Item<br />

No.<br />

2.10<br />

2.11<br />

2.12<br />

2.13<br />

2.14<br />

Descriptions<br />

Summary <strong>of</strong> Rate Analysis<br />

Unit Rate<br />

A<br />

Dismantling Kilometre Stone (Dismantling <strong>of</strong> kilometre stone including cutting <strong>of</strong><br />

earth, foundation <strong>and</strong> disposal <strong>of</strong> dismantled material with all lifts <strong>and</strong> lead upto<br />

1000 m <strong>and</strong> back filling <strong>of</strong> pit.)<br />

5th KM stone each 177.00<br />

B Ordinary KM Stone each 107.00<br />

C Hectometre Stone<br />

Dismantling <strong>of</strong> Fencing (Dismantling <strong>of</strong> barbed wire fencing/ wire mesh fencing<br />

including posts, foundation concrete, back filling <strong>of</strong> pit by manual means including<br />

each 21.00<br />

disposal <strong>of</strong> dismantled material with all lifts <strong>and</strong> up to a lead <strong>of</strong> 1000 metres,<br />

stacking serviceable material <strong>and</strong> unserviceable material separately. )<br />

metre 21.00<br />

Dismantling <strong>of</strong> CI Water Pipe Line (Dismantling <strong>of</strong> CI water pipe line 600 mm dia<br />

including disposal with all lifts <strong>and</strong> lead upto 1000 metres <strong>and</strong> stacking <strong>of</strong><br />

serviceable material <strong>and</strong> unserviceable material separately under supervision <strong>of</strong><br />

concerned department)<br />

Removal <strong>of</strong> Cement Concrete Pipe <strong>of</strong> Sewer Gutter (Removal <strong>of</strong> cement<br />

concrete pipe <strong>of</strong> sewer gutter 1500 mm dia under the supervision <strong>of</strong> concerned<br />

department including disposal with all lifts <strong>and</strong> up to a lead <strong>of</strong> 1000 metres <strong>and</strong><br />

stacking <strong>of</strong> serviceable <strong>and</strong> unserviceable material separately but excluding earth<br />

excavation <strong>and</strong> dismantling <strong>of</strong> masonry works.)<br />

Removal <strong>of</strong> Telephone / Electric Poles <strong>and</strong> Lines (Removal <strong>of</strong> telephone /<br />

Electric poles including excavation <strong>and</strong> dismantling <strong>of</strong> foundation concrete <strong>and</strong> lines<br />

under the supervision <strong>of</strong> concerned department, disposal with all lifts <strong>and</strong> up to a<br />

lead <strong>of</strong> 1000 metres <strong>and</strong> stacking the serviceable <strong>and</strong> unserviceable material<br />

separately)<br />

23<br />

metre 63.00<br />

metre 101.00<br />

each 79.00