strong>of</strong> Telephone / Electric Poles <strong>and</strong> Lines (Removal <strong>of</strong> telephone /<br />
Electric poles including excavation <strong>and</strong> dismantling <strong>of</strong> foundation concrete <strong>and</strong> lines<br />
under the supervision <strong>of</strong> concerned department, disposal with all lifts <strong>and</strong> up to a<br />
lead <strong>of</strong> 1000 metres <strong>and</strong> stacking the serviceable <strong>and</strong> unserviceable material<br />
separately)<br />
23<br />
metre 63.00<br />
metre 101.00<br />
each 79.00